Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Time Protocol”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

538 records · Page 30

Refinement of Protocols for Measuring the Apparent Optical Properties of Seawater

Ocean color satellite missions, like the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) or the Moderate Resolution Imaging Spectroradiometer (MODIS) projects, are tasked with acquiring a global ocean color data set, validating and monitoring the accuracy and quality of the data, processing the radiometric data into geophysical units using a set of atmospheric and bio-optical algorithms, and distributing the final products to the scientific community. The long-standing requirement of the SeaWiFS Project, for example, is to produce spectral water-leaving radiances, LW(lambda), to within 5% absolute (lambda denotes wavelength) and chlorophyll a concentrations to within 35% (Hooker and Esaias 1993), and most ocean color sensors have the same or similar requirements. Although a diverse set of activities are required to ensure the accuracy requirements are met (Hooker and McClain 2000), the perspective here is with field observations. The accurate determination of upper ocean apparent optical properties (AOPs) is essential for the vicarious calibration of ocean color data and the validation of the derived data products, because the sea-truth measurements are used to evaluate the satellite observations (Hooker and McClain 2000). The uncertainties with in situ AOP measurements have various sources: a) the sampling procedures used in the field, including the environmental conditions encountered; b) the absolute characterization of the radiometers in the laboratory; c) the conversion of the light signals to geophysical units in a processing scheme, and d) the stability of the radiometers in the harsh environment they are subjected to during transport and use. Assuming ideal environmental conditions, so this aspect can be neglected, the SeaWiFS ground-truth uncertainty budget can only be satisfied if each uncertainty is on the order of 1-2%, or what is generally referred to as 1% radiometry. In recent years, progress has been made in estimating the magnitude of some of these uncertainties and in defining procedures for minimizing them. For the SeaWiFS Project, the first step was to convene a workshop to draft the SeaWiFS Ocean Optics Protocols (hereafter referred to as the Protocols). The Protocols initially adhered to the Joint Global Ocean Flux Study (JGOFS) sampling procedures (JGOFS 1991) and defined the standards for optical measurements to be used in SeaWiFS calibration and validation activities (Mueller and Austin 1992). Over time, the Protocols were revised (Mueller and Austin 1995), and then recurringly updated on essentially an annual basis (Mueller 2000, 2002, and 2003) as part of the Sensor Inter-comparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) project. 98

Hooker, Stanford B.↗

Correlation between model observer and human observer performance in CT imaging when lesion location is uncertain

Purpose: The purpose of this study was to investigate the correlation between model observer and human observer performance in CT imaging for the task of lesion detection and localization when the lesion location is uncertain.Methods: Two cylindrical rods (3-mm and 5-mm diameters) were placed in a 35 × 26 cm torso-shaped water phantom to simulate lesions with −15 HU contrast at 120 kV. The phantom was scanned 100 times on a 128-slice CT scanner at each of four dose levels (CTDIvol = 5.7, 11.4, 17.1, and 22.8 mGy). Regions of interest (ROIs) around each lesion were extracted to generate images with signal-present, with each ROI containing 128 × 128 pixels. Corresponding ROIs of signal-absent images were generated from images without lesion mimicking rods. The location of the lesion (rod) in each ROI was randomly distributed by moving the ROIs around each lesion. Human observer studies were performed by having three trained observers identify the presence or absence of lesions, indicating the lesion location in each image and scoring confidence for the detection task on a 6-point scale. The same image data were analyzed using a channelized Hotelling model observer (CHO) with Gabor channels. Internal noise was added to the decision variables for the model observer study. Area under the curve (AUC) of ROC and localization ROC (LROC) curves were calculated using a nonparametric approach. The Spearman's rank order correlation between the average performance of the human observers and the model observer performance was calculated for the AUC of both ROC and LROC curves for both the 3- and 5-mm diameter lesions.Results: In both ROC and LROC analyses, AUC values for the model observer agreed well with the average values across the three human observers. The Spearman's rank order correlation values for both ROC and LROC analyses for both the 3- and 5-mm diameter lesions were all 1.0, indicating perfect rank ordering agreement of the figures of merit (AUC) between the average performance of the human observers and the model observer performance.Conclusions: In CT imaging of different sizes of low-contrast lesions (−15 HU), the performance of CHO with Gabor channels was highly correlated with human observer performance for the detection and localization tasks with uncertain lesion location in CT imaging at four clinically relevant dose levels. This suggests the ability of Gabor CHO model observers to meaningfully assess CT image quality for the purpose of optimizing scan protocols and radiation dose levels in detection and localization tasks for low-contrast lesions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Data Analytics for Electrical Distribution Systems with Micro PMUs (GMLC 1.4.9 Technical Report)

This report describes how electrical utilities with residential, industrial, commercial and government customers make decisions using Data Analytics (DA) applications and discusses how OpenFMB was leveraged to share that data among disparate types of devices for DA. OpenFMB is a data standard developed by utilities for distributed communication and control of power system assets. Here we explored how OpenFMB can be used for sharing analytics and what those analytics could be for a set of representative grid devices. A review of DA applications performed by electrical utilities and customers is presented. An overview of how the testbed we used was built and configured is summarized. Several experiments which were carried out to explore the capabilities of OpenFMB alongside other data sharing mechanisms for gathering sensor measurements and sharing analytics is also discussed. And finally a comparison of OpenFMB and LBNL’s SPARK framework is summarized. Today’s electrical utilities focus on monitoring the real-time customer consumptions, offering new real-time tariff models based on customer usage habits (rewards and punishments), providing energy peak during peak load times (plan energy generation and distribution), improving the load management for transformers and power lines, and controlling the energy and grid resources efficiently. On the other hand, the DA applications for residential customers are based on modifying the customer electricity usage habit to save money, making accurate and timely decisions for electrical billing. However, the DA applications for industrial, commercial and government customers focus on creating efficient programs to improve the environmental condition (reducing CO₂ emission), developing better load forecasting for industrial and/or commercial activities. In this project, a testbed was built to explore how the OpenFMB framework can be used to distribute data among various types of representative grid edge devices. Micro PMUs (Phasor Measurement Unit) were used to collect and transmit data to an OpenPDC server alongside relays with a framework configured with a system using OpenFMB to collect and transmit data. The testbed was composed of a physical asset based on a 60 Hz AC radial power system constructed using SI-GRID components. The power system consisted of a 3-phase 14 volts line-to-ground (24 volts line-to-line) power source, three 3-phase line emulators, a programmable resistive load bank, two smart relays, two micro PMUs, and a (SCADA) and Phasor Data Concentrator (PDC) computer. This testbed configuration allowed us to perform breaker operation tests collecting data from the micro PMUs and from the relays’ sensors. During the micro PMU breaker operation tests we collected the measured and estimated fundamental voltages, currents, frequency as well as the total true, reactive and apparent power. The displacement power factor from two micro PMUs located in parallel power lines was also used. The software steps for the implementation of the Synchrophasor system are explained in detail in this report. The setting (1-2-3) and data collection (4-5) phases were performed with a free download open source software. In the setting phase, the micro PMUs were set (1), the data stream for each micro PMU was validated, and the connection and configuration files were created (2). The PDC computer was set using the connection and configuration files of the micro PMUs (3). In the data collection phase, the binary data from the micro PMUs was collected (4), and the binary data files of the micro PMUs was converted to analyze the test results (5). OpenFMB was configured to use protocol translators to read Modbus and transform the reading into the OpenFMB data model to be read for DA applications.Our experiments showed that by leveraging the OpenFMB data model and the micro PMUs together we could obtain better situational awareness of network faults, which in some cases could lead to failures in the system and would be less perceivable otherwise. For example, in one experiment the fundamental RMS current angle, and the fundamental displacement power factor (estimated by the ratio between the measured real and apparent total power) had a disturbance at the micro PMU connected to the beginning of the parallel power line because the breaker was opened without the operators or SCADA system’s knowledge, and no current was available. Based on the breaker state scenarios and micro PMU locations, the DA applications using the current angle and displacement power factor from the micro PMUs should be studied in detail to avoid a non-desired measurement that could affect the decision from the DA. Also, the sample rates for PMU, Relay and micro PMU devices were compared. The DA application improved the control and operation between the electrical utilities and their customers (residential, industrial, transportation, commercial and government). The higher the sample rate, the better the quality of the measurement for DA estimations.

42 ENGINEERING↗

The National Opportunity for Interoperability and its Benefits for a Reliable, Robust, and Future Grid Realized Through Buildings

Today, increasing numbers of intermittent generation sources (e.g., wind and photovoltaic) and new mobile intermittent loads (e.g., electric vehicles) can significantly affect traditional utility business practices and operations. At the same time, a growing number of technologies and devices, from appliances to lighting systems, are being deployed at consumer premises that have more sophisticated controls and information that remain underused for anything beyond basic building equipment operations. The intersection of these two drivers is an untapped opportunity and underused resource that, if appropriately configured and realized in open standards, can provide significant energy efficiency and commensurate savings on utility bills, enhanced and lower cost reliability to utilities, and national economic benefits in the creation of new markets, sectors, and businesses being fueled by the seamless coordination of energy and information through device and technology interoperability. Or, as the Quadrennial Energy Review puts it, “A plethora of both consumer-level and grid-level devices are either in the market, under development, or at the conceptual stage. When tied together through the information technology that is increasingly being deployed on electric utilities’ distribution grids, they can be an important enabling part of the emerging grid of the future. However, what is missing is the ability for all of these devices to coordinate and communicate their operations with the grid, and among themselves, in a common language — an open standard.” In this paper, we define interoperability as the ability to exchange actionable information between two or more systems within a home or building, or across and within organizational boundaries. Interoperability relies on the shared meaning of the exchanged information, with agreed-upon expectations and consequences, for the response to the information exchange.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ground Based, Millimeter Wave Measurement of Ozone in the Middle Atmosphere

There is a need for highly reliable measurements of stratospheric ozone. Policy makers worldwide concerned with public health rely oil a clear consensus from the scientific community as a basis for ozone-related environmental policy that has a significant impact oil national economies. Tile latest Such consensus was presented in WMO, and used in a 1999 meeting of the parties considering amendments to the Montreal Protocol oil Substances that Deplete the Ozone Layer. Tile scientific community, in turn, needs highly precise and accurate measurements of ozone levels, and small time derivatives of these levels, both in continued - development of its understanding of the physical and chemical processes involved and as clear evidence that these processes are occurring as stated. Over most of the world, changes in ozone levels are small. For example, over the heavily populated northern midlatitudes, the linearized rate of ozone decline is between 0.2% per year and 0.7% per year, depending on altitude. These values are small enough to make measurement requirements technically challenging. Data quality may suffer from imperfections in individual instruments. In one instance, early results from a satellite-borne ozone sensor were later found to be invalid because of calibration drift. Even in the absence of drift, tile absolute calibration of a new sensor may differ slightly from that of its predecessor in service. Most ozone remote sensing instruments operate at ultraviolet or infrared wavelengths where scattering from dust and aerosols must be taken into account; results from these systems may be or are affected following a major volcanic eruption, such as tile one at Mt. Pinatubo in 1991. Given these difficulties, a consensus of measurements from several independent systems is required to insure a reliable understanding of stratospheric ozone levels. Because of the above-described need for highly precise and accurate ozone measurements using several independent techniques, there was interest in developing several techniques which were known but not highly developed in the 1980's into systems capable of being used in ail operational manner to make measurements with the level of quality needed to-detect small trends in ozone levels. A ground-based microwave instrument capable of remotely sensing stratospheric ozone had been designed by tile Principal Investigator of the present project. This instrument was built at tile Millitech Corporation in South Deerfield, Massachusetts before tile present work began. (Funding for design and construction of the instrument came from sources other than the present grant.) Tile instrument measured the spectrum of one of the many emission lines produced by purely rotational transitions of ozone, one at a frequency of 110.8 GHz. The altitude distribution of ozone can. in principle, be retrieved from the details of the pressure-broadened spectrum of the ozone transition. However, the level of contamination of the spectral measurement by instrumentally induced artifacts must be very low in order to retrieve a ozone profile of useful quality from it. The Millitech instrument demonstrated spectral purity at ail adequate level, and there were promising ideas for instrumental improvements and for further development of the technique. The initial objectives of the present project, then, were to develop techniques for calibrating the Millitech instrument, to minimize artifacts in tile spectra it produces, to optimally retrieve ozone profiles from tile spectra, to test tile quality of the microwave profiles by comparing them with profiles obtained using several other, independent techniques over both short and periods of time, and to perform research using the ozone data gathered with the instrument.

Parrish, Alan↗

Dose equations for shift-variant CT acquisition modes using variable pitch, tube current, and aperture, and the meaning of their associated CTDI{sub vol}

Purpose: With the increasing clinical use of shift-variant CT protocols involving tube current modulation (TCM), variable pitch or pitch modulation (PM), and variable aperture a(t), the interpretation of the scanner-reported CTDI{sub vol} is called into question. This was addressed for TCM in their previous paper published by Dixon and Boone [Med. Phys. 40, 111920 (14pp.) (2013)] and is extended to PM and concurrent TCM/PM as well as variable aperture in this work. Methods: Rigorous convolution equations are derived to describe the accumulated dose distributions for TCM, PM, and concurrent TCM/PM. A comparison with scanner-reported CTDI{sub vol} formulae clearly identifies the source of their differences with the traditional CTDI{sub vol}. Dose distribution simulations using the convolution are provided for a variety of TCM and PM scenarios including a helical shuttle used for perfusion studies (as well as constant mA)—all having the same scanner-reported CTDI{sub vol}. These new convolution simulations for TCM are validated by comparison with their previous discrete summations. Results: These equations show that PM is equivalent to TCM if the pitch variation p(z) is proportional to 1/i(z), where i(z) is the local tube current. The simulations show that the local dose at z depends only weakly on the local tube current i(z) or local pitch p(z) due to scatter from all other locations along z, and that the “local CTDI{sub vol}(z)” or “CTDI{sub vol} per slice” do not represent a local dose but rather only a relative i(z) or p(z). The CTDI-paradigm does not apply to shift-variant techniques and the scanner-reported CTDI{sub vol} for the same lacks physical significance and relevance. Conclusions: While the traditional CTDI{sub vol} at constant tube current and pitch conveys useful information (the peak dose at the center of the scan length), CTDI{sub vol} for shift-variant techniques (TCM or PM) conveys no useful information about the associated dose distribution it purportedly represents. On the other hand, the total energy absorbed E (“integral dose”) as well as its surrogate DLP remain robust (invariant) with respect to shift-variance, depending only on the total mAs = 〈i〉t{sub 0} accumulated during the total beam-on time t{sub 0} and aperture a, where 〈i〉 is the average current.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Intelligent Integrated Health Management for a System of Systems

An intelligent integrated health management system (IIHMS) incorporates major improvements over prior such systems. The particular IIHMS is implemented for any system defined as a hierarchical distributed network of intelligent elements (HDNIE), comprising primarily: (1) an architecture (Figure 1), (2) intelligent elements, (3) a conceptual framework and taxonomy (Figure 2), and (4) and ontology that defines standards and protocols. Some definitions of terms are prerequisite to a further brief description of this innovation: A system-of-systems (SoS) is an engineering system that comprises multiple subsystems (e.g., a system of multiple possibly interacting flow subsystems that include pumps, valves, tanks, ducts, sensors, and the like); 'Intelligent' is used here in the sense of artificial intelligence. An intelligent element may be physical or virtual, it is network enabled, and it is able to manage data, information, and knowledge (DIaK) focused on determining its condition in the context of the entire SoS; As used here, 'health' signifies the functionality and/or structural integrity of an engineering system, subsystem, or process (leading to determination of the health of components); 'Process' can signify either a physical process in the usual sense of the word or an element into which functionally related sensors are grouped; 'Element' can signify a component (e.g., an actuator, a valve), a process, a controller, an actuator, a subsystem, or a system; The term Integrated System Health Management (ISHM) is used to describe a capability that focuses on determining the condition (health) of every element in a complex system (detect anomalies, diagnose causes, prognosis of future anomalies), and provide data, information, and knowledge (DIaK) not just data to control systems for safe and effective operation. A major novel aspect of the present development is the concept of intelligent integration. The purpose of intelligent integration, as defined and implemented in the present IIHMS, is to enable automated analysis of physical phenomena in imitation of human reasoning, including the use of qualitative methods. Intelligent integration is said to occur in a system in which all elements are intelligent and can acquire, maintain, and share knowledge and information. In the HDNIE of the present IIHMS, an SoS is represented as being operationally organized in a hierarchical-distributed format. The elements of the SoS are considered to be intelligent in that they determine their own conditions within an integrated scheme that involves consideration of data, information, knowledge bases, and methods that reside in all elements of the system. The conceptual framework of the HDNIE and the methodologies of implementing it enable the flow of information and knowledge among the elements so as to make possible the determination of the condition of each element. The necessary information and knowledge is made available to each affected element at the desired time, satisfying a need to prevent information overload while providing context-sensitive information at the proper level of detail. Provision of high-quality data is a central goal in designing this or any IIHMS. In pursuit of this goal, functionally related sensors are logically assigned to groups denoted processes. An aggregate of processes is considered to form a system. Alternatively or in addition to what has been said thus far, the HDNIE of this IIHMS can be regarded as consisting of a framework containing object models that encapsulate all elements of the system, their individual and relational knowledge bases, generic methods and procedures based on models of the applicable physics, and communication processes (Figure 2). The framework enables implementation of a paradigm inspired by how expert operators monitor the health of systems with the help of (1) DIaK from various sources, (2) software tools that assist in rapid visualization of the condition of the system, (3) analical software tools that assist in reasoning about the condition, (4) sharing of information via network communication hardware and software, and (5) software tools that aid in making decisions to remedy unacceptable conditions or improve performance.

Smith, Harvey↗

DOE SciDAC's Earth System Grid Center for Enabling Technologies Final Report

The mission of the Earth System Grid Federation (ESGF) is to provide the worldwide climate-research community with access to the data, information, model codes, analysis tools, and intercomparison capabilities required to make sense of enormous climate data sets. Its specific goals are to (1) provide an easy-to-use and secure web-based data access environment for data sets; (2) add value to individual data sets by presenting them in the context of other data sets and tools for comparative analysis; (3) address the specific requirements of participating organizations with respect to bandwidth, access restrictions, and replication; (4) ensure that the data are readily accessible through the analysis and visualization tools used by the climate research community; and (5) transfer infrastructure advances to other domain areas. For the ESGF, the U.S. Department of Energy's (DOE's) Earth System Grid Center for Enabling Technologies (ESG-CET) team has led international development and delivered a production environment for managing and accessing ultra-scale climate data. This production environment includes multiple national and international climate projects (such as the Community Earth System Model and the Coupled Model Intercomparison Project), ocean model data (such as the Parallel Ocean Program), observation data (Atmospheric Radiation Measurement Best Estimate, Carbon Dioxide Information and Analysis Center, Atmospheric Infrared Sounder, etc.), and analysis and visualization tools, all serving a diverse user community. These data holdings and services are distributed across multiple ESG-CET sites (such as ANL, LANL, LBNL/NERSC, LLNL/PCMDI, NCAR, and ORNL) and at unfunded partner sites, such as the Australian National University National Computational Infrastructure, the British Atmospheric Data Centre, the National Oceanic and Atmospheric Administration Geophysical Fluid Dynamics Laboratory, the Max Planck Institute for Meteorology, the German Climate Computing Centre, the National Aeronautics and Space Administration Jet Propulsion Laboratory, and the National Oceanic and Atmospheric Administration. The ESGF software is distinguished from other collaborative knowledge systems in the climate community by its widespread adoption, federation capabilities, and broad developer base. It is the leading source for present climate data holdings, including the most important and largest data sets in the global-climate community, and - assuming its development continues - we expect it to be the leading source for future climate data holdings as well. Recently, ESG-CET extended its services beyond data-file access and delivery to include more detailed information products (scientific graphics, animations, etc.), secure binary data-access services (based upon the OPeNDAP protocol), and server-side analysis. The latter capabilities allow users to request data subsets transformed through commonly used analysis and intercomparison procedures. As we transition from development activities to production and operations, the ESG-CET team is tasked with making data available to all users seeking to understand, process, extract value from, visualize, and/or communicate it to others. This ongoing effort, though daunting in scope and complexity, will greatly magnify the value of numerical climate model outputs and climate observations for future national and international climate-assessment reports. The ESG-CET team also faces substantial technical challenges due to the rapidly increasing scale of climate simulation and observational data, which will grow, for example, from less than 50 terabytes for the last Intergovernmental Panel on Climate Change (IPCC) assessment to multiple Petabytes for the next IPCC assessment. In a world of exponential technological change and rapidly growing sophistication in climate data analysis, an infrastructure such as ESGF must constantly evolve if it is to remain relevant and useful. Regretfully, we submit our final report at the end of project funding. To continue to serve the climate-science community, we are currently seeking additional funding. Such funding would allow us to maintain and enhance ESGF production and operation of this vital endeavor of cataloging, serving, and analyzing ultra-scale climate science data. At this time, the entire ESG-CET team would like to take this opportunity to sincerely thank our funding agencies in the DOE Scientific Discovery through Advanced Computing (SciDAC) program and the Office of Biological and Environmental Research (OBER) - as well as our national and international collaborators, stakeholders, and partners - for allowing us to work with you and serve the community these past several years.

54 ENVIRONMENTAL SCIENCES↗

Medium Truck Duty Cycle Data from Real-World Driving Environments: Project Interim Report

Since the early part of the 20th century, the US trucking industry has provided a safe and economical means of moving commodities across the country. At the present time, nearly 80% of the US domestic freight movement involves the use of trucks. The US Department of Energy (DOE) is spearheading a number of research efforts to improve heavy vehicle fuel efficiencies. This includes research in engine technologies (including hybrid and fuel cell technologies), lightweight materials, advanced fuels, and parasitic loss reductions. In addition, DOE is developing advanced tools and models to support heavy vehicle truck research, and is leading the 21st Century Truck Partnership whose stretch goals involve a reduction by 50% of the fuel consumption of heavy vehicles on a ton-mile basis. This Medium Truck Duty Cycle (MTDC) Project is a critical element in DOE s vision for improved heavy vehicle energy efficiency and is unique in that there is no other national database of characteristic duty cycles for medium trucks. It involves the collection of real-world data for various situational characteristics (rural/urban, freeway/arterial, congested/free-flowing, good/bad weather, etc.) and looks at the unique nature of medium trucks drive cycles (stop-and-go delivery, power takeoff, idle time, short-radius trips), to provide a rich source of data that can contribute to the development of new tools for fuel efficiency and modeling, provide DOE a sound basis upon which to make technology investment decisions, and provide a national archive of real-world-based medium-truck operational data to support heavy vehicle energy efficiency research. The MTDC project involves a two-part field operational test (FOT). For the Part-1 FOT, three vehicles, each from two vocations (urban transit and dry-box delivery) were instrumented for one year of data collection. The Part-2 FOT will involve the towing/recovery and utility vocations. The vehicles participating in the MTDC project are doing so through gratis partnerships in return for early access to the results of this study. Partnerships such as these are critical to FOTs in which real-world data is being collected. In Part 1 of the project, Oak Ridge National Laboratory(ORNL) established partnerships with the H.T. Hackney Company, one of the largest wholesale distributors in the country, distributing products to 21 states; and with the Knoxville Area Transit (KAT), the City of Knoxville s transit system, operating services across the city of Knoxville and parts of Knox co. These partnerships and agreements provided ORNL access to three Class-7 2005/2007 International day-cab tractors, model 8600, which regularly haul 28 ft pup trailers (H.T. Hackney Co) and three Class-7 2005 Optima LF-34 buses (KAT), for collection of duty cycle data. In addition, ORNL has collaborated with the Federal Motor Carrier Safety Administration (FMCSA) to determine if there were possible synergies between this duty cycle data collection effort and FMCSA s need to learn more about the operation and duty cycles of the second-largest fuel consuming commercial vehicle category in the US. FMCSA s primary interest was in collecting safety data relative to the driver, carrier, and vehicle. In order to collect the duty cycle and safety-related data, ORNL developed a data acquisition and wireless communication system that was placed on each test vehicle. Each signal recorded in this FOT was collected by means of one of the instruments incorporated into each data acquisition system (DAS). Native signals were obtained directly from the vehicle s J1939 and J1708 data buses. A VBOX II Lite collected Global Positioning System related information including speed, acceleration, and spatial location information at a rate of 5 Hz, and communicated this data via the CAN (J1939) protocol. The Air-Weigh LoadMaxx, a self-weighing system which determines the vehicle s gross weight by means of pressure transducers and posts the weight to the vehicle s J1939 data bus, was used to collect vehicle payload information. A cellular modem, the Raven X EVDO V4221, facilitated the communication between the eDAQ-lite (the data collection engine of the system) and the user, via the internet. The modem functioned as a wireless gateway, allowing data retrievals and system checks to be performed remotely. Also, and in partnership with FMCSA, two additional safety sensors were installed on the combination vehicles: the MGM e-Stroke brake monitoring system and the Tire SafeGuard tire pressure monitoring system. Both of these systems posted data to the J1939 data bus, enabling these signals to be read without any additional DAS interface hardware. Seventy-three signals from the different deployed sensors and available vehicle systems were collected. Because of the differences in vehicle data buses (i.e., J1939 and J1708 data buses), not all desired signals were available for both types of vehicles.

duty cycles↗

SU-F-T-72: Experimental Determination of the Positionuncertainties for ROOS Ionization Chambers in Clinical Electron Beams

Purpose: National and international dosimetry protocols assume a position accuracy for ionization chambers of less than 0.2mm. To follow this precept the manufacturer PTW-Freiburg introduced a positioning assistance system (TRUFIX) for their particular ion chambers. Aim of this study is an experimental investigation of the positioning uncertainties for ROOS-type ionization chambers. Methods: For all measurements a linear accelerator Elekta Synergie was used. The experiments were performed in a water-phantom. To collimate the electron beam a 10×10cm{sup 2} applicator was installed. All measured depth dose curves were normalized to their maximum. In all cases the TRUFIX system was applied for chamber positioning. For the first measurement series, to determine the positioning reproducibility of a ROOS chamber, one person placed the chamber three times in a 6 MeV electron beam. The mean value of this three measurements was the reference for further six random persons who repeated this procedure. The results were compared for different depths (R{sub 50}, z{sub ref} and R{sub p}). To investigate the impact of different individual chambers of the same type 10 different ROOS chambers were placed by the same person in a 6, 12 and 18MeV electron beam and the measured reference depths z{sub ref} were compared. Results: The absolute positioning reproducibility is less than 0.1mm for the same person. The positioning uncertainties are increasing up to +/−0.3mm if different persons perform the chamber’s positioning within the water phantom. The comparison of the 10 different ROOS chambers resulted in reference depths z{sub ref} with deviations in the range of +/−0.45mm for all energies. Conclusion: The position accuracy of 0.2mm can be fulfilled with the TRUFIX system. The comparison of the 10 different ROOS ionization chambers showed noticeable deviations in the determined reference depth. The impact of a positioning uncertainty of about 0.3–0.4mm on the total perturbation correction will be considered.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Cherenkov imaging method for rapid optimization of clinical treatment geometry in total skin electron beam therapy

Purpose: A method was developed utilizing Cherenkov imaging for rapid and thorough determination of the two gantry angles that produce the most uniform treatment plane during dual-field total skin electron beam therapy (TSET). Methods: Cherenkov imaging was implemented to gather 2D measurements of relative surface dose from 6 MeV electron beams on a white polyethylene sheet. An intensified charge-coupled device camera time-gated to the Linac was used for Cherenkov emission imaging at sixty-two different gantry angles (1° increments, from 239.5° to 300.5°). Following a modified Stanford TSET technique, which uses two fields per patient position for full body coverage, composite images were created as the sum of two beam images on the sheet; each angle pair was evaluated for minimum variation across the patient region of interest. Cherenkov versus dose correlation was verified with ionization chamber measurements. The process was repeated at source to surface distance (SSD) = 441, 370.5, and 300 cm to determine optimal angle spread for varying room geometries. In addition, three patients receiving TSET using a modified Stanford six-dual field technique with 6 MeV electron beams at SSD = 441 cm were imaged during treatment. Results: As in previous studies, Cherenkov intensity was shown to directly correlate with dose for homogenous flat phantoms (R{sup 2} = 0.93), making Cherenkov imaging an appropriate candidate to assess and optimize TSET setup geometry. This method provided dense 2D images allowing 1891 possible treatment geometries to be comprehensively analyzed from one data set of 62 single images. Gantry angles historically used for TSET at their institution were 255.5° and 284.5° at SSD = 441 cm; however, the angles optimized for maximum homogeneity were found to be 252.5° and 287.5° (+6° increase in angle spread). Ionization chamber measurements confirmed improvement in dose homogeneity across the treatment field from a range of 24.4% at the initial angles, to only 9.8% with the angles optimized. A linear relationship between angle spread and SSD was observed, ranging from 35° at 441 cm, to 39° at 300 cm, with no significant variation in percent-depth dose at midline (R{sup 2} = 0.998). For patient studies, factors influencing in vivo correlation between Cherenkov intensity and measured surface dose are still being investigated. Conclusions: Cherenkov intensity correlates to relative dose measured at depth of maximum dose in a uniform, flat phantom. Imaging of phantoms can thus be used to analyze and optimize TSET treatment geometry more extensively and rapidly than thermoluminescent dosimeters or ionization chambers. This work suggests that there could be an expanded role for Cherenkov imaging as a tool to efficiently improve treatment protocols and as a potential verification tool for routine monitoring of unique patient treatments.

61 RADIATION PROTECTION AND DOSIMETRY↗

Characterization of Arsenic and Selenium in Coal Fly Ash to Improve Evaluations for Disposal and Reuse Potential (Final Technical Report)

Coal fly ash is a high volume waste material that is discarded in landfills and surface water impoundments across the U.S. and is also widely recycled for a variety of applications. The leaching of potential of contaminants of concern, such as arsenic (As) and selenium (Se), is often the driver of risk assessments for coal ash disposal and reuse. The extent of leachable As and Se depends on several factors related to environmental conditions and fly ash characteristics. Previous studies employed various methods to delineate the concentration, chemical form, and distribution of As and Se in fly ash materials. However, few studies have attempted to directly correlate these properties to mobilization parameters relevant to disposal and reuse. Instead, the coal residuals industries often rely upon standardized leaching protocols that can be laborious or involve hazardous chemicals. The goals of the project were to: 1) Develop and evaluate a characterization protocol that can be used to screen fly ash samples for leachability of As and Se; 2) Characterize As, Se, and associated constituents of fly ash particles at multiple length scales (nanometer to micrometer) to determine if elemental associations differ as a function of the resolution of characterization; and 3) Establish a predictive model for the chemical composition of coal ash produced annually at major U.S. coal fired power facilities on 50-year national coal supply records. For the first objective, we performed leaching experiments with 52 fly ash samples collected from 15 different U.S. power plants and representing coal feedstocks from the three major domestic coal regions. For this work, we assessed the mobilization potential of As and Se in fly ash based on standardized leaching protocols and performed multivariate and lasso regression analyses to explore correlations of leachable As and Se contents with characteristics such as major element contents, loss on ignition (LOI) and pH. The results of regression models indicated that major elements (Fe, Ca, Al) for a wide range of fly ashes can serve as predictor variables for the leaching potential of As, but not for Se. LOI and pH were not important predictive variables in the models. Both regression approaches resulted in relatively strong fits for leachable As (correlation coefficient R 2 = 0.78 for both models) compared to models for leachable Se (R 2 = 0.49). Overall, these results suggest that correlation models combined with on-site elemental analysis with portable analyzers may enable a screening method for leachable As in coal ash. For the second objective, we utilized nanoscale 2-D imaging (30-50 nm spot size) with the Hard X-ray Nanoprobe (HXN) in combination with microprobe X-ray capabilities (~5 µm resolution) to determine As and Se elemental associations in fly ash particles. Speciation of As and Se was also measured at the nano- to microscale with X-ray absorption spectroscopy. The enhanced resolution of HXN showed As and Se that were diffusely located around or comingled with Ca- and Fe-rich particles. The results also showed nanoparticles of Se attached to the surface of fly ash grains. Overall, a comparison of As and Se species across scales highlights the heterogeneity and complexity of chemical associations for these trace elements of concern in coal fly ash. For the final objective, we developed a predictive model for major element composition of coal ash in reserve at disposal sites of major U.S. coal fired power plants. This model was constructed from coal purchase records of 705 power stations from 1973-2022 and was trained on coal ash composition data showing that coal ash elemental composition is strongly associated with the source of feedstock coal. The model showed regional shifts in the major element contents of ash produced by power plants in the last 50 years, particularly for calcium and iron (expressed as %CaO and %Fe 2 O 3 ), as coal-fired power stations changed their source of coal over this time frame. Our approach enables an estimation of coal ash chemical composition that is stored in waste impoundments at individual power stations. Such information can help delineate the regional market potential for material applications that would utilize coal ash harvested from disposal sites across the U.S.

01 COAL, LIGNITE, AND PEAT↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Communication and Control for Distributed Energy Resource Integration: Phase 2 Scientific Report

The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design and proof-of-design, and Phase II involves real-world demonstration of the Phase I design architecture. The scope of work for Phase II of this ACCP involves demonstrating the Phase I design architecture in large scale real-world settings while integrating with the operations of one or more electricity supplier feeder lines. The communication and control architectures for integrated demonstration shall encompass combinations of software and hardware components, including: sensors, data acquisition and communication systems, remote monitoring systems, metering (interval revenue, real-time), local and wide area networks, Web-based systems, smart controls, energy management/information systems with control and automation of building energy loads, and demand-response management with integration of real-time market pricing. For Phase II, BPL Global shall demonstrate the Phase I design for integrating and controlling the operation of more than 10 DER units, dispersed at various locations in one or more Independent System Operator (ISO) Control Areas, at an aggregated scale of more than 1 MW, to provide grid support. Actual performance data with respect to each specified function above is to be collected during the Phase II field demonstration. At a minimum, the Phase II demonstration shall span one year of field operations. The demonstration performance will need to be validated by the target customer(s) for acceptance and subsequent implementation. An ISO must be involved in demonstration planning and execution. As part of the Phase II work, BPL Global shall develop a roadmap to commercialization that identifies and quantifies the potential markets for the integrated, aggregated DER systems and for the communication and control technologies demonstrated in Phase I. In addition, the roadmap must identify strategies and actions, as well as the regional and national markets where the aggregated DER systems with communication and control solutions will be introduced, along with a timeline projected for introduction into each identified market. In Phase I of this project, we developed a proof-of-concept ACCP system and architecture and began to test its functionality at real-world sites. These sites had just over 10 MW of DERs and allowed us to identify what needed to be done to commercialize this concept. As a result, we started Phase II by looking at our existing platform and identified its strengths and weaknesses as well as how it would need to evolve for commercialization. During this process, we worked with different stakeholders in the market including: Independent System Operators, DER owners and operators, and electric utility companies to fully understand the issues from all of the different perspectives. Once we had an understanding of the commercialized ACCP system, we began to document and prepare detailed designs of the different system components. The components of the system with the most significant design improvements were: the on-site remote terminal unit, the communication technology between the remote site and the data center, and the scalability and reliability of the data center application. As we began to implement the Phase II ACCP system, we upgraded the real-world demonstration sites from Phase I of the project as well as added additional sites to broaden the types of DER the platform was tested with. We worked with the owners and operators of these sites to understand how the system was meeting their needs and made modifications throughout the project as needed. This also included an effort to continue to understand the barriers to commercial adoption of the ACCP architecture and standardized communication protocols. The final aspect of this phase of the project was to prepare resources to aid in the commercial adoption of the ACCP architecture and standardized communication protocols. This entailed: presentations at conferences, published articles and papers, and web-based technical resources to provide tools to aid in the design and implementation of ACCP systems.

03 NATURAL GAS↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗