Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROGRAM MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Apollo Operations Handbook Lunar Module (LM 11 and Subsequent) Vol. 2 Operational Procedures

The Apollo Operations Handbook (AOH) is the primary means of documenting LM descriptions and procedures. The AOH is published in two separately bound volumes. This information is useful in support of program management, engineering, test, flight simulation, and real time flight support efforts. This volume contains crew operational procedures: normal, backup, abort, malfunction, and emergency. These procedures define the sequence of actions necessary for safe and efficient subsystem operation.

Source record↗

JPL Quarterly Technical Review, Volume 1, Number 3

Summary report including studies on computer programs, management systems, materials, orbits and trajectories, photography, power sources, propulsion, and telecommunication for space missions

Source record↗

Quantitative evaluation of water quality in the coastal zone by remote sensing

Remote sensing as a tool in a waste management program is discussed. By monitoring both the pollution sources and the environmental quality, the interaction between the components of the exturaine system was observed. The need for in situ sampling is reduced with the development of improved calibrated, multichannel sensors. Remote sensing is used for: (1) pollution source determination, (2) mapping the influence zone of the waste source on water quality parameters, and (3) estimating the magnitude of the water quality parameters. Diffusion coefficients and circulation patterns can also be determined by remote sensing, along with subtle changes in vegetative patterns and density.

James, W. P.↗

Saturn S-2 problem resolution history report

A summary of S-2 Program problems and the solutions that were implemented is presented. The problems occurred during a period starting with the initial design concepts and continuing through the launch of the tenth S-2 flight stage information is from nine separate disciplines: design, facilities, logistics, manufacturing, material, program management, quality assurance, safety, and tests.

Virgil, F. W.↗

Phase C/D program development plan. Volume 1: Program plan

The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

Source record↗

Space shuttle low cost/risk avionics study

All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.

Source record↗

Bureau and agency reports

A summary of the work done by Geography and Human-Cultural Resources Work Group on EROS resources management program is given. Work covers archeological surveys, outdoor recreational planning, and engineering studies.

Loelkes, G. L.↗

Summary of nondestructive testing theory and practice

The ability to fabricate design critical and man-rated aerospace structures using materials near the limits of their capabilities requires a comprehensive and dependable assurance program. The quality assurance program must rely heavily on nondestructive testing methods for thorough inspection to assess properties and quality of hardware items. A survey of nondestructive testing methods is presented to provide space program managers, supervisors and engineers who are unfamiliar with this technical area with appropriate insight into the commonly accepted nondestructive testing methods available, their interrelationships, used, advantages and limitations. Primary emphasis is placed on the most common methods: liquid penetrant, magnetic particle, radiography, ultrasonics and eddy current. A number of the newer test techniques including thermal, acoustic emission, holography, microwaves, eddy-sonic and exo-electron emission, which are beginning to be used in applications of interest to NASA, are also discussed briefly.

Meister, R. P.↗

Shuttle mission simulator requirements report, volume 1, revision A

The tasks are defined required to design, develop produce, and field support a shuttle mission simulator for training crew members and ground support personnel. The requirements for program management, control, systems engineering, design and development are discussed along with the design and construction standards, software design, control and display, communication and tracking, and systems integration.

Burke, J. F.↗

Cost estimation for unmanned lunar and planetary programs

A basic model is presented for estimating the cost of unmanned lunar and planetary programs. Cost data were collected and analyzed for eight lunar and planetary programs. Total cost was separated into the following components: labor, overhead, materials, and technical support. The study determined that direct labor cost of unmanned lunar and planetary programs comprises 30 percent of the total program cost. Twelve program categories were defined for modeling: six spacecraft subsystem categories (science, structure, propulsion, electrical power, communications, and guidance and integration, test and quality assurance, launch and flight operations, ground equipment, systems analysis and engineering, and program management). An analysis showed that on a percentage basis, direct labor cost and direct labor manhours compare on a one-to-one ratio. Therefore, direct labor hours is used as the parameter for predicting cost, with the advantage of eliminating the effect of inflation on the analysis.

Dunkin, J. H.↗

Study of solid rocket motor for space shuttle booster, Volume 3: Program acquisition planning

The program planning acquisition functions for the development of the solid propellant rocket engine for the space shuttle booster is presented. The subjects discussed are: (1) program management, (2) contracts administration, (3) systems engineering, (4) configuration management, and (5) maintenance engineering. The plans for manufacturing, testing, and operations support are included.

Source record↗

Shuttle mission simulator. Volume 2: Requirement report, volume 2, revision C

The requirements for space shuttle simulation which are discussed include: general requirements, program management, system engineering, design and development, crew stations, on-board computers, and systems integration. For Vol. 1, revision A see N73-22203, for Vol 2, revision A see N73-22204.

Burke, J. F.↗

MSFC Skylab Orbital Workshop, volume 5

The various programs involved in the development of the Skylab Orbital Workshop are discussed. The subjects considered include the following: (1) reliability program, (2) system safety program, (3) testing program, (4) engineering program management, (5) mission operations support, and (6) aerospace applications.

Source record↗

Natural resource inventories and management applications in the Great Basin

ERTS-1 resolution capabilities and repetitive coverage have allowed the acquisition of several statewide inventories of natural resource features not previously completed or that could not be completed in any other way. Familiarity with landform, tone, pattern and other converging factors, along with multidate imagery, has been required. Nevada's vegetation has been mapped from ERTS-1. Dynamic characteristics of the landscape have been studied. Sequential ERTS-1 imagery has proved its usefulness for mapping vegetation, following vegetation phenology changes, monitoring changes in lakes and reservoirs (including water quality), determining changes in surface mining use, making fire fuel estimates and determining potential hazard, mapping the distribution of rain and snow events, making range readiness determinations, monitoring marshland management practices and other uses. Feasibility has been determined, but details of incorporating the data in management systems awaits further research and development. The need is to accurately define the steps necessary to extract required or usable information from ERTS imagery and fit it into on-going management programs.

Tueller, P. T.↗