Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completeness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Completion of Launch Director Console Project and Other Support Work

There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

Steinrock, Joshua G.↗

Cassini Spacecraft Strategy for Recovering from a Complete Loss-Of-Signal Condition

Unlike other faults where the space craft’s automated Fault Protection (FP) routines can be relied upon to provide a carrier signal and telemetered data to the ground-based Spacecraft Operations Flight Support (SOFS) team to facilitate vehicle acquisition, diagnosis, and fault recovery, a complete Loss-of-Spacecraft-Signal (LOS) condition will yield no information at all to help re-acquire the vehicle and resolve the fault. For any FP response activation, the spacecraft’s downlink signal must be acquired via the Deep Space Network (DSN) on the expected (post-fault) Radio Frequency Subsystem (RFS) device configuration commanded by the FP; data that will not be attainable in the case of a complete LOS condition since there is no signal available for the ground station to lock onto. In the case of the Cassini Mission-to-Saturn spacecraft, numerous fault possibilities exist that can cause a LOS condition. Activations of the onboard RFS-related FP can reconfigure the post-fault RFS states, impeding the ground team’s ability to acquire the spacecraft’s downlink signal

Morgan, Paula S.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

Parsec-scale Properties of Steep- and Flat-spectrum Extragalactic Radio Sources from a VLBA Survey of a Complete North Polar Cap Sample

We observed with the Very Long Baseline Array (VLBA) at 2.3 and 8.6 GHz a complete flux-density-limited sample of 482 radio sources with decl. > +75° brighter than 200 mJy at 1.4 GHz drawn from the NVSS catalog. A total of 34% of the sources show parsec-scale emission above the flux density detection limit of 30 mJy; their accurate positions and parsec-scale structure parameters are determined. Among all the sources detected at least at the shortest VLBA baselines, the majority, or 72%, have a steep single-dish spectrum. The fraction of the sources with a detectable parsec-scale structure is above 95% among the flat-spectrum objects and close to 25% among the steep-spectrum objects. We identified 82 compact steep-spectrum source candidates, which make up 17% of the sample; most of them are reported for the first time. The compactness and the brightness temperature of the sources in our sample show a positive correlation with single-dish and VLBA spectral indices. All the sources with a significant 8 GHz variability were detected by the VLBA snapshot observations, which independently confirmed their compactness. We demonstrated that 54% of the sources detected by the VLBA at 2.3 GHz in our sample have a steep VLBA spectrum. The compact radio emission of these sources is likely dominated by optically thin jets or mini-lobes, not by an opaque jet core. These results show that future VLBI surveys aimed at searching for new sources with parsec-scale structure should include not only flat-spectrum sources but also steep-spectrum ones in order to reach an acceptable level of completeness.

A V Popkov↗

Completion of Dragonfly PPF Testing in the NFAC 80x120-Foot Wind Tunnel

The Dragonfly entry, descent, and landing team (JHU-APL, NASA Langley Research Center, NASA Ames Research Center, Sikorsky Aircraft) recently completed testing in the National Full-Scale Aerodynamics Complex (NFAC) 80x120-Foot Wind Tunnel. The facility is located at NASA Ames Research Center and is operated by the U.S. Air Force's Arnold Engineering Development Complex. The test was designed to simulate conditions of Preparation for Powered (PPF), an approximately 10-minute period during which the Lander is posed in front of the Backshell at low subsonic airspeeds, all under the main parachute, and the rotors are used to null residual Lander yaw rates prior to release i. e. de-spin. The Lander (approximately 50% scale) that previously was tested in the NASA Langley 14x22 Wind Tunnel in 2023 was used for the NFAC test with a new Backshell designed and fabricated specifically for NFAC. This memorandum summarizes execution of the test: objective, facility and models, instrumentation and data products, test procedure, and completed test matrix. Other future documents will include a test report (JHU-APL) and documentation of data processing/analysis and computational fluid dynamics (CFD) comparisons to test data (Sikorsky).

Dragonfly↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Complete genome sequence of Syntrophothermus lipocalidus type strain (TGB-C1T)

Syntrophothermus lipocalidus Sekiguchi et al. 2000 is the type species of the genus Syntrophothermus. The species is of interest because of its strictly anaerobic lifestyle, its participation in the primary step of the degradation of organic maters, and for releasing products which serve as substrates for other microorganisms. It also contributes significantly to maintain a regular pH in its environment by removing the fatty acids through -oxidation. The strain is able to metabolize isobutyrate and butyrate, which are the substrate and the product of degradation of the substrate, respectively. This is the first complete genome sequence of a member of the genus Syntrophothermus and the second in the family Syntrophomonadaceae. Here we describe the features of this organism, together with the complete genome sequence and annotation. The 2,405,559 bp long genome with its 2,385 protein-coding and 55 RNA genes is a part of the Genomic Encyclopedia of Bacteria and Archaea project.

59 BASIC BIOLOGICAL SCIENCES↗

Complete genome sequence of Sulfurimonas autotrophica type strain (OK10T)

Sulfurimonas autotrophica Inagaki et al. 2003 is the type species of the genus Sulfurimonas. This genus is of interest because of its significant contribution to the global sulfur cycle by oxidizing of sulfur compounds to sulfate and by its apparent occupation of deep-sea hydrothermal and marine sulfidic environments as potential ecological niche. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the second complete genome sequence of the genus Sulfurimonas and the duodenary in the family Helicobacteraceae. The 2,153,198 bp long genome with its 2,165 protein-coding and 55 RNA genes is a part of the Genomic Encyclopedia of Bacteria and Archaea project.

59 BASIC BIOLOGICAL SCIENCES↗

Complete One-Loop Renormalization of the Higgs-Electroweak Chiral Lagrangian

The electroweak sector of the Standard Model can be formulated in a way similar to Chiral Perturbation Theory (ChPT), but extended by a singlet scalar. The resulting effective field theory (EFT) is called Higgs-Electroweak Chiral Lagrangian (EWCh$\mathcal{L}$) and is the most general approach to new physics in the Higgs sector. It solely assumes the pattern of symmetry breaking leading to the three electroweak Goldstone bosons (i.e. massive $W$ and $Z$) and the existence of a Higgs-like scalar particle. The power counting of the EWCh$\mathcal{L}$ is given by a generalization of the momentum expansion of ChPT. It is connected to a loop expansion, making the theory renormalizable order by order in the EFT. I will briefly review the construction of the EWCh$\mathcal{L}$ and its power counting. Then, I will discuss the complete one-loop renormalization of the EWCh$\mathcal{L}$ employing the background-field method and the super-heat-kernel expansion. This computation confirms the power counting assumptions, is consistent with the completeness of the operator basis, and reproduces known results of subsectors in the appropriate limits.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Completion design improvement using a deep convolutional network

Maximizing stimulated natural and hydraulic fracture network is one of the primary hydraulic fracturing concerns for economic production from a horizontal shale gas well. Geomechanical facies and preexisting fractures in each stage are identified based on similarities in formation characteristics to optimize the locations of perforation clusters. This often requires analyzing large volumes of drilling, Logging While Drilling (LWD) and Measurement While Drilling (MWD) data. In this paper, we develop a methodology that calculates the mechanical specific energy (MSE) using real-time drill string acceleration signals directly from its definition. High resolution vibration signals have been collected using a tri-axial accerlometer, which was an auxiliary tool included in acoustic borehole imager. This technique provides a cost-efficient solution for engineered completion design. Furthermore, we adopt deep Convolutional Neural Network (CNN) with signal processing to build a data pipeline that effectively extracts patterns from dynamic acceleration signals for rock lateral MSE classification. First, we apply discrete wavelet transform and Short-Time Fourier Transform (STFT) for signal denoising and pattern recognition. Then we construct an image dataset using multi-scale image fusion at pixel level from 3 sensor channels, including axial, lateral acceleration spectrograms and zero-padded revolutions per minute (RPM). The resulted RGB image dataset includes 4,000 images of 5 MSE ranges with various rock strength conditions. Our results demonstrate that the proposed deep learning model can achieve more than 90% classification accuracy. The deep learning results, as a reference source, were applied in selected Marcellus Shale Energy and Environmental Lab (MSEEL) wells engineered completion located in the Marcellus shale gas site.

03 NATURAL GAS↗

A Mixed Fracture-Matrix Model for Evaluating Well Orientation and Completion Options for the Utah FORGE Site

Orientation and completion for well pairs that have been subjected to multi-zonal stimulation play a critical role in the long-term performance of an Enhanced Geothermal Reservoir. Here we present the development of a methodology to rapidly and efficiently numerically simulate mixed fracture-matrix flow systems for evaluation of well design and completion options. An example evaluation based on a small fracture network representative of FORGE Well 16(A and B)-78(32) follows a discussion of the theory and model validation.

58 GEOSCIENCES↗

Evaluation and Optimization of Well Completion Options for the Utah FORGE Site

Orientation and completion for well pairs that have been subjected to multi-zonal stimulation play a critical role in the long-term performance of an Enhanced Geothermal Reservoir. Enhanced geothermal systems often rely on preferential flow along fractures between well injection and production locations. Modeling this preferential flow using discrete fracture networks (DNF) relies on stochastic realizations of the DFN based on geological sampling. Here we present the development of a stochastic optimization methodology to determine well completion options in a discrete fracture network based on using parallel subset simulation. Stochastic optimization will provide insight into regions where placements of the injection and production wells are optimal. An example optimization of well-pair location optimization based on a deterministic-stochastic DFN model representing FORGE follows a discussion of the theory.

15 GEOTHERMAL ENERGY↗

WIPP PA Sensitivity Studies in Support of CRA-2014 Completeness Determination and Compliance Decision - 18209

The Waste Isolation Pilot Plant (WIPP) has been developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. Containment of TRU waste at the WIPP is regulated by the U.S. Environmental Protection Agency (EPA). The DOE demonstrates compliance with the containment requirements by means of performance assessment (PA) calculations. WIPP PA calculations estimate the probability and consequence of potential radionuclide releases from the repository to the accessible environment for a regulatory period of 10,000 years after facility closure. Since TRU waste was first received at the WIPP in 1999, compliance recertification applications (CRAs) have been required by the EPA on five-year cycle. The latest CRA (CRA-2014) was submitted by the DOE to the EPA in 2014. As part of the application, a formal set of PA calculations (CRA-2014 PA) was performed and results were documented in detail. The CRA-2014 PA incorporated several parameter updates based on new data, as well as the implementation of a different model for panel closures, barriers planned for the opening of each waste panel. The results presented as part of the CRA-2014 showed via the required complementary cumulative distribution function (CCDF) release curves that the estimated releases were within compliance limits. As part of their process for reviewing the completeness of the CRA-2014 [1], the EPA formally requested that the DOE perform sensitivity studies based on EPA-requested changes to model parameters. The DOE performed and documented the results of three sensitivity studies described below: CRA14-SEN2 [2], CRA14-SEN3 [3], and CRA14-SEN4 [4]. In each case, the new analysis results were compared to CRA- 2014 PA (CRA14) results to determine the impact of the EPA-requested changes. CRA14-SEN2: the application of EPA-requested modified parameters in the operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model resulted in increased pressures and decreased brine saturations in waste areas and increased pressures and brine saturations in the operations and experimental areas. However, the overall effects on total high-probability mean releases from the repository were entirely insignificant. It was concluded that the modeling assumptions associated with the operations and experimental areas of the repository have an insignificant effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN3: the application of EPA-requested modified parameters in the panel closure areas and operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model predominantly result in increased pressures and decreased brine saturations in waste areas, increased pressures and brine saturations in the operations and experimental areas, and decreased brine and gas flows across all panel closures. The pressure increases in repository waste regions yielded slightly decreased brine saturations (on average) in those areas. However, the overall effects on total high-probability mean releases from the repository are entirely insignificant. It was concluded that the modeling assumptions made for this sensitivity study which were associated with the panel closures and north end areas of the repository have only a small effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN4: the application of several changes to the current WIPP PA model (CRA14), including: parameter changes, use of an updated code, and a revised computational grid for the BRAGFLO code. The modifications to the repository model resulted in increased releases in all primary release mechanisms. The impacts of each EPA-requested change to CRA14 were analyzed with respect to each release mechanism in the CRA14-SEN4 study. Overall, total high-probability predicted mean releases from the repository were increased by about 15%. Total low-probability predicted mean releases were increased by about 107%. It was concluded that the EPA-requested changes to the CRA14 result in increases to the predicted total releases from the repository. However, releases calculated in the CRA14-SEN4 analysis remained below regulatory limits, demonstrating continued compliance of the WIPP. In January 2017, the EPA determined that CRA-2014 was complete and then began a technical evaluation of CRA-2014 to determine whether the WIPP continued to comply with the radiation protection standards for disposal. During their evaluation, the EPA utilized the sensitivity study results to inform their ultimate determination in July 2017 that the WIPP continues to comply with regulatory standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

"Hybrid fracture/matrix modeling for well completion options evaluation"

Orientation and completion for well pairs that have been subjected to multi-zonal stimulation play a critical role in the long-term performance of an Enhanced Geothermal Reservoir. Here we present the development of a methodology to rapidly and efficiently numerically simulate mixed fracture-matrix flow systems for evaluation of well design and completion options. The methodology is based on a loose coupling framework, allowing the fracture and matrix systems to be meshed separately. The fracture system includes the integration of fracture growth and aperture data from well stimulation simulations of stochastically generated fracture networks. Automatic mesh refinement is used in the matrix simulation to resolve heat transfer near the fracture network. This simulation framework is used to efficiently determine optimal production and injection well placement using adaptive sampling.

15 GEOTHERMAL ENERGY↗

A Mixed Fracture-Matrix Model for Evaluating Well Orientation and Completion Options for the Utah FORGE Site

Orientation and completion for well pairs that have been subjected to multi-zonal stimulation play a critical role in the long-term performance of an Enhanced Geothermal Reservoir. Here we present the development of a methodology to rapidly and efficiently numerically simulate mixed fracture-matrix flow systems for evaluation of well design and completion options. An example evaluation based on a small fracture network representative of FORGE Well 16(A and B)-78(32) follows a discussion of the theory and model validation.

15 GEOTHERMAL ENERGY↗

Complete genome sequence of Catenulispora acidiphila type strain (ID 139908T)

Catenulispora acidiphila Busti et al. 2006 is the type species of the genus Catenulispora, and is of interest because of the rather isolated phylogenetic location of the genomically little studied suborder Catenulisporineae within the order Actinomycetales. C. acidiphilia is known for its acidophilic, aerobic lifestyle, but can also grow scantly under anaerobic conditions. Under regular conditions C. acidiphilia grows in long filaments of relatively short aerial hyphae with marked septation. It is a free living, non motile, Gram-positive bacterium isolated from a forest soil sample taken from a wooded area in Gerenzano, Italy. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the first complete genome sequence of the actinobacterial family Catenulisporaceae, and the 10,467,782 bp long single replicon genome with its 9056 protein-coding and 69 RNA genes is a part of the Genomic Encyclopedia of Bacteria and Archaea project.

59 BASIC BIOLOGICAL SCIENCES↗

Complete genome sequence of Desulfomicrobium baculatum type strain (XT)

Desulfomicrobium baculatum is the type species of the genus Desulfomicrobium, which is the type genus of the family Desulfomicrobiaceae. It is of phylogenetic interest because of the isolated location of the family Desulfomicrobiaceae within the order Desulfovibrionales. D. baculatum strain XT is a Gram-negative, motile, sulfate-reducing bacterium isolated from water-saturated manganese carbonate ore. It is strictly anaerobic and does not require NaCl for growth, although NaCl concentrations up to 6percent (w/v) are tolerated. The metabolism is respiratory or fermentative. In the presence of sulfate, pyruvate and lactate are incompletely oxidized to acetate and CO2. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the first completed genome sequence of a member of the deltaproteobacterial family Desulfomicrobiaceae, and this 3,942,657 bp long single replicon genome with its 3494 protein-coding and 72 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

59 BASIC BIOLOGICAL SCIENCES↗