Search NASASearch

SEARCH · Search NASA

Results for “wind turbine”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

41 records · Page 3

Localizing the non-thermal X-ray emission of PSR J2229+6114 from its multi-wavelength pulse profiles

Context.Pulsars are detected over the whole electromagnetic spectrum, from radio wavelengths up to very high energies, in the GeV-TeV range. While the radio emission site for young pulsars is well constrained to occur at altitudes about several percent of the light-cylinder radius andγ-ray emission is believed to be produced in the striped wind, outside the light cylinder, the non-thermal X-ray production site remains unknown. Aims.The aim of this Letter is to localize the non-thermal X-ray emission region based on a multi-wavelength pulse profile fitting for PSR J2229+6114, which stands as a particularly good candidate given its high X-ray brightness. Methods.Based on the geometry deduced from the joint radio andγ-ray pulse profiles, we fixed the magnetic axis inclination angle and the line-of-sight (LoS) inclination angle. However, we left the region of X-ray emission unlocalized, setting it somewhere between the surface and the light cylinder. We localized this region and its extension by fitting the X-ray pulse profile as observed by the NICER,NuSTAR, and RXTE telescopes in the ranges of 2–7 keV, 3–10 keV, and 9.4–22.4 keV, respectively. Results.We constrained the non-thermal X-ray emission to arise from altitudes between 0.2 r L and 0.55 r L wherer L is the light-cylinder radius. The magnetic obliquity is approximatelyα ≈ 45° −50° and the LoS inclination angle isζ ≈ 32° −48°. Conclusions.This Letter is among the first works to offer a tight constraint on the location of non-thermal X-ray emission from pulsars. We plan to apply this procedure to several other promising candidates to confirm this new result.

Astronomy & Astrophysics

Utilities Perspective on Protection Challenges with High IBR Penetration

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This presentation identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, we are looking broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the presentation summarizes on gathered data and internal experiences.

24 POWER TRANSMISSION AND DISTRIBUTION

Development of Hydrogen Burner for FT4000® Aeroderivative Engine - Final Report

This report details an effort to develop a retrofittable fuel/air injector for the FT4000® aeroderivative gas turbine that enables use of hydrogen as a carbon-free fuel for efficient power generation. The FT4000 engine’s low-NOx combustor was developed by Pratt & Whitney and RTX Technology Research Center with core technology from the Pratt & Whitney PW4000 turbofan aircraft engine. The current FT4000 production engine operates on either natural gas or No. 2 fuel oil with water injection to achieve high thermal efficiency and low emissions. This engine is fielded by Mitsubishi Power Aero and delivers 70 MW of power with a simple-cycle efficiency of over 41% when operating with wet compression. The work reported here advances the technology readiness level of the FT4000 combustor for operation with hydrogen, starting with an experimental assessment of the current production hardware with increasing hydrogen content mixed with natural gas and ending with improved nozzle concepts for fully robust operation with 100% hydrogen. High-pressure single-sector combustor rig tests have been completed, demonstrating the ability for the dual fuel nozzle to operate an FT4000 combustor on 100% hydrogen with low nitrogen oxide (NOx) emissions. Metal temperature measurements and video images of the flame structure from zero to 100% hydrogen highlight opportunities to improve the fuel nozzle robustness for high hydrogen conditions. The design of new fuel/air mixer concepts to improve durability and operability with high hydrogen levels was also completed. A total of eleven new concepts were developed and analyzed, ranging from modifications to the bill-of-materials nozzle to fully clean sheet designs. The concepts were evaluated with non-reacting and reacting flow evaluations to assess the performance of the new hardware designs. Non-reacting tests included Phase Doppler Particle Analysis (PDPA) for droplet size and velocity, mechanical patternation for liquid water flux, and planar laser induced fluorescence (PLIF) with acetone-seeding for gaseous fuel/air mixing characterization. Five scaled candidate fuel nozzle designs, in addition to a scaled bill-of-materials nozzle, were then successfully evaluated in an atmospheric pressure burner rig. The nozzles were evaluated for performance with natural gas, hydrogen/natural gas blends, and pure hydrogen. For 100% hydrogen, the nozzles were evaluated with and without water injection. Optical and infrared imaging of the flame and fuel nozzle was captured. NOx emissions were sampled from fixed emissions probes. The results show measurable differences between the various designs, and the data was used to down-select the two most promising designs to advance to future full pressure rig testing. Results from this study have cleared the current production FT4000 engines with dual fuel nozzles to operate at baseload power on blends of hydrogen mixed with natural gas and water. Two promising nozzle designs have been developed to enable fully robust operation with up to 100% hydrogen. These nozzles require validation at full baseload operating conditions before they can be introduced to the field.

03 NATURAL GAS

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Nuclear Safety [Vol. 16, No. 2, March-April 1975]

Nuclear Safety covers significant developments in the field of nuclear safety. The scope is limited to topics relevant to the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, safety considerations in regard to the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 127 Quality Assurance in the Construction of Nuclear Power Plants by Sidney A. Bernsen, 141 1974 ANS Topical Meeting on Fast Reactor Safety by M. H. Fontana; CONTROL AND INSTRUMENTATION: 150 GBR-4 Protection Systems: Failures and Their Consequences by Peter Burgsmüller, J. J. Dekais, Albert Krähe, Raffaello Pignatelli, and Gottfried Vieider, 162 Standby Emergency Power Systems. Part 2—The Later Plants by E. W. Hagen; PLANT SAFETY FEATURES: 180 Radiotoxic Hazard Measure for Buried Solid Radioactive Waste by J. Hamstra, 190 The Thirteenth AEC Air-Cleaning Conference by D. W. Moeller, D. W. Underhill, and M. W. First, 203 Book Review: Nuclear Criticality Safety; CONSEQUENCES OF EFFLUENT RELEASE: 204 Environmental Radiation Effects of Nuclear Facilities in New York State by M. S. Terpilak and B. L. Jorgensen, 222 Book Review: Thermal Ecology; OPERATING EXPERIENCES: 223 Set-Point Drift in Nuclear Power-Plant Safety-Related Instrumentation Adapted by the Nuclear Safety Staff, 224 Diesel-Generator Operating Experience at Nuclear Power Plants, 227 Summary of Operating U. S. Power Reactors as of Jan. 1, 1975, 232 Selected Safety-Related Occurrences Reported in November and December 1974 Compiled by William R. Casto, 235 Recent Occurrences at Nuclear Reactors and Their Causes Compiled by William R. Casto; CURRENT EVENTS: 243 General Administrative Activities Compiled by Wm. B. Cottrell, 251 Action on Power-Reactor Projects Undergoing Regulatory Review or Consideration Compiled by Wm. B. Cottrell, 266 Action on Nonreactor Projects Undergoing Regulatory Review or Consideration Compiled by Wm. B Cottrell, 268 Proposed Rule Changes as of Jan. 1, 1975; MISCELLANY: 149 Course in Italy on High-Energy Radiation Dosimetry and Protection (Announcement), 250 Course at Northwestern on Safety of Light-Water-Cooled Nuclear Power Plants (Announcement), 266 Symposium of the Combined Effects on the Environment of Radioactive, Chemical, and Thermal Releases from the Nuclear Industry (Announcement), 271 Short Course on Engineering for Extreme Winds and Tornadoes (Announcement), 272 Three 1-Week Courses at MIT on Nuclear Power-Reactor Safety (Announcement), 272 Harvard University Short Courses (Announcement).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS