Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Launching the Future... Constellation Program at KSC

With the Constellation Program, NASA is entering a new age of space exploration that will take us back to the Moon, to Mars, and beyond, and NASA is developing the new technology and vehicles to take us there. At the forefront are the Orion spacecraft and the Ares I launch vehicle. As NASA's gateway to space, Kennedy Space Center (KSC) will process and launch the new vehicles. This will require new systems and extensive changes to existing infrastructure. KSC is designing a new mobile launcher, a new launch control system, and new ground support equipment; modifying the Vehicle Assembly Building, one of the launch pads, and other facilities; and launching the Ares I-X flight test. It is an exciting and challenging time to be an engineer at KSC.

Denson, Erik C.↗

Recent Weather Technologies Delivered to America's Space Program by the Applied Meteorology Unit

The Applied Meteorology Unit (AMU) is a unique joint venture of NASA, the Air Force and the National Weather Service (NWS) and has been supporting the Space Program for nearly two decades. The AMU acts as a bridge between the meteorological research community and operational forecasters by developing, evaluating and transitioning new technology and techniques to improve weather support to spaceport operations at the Eastern Range (ER) and Kennedy Space Center. Its primary customers are the 45th Weather Squadron at Cape Canaveral Air Force Station (CCAFS), the Spaceflight Meteorology Group at Johnson Space Center and the National Weather Service Office in Melbourne, FL. Its products are used to support NASA's Shuttle and ELV programs as well as Department of Defense and commercial launches from the ER. Shuttle support includes landing sites beyond the ER. The AMU is co-located with the Air Force operational forecasters at CCAFS to facilitate continuous two-way interaction between the AMU and its operational customers. It is operated under a NASA, Air Force, and NWS Memorandum of Understanding (MOU) by a competitively-selected contractor. The contract, which is funded and managed by NASA, provides five full time professionals with degrees in meteorology or related fields, some of whom also have operational experience. NASA provides a Ph.D.- level NASA civil service scientist as Chief of the AMU. The AMU is tasked by its customers through a unique, nationally recognized process. The tasks are limited to development, evaluation and operational transition of technology to improve weather support to spaceport operations and providing expert advice to the customers. The MOU expressly forbids using the AMU resources to conduct operations or do basic research. The presentation will provide a brief overview of the AMU and how it is tasked by its customers to provide high priority products and services. The balance of the presentation will cover a sampling of products delivered over the last 18 years that are currently in operational use. Each example will describe the problem to be solved, the solution provided, and the operational benefits of implementing that solution.

Bauman, WIlliam, H., III↗

On the hazard of hydrogen explosions at space shuttle launch pads

This report was prepared in support of efforts to assess the hazard of accidental explosions of unburned hydrogen at space shuttle launch pads. It begins with presentation of fundamental detonation theory and a review of relevent experiments. A scenario for a catastrophic explosion at a KSC launch pad and a list of necessary conditions contributing to it is proposed with a view to identifying those conditions which, if blocked, would prevent a catastrophe. The balance of the report is devoted to juxtaposition of reassuring and disquieting facts, presentation of a set of recommendations that ignition of hydrogen-air mixtures by weak ignition sources in unconfined geometries may produce a detonation, provided the effective flame area in the initial fireball is rapidly increased by turbulent mixing. Another conclusion is that detonability limits can be different from and narrower than flammability limits only if one restricts the rate of work that can be done on a flammable gas by mechanical agencies acting on its boundaries.

Russell, John M.↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗

Vandenberg Air Force Base Upper Level Wind Launch Weather Constraints

The 30th Operational Support Squadron Weather Flight (30 OSSWF) provides comprehensive weather services to the space program at Vandenberg Air Force Base (VAFB) in California. One of their responsibilities is to monitor upper-level winds to ensure safe launch operations of the Minuteman III ballistic missile. The 30 OSSWF tasked the Applied Meteorology Unit (AMU) to analyze VAFB sounding data with the goal of determining the probability of violating (PoV) their upper-level thresholds for wind speed and shear constraints specific to this launch vehicle, and to develop a tool that will calculate the PoV of each constraint on the day of launch. In order to calculate the probability of exceeding each constraint, the AMU collected and analyzed historical data from VAFB. The historical sounding data were retrieved from the National Oceanic and Atmospheric Administration Earth System Research Laboratory archive for the years 1994-2011 and then stratified into four sub-seasons: January-March, April-June, July-September, and October-December. The maximum wind speed and 1000-ft shear values for each sounding in each subseason were determined. To accurately calculate the PoV, the AMU determined the theoretical distributions that best fit the maximum wind speed and maximum shear datasets. Ultimately it was discovered that the maximum wind speeds follow a Gaussian distribution while the maximum shear values follow a lognormal distribution. These results were applied when calculating the averages and standard deviations needed for the historical and real-time PoV calculations. In addition to the requirements outlined in the original task plan, the AMU also included forecast sounding data from the Rapid Refresh model. This information provides further insight for the launch weather officers (LWOs) when determining if a wind constraint violation will occur over the next few hours on day of launch. The interactive graphical user interface (GUI) for this project was developed in Microsoft Excel using Visual Basic for Applications. The GUI displays the critical sounding data easily and quickly for the LWOs on day of launch. This tool will replace the existing one used by the 30 OSSWF, assist the LWOs in determining the probability of exceeding specific wind threshold values, and help to improve the overall upper winds forecast for the launch customer.

Shafer, Jaclyn A.↗

Improved Techniques for Measuring Static Ground Wind Loads on the NASA Space Launch System Mobile Launcher 2

Vertical distribution of static ground wind loads was directly measured on Mobile Launcher ground support hardware to the NASA Space Launch System (SLS) at 1.75% scale in the Langley Research Center 14- by 22-Foot Subsonic Tunnel. Low-speed wind tunnel testing in the liftoff phase of flight was conducted for the SLS Block 1B family of rockets with their associated ground support systems. Improved methods for measuring and estimating static ground wind loads on the launch tower assembly are introduced in detail. A novel, distributed loads measurement technique is introduced and compared against lower-fidelity, previously utilized methods.

Ground Wind Loads↗

NextSTEP Appendix A Modular ECLSS Effort Lessons Learned

NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.

NextSTEP↗

NextSTEP Appendix A Modular ECLSS Effort Lessons Learned

NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.

NextSTEP↗

X-34 Program Status

The National Aeronautics and Space Administration (NASA) initiated the current X-34 program in 1996 as part of the U.S. Space Agencie's effort to dramatically reduce the cost of access to space. The X-34 is the First in a series of 'Pathfinder' vehicles designed to conduct flight testing of key launch vehicle technologies at low cost. The X-34 program has moved rapidly from the drawing board to hardware buildup with the first flight scheduled for 1999. The development of the X-34 has been accomplished by a unique blend of industry and government organizations and personnel working closely together. The program will provide rocket-powered winged vehicles that can fly sub-orbital missions in support of advanced reusable launch vehicle (RLV) technology development. In addition, the X-34 vehicles will represent a hypersonic testbed for advanced experiments in the aeronautical sciences.

London, John R., III↗

X-34 Program Status

The National Aeronautics and Space Administration (NASA) initiated the current X-34 program in 1996 as part of the U.S. space agency's effort to dramatically reduce the cost of access to space. The X-34 is the first in a series of "Pathfinder" vehicles designed to conduct flight testing of key launch vehicle technologies at low cost. The X-34 program has moved rapidly from the drawing board to hardware build-up, with the first flight scheduled for 1999. The development of the X-34 has been accomplished by a unique blend of industry and government organizations and personnel working closely together. The program will provide rocket powered winged vehicles that can fly sub-orbital missions in support of advanced reusable launch vehicle technology development. In addition, the X-34 vehicles will represent a hypersonic test bed for advanced experiments in the aeronautical sciences.

London, John R., III↗

Proof-of-Concept Application of Impedance-Based Health Monitoring on Space Shuttle Ground Structures

Many of the structures responsible for the launch, ground systems and support operations of the space shuttle are still being used well past their nominal expected design life. This has led to an increased interest in monitoring these structures in order to decrease the risk of eventual breakdown or structural failure. One monitoring method, which has shown promising results for such applications, is the impedance-based structural health monitoring technique. This paper presents results from proof-of-concept tests on the launch pad's orbiter access arm bolted connection, solid rocket booster hold down post, mobile launch platform heat shield and crawler transporter bearing. Modification for future tests are suggested.

Peairs, Daniel M.↗

Investigation and Demonstration of Reliability Target Allocation to Support Reliability and Integrity Management Program

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States (U.S.), nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the U.S., and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy (DOE) launched multiple programs to support advanced reactor deployment. The research described in this report explores implementation strategies for the Reliability and Integrity Management Program that directly supports the DOE goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the DOE.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Closure of Regenerative Life Support Systems: Results of the Lunar-Mars Life Support Test Project

Future long duration human exploration missions away from Earth will require closed-loop regenerative life support systems to reduce launch mass, reduce dependency on resupply and increase the level of mission self sufficiency. Such systems may be based on the integration of biological and physiocochemical processes to produce potable water, breathable atmosphere and nutritious food from metabolic and other mission wastes. Over the period 1995 to 1998 a series of ground-based tests were conducted at the National Aeronautics and Space Administration, Johnson Space Center, to evaluate the performance of advanced closed-loop life support technologies with real human metabolic and hygiene loads. Named the Lunar-Mars Life Support Test Project (LMLSTP), four integrated human tests were conducted with increasing duration, complexity and closure. The first test, LMLSTP Phase I, was designed to demonstrate the ability of higher plants to revitalize cabin atmosphere. A single crew member spent 15 days within an atmospherically closed chamber containing 11.2 square meters of actively growing wheat. Atmospheric carbon dioxide and oxygen levels were maintained by control of the rate of photosynthesis through manipulation of light intensity or the availability of carbon dioxide and included integrated physicochemical systems. During the second and third tests, LMLSTP Phases II & IIa, four crew members spent 30 days and 60 days, respectively, in a larger sealed chamber. Advanced physicochemical life support hardware was used to regenerate the atmosphere and produce potable water from wastewater. Air revitalization was accomplished by using a molecular sieve and a Sabatier processor for carbon dioxide absorption and reduction, respectively, with oxygen generation performed by water hydrolysis. Production of potable water from wastewater included urine treatment (vapor compression distillation), primary treatment (ultrafiltration/reverse osmosis and multi-filtration) and post processing. For the Phase II test the water recovery rate ranged from 95 to 98%, depending on the processor. LMLSTP Phase III, the fourth test of the series, had a duration of 91 days and included four crew members. The test demonstrated an integration of physicochemical and biological technologies for air revitalization, water recovery and waste processing. Wheat supplemented the physicochemical air revitalization systems by providing approximately 25% of the oxygen required for the 4-person crew. The water recovery system included immobilized cell and trickling filter bioreactors for primary water treatment, reverse osmosis and air evaporation systems for secondary water treatment, followed by post processing. The 8 day initial supply of water was recycled through the chamber and crew 10 times over the course of the test. Grain from the wheat together with fresh lettuce from a small growth chamber within the crew chamber provided supplementation to the stored food system, but at a level less than 5% of the crew s caloric requirement. An incinerator was used to demonstrate mineralization of the crew s solid waste, with the combustion products (mainly carbon dioxide) returned to the wheat for conversion to oxygen.

Barta, Daniel↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE)

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

LEO to GEO (and Beyond) Transfers Using High Power Solar Electric Propulsion (HP-SEP)

Rideshare, or Multi-Payload launch configurations, are becoming more and more commonplace but access to space is only one part of the overall mission needs. The ability for payloads to achieve their target orbits or destinations can still be difficult and potentially not feasible with on-board propulsion limitations. The High Power Solar Electric Propulsion (HP-SEP) Orbital Maneuvering Vehicle (OMV) provides transfer capabilities for both large and small payload in excess of what is possible with chemical propulsion. Leveraging existing secondary payload adapter technology like the ESPA provides a platform to support Multi-Payload launch and missions. When coupled with HP-SEP, meaning greater than 30 kW system power, very large delta-V maneuvers can be accomplished. The HP-SEP OMV concept is designed to perform a Low Earth Orbit to Geosynchronous Orbit (LEO-GEO) transfer of up to six payloads each with 300kg mass. The OMV has enough capability to perform this 6 kms maneuver and have residual capacity to extend an additional transfer from GEO to Lunar orbit. This high deltaV capability is achieved using state of the art 12.5kW Hall Effect Thrusters (HET) coupled with high power roll up solar arrays. The HP-SEP OMV also provides a demonstration platform for other SEP technologies such as advanced Power Processing Units (PPU), Xenon Feed Systems (XFS), and other HET technologies. The HP-SEP OMV platform can be leveraged for other missions as well such as interplanetary science missions and applications for resilient space architectures.

Leo and Geo and HP-SEP↗

Lightning Protection System for Space Shuttle

The suitability and cost effectiveness of using a lightning mast for the shuttle service and access tower (SSAT) similar to the type used for the Apollo Soyuz Test Project (ASTP) mobile launcher (ML) was evaluated. Topics covered include: (1) ASTP launch damage to mast, mast supports, grounded overhead wires, and the instrumentation system; (2) modifications required to permit reusing the ASTP mast on the SSAT; (3) comparative costing factors per launch over a 10 year period in repetitive maintenance and refurbishment of the existing and modified masts, mast supports, grounded overhead wires, and ground instrumentation required to sustain mechanical and electrical integrity of the masts; (4) effects of blast testing samples of the ASTP ML type mast (corrosion and electrical flashover); (5) comparison of damages from ASTP launch and from blast testing.

Source record↗

An 8 Meter Monolithic UV/Optical Space Telescope

The planned Ares V launch vehicle with its 10 meter fairing and at least 55,600 kg capacity to Earth Sun L2 enables entirely new classes of space telescopes. A consortium from NASA, Space Telescope Science Institute, and aerospace industry are studying an 8-meter monolithic primary mirror UV/optical/NIR space telescope to enable new astrophysical research that is not feasible with existing or near-term missions, either space or ground. This paper briefly reviews the science case for such a mission and presents the results of an on-going technical feasibility study, including: optical design; structural design/analysis including primary mirror support structure, sun shade and secondary mirror support structure; thermal analysis; launch vehicle performance and trajectory; spacecraft including structure, propulsion, GN&C, avionics, power systems and reaction wheels; operations & servicing; mass budget and cost.

Stahl, H. Philip↗