Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Study of aerodynamic technology for VSTOL fighter/attack aircraft, phase 1

A conceptual design study was performed of a vertical attitude takeoff and landing (VATOL) fighter/attack aircraft. The configuration has a close-coupled canard-delta wing, side two-dimensional ramp inlets, and two augmented turbofan engines with thrust vectoring capability. Performance and sensitivities to objective requirements were calculated. Aerodynamic characteristics were estimated based on contractor and NASA wind tunnel data. Computer simulations of VATOL transitions were performed. Successful transitions can be made, even with series post-stall instabilities, if reaction controls are properly phased. Principal aerodynamic uncertainties identified were post-stall aerodynamics, transonic aerodynamics with thrust vectoring and inlet performance in VATOL transition. A wind tunnel research program was recommended to resolve the aerodynamic uncertainties.

Driggers, H. H.↗

A feasibility study of orbiter flight control experiments

The results of a feasibility study of orbiter flight control experiments performed are summarized. Feasibility studies were performed on a group of 14 experiments selected from a candidate list of 35 submitted to the study contractor by the flight control community. Concepts and requirements were developed for the 14 selected experiments and they were ranked on a basis of technical value, feasibility, and cost. It was concluded that all the selected experiments can be considered as potential candidates for the Orbiter Experiment program, which is being formulated for the Orbiter Flight Tests and subsequent operational flights, regardless of the relative ranking established during the study. None of the selected experiments has significant safety implications and the cost of most was estimated to be less than $200K.

Geissler, W. H.↗

FY 1978 scientific and technical reports, articles, papers, and presentations

Abstracts of 73 technical papers published or presented by MSFC personnel in FY-78 are presented. In addition, over 400 papers by contractors to that facility are listed along with the STAR document number for each report. Titles of 208 additional papers already cleared for publication are included.

White, O. L.↗

Configuration development study of the X-24C hypersonic research airplane

Bottom line results were made of a three-phase study to determine the feasibility of designing, building, and operating, and maintaining an air-launched high performance aircraft capable of cruising at speeds up to Mach 8 for short durations. The results show that Lockalloy heat-sink structure affords the capability for a 'work-horse' vehicle which can serve as an excellent platform for this research. It was further concluded that the performance of a blended wing body configuration surpassed that of a lifting body design for typical X-24C missions. The cost of a two vehicle program, less engines, B-52 modification and contractor support after delivery, can be kept within $70M (in Jan. 1976 dollars).

Combs, H. G.↗

Characterization of large 2219 aluminum alloy hand forgings for the space shuttle solid rocket booster

The mechanical properties, including fracture toughness, and stress corrosion properties of four types of 2219-T852 aluminum alloy hand forgings are presented. Weight of the forgings varied between 450 and 3500 lb at the time of heat treatment and dimensions exceeded the maximum covered in existing specifications. The forgings were destructively tested to develop reliable mechanical property data to replace estimates employed in the design of the Space Shuttle Solid Rocket Booster (SRB) and to establish minimum guaranteed properties for structural refinement and for entry into specification revisions. The report summarizes data required from the forgers and from the SRB Structures contractor.

Brennecke, M. W.↗

Evaluation of Selected Chemical Processes for Production of Low-cost Silicon, Phase 3

Refinements of the design of the 50 MT/year Experimental Process System Development Unit were made and competitive bids were received from mechanical, electrical, and structural contractors. Bids on most of the equipment were received and cataloged. Emergency procedures were defined to counter a variety of contingencies disclosed in operations and safety reviews. Experimental work with an electrolytic cell for zinc chloride disclosed no significant increase in power efficiency by steps taken to increase electrolyte circulation. On the basis of materials compatibility and permeability tests, 310 stainless steel was chosen for the shell of the fluidized-bed reactor and SiC-coated graphite for the liner.

Blocher, J. M.↗

The standard 20 AH cell, a status report

Progress of four contractors in producing standard 20 AH nickel-cadmium cells meeting a capacity requirement of 24 + or - 2 AH and an envelope requirement listed in NASA/GSFC specification S-711-17 is reported. Among the requirements were 10 burn in cycles 24 C, 0 C, and 35 C capacity tests, charge efficiency tests and precharge verification tests.

Halpert, G.↗

Ames Research Center publications, 1977

This bibliography lists 786 formal NASA publications, journal articles, books, chapters of books, patents, and contractor reports which appeared during 1977 or which were not included in previous annual bibliographies. Citations are arranged by directorate, type of publication, and author. Each NASA report is identified by a technical report and accession number to facilitate ordering. An author index is provided.

Source record↗

Work management plan for data systems and analysis directorate

A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

Nichols, L. R.↗

Proceedings of the Distribution Automation and Control Working Group. Volume 2: Proceedings

The meeting provided a forum in which electric utilities could communicate with each other, with DOE, and with DOE's contractors regarding research, development, and demonstration efforts to apply DAC (Distribution Automation and Control) to the electric power system. In the discussions emphasis was to be placed on identifying the priorities and needs for DAC development.

Caldwell, R.↗

Chemical analysis of positive and negative plates, a survey

Regular arrays of 1 inch discs cut from chemically impregnated positive and negative plates were sent to various contractors and government organizations for chemical analysis in order to determine whether there is consistency in analysis. Techniques used included NASA procedures as specified, variations, wet chemical techniques, and atomic absorption. The weight, thickness of disc, and active material quantity as measured by four respondents are discussed.

Halpert, G.↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

Source record↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 12: PEP data item descriptions

Contractor information requirements necessary to support the power extension package project of the space shuttle program are specified for the following categories of data: project management; configuration management; systems engineering and test; manufacturing; reliability, quality assurance and safety; logistics; training; and operations.

Source record↗

Phase 2 of the Array Automated Assembly Task for the Low Cost Solar Array Project

Two process specifications supplied by contractors were tested. The aluminum silk screening process resulted in cells comparable to those from sputtered Al. The electroless plating of contacts specification could be used only with extensive modification. Several experiments suggest that there is some degradation of the front junction during the Al back surface field (BSF) fabrication. A revised process sequence was defined which incorporates Al BSF formation. A cost analysis of this process yielded a selling price of $0.75/watt peak in 1980.

Campbell, R. B.↗

Testing programs for the Multimission Modular Spacecraft

The Multimission Modular Spacecraft (MMS) provides a standard spacecraft bus to a user for a variety of space missions ranging from near-earth to synchronous orbits. The present paper describes the philosophy behind the MMS module test program and discusses the implementation of the test program. It is concluded that the MMS module test program provides an effective and comprehensive customer buy-off at the subsystem contractor's plant, is an optimum approach for checkout of the subsystems prior to use for on-orbit servicing in the Shuttle Cargo Bay, and is a cost-effective technique for environmental testing.

Greenwell, T. J.↗

Optimized multisectioned acoustic liners

A critical examination is presented of the use of optimized axially segmented acoustic liners to increase the attenuation of a liner. New calculations show that segmenting is most efficient at high frequencies with relatively long duct lengths where the attenuation is low for both uniform and segmented liners. Statistical considerations indicate little advantage in using optimized liners with more than two segments while the bandwidth of an optimized two-segment liner is shown to be nearly equal to that of a uniform liner. Multielement liner calculations show a large degradation in performance due to changes in assumed input modal structure. Finally, in order to substantiate previous and future analytical results, in-house (finite difference) and contractor (mode matching) programs are used to generate theoretical attenuations for a number of liner configurations for liners in a rectangular duct with no mean flow. Overall, the use of optimized multisectioned liners (sometimes called phased liners) fails to offer sufficient advantage over a uniform liner to warrant their use except in low frequency single mode application.

Baumeister, K. J.↗

Preliminary QCGAT program test results

The paper presents the NASA Lewis program to demonstrate that large engine technology can be applied to general aviation engines to reduce noise, emissions, and fuel consumption. After a Phase I study, two contractors, Garrett AiResearch and AVCO-Lycoming, were selected to design, manufacture, assemble, test, and deliver their Quiet, Clean, General Aviation Turbofan (QCGAT) engines to NASA. Noise, emission, and performance goals and how well they were met are discussed. Noise goals involve take off noise 3.5 n. mi. from runway threshold, sideline noise at .25 n mi. and approach noise 1 n mi. from the runway at an altitude of 370 ft. The AiResearch engines power a stretched Learjet 35 and the Lycoming a specially conceived Beech executive jet, resulting in differing power goals. Thus the thrust goal for the Lycoming was 1622 lb. while the AiResearch goal was 3937 lb. Cruise thrust goals were 485 lb. at Mach 0.6 at 25,000 ft. and 903 lb. at Mach 0.8 at 40,000 ft. respectively. The design of both engines, based on existing cores, is studied, noting such special QCGAT features as new reduction gears, combustor and power turbine. Test results are given, indicating that while the goals for noise and thrust were met those for emissions were only partially met.

Koenig, R. W.↗