Measurement of Nuclear Power Plant Construction Performance Using EVMS Model
The Earned Value Management System (EVMS) method integrates three critical elements of project management: scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. Application of earned value management techniques is scalable to individual projects as determined by their size and complexity. Effective management of quality, cost, and time is the utmost objective for any type of construction project. An EVMS model provides an advanced systematic method of controlling these three performance measures in an integrated way. However, the additional management effort required to develop and maintain an effective Work Breakdown Structure (WBS) has been highlighted as a major barrier to application of this concept. This paper examines the influencing attributes that would facilitate effective EVMS implementation including a restructuring of the WBS for nuclear power plant construction.