Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

High-brightness electron injectors for high-duty cycle X-ray free electron lasers

The successful development in the last two decades of X-ray free electron lasers (FELs) with their revolutionary brightness performance has been tightly dependent on the parallel development of electron guns and injectors capable of providing the high-brightness electron beams required by FELs lasing at these short wavelengths. The ultimate brightness delivered by a linear accelerator (linac) is already set at its injector and the remaining part of the accelerator can be only designed to preserve the injector performance. The technology to be used for the accelerator part of an X-Ray FEL strongly depends on the duty-cycle at which the FEL operates. Normal-conducting, room-temperature, copper-based radio frequency (RF) technology is typically used for low duty-cycles of up to approximately 10 −3 . For higher duty-cycles and up to continuous wave (CW) operation, the linac must rely on superconductive RF technology because, with the higher duty-cycle, the increasingly higher power dissipated in normal conducting RF structures becomes excessive for the warm technology. The situation changes in the lower energy part of the accelerator, where injector schemes, based on direct current, normal-conducting, and superconducting RF electron guns, are demonstrating the beam quality performance required by high-duty-cycle X-ray FELs. In this paper we start with a description of the requirements for such injectors, followed by an overview of the pursued technologies and schemes, and by a discussion on the main differences in terms of beam dynamics between low and high duty-cycle injectors.

Sannibale, Fernando↗

Part 1: Detailed Electromagnetic Design of an Integrated and Compact 1.3 GHZ Superconducting Radio Frequency (SRF) Electron

There exists a need for compact, reliable, high-power electron sources for applications including those in water treatment, basic science, defense, and security. There also exists a need for compact electron-beam based light and power sources of various power levels and at different frequencies (mm-wave to gamma rays) for applications also in the fields of basic science, industry, and defense and security. Today’s examples of high-average-power electron sources are neither very compact nor highly efficient. The same may be said for many of the electron-beam based light sources operated worldwide for myriad of applications. Recent breakthroughs in superconducting (SC) materials technology, radio-frequency (RF) power systems, specialized cathodes, and RF cavity designs offer ways to overcome the above-mentioned shortcomings. In this report, all these new features are integrated in a comprehensive design into one promising concept for a compact superconducting RF (SRF) high-average power electron linear accelerator. This design is capable of 5-50 kW average electron beam power and continuous wave operation with the corresponding electron beam energy up to 10 MeV.

43 PARTICLE ACCELERATORS↗

Progress towards computer simulation of NiH2 battery performance over life

The long-term performance of rechargeable battery cells has traditionally been verified through life-testing, a procedure that generally requires significant commitments of funding and test resources. In the situation of nickel hydrogen battery cells, which have the capability of providing extremely long cycle life, the time and cost required to conduct even accelerated testing has become a serious impediment to transitioning technology improvements into spacecraft applications. The utilization of computer simulations to indicate the changes in performance to be expected in response to design or operating changes in nickel hydrogen cells is therefore a particularly attractive tool in advanced battery development, as well as for verifying performance in different applications. Computer-based simulations of the long-term performance of rechargeable battery cells have typically had very limited success in the past. There are a number of reasons for the lack in progress in this area. First, and probably most important, all battery cells are relatively complex electrochemical systems, in which performance is dictated by a large number of interacting physical and chemical processes. While the complexity alone is a significant part of the problem, in many instances the fundamental chemical and physical processes underlying long-term degradation and its effects on performance have not even been understood. Second, while specific chemical and physical changes within cell components have been associated with degradation, there has been no generalized simulation architecture that enables the chemical and physical structure (and changes therein) to be translated into cell performance. For the nickel hydrogen battery cell, our knowledge of the underlying reactions that control the performance of this cell has progressed to where it clearly is possible to model them. The recent development of a relative generalized cell modelling approach provides the framework for translating the chemical and physical structure of the components inside a cell into its performance characteristics over its entire cycle life. This report describes our approach to this task in terms of defining those processes deemed critical in controlling performance over life, and the model architecture required to translate the fundamental cell processes into performance profiles.

Zimmerman, Albert H.↗

Decision Point 3 of Statement of Project Objectives (SOPO) “Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems”

Air Products is carrying out a scope of work under Phase 5 of the ITM Oxygen Cooperative Agreement to design, build, and operate a ceramic membrane fabrication facility (the -CerFabII) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the -ITM Oxygen Development FacilityII), and to perform supporting development tasks in materials development and engineering development toward industrial, carbon capture and sequestration applications. Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 3 (DP3), which pertains to the status of all Tasks within Phase 5 and most notably the project status of the CerFab (Task 30) prior to authorization of funds for equipment purchase and construction of the facility. The intent of the DP3 is to provide the opportunity for DOE-NETL to review the status of these tasks and to make recommendations on forward project direction, including a recommendation to pass into Budget Period 8. In the area of Materials Development, Air Products has specified a high pressure dilatometer system which will enable measurements of material expansion of ITM ceramic compounds at very high oxygen partial pressures consistent with CCS applications. Under Task 28.2, subcontractor Ceramatec has made significant progress since DP2 in materials selection and process development and improvement for advanced architecture module fabrication. Ceramatec has determined a materials specification, and has selected a process for making the material. Ceramatec has further developed and selected the process for applying the membrane to unsintered advanced architecture wafers with a Two Step process. Ceramatec has built submodules meeting leak rate specifications and intact 1-TPD modules compromised of advanced architecture components. Equipment and processes required for implementation of the advanced architecture design in the CerFab have been identified and are included in the Task 30 scope of equipment supply. Under Task 29.0, Air Products has developed conceptual ideas for implementation of ITM Oxygen in a 2000 TPD test unit. These concepts are proposed for scale up of the ITM technology to large scale with reduced commercial risk. Under Task 30, Air Products and Ceramatec have collaborated to re-design the CerFab process with the advanced architecture wafer production process as primary, and laid out the new process in the Tooele building; the required process equipment have been specified. The project team updated the project cost and schedule estimates, including all environmental permit schedules. The team also re-assessed project risk and costs for the commissioning and operating phases of the program. Newly projected costs for the CerFab, for which details are provided here as attachments, indicate a savings of approximately $100,000 relative to the original estimate at the time of Phase 5 contract definitization. However, an assessment of risks associated with the equipment, process, and operations of the CerFab indicate that approximately $2.9 million of costs should be expected to address various issues in the project. In addition, $1.6 million of additional spending is expected relative to the original estimate to operate the facility during Task 30.2. Air Products proposes a plan to re-direct funds from Tasks 28, 29, and 31 to Task 30 as necessary to allow the CerFab to meet the Phase 5 program objectives.

Armstrong, Phillip↗

The CBETA Fractional Arc Test

As part of this development effort, the Cornell-BNL Energy recovery linac Test Accelerator (CBETA) [3], a 4-pass, 150 MeV energy recovery linac (ERL), utilizing a Non-scaling Fixed Field Alternating-gradient (NS-FFA) permanent magnet return loop, is currently under design and construction at Cornell University through the joint collaboration of Brookhaven National Lab (BNL) and the Cornell Laboratory for Accelerator based Sciences and Education (CLASSE). Building on the significant advancements in high-brightness photoelectron sources and SRF technology at Cornell, as well as the FFA magnet and lattice design expertise from BNL, CBETA will establish the operation of a multi-turn SRF based ERL utilizing a compact FFA return loop with large energy acceptance (a factor of roughly 3.6 in energy), and thus demonstrate one possible cost-reduction technology under consideration for the eRHIC design. Moreover, successful completion of the CBETA project requires the study and measurement of many critical phenomena relevant to designing the EIC: the Beam-Breakup (BBU) instability, halo-development and collimation, growth in energy spread from Coherent Synchrotron Radiation (CSR), and CSR micro bunching, and thus should provide valuable insight to the EIC and ERL communities. In order to demonstrate the viability of the CBETA design, the Fractional Arc Test (FAT) was added to the CBETA commissioning sequence.

43 PARTICLE ACCELERATORS↗

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform↗

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform↗

Curvature, Hydrogen, Q

The manufacturing of niobium SRF accelerator cavities is plagued by a mobile point defect, hydrogen. For efficient accelerator operation, niobium must function at both high electric and magnetic fields, and is compromised if magnetic impurities are located in the surface regions of the material. The finding that trace hydrogen in niobium can produce structures with magnetic properties is a feature that is not acceptable for a high performance cavity. X-ray diffraction has proved to be the key tool in assessing irreversible process damage to the niobium substrate. In future generations of accelerators, niobium will actually be merely the substrate for more effective superconductors that will allow for more efficient operation. The substrate analogy to the silicon wafer industry is useful since for niobium it may be possible to avoid some of the mistakes made in silicon technology. Because hydrogen attacks niobium on a number of different size scales, there is an inherent complexity in the trouble sources. There are also features in cavity design that are benign, such as local curvature considerations, requiring a fully non symmetric analysis of current flow to be appreciated.

36 MATERIALS SCIENCE↗

Report on the Radiation Effects Testing of the Infrared and Optical Transition Radiation Camera Systems

Presented in this report are the results tests performed at Argonne National Lab in collaboration with Los Alamos National Lab to assess the reliability of the critical 99 Mo production facility beam monitoring diagnostics. The main components of the beam monitoring systems are two cameras that will be exposed to radiation during accelerator operation. The purpose of this test is to assess the reliability of the cameras and related optical components when exposed to operational radiation levels. Both X-ray and neutron radiation could potentially damage camera electronics as well as the optical components such as lenses and windows. This report covers results of the testing of component reliability when exposed to X-ray radiation. With the information from this study we provide recommendations for implementing protective measures for the camera systems in order to minimize the occurrence of radiation-induced failure within a ten month production run cycle.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

United States Advanced Ultra-Supercritical Component Test Facility for 760°C Steam Power Plants ComTest Project

Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increase cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760°C). The steam turbine stop and control valve component has been designed to operate at full A-USC temperatures, and would be tested both in throttling operation and to accumulate accelerated, repetitive stroke cycles. A cycling header component has been designed to confirm the suitability of new high-temperature nickel alloys to cycling operation, expected of future coal-fired power plants. Current test plans would subject these components to A-USC operating conditions for at least 8,000 hours by September 2020. The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. This consortium is completing the Detailed Engineering phase of the project, with procurement scheduled to begin in late 2017. The effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory, along with the Ohio Development Services Agency. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides technical details on the design of the ComTest facility.

54 ENVIRONMENTAL SCIENCES↗

A Prototype Wire Position Monitoring System

The Wire Position Monitoring System (WPM) will track changes in the transverse position of LCLS Beam Position Monitors (BPMs) to 1{micro}m over several weeks. This position information will be used between applications of beam based alignment to correct for changes in component alignment. The WPM system has several requirements. The sensor range must be large enough so that precision sensor positioning is not required. The resolution needs to be small enough so that the signal can be used to monitor motion to 1{micro}m. The system must be stable enough so that system drift does not mimic motion of the component being monitored. The WPM sensor assembly consists of two parts, the magnetic sensor and an integrated lock-in amplifier. The magnetic sensor picks up a signal from the alternating current in a stretched wire. The voltage v induced in the sensor is proportional to the wire displacement from the center of the sensor. The integrated lock-in amplifier provides a DC output whose magnitude is proportional to the AC signal from the magnetic sensor. The DC output is either read on a digital voltmeter or digitized locally and communicated over a computer interface.

43 PARTICLE ACCELERATORS↗

Report on study of accelerating structures for muons in the velocity range of β=v/c=0.08-0.3 for J-PARC (g-2)/EDM experiment

We explored three types of structures for muon acceleration in the beam velocity range β = 0.08-0.3. Somewhat surprisingly, the venerable DTL looks like the best option based on its low maximal field, reasonable efficiency, and simplicity. It also provides the largest flexibility of the beam focusing options. The accelerating gradient for the DTL is the highest of the considered designs, and can be further increased if needed. The IH-APF structure, the baseline choice, is very attractive due its efficiency and potentially lower fabrication cost. However, detailed EM analysis indicated some reasons for concern, mainly related to the high maximal electric fields. We suggested to change the cavity design to CH type, which leads to a novel type of structure, CH-APF. Dr. M. Otani produced the CST model of CH-APF, and preliminary results of its EM analysis are encouraging. Unfortunately, the fabrication of CH-APF structure is likely more complicated than for IH-APF.

43 PARTICLE ACCELERATORS↗

Development of Transformative Preparation Methods to Push up High Q&G Performance of FRIB Spare HWR Cryomodule Cavities

The FRIB accelerator project construction, a top priority of US nuclear science, was completed in January 2022, and is now moving to user operation. The stable and reliable operation of the accelerating cryomodules is essential in achieving/fulfilling DOE and user expectations. So far, FRIB cryomodules meet all FRIB specifications for cavity performance. However, during the lifetime of machine operation, degradation of cryomodule performance is possible, as reported in similar operating facilities (CEBAF, SNS). If cryomodule degradation is observed at FRIB, the under-performing cryomodule will require replacement/maintenance. In effort to manage operational reliability, FRIB plans to construct a 0.53 half-wave cryomodule to serve as an active spare. In a parallel effort, FRIB will also work toward increasing operational Q and gradient of spare cryomodule cavities to gain an overall performance margin to support future operational reliability. The current FRIB cavity designs have a potential to operate at gradients higher than 8 MV/m, but are currently limited by field emission (FE) and/or high field Q slope (HFQS); known issue in buffered chemical polished (BCP) treated cavities. The proposal looks to develop transformative surface preparation treatments to improve the operational gradient of spare cryomodules higher than 10 MV/m while maintaining high Q. Thus, increasing operational margin by 30 - 50%. With the goal to improve operational reliability set, the proposal will investigate multiple objectives as possible paths forward to achieve an overall increase in cavity performance and gain a better understanding of SRF limiting mechanisms. The proposal will study the application of different chemical surface treatments to 0.53 half-wave cavities, with the addition of low temperature bakes (LTB), and measure their effects on accelerating performance. Proposed chemical treatments to be explored in this proposal include conventional EP acid mixtures, as well as innovated EP and BCP acid mixtures designed to simplify processing paths in migrating FE and HFQS. The proposed transformative treatment wet N-doping also has the potential to replicate recent advancements in SRF technology relating to nitrogen doping and high Q operation without the requirement for an ultra-high vacuum annealing furnace; currently being developed at FNAL and JLAB. In parallel, high Q performance relating to flux trapping will be investigated with the installation of a second layer of magnetic shielding in the vertical test Dewar. The research objectives presented in the proposal, and their corresponding effects on cavity performance, will provide essential knowledge and future guidance to the SRF community and provide possible paths for future SRF based projects and applications.

43 PARTICLE ACCELERATORS↗

Compact cryomodule for mobile stand-alone superconducting industrial accelerators

Superconducting RF (SRF) accelerators have the potential to be more profitable in comparison with normally conducting accelerators, as long they can be made compact, achieve operational simplicity, autonomy, trans- portability, satisfactory energy efficiency, as well as have reasonable costs. The development of SRF technologies such as Nb 3 Sn coating, conductively-cooled resonators, and high-capacity liquid-helium-free cryocoolers made SRF accelerators mobile and energetically and economically efficient at a beam power of tens of kW. One of the key elements of such an accelerator is the cryomodule, which must have minimal thermal losses to enable operation from low power cryoheads and enable conductive cooling of SRF resonator. In this research we present the design and test results of a compact cryomodule for an industrial stand-alone SRF linear accelerator proto- type, based on 650 MHz elliptical resonators, being developed at Fermi National Accelerator Laboratory.

43 PARTICLE ACCELERATORS↗

Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about 150 m{sup 2} of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m{sup 2} for a total active area of 1200 m{sup 2}. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS end-cap muon tracking system in the 2018/19 shutdown. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as 30 μm along the precision coordinate and 80 μm perpendicular to the chamber. In the prototyping towards the final configuration two similar quadruplets with dimensions 1.2 x 0.5 m{sup 2} have been built with the same structure as foreseen for the NSW upgrade. It represents the first example of a Micromegas quadruplet ever built, realized using the resistive-strip technology and decoupling the amplification mesh from the readout structure. All readout planes are segmented into strips with a pitch of 400 μm for a total of 4096 strips. In two of the four planes the strips are inclined by 1.5 deg. and provide a measurement of the second coordinate. The design and construction procedure of the Micromegas modules will be presented, as well as the design for the assembly of modules onto the New Small Wheel. Emphasis will be given on the methods developed to achieve the challenging mechanical precision. Measurements of deformation on chamber prototypes as a function of thermal gradients, gas over-pressure and internal stress (mesh tension and module fixation on supports) will be also shown in comparison to simulation. These tests were essential in the development of the final design in order to minimize the effects of deformations. During installation and operation all deformations and relative misalignments will be monitored through an optical alignment system and compensated in the tracking software. The optical alignment concept will also be outlined. 2 (authors)

43 PARTICLE ACCELERATORS↗

Status of the Development of Flight Power Processing Units for the NASAs Evolutionary Xenon Thruster - Commercial (NEXT-C) Project

A pathfinder prototype unit and two flight power processing units (PPUs) are being developed by the Aerojet Rocketdyne Corporation in Redmond, Washington and ZIN Technologies in Cleveland, Ohio, in support of the NEXT-C Project. This project is being led by the NASA Glenn Research Center in Cleveland, Ohio, and will also yield two flight thrusters. This hardware is being considered to be provided as Government Furnished Equipment for the New Frontiers Program, and is applicable to a variety of planetary science missions and astrophysics science missions. The design of the NEXT-C PPU evolves from the hardware fabricated under the NEXT technology development project. The power processing unit operates from two sources: a wide input 80 to 160 V high-power bus and a nominal 28 V low-power bus. The unit includes six power supplies. Four power supplies (beam, accelerator, discharge, and neutralizer keeper) are needed for steady state operation, while two cathode heater power supplies (neutralizer and discharge) are utilized during thruster startup. The unit in total delivers up to 7 kW of regulated power to a single gridded-ion thruster. Significant modifications to the initial design include: high-power adaptive-delay control, upgrade of design to EEE-INST-002 compliance, telemetry accuracy improvements, incorporation of telemetry to detect plume-mode operation, and simplification of the design in select areas to improve manufacturability and commercialization potential. The project is presently in the prototype phase and preparing for qualification level environmental testing.

NASAaEuro(TM)s Evolutionary Xenon Thruster↗

Sub-sized specimen testing and its relationship with Gen IV Materials Qualification

Renewed interest in advanced reactor technologies which can produce inherently safe, reliable, low carbon, low cost energy requires the development of new materials which can operate in the extreme environments proposed by Gen IV reactor designs. The primary focus of the Nuclear Materials Discovery and Qualification Initiative (NMDQi) is to accelerate the process by which new materials can make their way into commercial use, enabling new technologies and innovations within the nuclear sector. Due to limitations in the production of neutron irradiated material for testing and qualification, the use of specimens far smaller than those traditionally called for in regulatory codes becomes a necessity. While the use of these sub-sized specimens is necessary to achieve materials qualification on a realistic timeline and budget, literature showing the efficacy of these samples as an appropriate surrogate for ASME/ASTM defined samples is limited. This poster will detail historical efforts to compare the mechanical behavior of small geometry samples with bulk material behavior and the potential of sub-sized specimen testing at INL for future materials qualification efforts.

36 MATERIALS SCIENCE↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center (GRC) is supporting the development of high-efficiency power convertors for use in Radioisotope Power Systems (RPS). Significant progress was made towards such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was cancelled in 2013 by the Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton designs. The technology development contracts each consist of up to three phases: Design, Fabricate, and Test. As of May 2018, all contracts have completed the Design Phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the Phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, NASA GRC is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects which have similarities and relevance to current contract designs. Four of which are flexure-bearing based, and another six are gas-bearing based. One of the flexure-bearing convertors has accumulated over 110,000 hours of operation, and holds the current record for maintenance-free heat-engine run-time. Another flexure-bearing convertor was recently manually shutdown after 105,620 hours of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of runtime on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Amongst the gas-bearing convertors, the longest running unit has accumulated over 70,000 hours of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously, for which the longest runtime has reached 28,000 hours.

Oriti, Salvatore M.↗