39 records · Page 3

Collab Fracture Characterization: Preliminary Results from the Modeling and Flow Testing of Experiment 1

The EGS Collab project is developing ~10-20 m-scale field sites where fracture stimulation and flow models can be validated against controlled, small-scale, in-situ experiments. At the first experimental site, a hydraulic fracture will be created in metamorphic rock at the 4850 level in the former Homestake Mine. The experimental concept is for fracturing to be initiated at an injection well and continue until it intersects a production well approximately 10 meters away. Initial step-pressure flow testing of the fracture are to be performed to describe pressure-aperture-flow relationships. The flow field between the injector and producer boreholes will be characterized using a series of forced gradient dipole tracer tests. A number of fracture characterization models have been used to assist in the design of the tracer tests. The tracer test program will use conservative, sorbing, and particulate tracers, as well as sampling for radon gas to describe the fracture surface area (i.e., potential heat transfer area), flow pathway distribution, and volume. Tracer concentration at the production well (i.e. break through curves) will be measured using a series of inline sensors, liquid sampling devices, filtering of the effluent, and the measuring of gas concentrations in the effluent. Tracer monitoring data will be compared against results from a collection of numerical simulators developed at U.S. national laboratories and universities for the purpose of validating these flow and transport models. Ultimately these same models will be used to predict the heat transfer characteristics of the fracture and will be compared to a thermal characterization field test where cold water will be injected at the injection well and the temperature will be measured at the production well. This paper discusses the early tracer transport model predictions and parameters sensitivity that affect the tracer breakthrough curves at the production well.

15 GEOTHERMAL ENERGY↗

CarbonSAFE Rocky Mountain Phase I: Ensuring Safe Subsurface Storage of Carbon Dioxide in the Intermountain West

An integrated CCS pre-feasibility study, CarbonSAF E Rocky Mountain Phase I, was conducted by the U niversity of Utah and its partners as part of the US D epartment of Energy’s Carbon Storage Assurance a nd Facility Enterprise (CarbonSAFE) program. The a ssembled project team consisted of academic, indus try and governmental agencies covering the technic al and non- technical challenges of a commercial-sc ale CO 2 storage facility capable of storing 50 million tonnes of anthropogenically-sourced CO 2 . The Rock y Mountain CarbonSAFE team identified the Hunter Power Plant in central Utah as the primary source of CO 2 on which this study would be focused. The nea rby Huntington power plant, also operated by Rocky Mountain Power, was evaluated as a secondary sou rce of CO 2 . The Hunter plant was chosen because o f an interest in CO 2 capture technology by the plant operator, Rocky Mountain Power, and also because i t is a representative example of a typical coal-fired g enerating station in the Rocky Mountain west. Amine -based and cryogenic-based capture assessments w ere performed for approximately 3 million tonnes per year for one of the boiler units at the Hunter plant, yi elding cost of capture estimates of $\$56$/tonne and $\$4 1.50$/tonne. Transportation and intermediate compre ssion would increase the per tonne costs, but will be highly dependent on specific injection locations and available rights-of-way. A high-level technical sub-ba sinal evaluation was performed on the area surround ing the Hunter and Huntington power plants to verify CO 2 storage capacity and integrity. Initial geologic c haracterization efforts focused on sites immediately adjacent to the Hunter plant, including the deep eolia n Permian White Rim Sandstone, which in outcrop a nd core from other locations indicates high permeabi lity and high porosity. However, petrophysical logs fr om wells near Hunter indicate porosity of only 2-4%. As a result, potential injection sites were moved stru cturally down-dip (to the west), into the high permea bility (~200 mD) and high porosity (20%) Navajo san dstone. A comprehensive analysis of the reservoir a nd seals was conducted, providing data to the model , simulation and risk assessment groups on the proje ct. CO 2 capacity estimates for the Navajo Sandston e approximately 18 kilometers from the Hunter plant are well in excess of the 50 million tonnes goal of the project. Area of Review Delineation and Risk Asse ssment on the Navajo, associated seals and shallow groundwater aquifers identified the most significant risks and mitigation options. A non-technical assessment to a commercial-scale CO 2 storage facility in central Utah was conducted. EPA Underground Injection Control Class VI and National Environmental Policy Act permitting present particularly challenging issues related to the development of any saline aquifer for CO 2 storage, including the area around the Hunter plant. While surface and subsurface ownership and ri ghts are not straightforward, especially on any privat e land, many of the stakeholders in central Utah are accustomed and open to oil/gas/mineral-related activities similar to what would be required for CO 2 storage sites.

01 COAL, LIGNITE, AND PEAT↗

Carbon Capture and Sequestration (via Enhanced Oil Recovery) from a Hydrogen Production Facility in an Oil Refinery

The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE’s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities (associated with CO2 capture technologies and geologic sequestration MVA), and Environmental Information Volume. Specific accomplishments of this Phase include: 1. Finalization of the Project Management Plan 2. Development of engineering designs in sufficient detail for defining project performance and costs 3. Preparation of Environmental Information Volume 4. Completion of Hazard Identification Studies 5. Completion of control cost estimates and preparation of business plan During the Phase 1 detailed cost estimate, project costs increased substantially from the previous estimate. Furthermore, the detailed risk assessment identified integration risks associated with potentially impacting the steam methane reformer operation. While the Phase 1 work identified ways to mitigate these integration risks satisfactorily from an operational perspective, the associated costs and potential schedule impacts contributed to the decision not to proceed to Phase 2. We have concluded that the project costs and integration risks at Texas City are not commensurate with the potential benefits of the project at this time.

03 NATURAL GAS↗