Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

A random onset model for degradation of high-reliability systems

Both the U. S. Department of Defense (DoD) and Department of Energy (DOE) maintain weapons stockpiles: items like bullets, missiles and bombs that have already been produced and are being stored until needed. Ideally, these stockpiles maintain high reliability over time. To assess reliability, a surveillance program is implemented, where units are periodically removed from the stockpile and tested. The most definitive tests typically destroy the weapons so a given unit is tested only once. Surveillance managers need to decide how many units should be tested, how often they should be tested, what tests should be done, and how the resulting data are used to estimate the stockpile's current and future reliability. These issues are particularly critical from a planning perspective: given what has already been observed and our understanding of the mechanisms of stockpile aging, what is an appropriate and cost-effective surveillance program? Surveillance programs are costly, broad, and deep, especially in the DOE, where the US nuclear weapons surveillance program must 'ensure, through various tests, that the reliability of nuclear weapons is maintained' in the absence of full-system testing (General Accounting Office, 1996). The DOE program consists primarily of three types of tests: nonnuclear flight tests, that involve the actual dropping or launching of a weapon from which the nuclear components have been removed; and nonnuclear and nuclear systems laboratory tests, which detect defects due to aging, manufacturing, and design of the nonnuclear and nuclear portions of the weapons. Fully integrated analysis of the suite of nuclear weapons surveillance data is an ongoing area of research (Wilson et al., 2007). This paper introduces a simple model that captures high-level features of stockpile reliability over time and can be used to answer broad policy questions about surveillance programs. Our intention is to provide a framework that generates tractable answers that integrate expert knowledge and high-level summaries of surveillance data to allow decision-making about appropriate trade-offs between the cost of data and the precision of stockpile reliability estimates.

97 MATHEMATICS AND COMPUTING↗

Assessing the Costs and Benefits of the Superior Energy Performance Program

Industrial companies are seeking to manage energy consumption and costs, mitigate risks associated with energy, and introduce transparency into reports of their energy performance achievements. Forty industrial facilities are participating in the U.S. DOE supported Superior Energy Performance (SEP) program in which facilities implement an energy management system based on the ISO 50001 standard, and pursue third-party verification of their energy performance improvements. SEP certification provides industrial facilities recognition for implementing a consistent, rigorous, internationally recognized business process for continually improving energy performance and achievement of established energy performance improvement targets. This paper focuses on the business value of SEP and ISO 50001, providing an assessment of the costs and benefits associated with SEP implementation at nine SEP-certified facilities across a variety of industrial sectors. These cost-benefit analyses are part of the U.S. DOE?s contribution to the Global Superior Energy Performance (GSEP) partnership, a multi-country effort to demonstrate, using facility data, that energy management system implementation enables companies to improve their energy performance with a greater return on investment than business-as-usual (BAU) activity. To examine the business value of SEP certification, interviews were conducted with SEP-certified facilities. The costs of implementing the SEP program, including internal facility staff time, are described and a marginal payback of SEP certification has been determined. Additionally, more qualitative factors with regard to the business value and challenges related to SEP and ISO 50001 implementation are summarized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Metabolic Cost of a High Intensity Exercise Program During Bed Rest

Background: Given that disuse-related skeletal muscle atrophy may be exacerbated by an imbalance between energy intake and output, the amount of energy required to complete exercise countermeasures is an important consideration in the well being of subject health during bed rest and spaceflight. Objective: To evaluate the energy cost of a high intensity exercise program performed during short duration bed rest. Methods: 9 subjects (8 male and 1 female; 34.5 +/- 8.2 years) underwent 14 days of bed rest and exercise countermeasures. Exercise energy expenditure and excess post exercise oxygen consumption (EPOC) were collected once in each of 5 different exercise protocols (30 second, 2 minute and 4 minute intervals, continuous aerobic and a variety of resistance exercises) during bed rest. Body mass, basal metabolic rate (BMR), upper and lower leg muscle, subcutaneous, and intramuscular adipose tissue (IMAT) volumes were assessed before and at the end of bed rest. Results: There were no significant differences in body mass (pre: 75.1 +/- 10.5 kg; post: 75.2 +/- 10.1 kg), BMR (pre: 1649 +/- 216 kcal; post: 1657 +/- 177 kcal), muscle subcutaneous, or IMAT volumes (Table 2) after 14 days of bed rest and exercise. Body mass was maintained with an average daily intake of 2710 +/- 262 kcal (36.2 +/- 2.1 kcal/kg/day), while average daily energy expenditure was 2579 +/-311 kcal (34.5 +/- 3.6 kcal/kg/day). Exercise energy expenditure was significantly greater as a result of continuous aerobic exercise than all other exercise protocols.

Hackney, Kyle↗

Reliability of solid rocket motor cases and nozzles

A recent article in Aerospace America claims that 'the average success ratio of the current U.S. stable of launch vehicles, including upper stages, is about 92 percent (without upper stages it is close to 95 percent). The 8 percent failure probability implies an expected loss of $12M per flight, not including the lost opportunity costs'. Since payload costs are likely to be much greater than launch costs and even more so for the new launch vehicles for the Advanced Launch Development Program (ALDP), the cost of rocket motor unreliability at the current 8 percent rate can run into billions of dollars if expected increases in demand are realized. At an 8 percent failure rate, it is extremely unlikely that failure will occur during the first few ground tests of a new system. At that time, most of the design, analysis and tooling costs of the program have not expended. Since most systems are expected to be used ten to a hundred or more times, the likelihood of one or more failures is very large, and it can be expected that the above losses will be realized in the future. This will occur unless the problems are addressed and remedied. Recent trends suggest the problem is not being addressed adequately.

Crose, James G.↗

Ramjet cost estimating handbook

The subject program was conducted for the purpose of generating cost information on ramjet engines and developing a methodology that could be employed to accurately predict production costs ramjet engines. The methodology addresses many different ramjet types, sizes and production quantities. The methodology determines the cost of individual modules of ramjet assemblies based on similarity of the modules to baseline components that are identified in a cost handbook. (There are typically around 20 basic components of a given ramjet to be costed.) The total cost of the engine is a summation of all the appropriate cost elements. A significant accomplishment of the program was the development of a large cost data base on many different configurations, materials of construction and variations in manufacturing processes. This data base should provide a good foundation on which to build other cost data as it becomes available.

Emmons, H. T.↗

Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

Cornelius, David↗

The Solar Influencer Next Door: Predicting Low-Income Solar Referrals and Leads

Increasing the adoption of solar among low-to-moderate income (LMI) households remains an important policy goal because of its promise to simultaneously reduce energy burden and support the just distribution of benefits of renewable energy. However, scaling LMI solar remains challenging due to affordability and access issues. Most existing LMI adoption has occurred under public-funded programs, highlighting the importance of increasing the cost-effectiveness of these programs at scale. We develop a new household-level data set on LMI solar lead acquisition, referrals, and adoption to understand the processes through which LMI solar uptake has occurred in California. Then, we develop models to predict two sub-mechanisms in the solar adoption process: whether an otherwise qualified lead becomes "lost" i.e. non-responsive to outreach and, for existing clients, whether they refer solar to others. For the program analyzed, participants received their solar system at no cost, which deemphasizes economic drivers of solar adoption and could differ from other program experiences. Both models substantially improved the accuracy of prediction relative to a baseline. Overall, we find that peer effects and solar economics are important to predicting referrals, and household demographic factors in lead loss prediction. Finally, we find that referrals are both the highest quality and largest source of LMI solar leads, providing a promising mechanism to expand LMI programs further.

customer acquisition costs↗

IUS/TUG orbital operations and mission support study. Volume 5: Cost estimates

The costing approach, methodology, and rationale utilized for generating cost data for composite IUS and space tug orbital operations are discussed. Summary cost estimates are given along with cost data initially derived for the IUS program and space tug program individually, and cost estimates for each work breakdown structure element.

Source record↗

Superfluid Helium Tanker (SFHT) study

Replenishment of superfluid helium (SFHe) offers the potential of extending the on-orbit life of observatories, satellite instruments, sensors and laboratories which operate in the 2 K temperature regime. A reference set of resupply customers was identified as representing realistic helium servicing requirements and interfaces for the first 10 years of superfluid helium tanker (SFHT) operations. These included the Space Infrared Telescope Facility (SIRTF), the Advanced X-ray Astrophysics Facility (AXAF), the Particle Astrophysics Magnet Facility (Astromag), and the Microgravity and Materials Processing Sciences Facility (MMPS)/Critical Point Phenomena Facility (CPPF). A mixed-fleet approach to SFHT utilization was considered. The tanker permits servicing from the Shuttle cargo bay, in situ when attached to the OMV and carried to the user spacecraft, and as a depot at the Space Station. A SFHT Dewar ground servicing concept was developed which uses a dedicated ground cooling heat exchanger to convert all the liquid, after initial fill as normal fluid, to superfluid for launch. This concept permits the tanker to be filled to a near full condition, and then cooled without any loss of fluid. The final load condition can be saturated superfluid with any desired ullage volume, or the tank can be totally filed and pressurized. The SFHT Dewar and helium plumbing system design has sufficient component redundancy to meet fail-operational, fail-safe requirements, and is designed structurally to meet a 50 mission life usage requirement. Technology development recommendations were made for the selected SFHT concept, and a Program Plan and cost estimate prepared for a phase C/D program spanning 72 months from initiation through first launch in 1997.

Eberhardt, Ralph N.↗

BANTAM

The goals of BANTAM (low Cost Booster Technology Program) are to: 1) Reduce the payload cost to orbit by an order of magnitude, from $10,000 to $1,000 per pound, within 10 years and by an additional order of magnitude, from thousands to hundreds of dollars per pound, within 25 years. In-Space, achieve with 15 years, a factor of ten reduction in the cost of Earth orbital transportation, and a factor of two to three reduction in propulsion system mass and travel time required for planetary missions. Within 25 years, enable bold new missions to the edge of the solar system and beyond by reducing travel times by one to two orders-of magnitude.

Klem, Mark↗

Composite Nozzle/Thrust Chambers Analyzed for Low-Cost Boosters

The Low Cost Booster Technology Program is an initiative to minimize the cost of future liquid engines by using advanced materials and innovative designs, and by reducing engine complexity. NASA Marshall Space Flight Center s 60K FASTRAC Engine is one example where these design philosophies have been put into practice. This engine burns a liquid kerosene/oxygen mixture. It uses a one-piece, polymer composite thrust chamber/nozzle that is constructed of a tape-wrapped silica phenolic liner, a metallic injector interface ring, and a filament-wound epoxy overwrap. A cooperative effort between NASA Lewis Research Center s Structures Division and Marshall is underway to perform a finite element analysis of the FASTRAC chamber/nozzle under all the loading and environmental conditions that it will experience during its lifetime. The chamber/nozzle is a complex composite structure. Of its three different materials, the two composite components have distinctly different fiber architectures and, consequently, require separate material model descriptions. Since the liner is tape wrapped, it is orthotropic in the nozzle global coordinates; and since the overwrap is filament wound, it is treated as a monoclinic material. Furthermore, the wind angle on the overwrap varies continuously along the length of the chamber/nozzle.

Sullivan, Roy M.↗

Ground support system methodology and architecture

A synergistic approach to systems test and support is explored. A building block architecture provides transportability of data, procedures, and knowledge. The synergistic approach also lowers cost and risk for life cycle of a program. The determination of design errors at the earliest phase reduces cost of vehicle ownership. Distributed scaleable architecture is based on industry standards maximizing transparency and maintainability. Autonomous control structure provides for distributed and segmented systems. Control of interfaces maximizes compatibility and reuse, reducing long term program cost. Intelligent data management architecture also reduces analysis time and cost (automation).

Schoen, P. D.↗

Annual health examination program, Ames Research Center

A cost analysis of a low-volume multiphasic health testing program is presented. The results indicate that unit costs are similar to those of high-volume automated programs. The comparability in unit cost appears to result from the savings in personnel and space requirements of the smaller program as compared with the larger ones.

Hughes, L.↗

New benefit-cost studies of renewable and energy efficiency programs of the U.S. Department of Energy : methodology and findings.

Objectives of the Office of Energy Efficiency and Renewable Energy (EERE) 2009-2010 Studies (Solar, Wind, Geothermal, & Combustion Engine R&D) are to: (1) Demonstrate to investors that EERE research and technology development (R&D) programs & subprograms are 'Worth It'; (2) Develop an improved Benefit-Cost methodology for determining realized economic and other benefits of EERE R&D programs - (a) Model government additionality more thoroughly and on a case-by-case basis; (b) Move beyond economic benefits; and (c) Have each study calculate returns to a whole EERE program/subprogram; and (3) Develop a consistent, workable Methods Guide for independent contractors who will perform the evaluation studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sustainable Energy Solutions for Rural Alaska

The state of Alaska recognizes the challenges these rural communities face and provides financial support via the Power Cost Equalization (PCE) program. The PCE subsidizes the electricity prices paid by customers of these high-cost utilities. The PCE program is designed to spread the benefits of Alaska’s natural resources more evenly throughout the state. Yet even with this subsidy, electricity is still much more expensive for these rural customers. And beyond the PCE, other forms of assistance to rural utilities are becoming scarce given the state’s current fiscal environment. Nearly 90 percent of Alaska’s unrestricted budget funds in recent years have been tied to oil royalties—a sector experiencing significant declines in production and oil prices. Consequently, as Alaska looks to tighten budgets, the challenge of lowering rural utility costs, while encouraging self-sufficiency, has become more urgent.This study examines reliability, capital and strategic planning, management, workforce development, governance, financial performance and system efficiency in the various communities visited by the research team. Using those attributes, a tier system was developed to categorize rural Alaska utilities into Leading and Innovating Systems (Tier I), Advanced Diesel Systems (Tier II), Basic Systems (Tier III), and Underperforming Systems (Tier IV). The tier approach is not meant to label specific utilities, but rather to provide a general set of benchmarks and guideposts for improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗