Search NASASearch

SEARCH · Search NASA

Results for “work planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The space shuttle payload planning working groups. Volume 8: Earth and ocean physics

The findings and recommendations of the Earth and Ocean Physics working group of the space shuttle payload planning activity are presented. The requirements for the space shuttle mission are defined as: (1) precision measurement for earth and ocean physics experiments, (2) development and demonstration of new and improved sensors and analytical techniques, (3) acquisition of surface truth data for evaluation of new measurement techniques, (4) conduct of critical experiments to validate geophysical phenomena and instrumental results, and (5) development and validation of analytical/experimental models for global ocean dynamics and solid earth dynamics/earthquake prediction. Tables of data are presented to show the flight schedule estimated costs, and the mission model.

Source record

The space shuttle payload planning working groups: Executive summaries

The findings of a space shuttle payload planning group session are presented. The purpose of the workshop is: (1) to provide guidance for the design and development of the space shuttle and the spacelab and (2) to plan a space science and applications program for the 1980 time period. Individual groups were organized to cover the various space sciences, applications, technologies, and life sciences. Summaries of the reports submitted by the working groups are provided.

Source record

Predictive Integrated Stratigraphic Modeling (PRISM®) Work Plan Center Wide Per- and Polyfluoroalkyl Substances (PFAS) Potential Release Location (PRL) 237 Kennedy Space Center, Florida

This document presents a description of various site investigation activities that will be used to improve the conceptual site model (CSM) at the Kennedy Space Center (KSC) to develop a better understanding of the fate and transport of per- and polyfluoroalkyl substances (PFAS) in groundwater and surface water. The activities proposed herein include three primary tasks: a sequence stratigraphic analysis, groundwater and surface water gauging and sampling, and a stormwater pollutant modeling analysis.

PFAS

KSC Child Development Center (PRL 149) Confirmatory Sampling Report and Interim Measures Work Plan

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). The KSC Child Development Center (KCDC), the “site,” is designated as potential release location (PRL) 149 under the NASA RCRA permit. This report summarizes the results of the Confirmatory Sampling (CS) activities carried out on March 19, 2022, and May 16, 2023, at KCDC, PRL 149, KSC, Florida. This report additionally presents the results of an assessment conducted between July 7 and July 27, 2023, to determine whether construction activities in 2023 to replace certain playground equipment and the rubberized play surface released arsenic (As) contaminated soil.

CDC

The space shuttle payload planning working groups. Volume 10: Space technology

The findings and recommendations of the Space Technology group of the space shuttle payload planning activity are presented. The elements of the space technology program are: (1) long duration exposure facility, (2) advanced technology laboratory, (3) physics and chemistry laboratory, (4) contamination experiments, and (5) laser information/data transmission technology. The space technology mission model is presented in tabular form. The proposed experiments to be conducted by each test facility are described. Recommended approaches for user community interfacing are included.

Source record

The space shuttle payload planning working groups: Volume 9: Materials processing and space manufacturing

The findings and recommendations of the Materials Processing and Space Manufacturing group of the space shuttle payload planning activity are presented. The effects of weightlessness on the levitation processes, mixture stability, and control over heat and mass transport in fluids are considered for investigation. The research and development projects include: (1) metallurgical processes, (2) electronic materials, (3) biological applications, and (4)nonmetallic materials and processes. Additional recommendations are provided concerning the allocation of payload space, acceptance of experiments for flight, flight qualification, and private use of the space shuttle.

Source record

Corrosion Atmospheric Exposure Facility PRL #239 SWMU Assessment Report/Confirmation Sampling Work Plan

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). The Corrosion Atmospheric Exposure Facility (CAEF), also known as facility number K8-0600, and the Corrosion Test Area (CTA); also known as facility number K8-0237, herein referred to as the site, is designated Potential Release Location (PRL) 239 under the NASA RCRA permit. A SWMU Assessment (SA) was conducted between November 2019 and February 2020 to identify potential environmental impacts related to current and historic operations being conducted at the site. The SA included a site reconnaissance visit in February 2020, interviews with various personnel possessing knowledge of past work practices and operations at the site, and review of available historical documentation, engineering drawings, and facility inspection reports. Current site conditions were documented in photographs. Soil types and wildlife habitat were also evaluated. The objective of the assessment was to identify potential locations of concern (LOC) at the site and to determine whether further evaluation is required.

Kimberly Clower

The space shuttle payload planning working groups. Volume 1: Astronomy

The space astronomy missions to be accomplished by the space shuttle are discussed. The principal instrument is the Large Space Telescope optimized for the ultraviolet and visible regions of the spectrum, but usable also in the infrared. Two infrared telescopes are also proposed and their characteristics are described. Other instruments considered for the astronomical observations are: (1) a very wide angle ultraviolet camera, (2) a grazing incidence telescope, (3) Explorer-class free flyers to measure the cosmic microwave background, and (4) rocket-class instruments which can fly frequently on a variety of missions. The stability requirements of the space shuttle for accomplishing the astronomy mission are defined.

Source record

Phase II Solid Waste Management Unit (SWMU) Assessment Work Plan Center Wide Per- and Polyfluoroalkyl Substances (PFAS) Potential Release Location (PRL) 237 Kennedy Space Center, Florida

This document presents a description of solid waste management unit (SWMU) assessment activities that will be used to identify additional locations where per- and polyfluoroalkyl substances (PFAS) may have been used at the Kennedy Space Center (KSC). The activities described herein will also be used to identify potential off-Center sources of PFAS and potential background locations for PFAS within KSC.

Krista D Sommerfeldt

Formulation of consumables management models: Test plan for the mission planning processor working model

The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

Connelly, L. C.

Formulation of consumables management models. Development approach for the mission planning processor working model

The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

Connelly, L. C.

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Regional Commercialization Plan (Final): Work Products 4.4.b (Regional Commercialization Plan) & 4.3 (Socioeconomic Impacts of CCUS and Workforce Readiness)

Commercialization of carbon capture and storage (CCS) within the SECARB-USA region is scaling up and will continue as governments and private companies expand on current decarbonization efforts. The Inflation Reduction Act (2022) enhanced 45Q tax credits beyond the 2018 Bipartisan Budget Act levels by incentivizing previously uneconomic projects to develop CCS plans and infrastructure. Additionally, the continued interest and support for CCS mitigates the relative risk of commercial-scale projects that are seeking long-term viability to develop capture facilities to accommodate their emissions reduction goals. This multifaceted Commercialization Plan provides an overview of the current status and potential for CCS in the Southeast and the pathways to achieve emissions reduction goals in the region by 2050. Specifically, the study addresses: • The current status of CCS activities in the SECARB region, • Assessment of buildout pathways for CCS projects and carbon transport infrastructure development opportunities, • Estimation of CCS job creation and economic impacts, and • The social justice considerations and public benefits associated with CCS activities in the SECARB-USA region.

42 ENGINEERING

Abstract communication for coordinated planning

work offers evidence that distributed planning agents can greatly reduce communication costs by reasoning at abstract levels. While it is intuitive that improved search can reduce communication in such cases, there are other decisions about how to communicate plan information that greatly affect communication costs. This paper identifies cases independent of search where communicating at multiple levels of abstraction can exponentially decrease costs and where it can exponentially add costs. We conclude with a process for determining appropriate levels of communication based on characteristics of the domain.

coordination

United States Nuclear Data Program Annual Report for Fiscal Year 2025

The US Nuclear Data Program (USNDP) Annual Report for Fiscal Year 2025 summarizes the work of USNDP for the period of October 1, 2024 through September 30, 2025, with respect to the Work Plan for FY 2025 that was prepared in 2024. The Work Plan and Final Report for USNDP are prepared for the DOE Office of Science, Office of Nuclear Physics. The support for the nuclear data activity from sources outside the US Nuclear Data Program is summarized in the staffing table and Appendix A. This leverage amounts to about 22.8 FTE scientific, to be compared with 21.9 FTEs at USNDP units funded by the DOE Office of Science, Office of Nuclear Physics. Since it is often difficult to separate accomplishments funded by various sources, some of the work reported in the present report was accomplished with nuclear data program support leveraged by other funding. FY 2025 was the 25th year in which the USNDP has operated under a Work Plan developed by the program participants. The program continued to carry out important work in support of the DOE mission. The work balances the ongoing collecting, analyzing, and archiving of nuclear physics information critical to basic nuclear research and to the development and improvement of nuclear technologies with the electronic distribution of this information to users in a timely and easily accessible manner. The present section of the report consists of activity summaries for the major components of the USNDP. This is followed by an updated staff level assignment table that reflects the final distribution of effort among the tasks carried out during FY 2025. Then, we continue with the detailed status of work performed during FY 2025.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS