Search NASASearch

SEARCH · Search NASA

Results for “transformers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

40 records · Page 3

Radio Metric Errors Due to Mismatch and Offset Between a DSN Antenna Beam and the Beam of a Troposphere Calibration Instrument

Two components of the error of a troposphere calibration measurement were quantified by theoretical calculations. The first component is a beam mismatch error, which occurs when the calibration instrument senses a conical volume different from the cylindrical volume sampled by a Deep Space Network (DSN) antenna. The second component is a beam offset error, which occurs if the calibration instrument is not mounted on the axis of the DSN antenna. These two error sources were calculated for both delay (e.g., VLBI) and delay rate (e.g., Doppler) measurements. The beam mismatch error for both delay and delay rate drops rapidly as the beamwidth of the troposphere calibration instrument (e.g., a water vapor radiometer or an infrared Fourier transform spectrometer) is reduced. At a 10-deg elevation angle, the instantaneous beam mismatch error is 1.0 mm for a 6-deg beamwidth and 0.09 mm for a 0.5-deg beam (these are the full angular widths of a circular beam with uniform gain out to a sharp cutoff). Time averaging for 60-100 sec will reduce these errors by factors of 1.2-2.2. At a 20-deg elevation angle, the lower limit for current Doppler observations, the beam-mismatch delay rate error is an Allan standard deviation over 100 sec of 1.1 x 10 -14 with a 4-deg beam and 1.3 x 10 -15 for a 0.5-deg beam. A 50-m beam offset would result in a fairly modest (compared to other expected error sources) delay error (less than or equal to 0.3 mm for 60-sec integrations at any elevation angle is greater than or equal to 6 deg). However, the same offset would cause a large error in delay rate measurements (e.g., an Allan standard deviation of 1.2 x 10 -14 over 100 sec at a 20-deg elevation angle), which would dominate over other known error sources if the beamwidth is 2 deg or smaller. An on-axis location is essential for accurate troposphere calibration of delay rate measurements. A half-power beamwidth (for a beam with a tapered gain profile) of 1.2 deg or smaller is desired for calibration of all types of radio metrics. A water-vapor radiometer calibration beam of this size with very low sidelobes would require a clear aperture antenna with a diameter of at least 1.5 m if the primary water vapor sensing channel were in the 20-22 GHz range.

R P Linfield

NASA POWER: Providing Analysis-Ready, Cloud-Optimized Data for AI /ML Training and Applications in Earth Science

As global demand for sustainable development grows, the integration of Earth Observation (EO) data into decision making frameworks has become a primary objective for the scientific community. The NASA Prediction of Worldwide Energy Resources (POWER) project serves as a bridge between NASA EO data and the specialized needs of the renewable energy, sustainable infrastructure and agroclimatology communities. In this poster presentation we will present an overview of POWER data products and services along with its use in diverse research to decision-making workflows. By providing over 40 years of high-resolution historical, hourly and daily solar and meteorological data, POWER transforms satellite observations and global model reanalysis into actionable, Analysis-Ready Dataset (ARD). Currently, the project delivers over 250 industry-friendly parameters to the users from different NASA datasets like CERES SYN1Deg, MERRA-2, and IMERG alongside downscaled CMIP6 climate model data, fulfilling over 16 million requests from 50,000 unique users monthly. To ensure data quality and traceability, these parameters are rigorously validated against the ground-based observations from the Baseline Surface Radiation Network (BSRN) and the Global Surface Summary of the Day (GSOD) – these results will be discussed in the presentation. A newly introduced web-based PaRameter Uncertainty ViEwer (PRUVE) tool will be presented that provides an online validation platform to the users that benchmarks satellite-based and assimilation data products against these surface measurements. To reduce technical barriers to data adoption, POWER data is accessible through RESTful APIs, ESRI ArcGIS Image Services, a web-based Data Access Viewer tool, allowing users to visualize, validate and apply the dataset. For efficient data delivery POWER data is cloud-optimized into Zarr datastore accessible through NASA managed Amazon S3 ensures high-performance allowing users to integrate EO directly into operational pipelines. These customized services will be presented. Use cases from application will be presented from the energy sector - such as for design of generation systems, performance monitoring of solar power plants, in infrastructure sector- optimizing building energy efficiency and thermal comfort, in agriculture – such as driving crop simulation and yield forecasting models to enable climate resilient farming. Furthermore, the shift toward machine learning (ML) in EO research that has positioned POWER as a key provider for training datasets which will be discussed. Use-cases will be presented to showcase how NASA data is enabling the development of predictive tools for climate variability and resource management. The poster will present POWER’s future plans including technology development to enhance data traceability and reproducibility and improving I/O performance to support the rapid integration of new EO products, ensuring that POWER remains a robust scalable backend for the evolving landscape of AI-driven Earth Science. Additionally, POWER is developing an AI Agent and an MCP-Server to enable industry AI-Agentic workflows.

Neha Khadka

Automatic Dependent Surveillance-Broadcast (ADS-B) In-Trail Procedures (ITP)

Aircraft in oceanic and remote non-radar airspace frequently fly for extended periods of time in the same direction, at the same time, along similar flight paths as other aircraft. Since there is no radar surveillance, controllers use procedural separation to ensure that aircraft remain separated. Procedural separation distances are typically larger than radar separation distances and as a result aircraft operating in oceanic airspace are sometimes held at non-optimal flight levels due to conflicting traffic at intervening flight levels. Automatic Dependent Surveillance-Broadcast (ADS-B) In-Trail Procedures (ITP) were developed to enable flight level change maneuvers that would otherwise not be possible with current procedural separation standards. Aircraft operators choosing to equip with an ADS-B transceiver and an appropriate onboard decision support system would be able to take advantage of these procedures when operating in proximity to aircraft equipped with a suitable ADS-B transmitter (“ADS-B Out”). The ability to perform in-trail maneuvers to achieve more time at optimum altitudes could result in more efficient and predictable flight profiles thereby saving fuel and in some cases allowing operators to make beneficial operational decisions. NASA first began developing ADS-B ITP in 2003 as a result of a desire to develop methodologies, concepts, and procedures to reduce separation requirements for future air transportation systems using airborne ADS-B. The objectives were to provide insight into the details necessary to reduce separation requirements for the future and to develop applications that could provide incentives for operators to voluntarily equip with transformational technologies. From 2003 to 2008, NASA conducted research that supported the development of ITP including batch simulations, human-in-the-loop experiments and avionics and separation standards development. This research showed enough maturity and benefit that in 2008, the FAA Surveillance and Broadcast Services (SBS) program adopted ADS-B ITP as one of their three key, near-term applications to make use of ADS-B-In. The FAA developed an agreement with NASA to transition the technology and established an FAA project for the purpose of performing an operational trial of ADS-B ITP in revenue service in the summer of 2011. The objectives of the project are to a) validate the operational performance and economic benefits of ITP; and b) develop and validate ADS-B ITP Minimum Operational Performance Specifications (MOPS) material. As a part of this project, the FAA established agreements with United Airlines and Honeywell. The agreements include the work necessary for the development, certification and installation of onboard systems for twelve United Airlines 747-400s. ITP system development is nearly complete and certification activities are underway. The FAA project has also been working with Oakland Oceanic Control Center (ZOA) and the FAA’s Oceanic and Offshore Operations Office to develop controller procedures and safety analyses that are required to support the flight trial. The FAA has also been working on the development of an ITP Operational Specification that should be approved this April. The presentation will cover some of the key aspects of the development, challenges, and integration required to successfully transition ADS-B ITP from a concept in 2003 to flight trials in revenue service in 2011.

Kenneth M Jones

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat