Time-of-Flight Energy Measurements With BPMs

The energy of a bunched non-relativistic ion beam can be deduced from measuring the beam phases in neighbouring Beam Position Monitors (BPMs). This report discusses implementation of such a procedure at the PIP-II H- linac being constructed at Fermilab. The case when the flight time between BPMs is longer than the period of BPM frequency is considered in more detail. When absolute BPM phase calibration is not available, the BPM phase information can be used to track deviations of the beam energy from the de-sired value. Such energy deviation parameter is operationally implemented at the transfer line between 400 MeV Linac and the Booster, and its analog is expected to be used in the transfer line from PIP-II as well.

Shemyakin, Alexander V. [Fermilab] (ORCID:00000001↗

Characterization of Saltstone Grout Line Samples

During a prestart recirculation operation in the Saltstone Processing Facility (SPF), operations staff noticed hardened scaling falling into the hopper. As a result, SPF operators and Saltstone Engineering decided to postpone operation and conduct a process room hopper cleanout. During the cleanout effort personnel noted greater than normal buildup of damp solid material in the transfer line. A borescope investigation was conducted and confirmed buildup was present throughout the transfer line to the downstream valves. Savannah River National Laboratory personnel were asked to characterize the scale material and samples collected from the saltstone grout line and provide recommendations and/or further guidance as to whether additional corrosion testing is needed for useful equipment operating life information. Based on the samples characterized results, the plug material contained only the 60:40 slag:fly ash saltstone. Portland cement in the original 10:45:45 Portland cement:slag:fly ash mix may result in a less abrasive slurry compared to the 60:40 slag:fly ash mix because the slag is > 95 % crushed angular, sharp edged glass. Saltstone grout erosion and corrosion testing of A36 carbon steel is needed to determine if the 60:40 mix is more abrasive and corrosive for A36 carbon steel than the 10:45:45 mix.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stripping Foils at the RHIC Injectors: A History

Stripping foils are used throughout Collider-Accelerator Department to strip ions of unwanted electrons. This is done in stages throughout the complex to optimize the transmission of particles. For polarized protons, they are injected into the AGS Booster as H-, and then stripped to H+. For ions from the tandem source, there are two stripping foils: one at the center and the other at the end of the tandem. The tandem foils will not be covered in this document. For ions out of the EBIS source, there is no use of stripping foils upstream of injection into the Booster. All ions that are not fully stripped in Booster are stripped further in the Booster to AGS (BTA) transfer line stripping foil assembly. Finally, any ions that are not fully stripped in the AGS are either stripped in the AGS to RHIC transfer line stripping foil, or as they are being dumped in the AGS by the plunging stripping foil (PSF) dependent on the particles intensity and charge. The BTA foil is the workhorse of the complex, having to provide the desired charge state of ions as light as O, and as heavy as Uranium. Optimizing the stripping efficiency to the desired charge state, while minimizing the energy lost and emittance growth from transiting the foil, requires careful consideration of the foil materials and thicknesses. This paper serves an overview of stripping foils at C-AD, with a review of foils from the construction of the AGS Booster to now.

43 PARTICLE ACCELERATORS↗

Pre-Commissioning of the Wide-Dynamic Range Halo Monitor to be Installed in the FERMILAB MI-8 Line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from the beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, and the next steps in commissioning.

Babacan, B. [IIT, Chicago; Fermilab]↗

Radial Steering Displacement Method to Measure Dispersion

The measurement of the dispersion function in a transfer line plays the crucial role for the development of an accurate optics model for the beam tracking simulation. In this technical note, we describe an experimental method to measure the dispersion value at multi-wire location MW063 in the NASA Space Radiation Laboratory (NSRL) transfer line. Finally, we use our MADX model to calculate the dispersion function at the same multi-wire location. The ultimate goal of this measurement and calculation is to understand the right value of dispersion function and the beam size (emittance) at the entrance of NSRL beam line.

43 PARTICLE ACCELERATORS↗

Inverse model based error detection in beamline optics

Optics tuning in transfer lines and LINACs can be challenging due to the fact that multiple combinations of machine settings can lead to the same diagnostic output. Moreover, the lack of a periodic solution can limit the ability to infer optics in the same way as rings from BPM signals. Model based approaches are often used to assist with the optics tuning in combination with optimization or parameter estimation. Here we have developed a novel approach using machine learning inverse models trained on a known configuration to detect variations in quadrupole settings without explicitly including them in the model. This paper shows a comparison of neural network models and linear models on both a simulation based study and experimental studies conducted at the AGS to RHIC transfer line at Brookhaven National Lab.

43 PARTICLE ACCELERATORS↗

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

ORBIT CORRECTION STUDIES ON THE ELECTRON TRANSPORT LINE FROM RCS TO ESR

A dedicated electron transfer line from Rapid Cycling Synchrotron (RCS) to Electron Storage Ring (ESR), referred to as the RTE line has been designed for the Electron-Ion Collider (EIC). The beamline follows a straight-line geometry, with a length of 133 m, and is consists with two matching sections and a FODO section for beam diagnostics. Imperfections with magnet alignments introduce orbit distortions, making orbit correction scheme a critical component in the design. To facilitate orbit correction, each quadrupole magnet is equipped with a pair of beam position monitors (BPMs) and kickers. The Singular Value Decomposition (SVD) algorithm is used for orbit correction and tolerance studies. This paper presents the ongoing progress in the optics design and error correction scheme of the RTE line.

Neththikumara, I. [Thomas Jefferson National Accel↗

The Electromagnetic Design of the X/Y line Combined Function Magnets

This technical note presents the electromagnetic design of the combined function magnets which make up the FODO array of the X-line or Y-line magnets of the AGS to RHIC (AtR) transfer line. Prior to the presentation of the electromagnetic design of the combined function magnets a brief section will be devoted to familiarize the reader with the use of the combined function magnets which make up the elements of the X and Y lines of the AtR line.

43 PARTICLE ACCELERATORS↗

Ionospheric Transfer Function Tests: Line of Sight and Slab

Ionospheric transfer function (ITF) algorithms determine the effects of the ionosphere on an electromagnetic (EM) signal as it propagates through. In this report, analytic formulas are derived which can be used to compare results of ITF calculations from certain algorithms.

97 MATHEMATICS AND COMPUTING↗

Real-Time Fault Location Using the Retardation Method

A new method for short-circuit fault location is proposed. The method is based on instantaneous signal measurement and its first and second derivatives, which are the novel elements of the current approach. The derivatives allow associating a precise time stamp to the occurrence of the fault. Due to retardation phenomena, the difference between the times in which a signal is registered in two detectors can be used to locate the fault. We offer several mathematical models to describe the fault. Although a description of faults in terms of a lumped circuit is useful for elucidating the methods for detecting the fault, this description will not suffice to describe the fault signal propagation; hence, a distributed models is needed, which is given in terms of the telegraph equations. Those equations were used to derive a transmission line transfer function, and an exact analytical description of the fault signal propagating in the transmission line was obtained. The analytical solution was verified both by numerical simulations and experimentally.

42 ENGINEERING↗

Design and Evaluation of a Tethered, Open Port Sampling Interface for Liquid Extraction-Mass Spectrometry Chemical Analysis

Presented in this work is a tethered, liquid-extraction-sampling interface designed for the mass spectrometric surface sampling/analysis of 3D objects. The tethered, open port sampling interface (TOPSI) incorporates a vacuum line between the sampling probe and ionization source, which enables the ability for an extended, tethered sample transfer line. Herein, several designs of the hand-held TOPSI are presented and evaluated on the basis of the analytical metrics of analyte transport time, peak width, and analyte sensitivity. The best analytical metrics were obtained with capillary flow resistances arranged in a particular order and the vacuum region set at 6.2 kPa. This TOPSI design incorporated a transfer capillary 1 m in length, while retaining a fast analyte transport time (12 s), short signal peak width (5 s baseline-to-baseline), and high analyte signal at 90% of that obtained with a regular open port sampling interface (OPSI). The hand-held TOPSI was demonstrated for the characterization of extracted small molecules and metabolites from the surface of mint and rosemary leaves.

47 OTHER INSTRUMENTATION↗

Optimizing injection for the storage ring proton-EDM experiment

The proposed proton electric dipole moment (pEDM) experiment at Brookhaven National Laboratory (BNL), to be built inside the alternating gradient synchrotron (AGS) tunnel, aims to measure the proton’s electric dipole moment with a sensitivity of 10 −29 𝑒 cm. This paper presents the design of the injection line from the AGS booster to the pEDM storage ring, utilizing portions of the existing booster-to-AGS (BtA) transfer line. Building on the symmetric-hybrid lattice design [, Comprehensive symmetric-hybrid ring design for a proton-EDM experiment at below 10 −29 𝑒 cm, Phys. Rev. D 105, 032001 (2022)], our study emphasizes rigorous optics matching, detailed particle and spin tracking, and systematic error mitigation essential for achieving a target sensitivity of 10 −29 𝑒 cm. This design preserves the proton’s vertical spin orientation within ±20 mrad, a critical requirement for the pEDM measurement. Particle and spin tracking simulations using the ray-tracing code Zgoubi [F. Méot, Zgoubi users’ guide, Technical Report, Brookhaven National Laboratory (BNL), Relativistic Heavy Ion Collider (RHIC), Upton, NY, 2012] validate the design’s performance, demonstrating its feasibility for this precision experiment. The simulation results demonstrate that both clockwise (CW) and counterclockwise (CCW) injection lines meet the stringent beam envelope and polarization requirements.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Transfer and Flushing Evaluation for Potential Precipitated Solids in the 241-AP-106 to EMF Transfer Pipeline for DFLAW

Waste transfer pipeline flushing is necessary to maintain pipeline performance, but added flush fluid increases the nuclear waste inventory. During the Direct Feed Low-Activity Waste (DFLAW) mission, waste transfer lines from the Interim Low-Activity Waste Storage Tank (i.e., 241-AP-106) to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility must have the capability of being flushed to prevent accumulation of solids and to mitigate corrosion concerns. Operational experience at Hanford has shown that the solids precipitation occurs during processing operations from dilute Hanford liquids. Pacific Northwest National Laboratory was requested to evaluate the potential precipitated solid particle transport and flushing operational capabilities of the AP-106 through the Effluent Management Facility (EMF) low-point drain LAW feed pipeline. The evaluation results do not provide operational requirements, but rather provide a scoping basis for understanding the potential operational significance of solids precipitation in the pipeline. The salt and aluminum phase solids most likely to precipitate from the LAW feeds during cooling, evaporation, or mixing have particle densities that are estimated to range from 1.62 to 2.78 g/mL and a spherical particle size range of 8 to 2100 μm, depending on the solid phase considered. Application of the method to calculate the critical deposition velocity required by TFC-ENG-STD-26 at conservatively bounding estimates for the solids concentrations demonstrates that potentially precipitated solids may deposit on the bottom of the transfer pipe invert at the lower LAW feed pipeline flow rate, but the upper LAW feed pipeline flow rate will likely prevent deposition. The system pressure limit for the AP-106 through the EMF low-point drain LAW feed pipeline likely exceeds any pressure loss at a calculated critical deposition velocity even for the most adverse potential precipitated solid. However, should solids settle as a result of no-flow conditions, the flow capabilities of the AP-106 through the EMF low-point drain LAW feed pipeline are shown, based on the available literature, to be potentially inadequate for effective flushing operations to remove solids, even at solids concentrations below the maximum specified for LAW feed. Thus, stepwise solids accumulations over multiple transfers may be an issue, and eventual line plugging may occur. Further inadequacies may potentially be realized should the cohesive nature of certain precipitates be accounted for.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the finite slab geometry in the NORA code

In this work we develop the complete linearization formalism for the radiation transfer equation in slab geometry. This development was motivated by an observed convergence instability arising from the NORA code’s inner boundary while modeling a suite of simple test problems in slab geometry presented at the Line Transfer Workshop held in LLNL in May of 2019. The convergence issue was seen to emerge early on in Newton-Raphson iterations. These test problems required parameters in the former NORA inner boundary to achieve the asymptotic limit of zero incoming intensity. In this work we derive the limiting case directly to gain insight into the former algorithm’s pathology.

97 MATHEMATICS AND COMPUTING↗

A state of the art Lambertson septum magnet of the RHIC beam injection system

The beam injection system of the Relativistic Heavy Ion Collider (RHIC) is the last section of the beam transfer line which transports the beam from the Alternating Gradient Synchrotron (AGS) to RHIC and comes under the acronym AtR (AGS to RHIC). The Lambertson septum magnet is one of the magnetic elements of the RHIC injection system. This paper presents results from the 2D and 3D electromagnetic design of the RHIC Lambertson septum magnet which has unique design features to minimize the magnetic field at the circulated beam region including the fringe field regions at the entrance and exit of the magnet.

43 PARTICLE ACCELERATORS↗

Quantitative and three-dimensional assessment of holdup material

Nuclear material deposited in equipment, transfer lines, and ventilation systems of a processing facility is usually referred to as holdup. Operators need to know the location and amount of holdup in their facility for radiation safety and material accountability. In this work, we propose to use an array of detectors co-axial to the inspected pipe to measure the holdup material. This method is implementable into an automated system capable of crawling on surfaces and pipes of various curvatures, which would enable faster, easier, and more accurate holdup safeguards measurements. We first demonstrated that the current holdup assay procedure could lead to a non-negligible bias in the estimate of special nuclear material mass, due to the simplified assumption of deposited geometry introduced by the Generalized Geometry Holdup (GGH) model. The new approach consists of imaging the inner holdup material by characterizing the detector array’s response and unfolding it from the measured light output. Our experimental proof of principle consists of three NaI(Tl) detectors surrounding an aluminum pipe containing two cesium-137 ( 137 Cs) sources. We derived the source distribution inside the pipe by first calculating the detector response matrix using a method adaptive to the surface geometry of the object containing the measured holdup material. Creating a matrix of the detector array’s measured counts, we then proceed to solve an inverse problem, resulting in an accurately located source position and activity distribution within the response matrix’s spatial resolution. Furthermore, we then developed a simulated model of the envisioned experimental setup, which accurately described both the activity and position of the source in 2D. Finally, we extended our model onto a discretized three-dimensional model of the system, encompassing 36 detectors. The model was simulated to measure the source distribution and activity of multiple sources in pipes of varied geometries, which could then be conveniently translated to a real-time holdup measurement protocol. For the 3D simulation of four different source geometries, the model accurately localized the source position in 3D, while the activity retained a maximum relative error of ±5.32%.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗