Search NASASearch

SEARCH · Search NASA

Results for “utility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Strategies for Flood Resilience and Grid Investment Among Iowa's Electric Distribution Utilities

Flooding poses a growing threat to Iowa's electric distribution system, yet utilities face significant data and modeling challenges in planning effective resilience investments. This report provides a foundational assessment of how distribution utilities in Iowa, investor-owned, municipal, and cooperative, approach resilience planning, with a focus on flood risk. It combines hazard characterization, review of state and utility practices, and application of NLR's Energy Resilience Analysis for Distribution Systems (ERAD) and Capacity Expansion Decision Support for Distribution Networks (CADET) tools. Using FEMA floodplains, Iowa Flood Center depth grids, and utility infrastructure data, the analysis quantifies asset exposure, simulates outage risks, and evaluates resilience strategies such as pole hardening, undergrounding, and substation protection. Results indicate that while feeder-level upgrades provide incremental benefits, the most significant reductions in outage risk are achieved through targeted substation interventions. The report highlights key data gaps, such as limited elevation data and fragility functions, and underscores the need for probability-weighted investment frameworks to address both frequent and catastrophic flood events. These insights aim to support utilities, state agencies, and federal partners in prioritizing resilience investments that safeguard Iowa's electric grid against future flooding.

24 POWER TRANSMISSION AND DISTRIBUTION

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market

Gateway Utilization Capabilities and Status

Gateway will be a space station orbiting the Moon that will enable long-term presence in deep space. As part of the National Aeronautics and Space Administration’s (NASA) Artemis mission, Gateway will serve as a cornerstone of human deep space exploration and scientific discovery and a steppingstone to Mars. NASA leads the Gateway Program and serves as the integrator of spaceflight capabilities and contributions of U.S. commercial and international partners, European Space Agency (ESA), Japanese Aerospace Exploration Agency (JAXA) and the Canadian Space Agency (CSA), to develop and utilize Gateway. This paper provides an overview of the following utilization capabilities of Gateway: spacecraft overview, internal and external accommodations, resources for utilization, and vantage point for Earth, Sun, and Moon observations. Three utilization payloads have already been selected to fly on Gateway as part of the initial modules, Habitation and Logistics Outpost (HALO) and Power and Propulsion Element (PPE) modules: European Radiation Sensors Array (ERSA), Heliophysics Environmental and Radiation Measurement Experiment Suite (HERMES), and Internal Dosimeter Array (IDA). This paper will provide a short summary of each payload, the value behind conducting each payload, and share an overview of future utilization goals of Gateway.

Gateway

Utilities Perspective on Protection Challenges with High IBR Penetration

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This presentation identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, we are looking broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the presentation summarizes on gathered data and internal experiences.

24 POWER TRANSMISSION AND DISTRIBUTION

Climate Adaptation Approaches for Water and Electric Utilities: A compendium of existing strategies in a changing climate

Report analyzes plans developed by water and electric utilities to address the impacts of changes in the climate within their service territories. The analysis identifies the main types of changes that utilities address, such as sea level rise, extreme heat, and compound events such as freezing rain/show and extreme wind events. It then identifies adaptation approaches utilities have proposed or adopted to address the changes that are anticipated in their service territories. The report also identifies the mechanisms utilities (and in some cases the governments which the utilities are part of) use to ensure that energy or environmental equity is increased as a result of the resilience program. In summary, the report provides a compendium of adaptation strategies that can be used by others as they review their own need to increase climate resilience.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Utility Perspective on Protection Challenges with High Penetration of IBRs

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report / presentation identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, this report looks broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the report summarizes on gathered data and internal experiences.

14 SOLAR ENERGY

Assessment of the potential of solar thermal small power systems in small utilities

The potential economic benefit of small solar thermal electric power systems to small municipal and rural electric utilities is assessed. Five different solar thermal small power system configurations were considered in three different solar thermal technologies. The configurations included: (1) 1 MW, 2 MW, and 10 MW parabolic dish concentrators with a 15 kW heat engine mounted at the focal point of each dish, these systems utilized advanced battery energy storage; (2) a 10 MW system with variable slat concentrators and central steam Rankine energy conversion, this system utilized sensible thermal energy storage; and (3) a 50 MW central receiver system consisting of a field of heliostats concentrating energy on a tower-mounted receiver and a central steam Rankine conversion system, this system also utilized sensible thermal storage. The results are summarized in terms of break-even capital costs. The break-even capital cost was defined as the solar thermal plant capital cost which would have to be achieved in order for the solar thermal plants to penetrate 10 percent of the reference small utility generation mix by the year 2000. The calculated break-even capital costs are presented.

Steitz, P.

Waterproof Raised Floor Makes Utility Lines Accessible

Floor for laboratories, hospitals and factories waterproof yet allows access to subfloor utilities. Elevated access floor system designed for installations with multitude of diverse utility systems routed under and up through floor and requirement of separation of potentially conflicting utility services. Floor covered by continuous sheet of heat resealable vinyl. Floor system cut open when changes are made in utility lines and ducts. After modifications, floor covering resealed to protect subfloor utilities from spills and leaks.

Cohen, M. M.

Economics of wind energy for utilities

Utility acceptance of this technology will be contingent upon the establishment of both its technical and economic feasibility. This paper presents preliminary results from a study currently underway to establish the economic value of central station wind energy to certain utility systems. The results for the various utilities are compared specifically in terms of three parameters which have a major influence on the economic value: (1) wind resource, (2) mix of conventional generation sources, and (3) specific utility financial parameters including projected fuel costs. The wind energy is derived from modeling either MOD-2 or MOD-0A wind turbines in wind resources determined by a year of data obtained from the DOE supported meteorological towers with a two-minute sampling frequency. In this paper, preliminary results for six of the utilities studied are presented and compared.

Mccabe, T. F.

Experimental investigation of a variable speed constant frequency electric generating system from a utility perspective

As efforts are accelerated to improve the overall capability and performance of wind electric systems, increased attention to variable speed configurations has developed. A number of potentially viable configurations have emerged. Various attributes of variable speed systems need to be carefully tested to evaluate their performance from the utility points of view. With this purpose, the NASA experimental variable speed constant frequency (VSCF) system has been tested. In order to determine the usefulness of these systems in utility applications, tests are required to resolve issues fundamental to electric utility systems. Legitimate questions exist regarding how variable speed generators will influence the performance of electric utility systems; therefore, tests from a utility perspective, have been performed on the VSCF system and an induction generator at an operating power level of 30 kW on a system rated at 200 kVA and 0.8 power factor.

Herrera, J. I.

Space station utilization and commonality

Several potential ways of utilizing the space station, including utilization of learning experiences (such as operations), utilization of specific elements of hardware which can be largely common between the SS and Mars programs, and utilization of the on-orbit SS for transportation node functions were identified and discussed. The probability of using the SS in all of these areas seems very good. Three different ways are discussed of utilizing the then existing Low Earth Orbit (LEO) SS for operational support during assembly and checkout of the Mars Space Vehicle (SV): attaching the SV to the SS; allowing the SV to co-orbit near the SS; and a hybrid of the first 2 ways. Discussion of each of these approaches is provided, and the conclusion is reached that either the co-orbiting or hybrid approach might be preferable. Artists' conception of the modes are provided, and sketches of an assembly system concept (truss structure and subsystems derivable from the SS) which could be used for co-orbiting on-orbit assembly support are provided.

Butler, John

Canadian Space Agency Space Station Freedom utilization plans

Under the terms of the NASA/CSA Memorandum of Understanding, Canada will contribute the Mobile Servicing System and be entitled to use 3 percent of all Space Station utilization resources and user accommodations over the 30 year life of the Station. Equally importantly Canada, like NASA, can begin to exploit these benefits as soon as the Man-Tended Capability (MTC) phase begins, in early 1997. Canada has been preparing its scientific community to fully utilize the Space Station for the past five years; most specifically by encouraging, and providing funding, in the area of Materials Science and Applications, and in the area of Space Life Sciences. The goal has been to develop potential applications and an experienced and proficient Canadian community able to effectively utilize microgravity environment facilities such as Space Station Freedom. In addition, CSA is currently supporting four facilities; a Laser Test System, a Large Motion Isolation Mount, a Canadian Float Zone Furnace, and a Canadian Protein Crystallization Apparatus. In late April of this year CSA sent out a Solicitation of Interest (SOI) to potential Canadian user from universities, industry, and government. The intent of the SOI was to determine who was interested, and the type of payloads which the community at large intended to propose. The SOI will be followed by the release of an Announcement of Opportunity (AO) following governmental approval of the Long Term Space plan later this year, or early next year. Responses to the AO will be evaluated and prioritized in a fair and impartial payload selection process, within the guidelines set by our international partners and the Canadian Government. Payload selection is relatively simple compared to the development and qualification process. An end-to-end user support program is therefore also being defined. Much of this support will be provided at the new headquarters currently being built in St. Hubert, Quebec. It is recognized that utilizing the Space Station could be expensive for users; costing in many cases millions of dollars to get a payload from conception to retrieval. It is also recognized that some of the potential users cannot or will not invest a lot of money or effort into Space Station utilization, unless there is a perceived significant commercial potential. How best to fund Space Station payloads is under study. Space Station Freedom will provide the first opportunity for Canada to conduct experiments in a long-duration microgravity environment. CSA have been developing and funding potential users for some time, and considerable interest has been shown by the response to our SOI earlier this year. Canada can be one of the two earliest users for the Space Station, along with NASA. We hope to take full advantage of this opportunity.

Faulkner, James

Utilization of the Space Vision System as an Augmented Reality System For Mission Operations

Augmented reality is a technique whereby computer generated images are superimposed on live images for visual enhancement. Augmented reality can also be characterized as dynamic overlays when computer generated images are registered with moving objects in a live image. This technique has been successfully implemented, with low to medium levels of registration precision, in an NRA funded project entitled, "Improving Human Task Performance with Luminance Images and Dynamic Overlays". Future research is already being planned to also utilize a laboratory-based system where more extensive subject testing can be performed. However successful this might be, the problem will still be whether such a technology can be used with flight hardware. To answer this question, the Canadian Space Vision System (SVS) will be tested as an augmented reality system capable of improving human performance where the operation requires indirect viewing. This system has already been certified for flight and is currently flown on each shuttle mission for station assembly. Successful development and utilization of this system in a ground-based experiment will expand its utilization for on-orbit mission operations. Current research and development regarding the use of augmented reality technology is being simulated using ground-based equipment. This is an appropriate approach for development of symbology (graphics and annotation) optimal for human performance and for development of optimal image registration techniques. It is anticipated that this technology will become more pervasive as it matures. Because we know what and where almost everything is on ISS, this reduces the registration problem and improves the computer model of that reality, making augmented reality an attractive tool, provided we know how to use it. This is the basis for current research in this area. However, there is a missing element to this process. It is the link from this research to the current ISS video system and to flight hardware capable of utilizing this technology. This is the basis for this proposed Space Human Factors Engineering project, the determination of the display symbology within the performance limits of the Space Vision System that will objectively improve human performance. This utilization of existing flight hardware will greatly reduce the costs of implementation for flight. Besides being used onboard shuttle and space station and as a ground-based system for mission operational support, it also has great potential for science and medical training and diagnostics, remote learning, team learning, video/media conferencing, and educational outreach.

Maida, James C.

NASA's Asteroid Redirect Mission: A Robotic Boulder Capture Option for Science, Human Exploration, Resource Utilization, and Planetary Defense

NASA is examining two options for the Asteroid Redirect Mission (ARM), which will return asteroid material to a Lunar Distant Retrograde Orbit (LDRO) using a robotic solar electric propulsion spacecraft, called the Asteroid Redirect Vehicle (ARV). Once the ARV places the asteroid material into the LDRO, a piloted mission will rendezvous and dock with the ARV. After docking, astronauts will conduct two extravehicular activities (EVAs) to inspect and sample the asteroid material before returning to Earth. One option involves capturing an entire small (~4 - 10 m diameter) near-Earth asteroid (NEA) inside a large inflatable bag. However, NASA is also examining another option that entails retrieving a boulder (~1 - 5 m) via robotic manipulators from the surface of a larger (~100+ m) pre-characterized NEA. The Robotic Boulder Capture (RBC) option can leverage robotic mission data to help ensure success by targeting previously (or soon to be) well- characterized NEAs. For example, the data from the Japan Aerospace Exploration Agency's (JAXA) Hayabusa mission has been utilized to develop detailed mission designs that assess options and risks associated with proximity and surface operations. Hayabusa's target NEA, Itokawa, has been identified as a valid target and is known to possess hundreds of appropriately sized boulders on its surface. Further robotic characterization of additional NEAs (e.g., Bennu and 1999 JU3) by NASA's OSIRIS REx and JAXA's Hayabusa 2 missions is planned to begin in 2018. This ARM option reduces mission risk and provides increased benefits for science, human exploration, resource utilization, and planetary defense. Science: The RBC option is an extremely large sample-return mission with the prospect of bringing back many tons of well-characterized asteroid material to the Earth-Moon system. The candidate boulder from the target NEA can be selected based on inputs from the world-wide science community, ensuring that the most scientifically interesting boulder be returned for subsequent sampling. In addition, the material surrounding the boulder can be collected from the surface, thus providing geological contextual information and additional samples of NEA regolith. The robotic manipulators used for capturing the boulder will ensure some of the surface remains undisturbed and that the boulder will retain its structural integrity, which will preserve the context of any samples collected by the astronauts and ensure a high level of science return. Human Exploration: Due to the coherent nature of the boulder that will be collected, entire encapsulation of the asteroid material is not required. This facilitates exploration and sample collection of the boulder by astronauts in a variety of ways. The total time for EVA during the crew portion of the mission is very limited. Current estimates are that each of the two EVAs will only last four hours. The RBC option will allow crew members to have good situational awareness of the work site and quickly identify sample sites of interest. In addition, the samples to be collected can be readily accessed without having to deal with removal of an encapsulation system, which adds extra complexity and risk for the astronauts during EVA. Resource Utilization: One of the most crucial aspects for resource utilization is the identification and collection of appropriate materials (e.g., volatiles, organics, metals, etc.) that contain components of interest. Prior characterization of NEAs is required in order to increase the likelihood that appropriate materials will be returned. Ground-based observations of small (<10 m) NEAs are challenging, but characterization efforts of larger targets have demonstrated that NEAs with volatiles and organics have been identified. Two potential targets for the RBC option (Bennu and 1999 JU3) have been previously identified as potentially rich in resources, and both are already targets of currently planned robotic missions that will characterize their physical properties in great detail. Planetary Defense: The RBC option involves interaction with a well- characterized potentially hazardoussized NEA that would enable NASA to conduct one or more planetary defense demonstrations. The primary method would use the collected boulder to augment the mass of the ARV and perform an Enhanced Gravity Tractor (EGT) demonstration on the NEA. Additionally, other approaches could be demonstrated during the mission, such as Ion Beam Deflection (IBD) and/or observation of a Kinetic Impactor (KI). The relative effectiveness of a slow push-pull method such as the EGT or IBD could be directly compared and contrasted with the results of the more energetic KI method on the target NEA. Conclusions: This boulder option for NASA's ARM can leverage knowledge of previously characterized NEAs from prior robotic missions, which provides more certainty of the target NEA's physical characteristics and reduces mission risk. This increases the return on investment for NASA's future activities with respect to human exploration, resource utilization, and planetary defense.

Abell, P.

The Utilization Profiles of the CCSDS Unified Space Link Protocol (USLP)

The purpose of this paper is to identify the utilization profiles for interfacing the Data Protocol Sublayer using the Unified Space Link Protocols (USLP) (reference 1) with the space link coding procedures as specified in the CCSDS Coding & Synchronization Blue Books (references 2 through 5), used in both telecommand and telemetry applications. This paper describes how the USLP Protocol utilizes the coding and synchronization sublayer to support: a. Direct to Earth (DTE) telemetry links for engineering and science data b. Direct to Earth (DTE) telemetry links for very high rate science data c. Direct from Earth (DFE) command, sequencing and flight software loads d. Space to Space Links (Proximity) utilized by orbiters for data exchange to/from surface bound assets. The CCSDS has divided the functions of the Data Link Layer into two sublayers: the Data Link Protocol Sublayer (DLP-SL) and the Coding and Synchronization Sublayer (CS-SL). The Data Link Protocol Sublayer (DLP-SL) interfaces to the users, accepting the data that is to be transported, on the sending side of the link, and delivering that data on the receiving end. The Transfer Frame is the data unit that is transferred across the Data Link Protocol Sublayer and the Coding and Synchronization Sublayer boundary. The Coding and Synchronization Sublayer (CS-SL) provides the encoding, randomization, and frame synchronization functions that prepares the USLP Transfer Frame for transport across the space link. The CS-SL is divided into 2 processes: 1) The Frame Interface Processes (FIP) performs the interface functions required to prepare the data for delivery to the Coding/Decoding Process (CDP). This process includes prepending a Frame Start Marker to the provided frame, when management has designated that the frame is not to be aligned to the codeblock or when there is no block code used. 2) The Coding/Decoding Process (CDP) performs the forward error correction processes that are used to optimize the performance of the link and minimize the error rate. The CDP creates the symbol stream that is delivered to the Physical Layer. The transfer of the USLP transfer frames across different types of space links is the focus of this paper. The Protocol Data Unit (PDU) that is passed in both directions between the Data Link Protocol Sublayer (DLP-SL) and Coding and Synchronization Sublayer (CS-SL) is the transfer frame. The USLP frame structure provides flexibility that can be constrained by the functions utilized within the CS-SL that prepare the transfer frame for transit. For example, the USLP transfer frame contains a length field that enables the frame to be of variable length but CS-SL under certain conditions may constrain the frame to be fixed in length. This paper describes 5 operational modes available for use by the Data Link Layer to provide data exchange across the USLP space link. These modes are different because different operational requirements apply to vastly different types of space links and thus the communications implementation requirements differ. The environmental issues include the power or energy available, the distance between the end points of the link, the complexity of the equipment available at those end points, the atmospheric conditions and radiometric frequency selection. The CS-SL utilizes different forward error correcting codes supported by specific operational modes to configure the data for transit. This paper describes all of the operational modes in a series of data models which decompose the functionality between the Data Link Protocol Sublayer and the Coding and Synchronization sublayer. The operational modes described are: 1. Uncoded Mode: has been used for short links that contain significant available power to provide an acceptable frame error rate. The frames in this mode can be variable in length and typically use an error detection algorithm (i.e., CRC) to determine if there are errors in the received frame. 2. Convolutional Only Mode: is currently the prime forward error correction coding used for the proximity links. The frames in this mode can be variable in length and typically use an error detection algorithm (i.e., CRC) to determine if there are errors in the received frame. 3. Variable Length Frame Aligned to Variable Length Codeblock (TC): is used for Direct from Earth links were power levels are high and the simple, least complex code i.e., the BCH code is used. This mode has been in use since the early 1970s. The BCH code is a short code and the decoder is easy to implement. 4. Fixed Length Frame Aligned to Fixed Length Codeblock (AOS/TM): was introduced when the concatenated Convolutional and Reed-Solomon Code was formulated to provide significant reduction in link data error rate and the ability to determine if there was an error in the decoded codeblock. The frame is aligned to the codeblock so that there is a one to one relationship of frame errors to codeblock errors without additional error detection coding being added. This mode requires the protocol frames to be the exact size of the message portion of the codeblock. 5. Frames Unaligned to Fixed Length Codeblocks (Currently used for very high rates and space to space links): This mode is currently used for missions that have a very high data rate that can be controlled adaptively as the environment changes and as the next generation operating mode for the proximity link. This mode from a coded data stream point of view is exactly like that described in 4. above, except that the frame need not be aligned to the codeblock. There is no requirement on frame length when using this mode. Thus when using USLP it can be used to support links that require short or long frames. There is also no mandatory requirement that frames cannot be separated by idle data reducing the tight data rate connection requirements between the data link protocol sublayer and the coding & synchronization sublayer. In conclusion, how these operational modes can be put to use in mission operational scenarios is described for Direct from Earth links (DFE), Direct to Earth links (DTE), and Proximity links.

Greenberg, E.

Moon to Mars (M2M) Cross Program Utilization Payload Safety Process

It is the goal of Moon to Mars (M2M) to establish a single consolidated set of safety requirements and a safety review process for utilization payloads that will cross program vehicle hatches or operate externally on multiple program vehicles during transport or operation that satisfies Exploration Ground Systems (EGS), Orion, EVA, and Human Surface Mobility Program (EHP), Gateway (GW), and Human Landing System (HLS) programs. This document defines the Cross Program Utilization Payload (xPUP) safety review process for mission effectivity of Artemis III and beyond. This review process will help ensure protection of the overall Moon to Mars integrated system from potential hazards created by cross program payloads that either cross a program vehicle hatch or can interface with more than one M2M lunar exploration program vehicle. The process will identify payload hazards and controls that will protect ground personnel, flight crew, the integrated vehicle, ground equipment, or facilities. This process is also applicable to samples that cross hatches between vehicles including for return to Earth. The xPUP safety review process will be led by one of the M2M programs' integration safety panels, chosen on a per-payload basis. After the lead integration safety panel is determined, the common safety process is established, based on pre-determined criteria, which includes ad-hoc members from other stakeholder programs. Stakeholder programs are those that interface with the utilization payload in any way (e.g., operating on a lunar exploration vehicle or crossing program vehicle hatches). The xPUP will execute this safety review process for flight and ground utilization payload hardware design, its ground support equipment, and landing and recovery in accordance with the applicable safety requirements as specified in M2M-30043: Moon to Mars Cross Program Utilization Payload Safety Requirements. The xPUP safety process will follow the lead integration safety panel’s safety process requirements. Formal agreements will be communicated with the payload developer using the payload integration processes documented in M2M-30037, Artemis Payload Integration Implementation Plan.

payloads

Utility Perspective on Protection Challenges with High IBR Penetration [Slides]

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, this report looks broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the report summarizes on gathered data and internal experiences.

14 SOLAR ENERGY

Utility Programs Supporting Customer-Sited Battery Storage: Program Design to Ensure Mutual Benefits

Behind-the-meter (BTM) battery storage, when paired with solar, can benefit customers, utilities, and the electric grid. Some utility-sponsored programs have been implemented offset the cost of customer-owned batteries and recognize the value of batteries to the utility and the grid. This factsheet summarizes existing utility-sponsored battery programs and the value to the stakeholders. It then highlights Wattsmart, the customer-owned battery program offered by Rocky Mountain Power in Utah, and provides lessons-learned from a close look at the impact of the program design on commercial customer participation.

battery