Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) is the United States focal point to support operations controllers and payload developers conducting payload science operations for the National Aeronautics and Space Administration (NASA) aboard the International Space Station (ISS). Some of the key functions are planning, coordination and scheduling of science activities. This effort occurs in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. Additionally, in Fall 2017, NASA will increase its ability to perform payload science operations aboard the ISS with a fourth crew member. In order to support this, there will be an increasing need to quickly plan and schedule more activities. In the past, it was cumbersome and time-consuming to consolidate copious amounts of planning and change request data from various sources. Planners would summarize information from the Johnson Space Center (JSC) Operations Planning Timeline Integration System (OPTIMIS) and manually integrate it with other data in order to produce a Timeline Planning Summary (TPS). This lengthy process of updating static documents while planning and re-planning was cumbersome, introduced human error, and was inflexible to last minute changes. There was a need for a dynamic, more efficient, less erroneous, and more concise way of building a report that could be readily updated as fast as payload science plans change.

Pedoto, Ramon W.↗

Detect and Avoid Timeline

This brief presentation provides a timeline for the steps taken by an unmanned aerial system (UAS) pilot when maneuvering to avoid a conflicting aircraft. This talk also provides time estimates for each step in the timeline utilizing 'measured response' data from previous Human Systems Integration Division simulation research.

Fern, Lisa↗

Human Performance of Novice Schedulers for Complex Spaceflight Operations Timelines

Objective: Investigate the effects on human performance as a function of scheduling task complexity for novice schedulers creating spaceflight timelines. Background: Future astronauts will be expected to self-schedule, yet will not be experts in creating timelines that meet complex constraints inherent to spaceflight operations. Method: Conducted a within-subject experiment to measure scheduling efficiency, effectiveness, workload and situation awareness while varying scheduling task complexity factors, namely number of constraints and types of constraints. Results: Fifteen participants completed various scheduling problems. Performance differences were identified between the independent variables. There was a main effect due to the number of constraints and type of constraint for efficiency, effectiveness, and workload. Significant interactions were observed in situation awareness and workload for certain types of constraints. Results also suggest that a lower number of constraints may be manageable by novice schedulers when compared to scheduling activities without constraints. Conclusion: Results suggest that novice schedulers performance decreases with high number of constraints and future scheduling aids may have to be targeted to type of constraint. Application: Knowledge on the effect of scheduling task complexity will help design scheduling systems that will enable self-scheduling for future astronauts. It will also inform other domains that conduct complex scheduling, such as nursing and manufacturing.

scheduling↗

Integrating Mission Timelines and Procedures to Enhance Situational Awareness in Human Spaceflight Operations

Future human spaceflight missions to the Moon, Mars, and beyond will have significant transmission delays and reduced communications bandwidth compared to operations in Low Earth Orbit, requiring increased crew autonomy due to the limited availability of real-time support from Mission Control Center (MCC). In this paper, we argue for the development of technology to enhance situational awareness (SA) for a remote MCC and astronauts onboard the vehicle, describe a usability study conducted towards this aim, and identify key usability features for the design of future integrated timeline tools. By tightly integrating timelines and procedures, future crew systems can predict future constraint violations, suggest resolutions to these violations, and ultimately support more successful missions.

user experience↗

WLCG Transition from X.509 to Tokens. Status, Plans, and Timeline

Since 2017, the Worldwide LHC Computing Grid (WLCG) has been working towards enabling token-based authentication and authorization throughout its entire middleware stack. Following the initial publication of the WLCG Token Schema v1.0 in 2019, OAuth2.0 token workflows have been integrated across grid middleware. There are many complex challenges to be addressed before the WLCG can be end-to-end token-based, including not just technical hurdles but also interoperability with the wider authentication and authorization landscape. This paper presents the status of the WLCG coordination and deployment work, and how it relates to software providers and partner communities. The authors also detail how the WLCG token transition timeline has progressed, and how it has changed since its publication.

97 MATHEMATICS AND COMPUTING↗

Realization, Timeline, Challenges and Ultimate Limits of Future Colliders

We present a summary of the Snowmass’21 Accelerator Frontier discussions on the future collider facilities for HEP and possible implementation scenarios and challenges. The main findings of the Implementation Task Force on the required R&D duration and construction cost will be discussed. We also take a look into the possible limits of ultimate colliders in terms of energy, luminosity, size, cost, power, and timeline.

43 PARTICLE ACCELERATORS↗

Scenario Exploration and Timeline Analysis for Advanced Reactors [Slides]

Slides created to discuss the report "Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements" (August 2022 INL/ RPT-22-68664) for an upcoming DOE security workshop. Advanced reactors will be able to use risk insights for many design aspects. We need realistic scenarios for input into the licensing basis safety-case. These scenarios must include timing and physics. We need to automate the safety-case creation as much as possible.

97 MATHEMATICS AND COMPUTING↗

C-NR Sars-Cov-2 (Covid-19) Timeline

At the onset of the pandemic, then C-NR Group Leader, Felicia Taw, asked Roger A. Meade to compile a timeline of covid events. The following entries are announcements, statements, and email messages from the World Health Organization, the LANL homepage, LANL managers and by C Division manager and staff. Although the entries have been slightly edited and streamlined to enhance readability, they retain many of the original markings.

99 GENERAL AND MISCELLANEOUS↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

Interconnection Timelines and Costs for Distributed Energy Projects in the United States (2000-2025)

These slides summarize and explain empirical data on interconnection timelines and costs for distributed energy projects connected to U.S. utility distribution systems. The study explores how interconnection metrics vary across states, project sizes, technology types, and over time to indicate progress toward simple, fast, and affordable interconnection. Data encompasses 188 utilities in 24 states. Project types include biomass/biofuels, coal, hydropower, natural gas/oil, solar, storage, wind, hybrid, and

Chelminski, Kathryn↗

A timeline algorithm for astronomy missions

An algorithm is presented for generating viewing timelines for orbital astronomy missions of the pointing (nonsurvey/scan) type. The algorithm establishes a target sequence from a list of candidate targets in a way which maximizes total viewing time. Two special cases are treated. One concerns dim targets which, due to lighting constraints, are scheduled only during the antipolar portion of each orbit. They normally require long observation times extending over several revolutions. A minimum slew heuristic is employed to select the sequence of dim targets. The other case deals with bright, or short duration, targets, which have less restrictive lighting constraints and are scheduled during the portion of each orbit when dim targets cannot be viewed. Since this process moves much more rapidly than the dim path, an enumeration algorithm is used to select the sequence that maximizes total viewing time.

Moore, J. E.↗

Timeline Analysis Program (TLA-1)

The Timeline Analysis Program (TLA-1) was described. This program is a crew workload analysis computer program that was developed and expanded from previous workload analysis programs, and is designed to be used on the NASA terminal controlled vehicle program. The following information is described: derivation of the input data, processing of the data, and form of the output data. Eight scenarios that were created, programmed, and analyzed as verification of this model were also described.

Miller, K. H.↗

Timeline analysis program (TLA-1), appendices

Appendices for the Timeline Analysis Program (TLA-1) were given. The appendices contain the Atlanta terminal area scenarios, the task catalog and the control and display configurations for the forward and aft flight decks of the NASA 515 aircraft, and the event/procedure, phase, mission, and subsystem catalogs.

Miller, K. H.↗

Simulation of mission timelines for the Spacelab program

The paper describes the structure of the Special Purpose Simulation Language (SPSL) designed to overcome certain problems encountered in the use of the General Purpose Simulation Language (GPSL) when applied to simulation and validation of Spacelab mission timelines. The current analysis system is GROPE (Ground Resource Operations Planning Executive), the main data base models of which are the ground operations model, the mission model, the resource model, and the traffic model. Some of the simulation problem areas are mentioned, and unique features of the SPSL are highlighted.

Roberts, J. S.↗

Development of the Spartan 101 navigation and pointing timeline

This paper presents the techniques and analyses that were used to construct the Spartan 101 mission pointing timeline for the Space Shuttle Orbiter-detached portion of its flight. This covers the design process that had to transform requirements and constraints originating from the experimenter, the Space Transportation System, and the payload hardware design into a workable set of pointing instructions sequenced to mission events. The paper will discuss the technical approach used for initial attitude acquisition, determining target visibility, observation scheduling, and calculation of vehicle maneuvers.

Lambros, S. D.↗