Search NASA⌕ Search

SEARCH · Search NASA

Results for “uplink process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A Multi-mission Event-Driven Component-Based System for Support of Flight Software Development, ATLO, and Operations first used by the Mars Science Laboratory (MSL) Project

This paper details an architectural description of the Mission Data Processing and Control System (MPCS), an event-driven, multi-mission ground data processing components providing uplink, downlink, and data management capabilities which will support the Mars Science Laboratory (MSL) project as its first target mission. MPCS is developed based on a set of small reusable components, implemented in Java, each designed with a specific function and well-defined interfaces. An industry standard messaging bus is used to transfer information among system components. Components generate standard messages which are used to capture system information, as well as triggers to support the event-driven architecture of the system. Event-driven systems are highly desirable for processing high-rate telemetry (science and engineering) data, and for supporting automation for many mission operations processes.

Mission Data Processing and Control System (MPCS)↗

A Multi-mission Event-Driven Component-Based System for Support of Flight Software Development, ATLO, and Operations first used by the Mars Science Laboratory (MSL) Project

This viewgraph presentation reviews the architectural description of the Mission Data Processing and Control System (MPCS). MPCS is an event-driven, multi-mission ground data processing components providing uplink, downlink, and data management capabilities which will support the Mars Science Laboratory (MSL) project as its first target mission. MPCS is designed with these factors (1) Enabling plug and play architecture (2) MPCS has strong inheritance from GDS components that have been developed for other Flight Projects (MER, MRO, DAWN, MSAP), and are currently being used in operations and ATLO, and (3) MPCS components are Java-based, platform independent, and are designed to consume and produce XML-formatted data

Mission Data Processing and Control System (MPCS)↗

Investigation of air transportation technology at Ohio University: 1993-1994

The Joint University Program (JUP) offers students, faculty, and staff of the Avionics Engineering Center the opportunity to conduct basic research relating to the safety and efficiency of the National Airspace System. During the 1993-1994 year research was continued in a variety of GPS-related technologies and also in a hybrid data uplink system. (1) Processing techniques developed for the GPS attitude determination have been applied to centimeter-level kinematic GPS aircraft positioning for flight reference systems and aircraft autoland and taxiing operations. This resulted in the first real-time kinematic GPS autoland. (2) The fault detection and isolation (FDI) algorithm developed under the Joint University Program has been fully adopted by RTCA Special Committee 159 as the baseline algorithm for sole-means navigation of GPS integrated with GLONASS, LORAN-C, or baro-altimeter. (3) A Satellite Coverage Research Analysis Model (SCRAM) has been developed which provides outage areas, outage dynamics, and availability information for satellite-based navigation systems. RTCA Special Committee 159 has adopted this model for use in their work. (4) A basic receiver structure has been simulated and tested for use with the hybrid data uplink. This uplink utilizes the phase of an existing AM carrier to transmit digital data, thus both amplitude and phase modulation are applied, resulting in a hybrid carrier. The receiver simulation is directly applicable to real-time implementation as a result of the development platform.

Lilley, Robert W.↗

Development of a mobile research flight test support capability

This paper presents the approach taken by the NASA Western Aeronautical Test Range (WATR) of the Ames Research Center to develop and utilize mobile systems to satisfy unique real-time research flight test requirements of research projects such as the advanced fighter technology integration (AFTI)F-16, YAV-8B Harrier, F-18 high-alpha research vehicle (HARV), XV-15, and the UH-60 Black Hawk. The approach taken is cost-effective, staff efficient, technologically current, and provides a safe and effective research flight test environment to support a highly complex set of real-time requirements including the areas of tracking and data acquisition, communications (audio and video) and real-time processing and display, postmission processing, and command uplink. The development of this capability has been in response to the need for rapid deployment at varied site locations with full real-time computations and display capability. This paper will discuss the requirements, implementation and growth plan for mobile systems development within the NASA Western Aeronautical Test Range.

Rhea, Donald C.↗

Development of a mobile research flight test support capability

This paper presents the approach taken by the NASA Western Aeronautical Test Range (WATR) of the Ames Research Center (ARC) to develop and utilize mobile systems to satisfy unique real-time research flight test requirements of research projects such as the advanced fighter technology integration (AFTI) F-16, YAV-8B Harrier, F-18 high-alpha research vehicle (HARV), XV-15, and the UH-60 Black Hawk. The approach taken is cost-effective, staff efficient, technologically current, and provides a safe and effective research flight test environment to support a highly complex set of real-time requirements including the areas of tracking and data acquisition, communications (audio and video) and real-time processing and display, postmission processing, and command uplink. The development of this capability has been in response to the need for rapid deployment at varied site locations with full real-time comutation and display capability. This paper will discuss the requirements, implementation and growth plan for mobile systems development within the NASA Western Aeronautical Test Range.

Rhea, Donald C.↗

Optimization of an optically implemented on-board FDMA demultiplexer

Performance of a 30 GHz frequency division multiple access (FDMA) uplink to a processing satellite is modelled for the case where the onboard demultiplexer is implemented optically. Included in the performance model are the effects of adjacent channel interference, intersymbol interference, and spurious signals associated with the optical implementation. Demultiplexer parameters are optimized to provide the minimum bit error probability at a given bandwidth efficiency when filtered QPSK modulation is employed.

Fargnoli, J.↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Multimission Software Reuse in an Environment of Large Paradigm Shifts

The ground data systems provided for NASA space mission support are discussed. As space missions expand, the ground systems requirements become more complex. Current ground data systems provide for telemetry, command, and uplink and downlink processing capabilities. The new millennium project (NMP) technology testbed for 21st century NASA missions is discussed. The program demonstrates spacecraft and ground system technologies. The paradigm shift from detailed ground sequencing to a goal oriented planning approach is considered. The work carried out to meet this paradigm for the Deep Space-1 (DS-1) mission is outlined.

Wilson, Robert K.↗

Onboard multichannel demultiplexer/demodulator

An investigation performed for NASA LeRC by COMSAT Labs, of a digitally implemented on-board demultiplexer/demodulator able to process a mix of uplink carriers of differing bandwidths and center frequencies and programmable in orbit to accommodate variations in traffic flow is reported. The processor accepts high speed samples of the signal carried in a wideband satellite transponder channel, processes these as a composite to determine the signal spectrum, filters the result into individual channels that carry modulated carriers and demodulate these to recover their digital baseband content. The processor is implemented by using forward and inverse pipeline Fast Fourier Transformation techniques. The recovered carriers are then demodulated using a single digitally implemented demodulator that processes all of the modulated carriers. The effort has determined the feasibility of the concept with multiple TDMA carriers, identified critical path technologies, and assessed the potential of developing these technologies to a level capable of supporting a practical, cost effective on-board implementation. The result is a flexible, high speed, digitally implemented Fast Fourier Transform (FFT) bulk demultiplexer/demodulator.

Campanella, S. Joseph↗

ULSGEN (Uplink Summary Generator)

Uplink is an important part of spacecraft operations. Ensuring the accuracy of uplink content is essential to mission success. Before commands are radiated to the spacecraft, the command and sequence must be reviewed and verified by various teams. In most cases, this process requires collecting the command data, reviewing the data during a command conference meeting, and providing physical signatures by designated members of various teams to signify approval of the data. If commands or sequences are disapproved for some reason, the whole process must be restarted. Recording data and decision history is important for traceability reasons. Given that many steps and people are involved in this process, an easily accessible software tool for managing the process is vital to reducing human error which could result in uplinking incorrect data to the spacecraft. An uplink summary generator called ULSGEN was developed to assist this uplink content approval process. ULSGEN generates a web-based summary of uplink file content and provides an online review process. Spacecraft operations personnel view this summary as a final check before actual radiation of the uplink data. .

Wang, Y.-F.↗

Metrics for Flight Operations: Application to Europa Clipper Tour Selection

Objective measures are ubiquitous in the formulation, design and implementation of deep space missions. Tour durations, flyby altitudes, propellant budgets, power consumption, and other metrics are essential to developing and managing NASA missions. But beyond the simple metrics of cost and workforce, it has been difficult to identify objective, quantitative measures that assist in evaluating choices made during formulation or implementation phases in terms of their impact on flight operations. As part of the development of the Europa Clipper Mission system, a set of operations metrics have been defined along with the necessary design information and software tooling to calculate them. We have applied these methods and metrics to help assess the impact to the flight team on the six options for the Clipper Tour that are currently being vetted for selection in the fall of 2021. To generate these metrics, the Clipper MOS team first designed the set of essential processes by which flight operations will be conducted, using a standard approach and template to identify (among other aspects) timelines for each process, along with their time constraints (e.g., uplinks for sequence execution). Each of the resulting 50 processes is documented in a common format and concurred by stakeholders. Process timelines were converted into generic schedules and workforce-loaded using COTS scheduling software, based on the inputs of the process authors and domain experts. Custom code was generated to create an operations schedule for a specific portion of Clipper's prime mission, with instances of a given process scheduled based on specific timing rules (e.g., process X starts once per week on Thursdays) or relative to mission events (e.g., sequence generation process begins on a Monday, at least three weeks before each Europa closest approach). Over a 5-month period, and for each of six Clipper candidate tours, the result was a 20,000+ line, workforce-loaded schedule that documents all of the process-driven work effort at the level of individual roles, along with a significant portion of the level-of-effort work. Post-processing code calculated the absolute and relative number of work hours during a nominal 5 day / 40 hour work week, the work effort during 2nd and 3rd shift, as well as 1st shift on weekends. The resultant schedules and shift tables were used to generate objective measures that can be related to both human factors and to operational risk and showed that Clipper tours which utilize 6:1 resonant (21.25 day) orbits instead of 4:1 resonant (14.17 day) orbits during the first dozen or so Europa flybys are advantageous to flight operations. A similar approach can be extended to assist missions in more objective assessments of a number of mission issues and trades, including tour selection and spacecraft design for operability.

Sarrel, Marc↗

Planetary mission operations

A high-level overview is presented of the process through which the uplink segment of NASA's prospective planetary missions will be instituted; the overview is supplemented by suggestions as to how costs can be reduced. Uplink costs constitute two-thirds of the total cost of operations. Attention is given to 'sequence loading', which is a time-lagged set of commands and supporting information that is prepared on the ground and uplinked to the spacecraft's onboard computer. The sequence is the primary guide used by the spacecraft to accomplish its mission; sequences are supplemented by real-time commands that are executed upon reception from the ground.

Mclaughlin, W. I.↗

More rain compensation results

To reduce the impact of rain-induced attenuation in the 20/30 GHz band, the attenuation at a specified signal frequency must be estimated and extrapolated forward in time on the basis of a noisy beacon measurement. Several studies have used model based procedures for solving this problem in statistical inference. Perhaps the most widely used model-based paradigm leads to the Kalman filter and its lineal variants. In this formulation, the dynamic features of the attenuation are represented by a state process (x(sub t)). The observation process (y(sub t)) is derived from beacon measurements. Some ideas relating to the signal processing problems related to uplink power control are presented. It is shown that some easily implemented algorithms hold promise for use in estimating rain induced fades. The algorithms were applied to actual data generated at the Virginia Polytechnic Institute and State University (VPI) test facility. Because only one such event was studied, it is not clear that the algorithms will have the same effectiveness when a wide range of events are studied.

Sworder, D. D.↗

Space Shuttle Day-of-Launch Trajectory Design and Verification

A top priority of any launch vehicle is to insert as much mass into the desired orbit as possible. This requirement must be traded against vehicle capability in terms of dynamic control, thermal constraints, and structural margins. The vehicle is certified to a specific structural envelope which will yield certain performance characteristics of mass to orbit. Some envelopes cannot be certified generically and must be checked with each mission design. The most sensitive envelopes require an assessment on the day-of-launch. To further minimize vehicle loads while maximizing vehicle performance, a day-of-launch trajectory can be designed. This design is optimized according to that day s wind and atmospheric conditions, which will increase the probability of launch. The day-of-launch trajectory verification is critical to the vehicle's safety. The Day-Of-Launch I-Load Uplink (DOLILU) is the process by which the Space Shuttle Program redesigns the vehicle steering commands to fit that day's environmental conditions and then rigorously verifies the integrated vehicle trajectory's loads, controls, and performance. The Shuttle methodology is very similar to other United States unmanned launch vehicles. By extension, this method would be similar to the methods employed for any future NASA launch vehicles. This presentation will provide an overview of the Shuttle's day-of-launch trajectory optimization and verification as an example of a more generic application of dayof- launch design and validation.

Harrington, Brian E.↗

Advanced technology for a satellite multichannel demultiplexer/demodulator

Satellite on-board processing is needed to efficiently service multiple users while at the same time minimizing earth station complexity. The processing satellite receives a wideband uplink at 30 GHz and down-converts it to a suitable intermediate frequency. A multichannel demultiplexer then separates the composite signal into discrete channels. Each channel is then demodulated by bulk demodulators, with the baseband signals routed to the downlink processor for retransmission to the receiving earth stations. This type of processing circumvents many of the difficulties associated with traditional bent-pipe repeater satellites. Uplink signal distortion and interference are not retransmitted on the downlink. Downlink power can be allocated in accordance with user needs, independent of uplink transmissions. This allows the uplink users to employ different data rates as well as different modulation and coding schemes. In addition, all downlink users have a common frequency standard and symbol clock on the satellite, which is useful for network synchronization in time division multiple access schemes. The purpose of this program is to demonstrate the concept of an optically implemented multichannel demultiplexer (MCD). A proof-of-concept (POC) model has been developed which has the ability to receive a 40 MHz wide composite signal consisting of up to 1000 40 kHz QPSK modulated channels and perform the demultiplexing process. In addition a set of special test equipment (STE) has been configured to evaluate the performance of the POC model. The optical MCD is realized as an acousto-optic spectrum analyzer utilizing the capability of Bragg cells to perform the required channelization. These Bragg cells receive an optical input from a laser source and an RF input (the signal). The Bragg interaction causes optical output diffractions at angles proportional to the RF input frequency. These discrete diffractions are optically detected and output to individual demodulators for baseband conversion. Optimization of the MCD design was conducted in order to achieve a compromise between two opposing sources of signal degradation: adjacent channel interference and intersymbol interference. The system was also optimized to allow simple, inexpensive ground stations communications with the MCD. These design goals led to the realization of a POC MCD which demonstrates the demultiplexing function with minimal signal degradation. Performance evaluation results using the STE equipment indicate that the dynamic range of the demultiplexer in the presence of adjacent and multiple channel loading is 40 - 50 dB. Measured bit error rate (BER) probabilities varied from the predicted theoretical results by one dB or less. The performance of the proof-of-concept model indicate that the development of a space qualified optically implemented MCD are feasible. The advantages to such an implementation include reduced size, weight and power and increased reliability when compared with electronic approaches. All of these factors are critical to on-board satellite processors. Further optimization can be conducted which trade ground station complexity and MCD performance to achieve desired system results.

Abramovitz, Irwin J.↗

Propulsion/flight control integration technology (PROFIT) software system definition

The Propulsion Flight Control Integration Technology (PROFIT) program is designed to develop a flying testbed dedicated to controls research. The control software for PROFIT is defined. Maximum flexibility, needed for long term use of the flight facility, is achieved through a modular design. The Host program, processes inputs from the telemetry uplink, aircraft central computer, cockpit computer control and plant sensors to form an input data base for use by the control algorithms. The control algorithms, programmed as application modules, process the input data to generate an output data base. The Host program formats the data for output to the telemetry downlink, the cockpit computer control, and the control effectors. Two applications modules are defined - the bill of materials F-100 engine control and the bill of materials F-15 inlet control.

Carlin, C. M.↗

Preparing Cassini Uplink Operations for Extended Mission

The Cassini-Huygens Mission to Saturn and Titan, a joint venture between the National Aeronautics and Space Administration, the European Space Agency, and the Italian Space Agency, is conducting a four-year, prime mission exploring the Saturnian system, including its atmosphere, rings, magnetosphere, moons and icy satellites. Launched in 1997, Cassini began its prime mission in 2004. Cassini is now preparing for a new era, a two-year extended mission to revisit many of the highlights and new discoveries made during the prime mission. Because of the light time delay from Earth to Saturn, and the time needed to coordinate the complicated science and engineering activities that take place on the spacecraft, commanding on Cassini is done in approximately 40-day intervals known as sequences. The Cassini Uplink Operations team is responsible for the final development and validation of the pointing profile and instrument and spacecraft commands that are contained in a sequence. During this final analysis prior to uplink to the spacecraft, thorough and exact evaluation is necessary to ensure there are no mistakes during commanding. In order to perform this evaluation, complete and refined processes and procedures are fundamental. The Uplink Operations team is also responsible for anomaly response during sequence execution, a process in which critical decisions often are made in real-time. Recent anomalies on other spacecraft missions have highlighted two major risks in the operations process: (1) personnel turnover and the retirement of critical knowledge and (2) aging, outdated operations procedures. If other missions are a good barometer, the Cassini extended mission will be presented with a high personnel turnover of the Cassini flight team, which could lead to a loss of expertise that has been essential to the success of the prime mission. In order to prepare the Cassini Uplink Operations Team for this possibility and to continue to develop and operate safe science and engineering sequences, a review and major update of the current documentation and operations procedures was needed. This paper will address the changes made to extended mission sequence generation processes primarily due to new restrictions in spacecraft operating capability and lessons learned from prime mission. In addition, it will address the state of the prime mission operations procedures, the philosophy changes and updates that were made to those procedures in response to process improvement, and the validation of those new procedures through the training of current and new personnel. And lastly, it will address the lessons learned throughout prime mission and how the Uplink Operations team chose to incorporate those lessons into the working documentation and team knowledge. This incorporation was necessary to facilitate the success of the extended mission with potentially all new personnel at some point prior to the end of the mission.

Maxwell, Jennifer L.↗