Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

In-situ Lunar Launch and Landing Pad Construction with Regolith-Thermoset Polymer Composite Materials

Lunar launch and landing pads are necessary to mitigate risks to lander/ascent vehicles and surrounding surface assets from rocket plume ejected regolith. The current state of the art of landing and launching from the lunar surface is to land/launch on unprepared regolith surfaces. Though this has been a relatively successful approach, significant risks exist for the Artemis Program due to higher thrust levels leading to increased ejecta and cratering, presence of co-located assets in the ejecta path, and potential strict surface levelness requirements. Regolith-thermoset polymer composite materials were developed and evaluated for off Earth launch and landing pad applications. Performance under hot fire conditions was assessed for two simulated Starship lunar launch/landing environments, one targeting thermal conditions and the second targeting pressure conditions. Paver test articles were prepared at 20% and 11% polymer mass fractions. Sintered paver test articles were prepared with 20% polymer grouting filling the seams between pavers. Though significant erosion was experienced during the more extreme thermal testing conditions, all test articles successfully mitigated regolith ejecta from plume effects. A concept for preparing and emplacing the materials was developed and tested in laboratory conditions. The testing evaluated the feasibility of using twin and single screw extruder technology to mix, convey and deposit materials. Both the twin and single screw extruders were capable of processing and extruding the composite with a maximum of 90% mass fraction of regolith achieved by the twin screw extruder.A primary risk for application of regolith-thermoset polymer composites as lunar launch/landingpad is the mass of polymer required to be landed on the moon. Calculations were performed that show that a 100 m diameter, 0.025 m thick pad with polymer mass fraction of 15% will require a payload mass of 72 mt to the Lunar surface. This is below the planned Starship payload capacity to the lunar surface of 100 mt. The regolith-thermoset polymer composite based construction approach proved feasibility in three critical areas: performance under launch/landing conditions, demonstration of a mixing and depositing strategy, and fitting within the planned lunar payload capacity. It is recommended that materials and systems be developed to TRL 6 for a small-scale lunar demonstration of emplacement of a launch/landing pad via a CLPS mission to support Artemis Program roadmap gap closure activities.

ISRU↗

CAUSE OF A MULTI-SPECIES RADIOIODINE PLUME THAT IS INCREASING IN CONCENTRATION

Field and laboratory studies were carried out to understand the cause for steady increases in {sup 129}I concentrations emanating from radiological seepage basins located on the Savannah River Site. The basins were closed in 1988 by adding limestone and blast furnace slag and then capping with a RCRA low permeability engineered cover. Groundwater {sup 129}I concentrations in a well near the seepage basin in 1993 were 200 pCi L{sup -1} and are presently between 400 and 1000 pCi L{sup -1}. Iodine speciation in the plume was not uniform. Near the source, the iodine was comprised of 86% iodide, 2% iodate, and 12% organo-iodine (total activity = 178 pCi L{sup -1}). Whereas, groundwater iodine speciation 365 m down stream (25 m up stream from a wetland) was 0% iodide, 93% iodate, and 7% organo iodine. Batch desorption studies demonstrated that high concentrations of {sup 129}I could be incrementally desorbed from an archived seepage basin sediment sample by raising the pH. Batch sorption studies showed that iodate, IO{sub 3}{sup -}, sorbed more strongly than iodide, I{sup -}, to a subsurface clayey sediment, but equally well as iodide to a subsurface sandy sediment and a wetland sediment. Placing an organic-rich wetland sediment, but not nearby mineral sediments, under reducing (or microaerobic) conditions resulted in a large decrease in iodide K{sub d} values (from 73 to 10 mL g{sup -1}) and iodate K{sub d} values (from 80 to 7 mL g{sup -1}). Between pH and reduction-oxidation potential, it appears that pH seems to have a stronger influence on iodide and iodate sorption to mineral sediment. This may not be true for sediments containing higher concentrations of organic matter, such as the 7.6% organic matter sediment used in this study. First order calculations based on desorption studies with seepage basin sediments indicate that the modest increase of 0.7 pH units detected in the study site groundwater over the last 17 years since closure of the seepage basin may be sufficient to produce the observed increased groundwater {sup 129}I concentrations. Groundwater monitoring of the plume at the F-Area seepage basin has shown that the migration of many of the high risk radionuclides originally present at this complex site has been attenuated. However, {sup 129}I continues to leave the source at a rate that may have been exacerbated by the initial remediation efforts. This study underscores the important of identifying the appropriate in situ stabilization technologies for all contaminants present at a source term, especially if their geochemical behaviors differ.

54 ENVIRONMENTAL SCIENCES↗

Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY 2012

The US Department of Energy (DOE) National Nuclear Security Administration (NNSA), Nevada Site Office (NSO), Environmental Management’s Soils Activity has authorized the Desert Research Institute (DRI) to conduct field assessments of potential sediment transport of contaminated soil from Corrective Action Unit (CAU) 550, Smoky Contamination Area (CA), during precipitation runoff events. CAU 550 includes Corrective Action Sites (CASs) 08-23-03, 08-23-04, 08-23-06, and 08-23-07; these CASs are associated with tests designated Ceres, Smoky, Oberon, and Titania, respectively. Field measurements at the T-4 Atmospheric Test Site, CAU 370, suggest that radioactive material may have migrated along a shallow ephemeral drainage that traverses the site (NNSA/NSO, 2009). (It is not entirely clear how contaminated soils got into their present location at the T-4 Site, but flow to the channel has been redirected and the contamination does not appear to be migrating at present.) Although DRI initially looked at the CAU 370 site, given that it could not be confirmed that migration of contamination into the channel was natural, an alternate study site was selected at CAU 550. Aerial surveys in selected portions of the Nevada National Security Site (NNSS) also suggest that radioactivity may be migrating along ephemeral channels in Areas 3, 8, 11, 18, and 25 (Colton, 1999). Figure 1 shows the results of a low-elevation aerial survey (Colton, 1999) in Area 8. The numbered markers in Figure 1 identify ground zero for three safety experiments conducted in 1958 [Oberon (number 1), Ceres (number 2), and Titania (number 4)] and a weapons effects test conducted in 1964, Mudpack (number 3). This survey suggests contaminants may be migrating down the ephemeral channels that traverse CAU 550. Note particularly the lobe of higher concentration extending southeastward at the south end of the high concentration area marked as number 3 in Figure 1. CAU 550 in Area 8 of the NNSS was selected for the study because the aerial survey indicates that a channel mapped on the United States Geological Survey topographic map of the area traverses the south end of the area of surface contamination; this channel lies south of the point marked number 3 in Figure 1, and anecdotal information indicates that sediment has been deposited on the road bordering the southeast boundary of the CAU from an adjacent channel (Traynor, J, personal communication, 2011). Because contamination is particularly close to the boundary of CAU 550, Smoky CA, it is important to know if contaminants are moving, what meteorological conditions result in movement of contaminated soils, and what particle size fractions associated with contamination are involved. Closure plans are being developed for the CAUs on the NNSS. The closure plans may include post-closure monitoring for possible release of radioactive contaminants. Determining the potential for transport of contaminated soils under ambient climatic conditions will facilitate an appropriate closure design and post-closure monitoring program.

54 ENVIRONMENTAL SCIENCES↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a One-Domain Volume-Averaged Navier–Stokes Solver

The interaction between a high-enthalpy flow and a thermal protection material is inherently multiscale and multiphysics. In conventional aerothermal analyses, the external flow and material response are generally modeled using separate computational domains coupled through boundary conditions at the material surface. Although this approach has supported many practical applications, it requires assumptions about the location and behavior of the interface and may become difficult to apply when material decomposition, internal reactions, and surface recession substantially alter the porous structure. This report presents the development of a one-domain formulation in which the free-fluid and porous-material regions are represented within a single computational domain. The formulation is based on the volume-averaged Navier–Stokes (VANS) equations, derived from the governing equations for reacting, compressible flow and condensed material. Volume averaging transfers the influence of the unresolved material microstructure to the macroscale equations through effective transport properties, interfacial source terms, and dispersion fluxes. Particular attention is given to regions in which porosity and permeability vary rapidly, including the diffuse transition between a porous material and the surrounding fluid. The resulting equations are implemented in the Porous-material Analysis Toolbox based on OpenFOAM (PATO). The report describes the pressure–velocity coupling strategy used by the solver, examines spatial filtering techniques for deriving effective properties, and evaluates the influence of a smoothly varying interface permeability. Numerical demonstrations include canonical porous-flow configurations, a flow-tube configuration representative of FiberForm® permeability experiments, and the oxidation of a porous carbon material. The purpose of this work is to establish a mathematical and computational foundation for a unified treatment of flow and thermal protection material response. The present formulation is intended to support the progressive inclusion of additional physical processes, including multicomponent transport, finite-rate gas–surface chemistry, pyrolysis, internal oxidation, and material recession. It also provides a framework for connecting pore-scale simulations and microstructural characterization with macroscale aerothermal-response calculations. This report is intended for researchers and engineers working in computational fluid dynamics, porous-media transport, material response, and thermal protection system modeling. It documents both the theoretical development and the initial numerical assessment of the one-domain approach, while identifying the closure of effective and dispersion terms as an important subject for continued investigation.

Ablation↗

Creep Properties of Shale and Predicted Impact on Proppant Embedment for the Caney Shale, Oklahoma

The Caney shale is an emerging hydrocarbon play located in southwest Oklahoma, USA. Within the Caney shale exist facies which were initially dubbed “reservoir” and “ductile” based on evaluation of well logging data. While past work has shown the distinction of “brittle” and “ductile” is not mechanically justifiable according to formal definitions, here the current work shows some important differences between nominally ductile and reservoir zones. First, the “ductile” zones are more clay rich and have textural differences which can be expected to lead to differences in mechanical properties. One important impact of these differences is observed in triaxial creep experiments showing the “ductile” zones are more prone to creep deformation. Numerical simulations predict the “reservoir” zones will experience very little proppant embedment due to creep deformation of hydraulic fractures around proppant particles. On the other hand, “ductile” zones can be expected to undergo creep-driven proppant embedment leading to loss of fracture aperture ranging up to 100% loss, depending upon the spatial density of the proppant distribution. Hence, this research shows the identification of nominally “ductile” zones from well logs, while a misnomer, can be useful in finding clay-rich, creep-prone zones which will be the most prone to proppant embedment and hence vulnerable to greater production decline over time.

58 GEOSCIENCES↗

Analysis of Impacts of Terminal Restrictions on Departures in D10 TRACON

The D10 – Dallas-Fort Worth Terminal Radar Approach CONtrol (TRACON) is an air traffic facility that controls and manages aircraft and airspace that consists of multiple airports located in the North Texas area. From an air traffic management standpoint, one of the main challenges in the D10 TRACON is the departure fix capacity as multiple airports compete for resources. This problem is magnified when en route demand/capacity imbalance and inclement weather around the TRACON reduce the capacity at the terminal fixes. This leads to multiple, dynamic Traffic Management Initiative (TMI) restrictions being issued by the Air Traffic Control (ATC) on departing flights. This, in turn, propagates delay to the surface of each airport within the metroplex. The NASA Airspace Technology Demonstration 2 (ATD-2) Phase 3 is deployed in D10 to demonstrate new technologies developed to manage the Integrated Arrival, Departure, and Surface (IADS) traffic in a metroplex environment where multiple airports are interacting and sharing resources at the terminal boundary. This paper uses the ATD-2 terminal restriction data collected in the D10 TRACON to quantify the impact of restrictions on the demand, analyze the relation between terminal restrictions and departure taxi time on airport surface, and establish relationships between restrictions and surface delay. We found that the restrictions on departure flights have a direct adverse effect on departure excess taxi time on the airport surface.

ATD-2↗

Analysis of Impacts of Terminal Restrictions on Departures in D10 TRACON

The D10 – Dallas-Fort Worth Terminal Radar Approach CONtrol (TRACON) is an air traffic facility that controls and manages aircraft and airspace that consists of multiple airports located in the North Texas area. From an air traffic management standpoint, one of the main challenges in the D10 TRACON is the departure fix capacity as multiple airports compete for resources. This problem is magnified when en route demand/capacity imbalance and inclement weather around the TRACON reduce the capacity at the terminal fixes. This leads to multiple, dynamic Traffic Management Initiative (TMI) restrictions being issued by the Air Traffic Control (ATC) on departing flights. This, in turn, propagates delay to the surface of each airport within the metroplex. The NASA Airspace Technology Demonstration 2 (ATD-2) Phase 3 is deployed in D10 to demonstrate new technologies developed to manage the Integrated Arrival, Departure, and Surface (IADS) traffic in a metroplex environment where multiple airports are interacting and sharing resources at the terminal boundary. This paper uses the ATD-2 terminal restriction data collected in the D10 TRACON to quantify the impact of restrictions on the demand, analyze the relation between terminal restrictions and departure taxi time on airport surface, and establish relationships between restrictions and surface delay. We found that the restrictions on departure flights have a direct adverse effect on departure excess taxi time on the airport surface.

ATD-2↗

Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with waste unit remediation activities to streamline regulatory approval and execution. Achieving footprint reduction fulfills the Government's responsibility to address legacy contamination; allows earlier completion of legally enforceable compliance agreement milestones; and enables future potential reuse of DOE resources, including land and infrastructure for other missions. Over the last 3.5 years significant achievements were met that contributed to footprint reduction, including the closure of 41 waste units (including 20 miles of radiologically contaminated stream) and decommissioning of 30 facilities (including the precedent setting in situ closure of two former production reactors, the first in the DOE Complex). Other notable achievements included the removal of over 39,750 cubic meters of debris and 68,810 cubic meters of contaminated soils, including 9175 cubic meters of lead-contaminated soil from a former site small arms testing range and treatment of 1,262 cubic meters of tritium-laden soils and concrete using a thermal treatment system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soil Desiccation Treatability Testing at BC Waste Disposal Cribs

During Hanford’s production period, low-level waste products generated from chemical processing of uranium fuel rods were discharged directly to the ground through a system of cribs and trenches located in the 200-BC-1 Operable Unit (OU). The site consists of 6 cribs and 20 trenches that received more than 117,000 m3 of radioactive liquid waste discharged to the soil. These unlined infiltration galleries held volumes of liquid waste while it seeped into the ground, with the understanding that the 100 m (330 ft) thick vadose zone in the area would effectively capture the effluent and prevent groundwater impacts. A conceptual model showing the operation of cribs and trenches is shown in Figure 1. Data show effluent from the 26 cribs and trenches containing about 410 curies of Technetium-99 (Tc-99) is primarily located between 30 m and 70 m (98 ft and 230 ft) depth (Corbin et al., 2005; Ward et al., 2004). Despite no evidence indicating that the contamination has reached the groundwater at BC cribs and trenches, the mobility of Tc-99 had been demonstrated in laboratory tests and was recognized as a threat to groundwater at the site. Using data from numerical models, laboratory analyses, field investigations, and information on historical discharges, the EPA and Ecology identified Tc-99 and U contamination of the vadose zone as a remediation priority. The U.S. DOE was notified by EPA and Ecology regarding risks associated with Tc-99 contamination in a letter requesting development of a strategy for improved methods to understand the nature and extent of vadose zone contamination, specifically Tc-99, and to develop remedial options for addressing such contamination. To develop the appropriate technology for characterizing, remediating, and monitoring the deep vadose zone Tc-99 contamination, the U.S. DOE worked with the EPA and Ecology to create a Treatability Test Plan under a Remedial Investigation/Feasibility Study (RI/FS) for the Hanford 200 Areas. Under this RI/FS, it was determined that a treatability test for soil desiccation should be carried out as it was identified as a promising in-situ treatment technology for mitigating risks posed by Tc-99 contamination to the groundwater table. The BC Cribs and Trenches site was identified as a representative site for Tc-99 and U contamination and selected for the soil desiccation treatability test. In this chapter, we summarize the overlying regulatory framework of RI/FS and treatability tests and illustrate how development and experimentation supported the evaluation of selected remedies. We briefly discuss the RI/FS for the 200 Areas of the Hanford Site and focus on the soil desiccation treatability testing performed at the BC cribs and trenches site under the Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau (DVZ-TT). The DVZ-TT is one component of the remedial investigation/feasibility study for the Hanford 200 Areas and represents the underlying regulatory framework that drives site operations towards records of decision and site closure.

Mangel, Adam R.↗

FY19 Status of the Full Circumference Examination of the Inner Container Closure Weld Region for Selected 3013 DE Containers

One of the main focus areas of the 3013 Surveillance Program is a thorough evaluation of the inner container closure weld region (ICCWR) opened for destructive examination (DE). As part of the protocol to investigate the corrosion in the ICCWR a laser confocal microscope (LCM) is used to perform close visual examination of the surface and measurements of corrosion features on the surface. In FY17, DE containers from FY13 through FY16 were evaluated to select candidates for a full circumference analysis of the ICCWR. In FY18, the selected DE containers for full circumference evaluation (FCE) were processed according to the ICCWR protocol and LCM data collection was completed for the full circumference only for FY15 DE07. In FY19 the remaining DE containers were completed. The ICCWR protocol was completed as follows: (1) the FCE containers were sectioned into quarters and the weld removed to access the ICCWR; (2) a series of images of the ICCWR full circumference were taken using a stereo microscope and assembled into panoramic views; (3) SEM/EDS analysis performed on selected sections showed what is most likely corrosion products on the surface and chlorides randomly dispersed; (4) the presence of chlorides was also confirmed with ion chromatography of citric acid washes, in which FY15 DE07 and FY16 DE05 showed a significant amount of chlorides with FY15 DE08 showing the less amount of chlorides; (5) dye penetrant examination was performed on the interior and exterior surfaces of all the sidewall sections but reveled no relevant indication of surface-breaking defects, (6) finally, as described above, the full circumference examination of the ICCWR by LCM was completed. The three ICCWRs show general and localized corrosion on the surface. However, FY15 DE08 show more areas with agglomerated pits in Zones 2 and 3 than the other two DEs. The major suspect corrosion events were observed for FY15 DE07 on Sections C1 and C2 and for FY15 DE08 on Section C2. These events correspond to suspect cracks or crack-like features identified with a unique name to easily refer to each feature. FY15 DE07 shows a crack-like feature, identified as Acrux, in Section C1 and three features in Section C2 identified as Bellatrix, Cursa Minor and Cursa Major. Acrux and Bellatrix are located at the boundary of Zone 2 and Zone 3. Cursa Minor and Cursa Major are in Zone 2. FY15 DE08 shows two crack-like features, identified as Denebola and Draco, in Section C2. Both features are located at the boundary of Zone 2 and Zone 3. However, gas analysis and statistical evaluation of the gas compositions and pressures via GEST analyses suggest that leakage between the OI and IC volumes was unlikely. Additional characterization and analysis will be performed on the locations where the cracks were found.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 years of environmental remediation in the general separations area of the Savannah river site: lessons learned about what worked and what did not work in soil and groundwater cleanup - 15270

The Savannah River Site, which is owned and administered by the US Department of Energy, covers approximately 900 square kilometers. The General Separation Area is located in the center of the site and includes: radioactive material chemical separations facilities, radioactive waste tank farms, radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the General Separation Area from the mid-1950's through the mid-1990's. Operations at the F Canyon began in 1954 and at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility and Low Level Radioactive Waste Disposal Facility received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970's through 1990's led to changes in waste management and environmental cleanup practices. The US Congress passed the Clean Air Act in 1970 and the Clean Water Act in 1972; the Resource Conservation and Recovery Act was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act was enacted by Congress in 1980; and the Federal Facilities Compliance Act was signed into law in 1992. Environmental remediation at the Savannah River Site essentially began with a 1987 Settlement Agreement between the Savannah River Site and the State of South Carolina. The site manages several of the larger groundwater remedial activities under the Resource Conservation and Recovery Act for facilities recognized early on as environmental problems. All subsequent remediation projects are managed under a tri-party agreement (Department of Energy, Environmental Protection Agency, and South Carolina Department of Health and Environmental Control) through the Federal Facilities Agreement. Environmental remediation activities during the past 25 years have stabilized and capped seepage basins as well as consolidated and capped waste units and burial grounds in the General Separation Area. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Concentrations of contaminants in the aquifers beneath the General Separation Area and in surface water streams in the General Separation Area have decreased over the past 25 years. Closure of 65 waste sites and 4 Resource Conservation and Recovery Act facilities has been successfully accomplished. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process of remediating the General Separations Area. Geo-textile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive and enhanced natural processes to address contamination are much more cost effective than pump and treat systems. Forest irrigation can be very effective in water management situations with non-accumulative contaminants such as tritium and volatile organic contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive contamination from 1920-50's at an urban site of the New York City and interim remedial action - 15630

The former Wolff-Alport Chemical Company operated at the location in densely populated urban area in Queens, New York, between 1920 to about 1954. The company imported, stored on-site and processed monazite sand ores from the Belgium Congo. The extracted refined products enriched in rare-earth metals were sold on the commercial market. The process residues, rich in thorium and its progeny, were originally disposed of directly to the city sewer line and probably on-site also. The site's buildings are currently occupied by the auto shops, corner delicatessen store, light construction company, ice maker/distributor, and two residential apartments. Preliminary site investigations found multiple areas with elevated levels of direct gamma radiation with the maximum reported rates of 22 micro-sievert/hour (2.2 milli-rem/hour) at surface level and 40 micro-sievert/hour (4 milli-rem/hour) inside sewer manhole access. The thoron (Rn-220) gas air concentration in outdoor areas was reported reaching 13.5 kBq/m{sup 3} (366 pCi/L) and the radon (Rn-222) gas air concentrations was reported exceeding 148 Bq/ m{sup 3} (4 pCi/L) in some buildings. The dose assessments indicated that, under realistic scenarios, some members of the public were likely to receive the radiation exposure from this contamination in excess of the New York City and Nuclear Regulatory Commission general public radiation dose limit of 1 milli-sievert /yr (100 milli-rem/yr). The interim remedial action was planned and conducted by the U.S. Environmental Protection Agency (U.S. EPA) Region 2 in close cooperation with the New York City and New York State in 2012-13. The purpose of the action was to take necessary interim measures to reduce annual public dose below limit of 1 milli-sievert/yr (100 milli-rem/yr) and reduce radon gas concentration levels in impacted indoor spaces below U.S. EPA Action Level for residencies of 148 Bq/ m{sup 3} (4 pCi/L). In order to achieve these goals, the following actions were taken: detailed radiological and occupancy surveys; development of realistic exposure scenarios; dose assessments; installation of the fence and gates around the 'backyard' portion of the site; vegetation removal; development and detailed assessment of the radiation shielding options; application of the multilayer radiation shielding in some buildings, portions of the sidewalk and unpaved areas; mitigation of radon/thoron gas entry point; and installation of the radon mitigation system in one of the buildings. The preliminary post-action analyses indicated that the action goal would likely be achieved. The interim remedial action was conducted in a tight urban setting; it has significantly reduced public health risk from radiation without closure of businesses that continued operating within the site perimeter. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Statistical Analysis of Tank 5 Floor Sample Results (U)

Sampling has been completed for the characterization of the residual material on the floor of Tank 5 in the F-Area Tank Farm at the Savannah River Site (SRS), near Aiken, SC. The sampling was performed by Savannah River Remediation (SRR) LLC using a stratified random sampling plan with volume-proportional compositing. The plan consisted of partitioning the residual material on the floor of Tank 5 into three non-overlapping strata: two strata enclosed accumulations, and a third stratum consisted of a thin layer of material outside the regions of the two accumulations. Each of three composite samples was constructed from five primary sample locations of residual material on the floor of Tank 5. Three of the primary samples were obtained from the stratum containing the thin layer of material, and one primary sample was obtained from each of the two strata containing an accumulation. This report documents the statistical analyses of the analytical results for the composite samples. The objective of the analysis is to determine the mean concentrations and upper 95% confidence (UCL95) bounds for the mean concentrations for a set of analytes in the tank residuals. The statistical procedures employed in the analyses were consistent with the Environmental Protection Agency (EPA) technical guidance by Singh and others [2010]. Savannah River National Laboratory (SRNL) measured the sample bulk density, nonvolatile beta, gross alpha, and the radionuclide1, elemental, and chemical concentrations three times for each of the composite samples. The analyte concentration data were partitioned into three separate groups for further analysis: analytes with every measurement above their minimum detectable concentrations (MDCs), analytes with no measurements above their MDCs, and analytes with a mixture of some measurement results above and below their MDCs. The means, standard deviations, and UCL95s were computed for the analytes in the two groups that had at least some measurements above their MDCs. The identification of distributions and the selection of UCL95 procedures generally followed the protocol in Singh, Armbya, and Singh [2010]. When all of an analyte's measurements lie below their MDCs, only a summary of the MDCs can be provided. The measurement results reported by SRNL are listed, and the results of this analysis are reported. The data were generally found to follow a normal distribution, and to be homogenous across composite samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Tank 5F Final Characterization Samples-2011 (U)

The Savannah River National Laboratory (SRNL) was requested by SRR to provide sample preparation and analysis of the Tank 5F final characterization samples to determine the residual tank inventory prior to grouting. Two types of samples were collected and delivered to SRNL: floor samples across the tank and subsurface samples from mounds near risers 1 and 5 of Tank 5F. These samples were taken from Tank 5F between January and March 2011. These samples from individual locations in the tank (nine floor samples and six mound Tank 5F samples) were each homogenized and combined in a given proportion into 3 distinct composite samples to mimic the average composition in the entire tank. These Tank 5F composite samples were analyzed for radiological, chemical and elemental components. Additional measurements performed on the Tank 5F composite samples include bulk density and water leaching of the solids to account for water soluble species. With analyses for certain challenging radionuclides as the exception, all composite Tank 5F samples were analyzed and reported in triplicate. The target detection limits for isotopes analyzed were based on customer desired detection limits as specified in the technical task request documents. SRNL developed new methodologies to meet these target detection limits and provide data for the extensive suite of components. While many of the target detection limits were met for the species characterized for Tank 5F, as specified in the technical task request, some were not met. In a few cases, the relatively high levels of radioactive species of the same element or a chemically similar element precluded the ability to measure some isotopes to low levels. The Technical Task Request allows that while the analyses of these isotopes is needed, meeting the detection limits for these isotopes is a lower priority than meeting detection limits for the other specified isotopes. The isotopes whose detection limits were not met in all cases included the following: Al-26, Sn-126, Sb-126, Sb-126m, Eu-152 and Cf-249. SRNL, in conjunction with the plant customer, reviewed all these cases and determined that the impacts were negligible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization of the St. Peter Sandstone in the Illinois Basin for CO2 Sequestration

This project is part of a larger project co-funded by the United States Department of Energy (US DOE) under cooperative agreement DE-FE0002068 from 12/08/2009 through 9/31/2014. The study is to evaluate the potential of formations within the Cambro-Ordovician strata above the Mt. Simon Sandstone as potential targets for carbon dioxide (CO2) sequestration in the Illinois and Michigan Basins. This report evaluates the potential injectivity of the Ordovician St. Peter Sandstone. The evaluation of this formation was accomplished using wireline data, core data, pressure data, and seismic data acquired through funding in this project as well as existing data from two additional, separately funded projects: the US DOE funded Illinois Basin – Decatur Project (IBDP) being conducted by the Midwest Geological Sequestration Consortium (MGSC) in Macon County, Illinois, and the Illinois Industrial Carbon Capture and Sequestration (ICCS) Project funded through the American Recovery and Reinvestment Act (ARRA), which received a phase two award from DOE. This study addresses the question of whether or not the St. Peter Sandstone may serve as a suitable target for CO2 sequestration at locations within the Illinois Basin where it lies at greater depths (below the underground source of drinking water (USDW)) than at the IBDP site. The work performed included numerous improvements to the existing St. Peter reservoir model created in 2010. Model size and spatial resolution were increased resulting in a 3 fold increase in the number of model cells. Seismic data was utilized to inform spatial porosity distribution and an extensive core database was used to develop porosity-permeability relationships. The analysis involved a Base Model representative of the St. Peter at “in-situ” conditions, followed by the creation of two hypothetical models at in-situ + 1,000 feet (ft.) (300 m) and in-situ + 2,000 ft. (600 m) depths through systematic depthdependent adjustment of the Base Model parameters. Properties for the depth shifted models were based on porosity versus depth relationship extracted from the core database followed by application of the porosity-permeability relationship. Each of the three resulting models were used as input to dynamic simulations with the single well injection target of 3.2 million tons per annum (MTPA) for 30 years using an appropriate fracture gradient based bottom hole pressure limit for each injection level. Modeling results are presented in terms of well bottomhole pressure (BHP), injection rate profiles, and three-dimensional (3D) saturation and differential pressure volumes at selected simulation times. Results suggest that the target CO2 injection rate of 3.2 MTPA may be achieved in the St. Peter Sandstone at in-situ conditions and at the in-situ +1,000 ft. (300 m) depth using a single injector well. In the latter case the target injection rate is achieved after a ramp up period which is caused by multi-phase flow effects and thus subject to increased modeling uncertainty. Results confirm that the target rate may not be achieved at the in-situ +2,000 ft. (600 m) level even with multiple wells. These new modeling results for the in-situ case are more optimistic than previous modeling results. This difference is attributed to the difference in methods and data used to develop model permeability distributions. Recommendations for further work include restriction of modeling activity to the in-situ +1,000 ft. (300 m) and shallower depth interval, sensitivity and uncertainty analysis, and refinement of porosity and permeability estimates through depth and area selective querying of the available core database. It is also suggested that further modeling efforts include scope for evaluating project performance in terms of metrics directly related to the Environmental Protection Agency (EPA) Class VI permit requirements for the area of review (AoR) definition and post injection site closure monitoring.

Will, Robert↗