Topology Control for Load Shed Recovery

This paper introduces load shed recovery actions for transmission networks by presenting the dc optimal load shed recovery with transmission switching model (DCOLSR-TS). The model seeks to reduce the amount of load shed, which may result due to transmission line and/or generator contingencies, by modifying the bulk power system topology. Since solving DCOLSR-TS is computationally difficult, the current work also develops a heuristic (MIP-H), which improves the system topology while specifying the required sequence of switching operations. Experimental results on a list of N-1 and N-2 critical contingencies of the IEEE 118-bus test case demonstrate the advantages of utilizing MIP-H for both on-line load shed recovery and recurring contingency-response analysis. This is reinforced by the introduction of a parallelized version of the heuristic (Par-MIP-H), which solves the list of critical contingencies close to 5x faster than MIP-H with 8 cores and up to 14x faster with increased computational resources. The current work also tests MIP-H on a real-life, large-scale network in order to measure the computational performance of this tool on a real-world implementation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Black Start Resource Allocation

The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Root Cause Analysis of AC Overcurrent in July 2020 San Fernando Disturbance

On July 7 2020, approximately 1,000 MW reduction in solar photovoltaic (PV) output was experienced by the bulk power system in Southern California after a three-phase fault. Disturbance analysis indicates that instantaneous AC current caused inverter tripping. The projection of the root cause of AC overcurrent from the NERC report is that inverter current control is not tight. This letter provides a quantitative analysis on ac overcurrent and addresses the following questions: (i) what type of current controls may lead to ac overcurrent; and (ii) how controller parameters and grid strength influence ac overcurrent. Here, the letter provides frequency-domain analysis and time-domain simulation results of a grid-integrated inverter to illustrate the effect of control parameters and grid strength on ac overcurrent.

14 SOLAR ENERGY↗

Enabling Resiliency Operations across Multiple Microgrids with Grid Friendly Appliance Controllers

Changes in economic, technological, and environmental policies are resulting in a re-evaluation of the dependence on large central generation facilities and their associated transmission networks. Emerging concepts of smart communities/cities are examining the potential to leverage cleaner sources of generation, as well as integrating electricity generation with other municipal functions. When grid connected, these generation assets can supplement the existing interconnections with the bulk transmission system, and in the event of an extreme event, they can provide power via a collection of microgrids. To achieve the highest level of resiliency, it may be necessary to conduct switching operations to interconnect individual microgrids. While the interconnection of multiple microgrids can increase the resiliency of the system, the associated switching operations can cause large transients in low inertia microgrids. The combination of low system inertia and IEEE 1547 and 1547a-compliant inverters can prevent multiple microgrids from being interconnected during extreme weather events. This study will present a method of using end-use loads equipped with Grid Friendly™ Appliance controllers to facilitate the switching operations between multiple microgrids; operations that are necessary for optimal operations when islanded for resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Feeder-Scale Fast Frequency Response via Optimal Coordination of Net-load Resources Part I: Solution Design

This work is the first of a two-part series that develops and experimentally demonstrates a first-of-its-kind hierarchical control solution for optimally dispatching thousands of deferrable loads and distributed energy resources (DERs) across a distribution feeder to provide fast frequency response (FFR) within 500 ms to the bulk power system. This approach rapidly coordinates resources online after a frequency event occurs, allowing fast-changing, behind-the-meter (BTM) resources to be incorporated and aggregate FFR power set points to be achieved more quickly and accurately than existing approaches. We also present a solution for determining the optimal amount of headroom to operate solar inverters with to minimize opportunity cost while ensuring the FFR response viability of a building with the inverter and deferrable loads. In Part I, we develop practical algorithms for fast, cost-based optimal dispatch at multiple aggregation scales (single building, multiple buildings, and full distribution feeder), establish their optimality, and demonstrate via simulation that they are faster than state-of-the-art, coordinated frequency response approaches. In Part II, the entire platform is implemented and experimentally verified using a unique power hardware-in-the-loop demonstration, including more than 100 powered loads and DERs connected to a real-world distribution network model and over 10,000 net-load resources dispatched.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Nanocrystalline SnO 2 –TiO 2 System‒Part II: Surface Energies and Thermodynamic Stability

The thermodynamic stability of nanocrystalline SnO 2 –TiO 2 solid solutions was studied experimentally. Microcalorimetry of water adsorption revealed a systematic decrease in the surface energy with increasing Ti 4+ content in the SnO 2 ‐rich compositions, consistent with previous reports of Ti 4+ segregation on the surface. The surface energy change was accompanied by an increase in the magnitude of the heat of water adsorption, also indicating a modification of the SnO 2 surface by Ti 4+ . Supporting the water adsorption data, calculations using high‐temperature oxide melt solution calorimetry data also suggest a decrease in the interface energies. A thermodynamic analysis showed that the observed surface energy decrease is responsible for an increase in the stability of solid solutions in the nanophase regime. Although a miscibility gap is expected in this system from bulk phase diagrams, the surface energy contribution modifies the bulk trend and promotes extensive solid solutions when the surface area is above a critical value dependent on the surface energy and the bulk enthalpy of mixing.

Miagava, Joice↗

Critical Assessment of the Foundations of Power Transmission and Distribution Reliability Metrics and Standards

The U.S. federal government regulates the reliability of bulk power systems, while the reliability of power distribution systems is regulated at a state level. In this article, we review the history of regulating electric service reliability and study the existing reliability metrics, indices, and standards for power transmission and distribution networks. We assess the foundations of the reliability standards and metrics, discuss how they are applied to outages caused by large exogenous disturbances such as natural disasters, and investigate whether the standards adequately internalize the impacts of these events. Our reflections shed light on how existing standards conceptualize reliability, question the basis for treating large‐scale hazard‐induced outages differently from normal daily outages, and discuss whether this conceptualization maps well onto customer expectations. We show that the risk indices for transmission systems used in regulating power system reliability do not adequately capture the risks that transmission systems are prone to, particularly when it comes to low‐probability high‐impact events. We also point out several shortcomings associated with the way in which regulators require utilities to calculate and report distribution system reliability indices. We offer several recommendations for improving the conceptualization of reliability metrics and standards. We conclude that while the approaches taken in reliability standards have made considerable advances in enhancing the reliability of power systems and may be logical from a utility perspective during normal operation, existing standards do not provide a sufficient incentive structure for the utilities to adequately ensure high levels of reliability for end‐users, particularly during large‐scale events.

Nateghi, Roshanak↗

Neutron diffraction investigation of the evolution of the crystal structure of oxygen-conducting solid solutions (Yb{sub 1-x}Ca{sub x}){sub 2}Ti{sub 2}O{sub 7} (x = 0, 0.05, 0.10)

The crystal structure of pyrochlore-like solid solutions (Yb{sub 1-x}Ca{sub x}){sub 2}Ti{sub 2}O{sub 7} (x = 0, 0.05, 0.10) synthesized by high-temperature annealing of mechanically activated initial oxides at temperatures of 1300-1500 deg. C is studied using neutron diffraction. It is found that the Ca{sup 2+} cations are located in the ytterbium sublattice, which apparently favors the splitting of one of the oxygen sublattices [O(2) (48f)] of the pyrochlore structure: the decrease in the occupancy of this sublattice is accompanied by the formation of a new sublattice O(3) (8b), whereas the other oxygen sublattice O(1) (8a) remains unchanged. This rearrangement of the anions in the oxygen subsystem due to the incorporation of an alkaline-earth cation explains the high ionic conductance ({approx}0.2 S/cm at 1000 deg. C) for (Yb{sub 0.9}Ca{sub 0.1}){sub 2}Ti{sub 2}O{sub 7} {approx} 0.2, which is the maximum value observed to date for pyrochlores of the A{sub 2}B{sub 2}O{sub 7} type, where A = Ln and B is a Subgroup IVA element of the periodic system. The bulk and grain-boundary components of the conductivity of (Yb{sub 0.95}Ca{sub 0.05}){sub 2}Ti{sub 2}O{sub 7} synthesized at temperatures of 1300, 1400, and 1500 deg. C are studied using impedance spectroscopy. It is found that the (Yb{sub 0.95}Ca{sub 0.05}){sub 2}Ti{sub 2}O{sub 7} sample synthesized at 1500 deg. C has the highest total conductivity due to the increased grain-boundary component. The bulk component of the ionic conductivity of (Yb{sub 0.95}Ca{sub 0.05}){sub 2}Ti{sub 2}O{sub 7} is hardly affected by the synthesis temperature and depends mainly on the degree of heterovalent substitution.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Probabilistic Resource Adequacy Suite (PRAS)

The Probabilistic Resource Adequacy Suite (PRAS) provides an open-source, research-oriented collection of tools for analysing the resource adequacy of a bulk power system. The simulation methods offered support everything from classical convolution-based analytical techniques through to high-performance sequential Monte Carlo methods supporting multi-region composite reliability assessment, including simulation of energy-limited resources such as storage.

Stephen, Gord↗

Frequency Response Tool

According to the North American Electric Reliability Corporation (NERC) definition: "Frequency response is a measure of an Interconnection's ability to stabilize frequency immediately following the sudden loss of generation or load, and is a critical component of the reliable operation of the Bulk-Power System, particularly during disturbances and recoveries. Failure to maintain frequency can disrupt the operation of equipment and initiate disconnection of power plant equipment to prevent it from being damaged, which could lead to wide-spread blackouts." Frequency Response Tool automates the power system frequency response analysis process. The tool performs initial estimation of the system frequency parameters (initial frequency, minimum frequency, settling point). User can visually inspect and adjust these parameters. The tool also calculates the frequency response performance metrics of the system, archives the historic events and baselines the system performance. Frequency response performance characteristics of the system are calculated using phasor measurement unit (PMU) information. Methodology of the frequency response performance assessment implemented in the tool complies with the NERC Frequency response standard.

Etingov, Pavel↗

Open Source High Fidelity Modeling Of A Type-5 Wind Turbine Drivetrain

The purpose of this code is to provide a high-fidelity model of Type-5 wind turbine drivetrain for grid integration and transient stability studies. The increasing integration of renewable energy resources in evolving bulk power system (BPS) is impacting the system’s inertia. Type-5 wind turbine generation has the potential to behave like a traditional synchronous generator and can help mitigate the aforementioned impact. A hydraulic torque converter (TC) and gearbox with torque limiting feature are integral parts of a Type-5 wind turbine unit. A generic and high-fidelity model of a Type-5 wind turbine drivetrain is not openly and widely available for grid integration and transient stability studies. This hinders appropriate assessment of Type-5 wind power plant's contribution to the BPS resilience. This work develops and validates a TC model based on those generally used in automobile's transmission system.

Hussain, Tanveer↗

Sparsity-Promoting Optimal Wide-Area Control of Power Networks

Inter-area oscillations in bulk power systems are typically poorly controllable by means of local decentralized control. Recent research efforts have been aimed at developing wide-area control strategies that involve communication of remote signals. In conventional wide-area control, the control structure is fixed a priori typically based on modal criteria. In contrast, here we employ the recently-introduced paradigm of sparsity-promoting optimal control to simultaneously identify the optimal control structure and optimize the closed-loop performance. To induce a sparse control architecture, we regularize the standard quadratic performance index with an ℓ 1 -penalty on the feedback matrix. The quadratic objective functions are inspired by the classic slow coherency theory and are aimed at imitating homogeneous networks without inter-area oscillations. We use the New England power grid model to demonstrate that the proposed combination of the sparsity-promoting control design with the slow coherency objectives performs almost as well as the optimal centralized control while only making use of a single wide-area communication link. In addition to this nominal performance, we also demonstrate that our control strategy yields favorable robustness margins and that it can be used to identify a sparse control architecture for control design via alternative means.

25 ENERGY STORAGE↗

Secure Information Exchange Gateway for Electric Grid Operations

The major objectives of the SIEGate project were to improve the security posture and minimize the cyber-attack surface of electric utility control centers and to reduce the cost of maintaining control-room-to-control-room information exchange. Major project goals included the design, development, testing, and commercialization of a single security-hardened appliance that could meet industry needs for resisting cyber-attacks while protecting the confidentiality and integrity of a growing volume of real-time information needed to ensure the reliability of the bulk electric system and interoperating with existing data formats and networking technologies. The SIEGate project has achieved its goals and objectives. The SIEGate Design Document, issued in March 2012, presented SIEGate use cases, provided SIEGate requirements, established SIEGate design principles, and prescribed design functionality of SIEGate as well as the components that make up SIEGate. SIEGate Release Version 1.0 was posted in January 2014. Release Version 1.0.83, which was posted on March 28, 2014, fixed many issues discovered by early adopters and added several new features. Release Candidate 1.1, which added additional improvements and bug fixes, was posted in June 2014. SIEGate executables have been downloaded more than 300 times. SIEGate has been tested at PJM, Entergy, TVA, and Southern. Security testing and analysis of SIEGate has been conducted at PNNL and PJM. Alstom has provided a summary of recommended steps for commercialization of the SIEGate Appliance and identified two deployment models with immediate commercial application.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Load Participation in Ancillary Services

Of five basic types of load response (participation), DOE load participation in ancillary services workshop focused on bulk power system reliability services regulation response and spinning reserve.

DOE load participation in ancillary services↗

Novel Sorbent to Clean Up Biogas for CHPs

In this project, TDA Research Inc. (TDA) has developed low-cost (on a per unit volume of gas processed basis), high-capacity expendable sorbents that can remove both the H 2 S and organic sulfur species in biogas to the ppb levels. The proposed sorbents will operate downstream of a bulk desulfurization system as a polishing bed to provide an essentially sulfur-free gas to a fuel cell (or any other application that needs a completely sulfur-free feed). Our sorbents use a highly dispersed mixed metal oxides active phase with desired modifiers prepared over on a mesoporous support. The support structure allows the large organic sulfur compounds (such as the diethyl sulfide and dipropyl sulfide phases with a large kinetic diameter) to enter the sorbent pores so that they can be adsorbed and removed from the gas stream.

09 BIOMASS FUELS↗

An Investigation on X-ray Reflectivity technique at LLNL

This report documents the work carried out to determine the feasibility of using this technique for Pu oxide grown on bulk Pu system. It also provides the experimental and theoretical considerations in carrying out XRR technique to determine film thicknesses. The intention of this work is to develop the methodology and understand the limits for carrying out such experiments using the in-house technique.

36 MATERIALS SCIENCE↗

The Future of Electricity Resource Planning

Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industry regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4) transmission and (5) uncertainty and risk management. The analysis draws on a review of recent resource plans for 10 utilities that reflect some of the U.S. electricity industry’s extensive diversity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2025 California Demand Response Potential Study - Charting California’s Demand Response Future. Final Report on Phase 2 Results

California’s legislative and regulatory goals for renewable energy are changing the power grid’s dynamics. Increased variable generation resource penetration connected to the bulk power system, as well as, distributed energy resources (DERs) connected to the distribution system affect the grid’s reliable operation over many different time scales (e.g., days to hours to minutes to seconds). As the state continues this transition, it will require careful planning to ensure resources with the right characteristics are available to meet changing grid management needs. Demand response (DR) has the potential to provide important resources for keeping the electricity grid stable and efficient, to defer upgrades to generation, transmission and distribution systems, and to deliver customer economic benefits. This study estimates the potential size and cost of future DR resources for California’s three investor-owned utilities (IOUs): Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE), and San Diego Gas & Electric Company (SDG&E). Our goal is to provide data-driven insights as the California Public Utilities Commission (CPUC) evaluates how to enhance DR’s role in meeting California’s resource planning needs and operational requirements. We address two fundamental questions: 1. What cost-competitive DR service types will meet California’s future grid needs as it moves towards clean energy and advanced infrastructure? 2. What is the size and cost of the expected resource base for the DR service types?

24 POWER TRANSMISSION AND DISTRIBUTION↗