Phase A conceptual design study of the Atmospheric, Magnetospheric and Plasmas in Space (AMPS) payload

The 12 month Phase A Conceptual Design Study of the Atmospheric, Magnetospheric and Plasmas in Space (AMPS) payload performed within the Program Development Directorate of the Marshall Space Flight Center is presented. The AMPS payload makes use of the Spacelab pressurized module and pallet, is launched by the space shuttle, and will have initial flight durations of 7 days. Scientific instruments including particle accelerators, high power transmitters, optical instruments, and chemical release devices are mounted externally on the Spacelab pallet and are controlled by the experimenters from within the pressurized module. The capability of real-time scientist interaction on-orbit with the experiment is a major characteristic of AMPS.

Source record↗

Payload specialist station study. Volume 2, part 1: Preliminary design document

The details of six tasks of the payload Specialist Station study are discussed: (1) derive payload control and display requirements; (2) perform functional analyses; (3) perform system synthesis; (4) perform trade studies; (5) perform preliminary design; and (6) provide data format. Functional analysis diagrams were developed for the study payloads. These diagrams presented the payload's functional activities flow based on the six mission phases established. These phases are: (1) launch, ascent, orbit insertion; (2) on-orbit checkout and activation; (3) on-orbit operation; (4) deployment/retrieval; (5) on-orbit deactivation; and (6) descent, landing, post-landing. To perform system synthesis the widest variety of available hardware and software, as individual pieces of equipment and as systems, was investigated. The intent was to synthesize a complete AFD system or systems which could accommodate the range of requirements identified for the study missions.

Source record↗

Simulating flight boundary conditions for orbiter payload modal survey

An approach to simulate the characteristics of the payload/orbiter interfaces for the payload modal survey was developed. The flexure designed for this approach is required to provide adequate stiffness separation in the free and constrained interface degrees of freedom to closely resemble the flight boundary condition. Payloads will behave linearly and demonstrate similar modal effective mass distribution and load path as the flight if the flexure fixture is used for the payload modal survey. The potential non-linearities caused by the trunnion slippage during the conventional fixed base modal survey may be eliminated. Consequently, the effort to correlate the test and analysis models can be significantly reduced. An example is given to illustrate the selection and the sensitivity of the flexure stiffness. The advantages of using flexure fixtures for the modal survey and for the analytical model verification are also demonstrated.

Chung, Y. T.↗

Telescience Resource Kit (TReK)

Telescience Resource Kit (TReK) is one of the Huntsville Operations Support Center (HOSC) remote operations solutions. It can be used to monitor and control International Space Station (ISS) payloads from anywhere in the world. It is comprised of a suite of software applications and libraries that provide generic data system capabilities and access to HOSC services. The TReK Software has been operational since 2000. A new cross-platform version of TReK is under development. The new software is being released in phases during the 2014-2016 timeframe. The TReK Release 3.x series of software is the original TReK software that has been operational since 2000. This software runs on Windows. It contains capabilities to support traditional telemetry and commanding using CCSDS (Consultative Committee for Space Data Systems) packets. The TReK Release 4.x series of software is the new cross platform software. It runs on Windows and Linux. The new TReK software will support communication using standard IP protocols and traditional telemetry and commanding. All the software listed above is compatible and can be installed and run together on Windows. The new TReK software contains a suite of software that can be used by payload developers on the ground and onboard (TReK Toolkit). TReK Toolkit is a suite of lightweight libraries and utility applications for use onboard and on the ground. TReK Desktop is the full suite of TReK software -most useful on the ground. When TReK Desktop is released, the TReK installation program will provide the option to choose just the TReK Toolkit portion of the software or the full TReK Desktop suite. The ISS program is providing the TReK Toolkit software as a generic flight software capability offered as a standard service to payloads. TReK Software Verification was conducted during the April/May 2015 timeframe. Payload teams using the TReK software onboard can reference the TReK software verification. TReK will be demonstrated on-orbit running on an ISS provided T61p laptop. Target Timeframe: September 2015 -2016. The on-orbit demonstration will collect benchmark metrics, and will be used in the future to provide live demonstrations during ISS Payload Conferences. Benchmark metrics and demonstrations will address the protocols described in SSP 52050-0047 Ku Forward section 3.3.7. (Associated term: CCSDS File Delivery Protocol (CFDP)).

Lippincott, Jeff↗

Design, development, and flight of a spacecraft charging sounding rocket payload

Results of the flight of the spacecraft charging sounding rocket payload are given. The payload was designed to create charging by the emission of both positive ions and electrons. The relationship between environmental parameters and changes in vehicle potential during periods of emission was also studied.

Cohen, H. A.↗

Research in X-ray Astronomy

This research grant supported an active sounding rocket program at Penn State University over a period of over 10 years. During this period, the grant supported at least 8 graduate students in Astronomy & Astrophysics for at least a portion of their research. During the same period, our group was involved in seven sounding rocket flights, launched from White Sands, New Mexico, and from Woomera, Australia. Most of these rocket flights, and most of the work supported by this grant, involved the use of X-ray CCD cameras. The first X-ray CCD camera ever flown in space was our sounding rocket observation of SN1987A (flight 36.030 in 1987). Subsequent flights utilized improved CCD detectors, culminating in the'state-of-the-art EEV detector developed for our CUBIC mission, which was flown on 36.093 last May. Data from the last three flights, which observed the diffuse X-ray background with CCDS, include detection of the OVII He(alpha) line in the high latitude diffuse background and detection of the Mg XI He(alpha) line in the North Polar Spur. These results have been reported at meetings of the American Astronomical Society and the SPIE. The analysis of flights 36.092 and 36.106 is part of Jeff Mendenhall's PhD thesis and will be published in the Astrophysical Journal next year. The 36.093 data are currently being analyzed by PhD student Laura Cawley. From 1990 to 1996 this grant supported our development and launch of the CUBIC instrument on the SAC-B satellite, which was designed to measure the spectrum of the soft X-ray diffuse background with moderate energy resolution and high S/N ratio. Unfortunately, this mission terminated shortly after launch due to a failure of the Pegasus XL launch vehicle. This work resulted in publication of 4 papers in the SPIE Proceedings and four others in refereed journals, in addition to several other conference proceedings and contributed papers. In addition to the CCD flights described above, this grant has supported preliminary development of a new sounding rocket payload utilizing a replicated Ni mirror that is being developed at PSU in collaboration with MSFC. Initial testing of the coating technology has produced promising results.

Source record↗

Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR)

Goddard Space Flight Center (GSFC) Wallops Flight Facility (WFF) manages NASA's Shuttle Small Payloads Project (SSPP). The SSPP designs, develops, tests, integrates and flies a group of small payload carrier systems for the space shuttle. These carriers - the Hitchhiker, Getaway Specials (GAS), and Space Experiment Module (SEM) - support payloads supplied by NASA, other U.S. government agencies, universities, high schools, domestic commercial customers, and foreign nationals and governments. These carriers can support payloads that range in size between 50 lbs. (23 kg) and 4,000 lbs. (2,270 kg).

Source record↗

Large Payload Transportation and Test Considerations

Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure - roads, bridges, airframes, and buildings - necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider how large spacecraft are designed, and where they are manufactured, tested, or launched, could result in unforeseen cost to modify/develop infrastructure, or incur additional risk due to increased handling or elimination of key verifications. During test and verification planning for the Altair project, a number of transportation and test issues related to the large payload diameter were identified. Although the entire Constellation Program - including Altair - was canceled in the 2011 NASA budget, issues identified by the Altair project serve as important lessons learned for future payloads that may be developed to support national "heavy lift" strategies. A feasibility study performed by the Constellation Ground Operations (CxGO) project found that neither the Altair Ascent nor Descent Stage would fit inside available transportation aircraft. Ground transportation of a payload this large over extended distances is generally not permitted by most states, so overland transportation alone would not have been an option. Limited ground transportation to the nearest waterway may be permitted, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing (which includes hypergolic fuels, pyrotechnic devices, and high pressure gasses).

Rucker, Michelle A.↗

Active thermal control for an advanced power platform

Effective use of the Shuttle Orbiter during the operational phase will require the provision of electrical power from free-flying power platforms which will interface with the Orbiter. Such platforms present unique requirements for active thermal control based upon the long life and high heat load requirements which will be necessary to provide 25 kW or more of electricity to the Orbiter and payloads. This paper will present key issues in the design of these active thermal control systems (ATCS) and will discuss potential solutions intended to ensure maximum effectiveness of advanced power platforms. Such issues include proper selection of coolant fluid for the power platform and payload loops; selection and development of thermal control surfaces for five-year life; the use of off-the-shelf hardware vs development of unique hardware, central vs decentralized control of the ATCS; system life and reliability as a factor in determining redundancy and the possibility of on-orbit EVA maintenance; and the interfaces between the power platform and the Orbiter and payloads.

Owen, J. W.↗

Interim Control Module Extraction Strut Assembly

The Interim Control Module is a propulsion and attitude control module for the International Space Station developed to serve as a replacement for the Russian Service Module in the event that Russia does not deliver the hardware as expected. The hardware was developed through a joint NASA/Naval Research Laboratory program and is based on a Department of Defense payload. This paper discusses the development and testing of the Extraction Strut hardware that will be used to assist in removing the Interim Control Module from the Shuttle's payload bay.

Hansen, Chris↗

Engineering evaluation of existing space hardware for utilization in small self-contained payloads

The NASA small self-contained payload program allows research and development experiments of less than 5 cu ft to be flown in the Orbiter payload bay on a space available basis. Materials processing equipment available from Apollo, Skylab, SPAR, and MEA that include such items as furnaces for metallurgical processing and crystal growth, apparatus for measuring crystallization processes, and electrophoretic separators for cell separation are being offered by NASA through this program. Eighteen items for the self-contained payload program were evaluated and many were found to be suitable.

Lovoi, P. A.↗

STS-59 Space Shuttle mission report

The STS-59 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the sixty-second flight of the Space Shuttle Program and sixth flight of the Orbiter vehicle Endeavor (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-63; three SSME's which were designated as serial numbers 2028, 2033, and 2018 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-065. The RSRM's that were installed in each SRB were designated as 360W037A (welterweight) for the left SRB, and 360H037B (heavyweight) for the right SRB. This STS-59 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-59 mission was to successfully perform the operations of the Space Radar Laboratory-1 (SRL-1). The secondary objectives of this flight were to perform the operations of the Space Tissue Loss-A (STL-A) and STL-B payloads, the Visual Function Tester-4 (VFT-4) payload, the Shuttle Amateur Radio Experiment-2 (SAREX-2) experiment, the Consortium for Materials Development in Space Complex Autonomous Payload-4 (CONCAP-4), and the three Get-Away Special (GAS) payloads.

Fricke, Robert W., Jr.↗

Evolution of the NASA long-duration balloon program

The development of long-duration ballooning techniques to support flights of 1-2 ton payloads for periods up to 2 weeks, possibly even longer, offers a near-space scientific mission capability with an order of magnitude improvement over traditional balloon flights. This revolution in scientific research ballooning began with the solution of the manufacturing difficulties that plagued the program in the first half of the 1980's, and it has culminated in the early 1990's with three successive circumnavigations of the Antarctic continent in 9 to 14 day flights. A complementary capablity in the Northern hemisphere, which would approximately double the number of flights that could be supported each year, is needed to accommodate the trend for conventional payloads to be modified, or developed, for long-duration flights. Plans are already underway to employ the order-of-magnitude increased flight time for support of multi-flight research programs that will produce results comparable to some space missions. An overview of the current status and near-term plans for ballooning will be presented, along with a discussion of some major science initiatives that have been enabled.

Jones, W. Vernon↗

Enhanced International Space Station Ku-Band Telemetry Service

The International Space Station (ISS) is in an operational configuration. To fully utilize the ISS and take advantage of the modern protocols and updated Ku-band access, the Huntsville Operations Support Center (HOSC) has designed an approach to extend the Kuband forward link access for payload investigators to their on-orbit payloads. This dramatically increases the ground to ISS communications for those users. This access also enables the ISS flight controllers operating in the Payload Operations and Integration Center to have more direct control over the systems they are responsible for managing and operating. To extend the Ku-band forward link to the payload user community the development of a new command server is necessary. The HOSC subsystems were updated to process the Internet Protocol Encapsulated packets, enable users to use the service based on their approved services, and perform network address translation to insure that the packets are forwarded from the user to the correct payload repeating that process in reverse from ISS to the payload user. This paper presents the architecture, implementation, and lessons learned. This will include the integration of COTS hardware and software as well as how the device is incorporated into the operational mission of the ISS. Thus, this paper also discusses how this technology can be applicable to payload users of the ISS.

Cecil, Andrew J.↗

STS-26 Preflight Press Briefing: Other Payloads

This NASA KSC video release presents a press conference that discusses the commercial development and NASA science Mid-deck payloads of Discovery STS-26. Larry Delucas (Univ. Alabama-Birmingham, Center for Macromolecular Crystallography), Chris Podsiadly (3-M Co., Marshall Space Flight Center's (MSFC's) Rep. for Material Processing) and Ed Valentine (MSFC) present discussions of the science and commercial development that surround the Physical Vapor Transport of Organic Solids-2 (PVTOS-2) payload. Their presentations are followed by a question and answer period for journalists from scientific journals.

Source record↗

Program for Space Shuttle Payload Cabling

EXCABL is expert-system computer program developed to route electrical cables in Space Shuttle Orbiter payload bay for each mission. Automates cable-routing process and provides data for cable-installation documents. Automation increased speed and accuracy of payload-integration process, and expert system codifies knowledge cabling experts have acquired. Written in ART.