Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

PARAMETRIC STUDY OF GROUND SOURCE HEAT PUMP SYSTEM FOR HOT AND HUMID CLMATE

The U-tube sizes and varied thermal conductivity with different grout materials are studied based on the benchmark residential building in Hot-humid Pensacola, Florida. In this study, the benchmark building is metered and the data is used to validate the simulation model. And a list of comparative simulation cases with varied parameter value are simulated to study the importance of pipe size and grout to the ground source heat pump energy consumption. The simulation software TRNSYS [1] is employed to fulfill this task. The results show the preliminary energy saving based on varied parameters. Future work needs to be conducted for the cost analysis, include the installation cost from contractor and materials cost.

15 GEOTHERMAL ENERGY↗

Strengthening the Workforce in Better Buildings Neighborhoods

The Better Buildings Neighborhood Program is supporting an expanding energy efficiency workforce upgrading buildings in communities around the country. Contractors are being trained and have access to additional job opportunities, spurring local economic growth while helping Americans use less energy, save money, and be more comfortable in their homes and other buildings.

14 SOLAR ENERGY↗

Buy Energy-Efficient Products: A Guide for Federal Purchasers and Specifiers

In a single year, energy-efficient product purchases could save the federal government almost a half billion dollars worth of energy. By purchasing products that exceed the minimum required efficiency levels, buyers can save the government even more energy and money. Federal employees and contractors must take an active role in ensuring that the government receives products that meet efficiency requirements. This document provides an overview of product purchasing requirements and shows you how to write compliant contracts, find funding, and confirm product compliance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Decommissioning Nuclear Facilities: First lessons Learned from UP1, Marcoule, France

On September 30, 1997, UP1, Marcoule Fuel reprocessing facility, dissolved its last spent Fuel rod. Final shutdown and stage 1 decommissioning began immediately after, under the supervision of CODEM , a consortium composed of The French Atomic Energy Commission, COGEMA, France fuel Cycle Company and EDF, the French Electricity Utility. The goal of the decommissioning program was to achieve stage 2 decommissioning , as per IAEA standards, within a period of about 15 years. 10 years later, a significant amount of decontamination and decommissioning works has been conducted with success. The contractual structure under which the program was launched has been profoundly modified, and the capacity of The French Atomic Energy Commission (CEA) and AREVA NC to complete full decommissioning programs has been confirmed. In the present document, we propose to examine the main aspects involved in the management of such decommissioning programs, and highlight, with significant examples, the main lessons learnt. In conclusion: As of 2007, UP1 decommissioning program proves to be a success. The choice of early decommissioning, the partnership launched between the French Atomic Energy Commission as owner of the site and decommissioning fund, with AREVA NC as operator and main contractor of the decommissioning works has been a success. The French Atomic Energy commission organized a contractual framework ensuring optimal safety conditions and work completion, while AREVA NC gained a unique experience at balancing the various aspects involved in the conduction of complete decommissioning programs. Although such a framework may not be applicable to all situations and facilities, it provides a positive example of a partnership combining institutional regulations and industrial efficiency.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons From Love Canal: Considerations for the Effective Use of Institutional Controls

The purpose of this paper is to provide background on a well-known failure of an institutional control (IC), an overview of the types and potential shortcomings of individual ICs, provide some considerations for more effectively selecting and maintaining appropriate ICs in the context of a decommissioning project (including those that may be subject to various federal and state requirements). In light of these considerations, it should be clear that the potential liabilities arising from the failure to comply with ICs may be very significant, even if such failure is not directly caused by the party responsible for the pre-existing conditions. A number of options exist to help manage risk at sites where impacts will remain in place following the completion of active decommissioning efforts. It is important to involve all appropriate professionals early on and throughout the process and to consult with other relevant parties (e.g., regulatory agencies, the community, and potential site owners and occupants) to evaluate the most appropriate ICs available. This is particularly critical in the context of a long-term decommissioning project involving a large number of contractors, personnel turnover or departure, potential isolation of individuals with focused technical or regulatory expertise, or other factors that may affect more ideal communication. Mechanisms for ensuring long-term compliance with ICs, as well as reliable approaches for enforcing their terms, also warrant early and on-going attention. However, even with a detailed and thoughtful approach, it must be recognized under certain circumstances that a more realistic goal may be to continue to reasonably minimize potential risks rather than absolutely avoid all risks for all time.

99 GENERAL AND MISCELLANEOUS↗

Development Of Strategy For The Management Of LLW In The United Kingdom

The Nuclear Decommissioning Authority (NDA) is a UK non-departmental public body with a remit to clean up the civil public sector nuclear legacy. Much work has been done to date on developing contractor competition for the management of NDA-owned sites, including the UK's principal disposal facility: the Low Level Waste Repository (LLWR) in Cumbria. The competition goals and principles are integrated with the framework for the development of a UK Low Level Waste (LLW) management plan, through which the NDA will deliver its commitments to UK Government and stakeholders. Nexia Solutions has undertaken work for the NDA in assessing strategic options and scenarios for the management and disposal of current UK LLW. The volumetric, radiological and strategic limitations of existing disposition routes have been assessed against the inventories and characteristics of LLW forecast to arise. A number of potential alternative scenarios and variants for future LLW management have been modelled and assessed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Communicating potential risks of uncontrolled site development at a Fusrap site

This paper describes a particular risk communication challenge at the FUSRAP Maywood Superfund Site (the Site) in Maywood, New Jersey, USA. That challenge is communicating the potential human exposure risks of uncontrolled site development to landowners, tenants, private contractors and public works entities that may engage in construction activities at or adjacent to Site properties. This is of special concern because the Site does not have the authority to establish physical control over most of the properties where contamination is known or suspected to exist. Consequently, a range of communications techniques have been employed to alert property owners and others to the risks of uncontrolled site development. Each technique has its particular limitations, but collectively this multi-channel communication strategy has proved successful in delivering the risk message. (authors)

54 ENVIRONMENTAL SCIENCES↗

Ten Years of Legacy Management: U.S. DOE Office of Legacy Management Accomplishments - 13246

The U.S. Department of Energy (DOE) established the Office of Legacy Management (LM) to provide a long-term, sustainable solution to environmental impacts that remain from nuclear weapons production during World War II and the Cold War. The production activities created adverse environmental conditions at over 100 sites. When LM was established on December 15, 2003, it became responsible for 33 sites where active environmental remediation was complete. Currently, LM is responsible for long-term surveillance and maintenance of environmental remedies, promotion of beneficial reuse of land and buildings, and management of records and information at 89 sites in 29 states and Puerto Rico. LM is also responsible for meeting contractual obligations associated with former contractor workers' pensions and post-retirement benefits. Effectively addressing this environmental and human legacy will continue to require a focused and well-managed effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 'People Plan' Concept for Contract Closure - 12432

The U.S. Department of Energy's (DOE) first-of-a-kind closure project at the Hanford Site in Richland, Washington, still has more than 3 years to run, but its contractor, Washington Closure Hanford (WCH), has already started its plans for going out of business. It will be the first contract that closes in increments and, paramount to its success, will be its ability to provide a disciplined and positive approach to release personnel while at the same time retaining personnel critical to timely and safe completion of the work scope. In May 2011, WCH produced the people plan, a program that maximizes communication and support for employees being released, provides an incentivization strategy to retain personnel to the end of their assignments, and reflects a sensitivity to the long-term goals of the contract and WCH's parent companies. The combination of all of these efforts equal one thing: treating employees with respect by providing specific information in a timely manner; respecting employees by sharing as much information as possible, as soon as possible, with as much detail as possible; and respecting each individual's ability to be in control of their next step in their life or career. The project is only in the second ORW and has 13 more before the end of the contract. That time remaining will continue to bring new challenges and unknowns, but the confidence and trust of the employees is proving to be solid. This is largely as a result of the stability provided by the people plan program. A success that can only truly be measured by the continued positive response it has already received from WCH's employees. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Complex Challenges of Remotely Removing Redundant Pipework and Cleaning/Remediation of Aging Civil Structures at Sellafield - 12446

This paper identifies how a joint Sellafield Ltd/Nuclear Management Partners Tactical Review Team and main contractor, SA Robotics, developed and successfully deployed a solution to clean and coat the wall surface of an aging structure on the Sellafield Site. This involved removal of redundant pipework from the wall, cleaning and coating of the surface using a bespoke designed robotic manipulator with various end effectors. This system was able to safely and in a controlled manner remove the pipework, clean down the wall and prime and coat it within the required programme duration which was 5 months earlier than a previous shielding only option. This was done in a high radiation field and in the challenging conditions of winter in Northern England. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning and Demolition of a Redundant UK Research Facility at AWE Aldermaston - 12453

The redundant two-storey brick built research facility on the AWE Site at Aldermaston, UK is in the closing stages of decommissioning and demolition. The facility was used for a variety of purposes up to 1995 predominately involving the use of alpha-emitting isotopes. The two main areas of alpha-based contamination have been decommissioned with the removal of hot -boxes and fume cupboards on the ground floor and HEPA filter units and ventilation equipment on the first floor. Many of these activities were undertaken using both airline fed suits, (supplied via a free standing mobile unit), and full face respirators. Asbestos materials were located and cleared from the first floor by specialist contractor. All sections of active drain running from the building to the site active effluent disposal system were removed early in the program using established techniques with specialist monitoring equipment used to provide confidence in the data required for disposal of the decommissioning debris. In particular a dedicated High Resolution Gamma Spectrometer (radioactive materials scanning unit) was utilized to categorise waste drums and wrapped packages. The building has been decommissioned and the monitoring and sampling of the structure was completed in November 2011 - the results demonstrating that the building was clear of contamination in accordance with UK clearance and exemption requirements. The demolition plan was developed and implemented in December with site excavation of foundations and site clearance currently ongoing in preparation for final site backfill activities and project close. A number of useful lessons have been learnt during the operations and are set out at the rear of the main text. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Making a Lasting Impression: Recovery Act Reporting At Hanford - 12528

The award of American Recovery and Reinvestment Act funding came with an unprecedented request for transparency to showcase to the American public how the stimulus funding was being put to work to achieve the goals put forth by the U.S. Government. At the U.S. Department of Energy Hanford Site, this request manifested in a contract requirement to provide weekly narrative, photos and video to highlight Recovery Act-funded projects. For DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL), the largest recipient of Hanford's funding, the reporting mechanism evolved into a communications tool for documenting the highly technical cleanup, then effectively sharing that story with the DOE and its varying stakeholder audiences. The report set the groundwork for building a streaming narrative of week-by-week progress. With the end of the Recovery Act, CH2M HILL is applying lessons learned from this stringent, transparent reporting process to its long-term reporting and communications of the progress being made in nuclear decommissioning at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US DOE Office of Technology Innovation and Development - Integration of the EM R and D Program in 2012 and Beyond - 12537

Applied research and technology development has the potential to accelerate environmental cleanup and reduce the cost for cleanup and closure of U.S. Department of Energy (DOE) legacy waste sites throughout the United States. Providing the scientific understanding, knowledge, and technologies to enable successful completion of the DOE Office of Environmental Management (EM) mission, the Technology Innovation and Development program is transforming science and innovation into practical solutions for environmental cleanup. Through integration, collaboration, and communication with DOE partner organization, DOE site managers and contractors, these technologies will reduce human health and environmental risk, cost, and time associated with cleanup and closure. The Office of Technology Innovation and Development (OTID) focused efforts in fiscal year 2011 (FY 2011) to a proactive, visionary program balance with integrated, cross-disciplinary applied research and technology development activities. This transition provides the necessary scientific and technical advancements to address near-term needs. In addition, it fills the critical role in providing scientific approaches and advanced technologies that look beyond today's known needs and requirements to provide innovative technologies to make the necessary long-term changes required to facilitate cleanup and bring sites to closure. The outcomes and impacts of this strategy are summarized in the Impact Plan, which describes potential reduction in life-cycle costs through the development and deployment of advanced technologies supporting EM needs associated with waste processing, groundwater and soil remediation, deactivation and decommissioning, and spent nuclear fuel and materials disposition. Additionally, the OTID International Program Strategic Plan 2010-2015 outlines cooperation and collaboration with the international community that has similar nuclear legacy management experience and expertise to foster transfer of best science practices being used in the field. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintaining department of energy (DOE) waste disposition pathways in today's uncertain budgetary environment - 15129

For many years the Department of Energy (DOE) and its prime contractors have worked collaboratively with commercial waste transportation, treatment, and disposal providers to develop and implement outlets for the efficient management and disposition of radioactive wastes, particularly 'no-path-forward' or 'difficult-to-treat' wastes. Both the DOE and commercial providers have made substantial investments to develop capabilities and infrastructure to address these wastes and both have benefited from this collaboration. For example, DOE realized significant cost savings and avoidances when a commercial facility became available that allowed closure of the TSCA incinerator in Oak Ridge or when commercial capabilities were expanded that precluded the need to build a new Hanford M-91 waste treatment facility, estimated at $540 million for design, permitting, and construction. In addition, expanded capabilities developed at commercial facilities ensured a known, if not guaranteed, source for managing waste and improving efficiencies for wastes which previously had no viable disposition outlet or that required extended schedules and cost for completion. Such wastes include sodium- and mercury-bearing wastes, classified shapes, or many forms of suspect transuranic (TRU) wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge management information tool Web analytics - 15182

The Knowledge Management Information Tool (KM-IT) is a web-based [01] system developed to maintain and preserve the Department of Energy's (DOE's) D and D knowledge base. The system was developed by Florida International University's Applied Research Center (FIU-ARC) with the support of the D and D community including the DOE Office of Environmental Management, and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. The D and D KM-IT is an interactive web-based system operational and available for free access at www.dndkm.org. [02] The D and D KM-IT is currently composed of the following tailored D and D modules: Web Crawler, Hotline, Technology, Document Library (including Hanford's and Savannah River Sites' ALARA Center Reports), Specialist Directory, Lessons Learned, Best Practices, Video/Picture Library, Vendors, Collaboration Tools, Training, and Mobile Systems. The Web Crawler dynamically searches through the D and D KM-IT repository as well as the web and displays search results based on the search criteria. The Hotline allows registered users to post questions/problems related to D and D and to receive solutions from a subject-matter specialist. The Technology module serves as repository of D and D technologies and contains technology/ demonstration fact sheets and vendor information. D and D community members can add Lessons Learned, Best Practices, Documents, and Pictures/Videos to the D and D KM-IT repository, after a formal approval process. The Vendor module provides a directory of commercial vendors who provide D and D related technologies, supplies, and services. D and D KM-IT makes excellent use of the knowledge that exists within the D and D community by allowing D and D project managers around the DOE complex to collaborate by sharing innovative ideas, past experiences, and practices and by maintaining a directory of subject matter specialists. The mobile version of the KM-IT can be accessed from m.dndkm.org [03] and currently has six active modules: Vendor, Technology, Picture/Video Library, Hotline, Lessons Learned and Specialist Directory. Web analytics is a key tool being implemented by the D and D KM-IT project team in an effort to enhance the system to better meet users' needs. The D and D KM-IT project team incorporates web analytics as part of its operational elements to analyze information and key data points on how the system is being used. Web analytics is the measurement, collection, analysis and reporting of internet data for the purposes of understanding and optimizing web usage. The use of web analytics retains or attracts D and D community members to access and share knowledge through virtual collaboration on the KM-IT platform. D and D KM-IT web analytics measures details on the overall usage of the system without tracking personal information or specific user behavior: how many users visited the application, how many of those users were unique visitors, how visitors come to the system (i.e., by following a link to the system or by using the web site URL via bookmark or directly typing the address), what keywords were used to perform searches with the search engine, how long the average user stayed on a given screen or on the entire system and what links were clicked on. This information is used to identify which areas of the system are more popular than the others and provides information that can be used to streamline the application for a better user experience. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Environmental requirements management: Maintaining an effective compliance program is key to a robust environmental management system - 15184

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organisation's ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: - Communicating requirements- Planning work - Maintaining work controls - Maintaining compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating regulatory, programmatic and technical needs for modeling tools to support decision-making - 15219

The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater Remediation, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM provides a modeling work-flow to support decision-making for site restoration, tank closure and waste management activities. Potential users involved in regulatory applications (e.g., performance and risk assessments and other activities supporting regulatory decisions) are a key target group for the tool-set. Decision-making in these applications often requires consideration of multiple perspectives, including: regulators and the public, oversight and project management personnel, as well as practitioners involved in conducting the calculations, each with different interests. From its inception, a key objective of the ASCEM project has been to actively seek input from these different user perspectives to help guide development. ASCEM formed a User Steering Committee (USC) with membership representing interests from management/staff at DOE Site Contractors, DOE-HQ and Field offices and Regulators (State and Federal). The project also provides opportunities for input from the broader user community through participation in meetings of the Performance and Risk Assessment (P and RA) Community of Practice (CoP), routine briefings and participation in meetings of the Low-Level Waste Disposal Facility Federal Review Group, and direct interactions with users involved in regulatory applications. Interactions with users involved in regulatory applications have influenced the requirements for the tool-sets and are reflected in capabilities that have been and are being implemented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗