Search NASA⌕ Search

SEARCH · Search NASA

Results for “wave energy converter testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The wave energy converter control competition (WECCCOMP): Wave energy control algorithms compared in both simulation and tank testing

The wave energy control competition established a benchmark problem which was offered as an open challenge to the wave energy system control community. The competition had two stages: In the first stage, competitors used a standard wave energy simulation platform (WEC-Sim) to evaluate their controllers while, in the second stage, competitors were invited to test their controllers in a real-time implementation on a prototype system in a wave tank. The performance function used was based on converted energy across a range of standard sea states, but also included aspects related to economic performance, such as peak/average power, peak force, etc. This paper compares simulated and experimental results and, in particular, examines if the results obtained in a linear system simulation are borne out in reality. Overall, within the scope of the device tested, the range of sea states employed, and the performance metric used, the conclusion is that high-performance WEC controllers work well in practice, with good carry-over from simulation to experimentation. However, the availability of a good WEC mathematical model is deemed to be crucial.

16 TIDAL AND WAVE POWER↗

Characterizing Interference in a Wave-Powered Buoy

Oceanographic measurement buoys are power constrained by the capacity of their batteries and the available solar power. Many buoys are in locations with abundant wave energy, but wave energy converters are not being used to power them. One reason wave energy converters may not have not been developed for wave measurement buoys is that many buoys measure waves by precisely following the wave motion. Wave energy converters may inhibit this wave-following ability by altering a buoy's response to incoming waves. In this report, we present the results of field tests that measured the extent to which buoy motion was changed by modifications to the buoy for wave energy harvesting. The motion of the buoy was significantly modified by the addition of the hardware components necessary for harvesting wave energy. The ratio of the mass of the wave energy converter to the mass of the buoy was high for the system tested, which strongly affected buoy motion. A lower value for this ratio would decrease the effect of the wave energy converter on the motion of the buoy, thereby decreasing the impact on the buoy's ability to measure waves but also decreasing the power production capabilities. Therefore, the use of wave energy converters to power wave measurement buoys may be feasible for large buoys that measure low-frequency waves and have low power requirements.

16 TIDAL AND WAVE POWER↗

MASK4 Test Campaign for Sandia WaveBot Device

This data and report details the findings from a wave tank test focused on production of useful work of a wave energy converter (WEC) device. The experimental system and test were specifically designed to validate models for power transmission throughout the WEC system. Additionally, the validity of co-design informed changes to the power take-off (PTO) were assessed and shown to provide the expected improvements in system performance. These data describe the "MASK4" wave tank test of the Sandia WaveBot device. The WaveBot device has been tested a number of times in different permutations at the US Navy's Maneuvering and Sea Keeping (MASK) basin. Each test in this series is referred to as MASK1, MASK2, etc. The WaveBot device was first tested in one degree of freedom (heave) in 2016. This MASK1 test focused primarily on system identification and modeling. After MASK1, major modifications were performed to improve the overall real-time control and measurement system, improve the heave drive train, and add surge and pitch degrees of freedom. The second set of testing, which was broken up in to two stages: MASK2A and MASK2B, focused on bench testing and closed-loop control performance as well as nonlinear modeling. MASK3 then focused on multi-input, multi-output modeling and control for maximization of electrical power. The attached report presents the results from MASK4, which focuses on detailed modeling of the power conversion chain and validation co-design principles by way of the introduction of a magnetic spring. The test log, report, and data from the MASK4 test of the WaveBot augmented with a tunable magnetic spring. Processing codes can be found at the Github link below.

16 TIDAL AND WAVE POWER↗

Highly Accurate Experimental Heave Decay Tests with a Floating Sphere: A Public Benchmark Dataset for Model Validation of Fluid–Structure Interaction

Highly accurate and precise heave decay tests on a sphere with a diameter of 300 mm were completed in a meticulously designed test setup in the wave basin in the Ocean and Coastal Engineering Laboratory at Aalborg University, Denmark. The tests were dedicated to providing a rigorous benchmark dataset for numerical model validation. The sphere was ballasted to half submergence, thereby floating with the waterline at the equator when at rest in calm water. Heave decay tests were conducted, wherein the sphere was held stationary and dropped from three drop heights: a small drop height, which can be considered a linear case, a moderately nonlinear case, and a highly nonlinear case with a drop height from a position where the whole sphere was initially above the water. The precision of the heave decay time series was calculated from random and systematic standard uncertainties. At a 95% confidence level, uncertainties were found to be very low—on average only about 0.3% of the respective drop heights. Physical parameters of the test setup and associated uncertainties were quantified. A test case was formulated that closely represents the physical tests, enabling the reader to do his/her own numerical tests. The paper includes a comparison of the physical test results to the results from several independent numerical models based on linear potential flow, fully nonlinear potential flow, and the Reynolds-averaged Navier–Stokes (RANS) equations. A high correlation between physical and numerical test results is shown. The physical test results are very suitable for numerical model validation and are public as a benchmark dataset.

42 ENGINEERING↗

Mooring Load Monitoring of a Wave Energy Converter Using a Self-Synchronizing Underwater Acoustic Network

A self-synchronizing underwater acoustic network, designed for remote monitoring of mooring loads in Wave Energy Converters (WEC), has been developed and tested. This network uses Time Division Multiple Access and operates self-contained with the ability for users to remotely transmit commands to the network as needed. Each node is a self-contained unit, consisting of a protocol adaptor board, an underwater acoustic modem and a battery pack. A node can be connected to a load cell, to a topside user or to the WEC. Every node is swapable. The protocol adaptor board, named Protocol Adaptor for Digital LOad Cell (PADLOC) supports a variety of digital load cell message formats (CAN, MODBUS, custom ASCII) and underwater acoustic modem serial formats. PADLOC enables topside users to connect to separate load cells through a user-specific command.

acoustic↗

Advanced Laboratory and Field Arrays: Technical Report for Performance Enhancement for Marine Energy Converter (MEC) Arrays (Task 5)

Task 5 consisted of two parts, wave energy converter (WEC) arrays and current energy converter (CEC) arrays. The two parts of the project were executed independently, and this report covers only the work on WECs. In this part of the task, the team characterized the behavior of and developed control schemes for wave energy converter (WEC) arrays that improved performance (i.e., maximized aggregate power generation and reduced the levelized cost of energy) over baseline, non-coordinated control approaches. Specifically, for WEC arrays: the team developed optimal layouts of arrays that considered the effect of WEC placement within an array on coordinated array control with real-time estimation schemes. The numerical codes developed through this task were made available to users for array design. These tools utilized existing commercial software as well as software developed within the project team.

13 HYDRO ENERGY↗

Performance Testing of an Integrated Magnetic Power Take-Off

A wave energy converter (WEC) and the power take-off (PTO) generator system can be represented by using a mass-spring-dampener model. By incorporating a negative stiffness spring within the PTO, the overall stiffness of the PTO can be lowered allowing the impedance of the PTO to be more closely matched with the WEC. By designing for impedance matching the WEC can greatly enhance its power generation capability. This project has involved the design, fabrication and testing of a new type of linear-stroke length and rotary stroke length adjustable negative stiffness magnetic springs for use within a wave energy converter (WEC). The magnetic springs were studied by using 3-D finite element analysis with the objective of creating high energy density and a long linear stroke length. After the construction and testing of both a proof-of-principle adjustable linear and rotary magnetic spring prototype the rotary (torsional) magnetic spring was selected for scaling up analysis. The selected scaled-up proof-of-principle magnetic spring had a peak torque of 850 Nm with a ±45 degree stroke length. By translating the inner rotor relative to the outer rotor, the stiffness could be adjusted to be either negative or positive stiffness. During this project a magnetic lead screw was also studied, and it was shown that by combining the magnetic lead screw with a linearly translating magnetic spring a very long rotary stroke length could be attained. However, as the magnetic lead screw increased complexity and reduced overall energy density relative to a rotary (torsional) spring, this design approach was not further pursed. Dynamometer testing of the variable stiffness magnetic springs was first completed by Portland State University and following this the magnetic spring performance was independently verified by Sandia National Laboratory (Sandia). A WEC analysis when using a variable stiffness magnetic spring was completed by using the WecOptTool. WecOptTool is an open-source WEC optimization software developed by Sandia that supports efficient power take-off (PTO) and control optimization. Wave condition data from the Oregon PacWave test-site was used in this study. The analysis showed that a WEC with a tunable stiffness value could consistently achieve about 80% of its maximum theoretical power production. The use of a tunable stiffness WEC, rather than zero-stiffness or a constant stiffness WEC was also shown to lead to a smaller maximum PTO force requirement. The variable stiffness magnetic spring was integrated into an experimental WEC developed by Sandia, called a Wave-Bot. Sandia successfully completed water-tank testing of the Wave-Bot at the Navy’s Carderock, Maryland, wave-basin test site. The wave-basin testing helped to experimentally demonstrate the operating capabilities and increased power generation capability of a WEC containing an integrated variable stiffness magnetic spring. A WEC capacity factor analysis was also completed. The capacity factor was defined as the ratio of annual average WEC generator power to the maximum (RMS) generated power. This capacity factor provided a means of identifying the ratio of potential revenue to cost. It was calculated that if a tunable variable stiffness magnetic spring has RMS constraints it could operate with a capacity factor above 30%. This is comparable to a wind turbine’s capacity factor.

16 TIDAL AND WAVE POWER↗

2023 Risk Management Plan and Register for Low-Power WEC for Non-Grid Applications

This is an updated risk management plan and risk register for the design, build and test of a novel, remote, low-power wave energy converter (WEC) for non-grid applications. This Columbia Power Technologies project seeks to develop a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. The testing location for this prototype is the U.S. Navy Wave Energy Test Site (WETS) in Kaneohe Bay, O'ahu, Hawai'i. Detailed in the Risk Management Plan document is a Failure Modes, Effects, and Criticality Analysis (FMEC) that systematically identifies all potential failure modes and their effects on the system. Risk registers for major subsystems were completed according to the methodology described in the Risk Management Plan and are also included here.

16 TIDAL AND WAVE POWER↗

Testing and Expertise for Marine Energy (TEAMER) Program Support (CRADA Final Report)

Virginia Tech (VT) had previously developed a 50 kW AC to DC power converter that is specifically designed to improve the performance and efficiency of wave energy converters (WECs). Through this CRADA, NLR will test the VT power converter via a coupled dynamometer and power electronics test platform. The NLR test platform will be comprised of (1) a rotary dynamometer that will drive a VT provided gearbox and generator, (2) one or more DC regenerative power supplies that provide input power to and take power from the VT supplied power electronics, and (3) a data acquisition system for measurement. NLR will work with VT to develop a test plan, set up the test platform and integrate the test article, perform the testing, and assist in the data analysis.

16 TIDAL AND WAVE POWER↗

HERO WEC V1: Design and Experimental Data Collection Efforts

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) is a research platform aimed at developing a modular, small-scale wave-powered desalination system for remote and disaster-response applications. Funded by the Department of Energy (DOE)'s Water Power Technologies Office (WPTO), the project aims to advance wave-powered desalination by developing and testing a small-scale, modular wave energy converter (WEC). The insights gained from this project will help guide the design and development of larger-scale wave energy devices as well as the integration of marine energy and reverse osmosis (RO) desalination. The HERO WEC was initially developed to derisk the Waves to Water prize, enabling the staff to practice WEC deployment and recovery, while optimizing installation protocols ologies, aiming to advance the broader fields of marine energy and water treatment.

13 HYDRO ENERGY↗

Hydrodynamics and Load Shedding Behavior of a Variable-Geometry Oscillating Surge Wave Energy Converter (OSWEC)

In order to improve their long-term viability, wave energy converters (WECs) need to be able to shed loads when a threshold wave condition is exceeded. As shown by Tom et al. (2016) [1], provision of adjustable flaps within the body of an oscillating surge wave energy converter (OSWEC) allows wave energy to pass through the device. A control system may then be able to open and close the flaps when waves approaching the device exceed preset thresholds. The variable-geometry OSWEC (VG-OSWEC) concept studied in this paper is a bottom-hinged, rectangular wave paddle with five flaps of elliptical cross-section embedded into the face of the paddle. System ID tests were conducted on this VG-OSWEC device at a 1:14 scale in a wave basin. Free decay tests showed that the damping was distinctly nonlinear when the flaps were fully open, and the natural frequency increased by 40% when compared with the flaps in a fully closed configuration. Tests with regular wave conditions were used to develop the response amplitude operator for the rotational motion about the hinge. These response amplitude operator results when compared with numerical simulations run using WEC-Sim/WAMIT and ANSYS AQWA, show strong agreement with the flap open and closed conditions. The regular-wave condition measurements also show that the wave excitation moment about the hinge was reduced by up to 60% when the flaps were fully open. The experiments serve to demonstrate the potential of the variable geometry design to shed loads and survive harsh ocean environments.

load shedding↗

An Intelligent Adaptable Monitoring Package. Final Report

The “Intelligent Adaptable Monitoring Package” project was a four-year effort that demonstrated the feasibility of integrated sensing packages at tidal and wave energy sites. Such integration is generally required by the breadth of sensors required to understand environmental effects at marine energy sites and the operational difficulty of deploying, maintaining, and recovering such sensors. Over the course of the project, the Adaptable Monitoring Package (AMP) was deployed in multiple settings, each corresponding to a project budget period: - Budget Period 1: Demonstration of cabled deployment at Pacific Northwest National Laboratory’s Marine Science Laboratory. The deployment highlighted AMP hardware endurance over a 4-month deployment in a tidally-dominated environment and laid the groundwork for machine learning algorithms to detect and classify targets present in active sonar data. - Budget Period 2: Demonstration of an autonomous deployment at PacWave South off the coast of Newport, Oregon. The deployment highlighted the stability of AMP hardware and software, with the autonomous package collecting data on a duty cycle over a 1.5-month deployment. - Budget Period 3: Demonstration of an autonomous deployment powered by a wave energy converter at the U.S. Navy’s Wave Energy Test Site. The deployment highlighted the potential of wave energy to power ocean observatories and led to the development of machine learning algorithms to detect and classify targets in optical camera data. In aggregate, this project’s greatest success was demonstrating the AMP’s flexibility in a range of deployment scenarios. Each budget period represented a “first of a kind” demonstration of integrated instrumentation – cabled AMP, autonomous AMP, wave-energy powered AMP – and each deployment helped to identify and set goals for the next. Further, despite the exploratory nature of these deployments, each one achieved high system up-time and proved that flexible integration of multiple sensors in a single package represents a viable strategy for marine energy environmental monitoring. The key lessons learned from the project are: - Without continuous power, either from a shore cable or in situ source, many of the benefits of integration are lost (If continuous power is not available, the ability to detect rare events is lost, as is the ability to minimize the risk of behavioral changes through adaptive sensing. However, even on a duty cycle, there is still value in being able to acquire synchronous data from multiple sensors.); and - Observations from a moving platform present substantially greater data processing challenges than those from stationary platforms. Finally, these deployments also demonstrate an important truth: successful integration alone does not guarantee that relevant data are collected. To grow the knowledge base about environmental interactions with marine energy converters, integrated systems, like the AMP, need to include the right sensor mix and connect the data pipelines to effective processing algorithms. These deployments establish a strong foundation for future collaborations with the environmental research community: not only to understand the environmental effects of marine energy, but also to improve our general ability to study life in the sea.

16 TIDAL AND WAVE POWER↗

CFD Data on a Vertical Axis Wave Turbine

In this study January to July, 2023, different variations of the original geometry of a vertical-axis wave turbine (VAWT) were generated and evaluated for hydrodynamic power efficiency using computational fluid dynamics (CFD). The key geometrical parameters considered in this parametric study included the chord length of the rotor blades and the horizontal semi-axis length. The immersion depth of the rotor was also examined as a key deployment parameter for the wave turbine. The CFD simulation results revealed that a medium chord length of the blade (i.e., the same as that of the baseline design) and a shorter horizontal semi-axis for the guide curve of the blade than that of the baseline design resulted in higher hydrodynamic power to extract. With the most efficient turbine rotor geometry identified in this study, a deployment depth that could assure full submergence of the rotor in waves but as close to the free surface as possible led to a higher hydrodynamic power. These findings revealed a pathway for the improvement of the wave turbine energy efficiency.

16 TIDAL AND WAVE POWER↗

The Design, Fabrication, and Test Program for NREL's Wave-Powered Desalination System

Starting in 2018, the U.S. Department of Energy's Water Power Technologies Office (WPTO), initiated the development of a prize competition as a foundational investment of Powering the Blue Economy, the prize encouraged the development of small, modular, cost-competitive wave-powered desalination systems. The National Renewable Energy Laboratory (NREL) was tasked with managing the prize, known as the Waves to Water Prize (W2W), and providing technical input based on prior desalination research performed at the lab. NREL partnered with the Coastal Studies Institute (CSI) and Jennette's Pier in North Carolina for their expertise in deploying research articles at the Jennette's Pier research facility. The prize consisted of five stages that included high-level concept proposals, numerical modelling, site-specific design, subsystem prototyping, and a final ocean demonstration. Due to the logistical risks of installing numerous prototypes in the ocean at the same time, NREL was tasked with designing and building a test article to de-risk the final event. The test article design needed to represent the technologies expected in the final stage of the prize. This meant that the design was expected to follow the same rules as the competitors, providing CSI with an opportunity to practice installations and develop a final logistics plan prior to the final event. After concluding the W2W event in April 2022, the NREL test article was redeployed in August 2022 to better understand the challenges of anchoring wave energy converters (WECs) in shallow water conditions with breaking waves.

desalination↗

Pioneer WEC v1 testing report

The “Pioneer WEC” project is tasked with developing a wave energy converter (WEC) to provide additional electrical power to the CeNtral Surface Mooring (CNSM) within the NSF-funded Ocean Observatories Initiative (OOI) Pioneer Array. This report summarizes the design, testing, and deployment of the “Pioneer WEC v1 prototype.”

Coe, Ryan Geoffrey [Sandia National Laboratories (↗

HERO WEC V1 Upgrade - 2023 Laboratory Testing (Raw Data)

This submission contains the original, unprocessed data from the 2023 Large Amplitude Motion Platform (LAMP) testing of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This data serves as a companion to MHKDR #520. Data was collected using NREL's Modular Ocean Data AcQuisition (MODAQ) system in TDMS format. Specifications of TDMS files can be found on the NI website. The TDMS files have been separated into zip files corresponding to either Drivetrain, Hydraulic, or Electric configuration runs representing the respective test cases that were run. The drivetrain runs were used to characterize the drivetrain only (no pump or generator). The Hydraulic runs represent the configuration when the seawater pump is installed, and the Electric runs represents the configuration when the generator is installed. The following sub-categories of data are included for each type: - DW - Deep water (monochromatic sine wave) profile (not run in drivetrain configuration) - Heave - Heave only (monochromatic sine wave) profile - Heave_NoRO (hydraulic configuration only) - Heave_ACC (hydraulic configuration only) - IR - Surge and heave irregular wave profile (not run in drivetrain configuration) - RW - Heave only profile created from real world encoder data (not run in drivetrain configuration) Reference documents: - "HERO WEC Lamp Test Run Log.xlsx": contains specifications for each test run - "Lamp Data Description.docx": provides detailed information about data types and processing methods For those interested in the processed data the authors have created a separate submission, MHKDR #520, linked below. This data set has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

Advancing the HERO WEC Through Integrated Modeling, Testing, and Field Deployments

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) was developed by the National Laboratory of the Rockies as a modular platform for advancing wave-powered desalination technologies. Designed to operate in either a hydraulic or electric configuration, the system enables direct comparison of mechanical-to-water and electrical-to-water conversion pathways using a single hardware architecture. Deployments in 2022 and 2024 at the Jennette's Pier test site in North Carolina demonstrated freshwater production between 60 and 300 gallons per day, including successful operation in wave heights as low as 0.25 m. A structured evaluation approach combining numerical modeling of hydrodynamic and power take-off response, controlled laboratory testing, and in-ocean field deployments has been used to characterize and refine system performance. Specifically, insights from these efforts are now informing the second-generation HERO WEC (V2) to increase robustness and overall survivability. Changes from the original prototype include improved drivetrain components, refined geometry, enhanced control systems, and design. The HERO WEC platform continues to serve as an open-access research asset supporting broader marine energy and desalination development.

16 TIDAL AND WAVE POWER↗