Search NASA⌕ Search

SEARCH · Search NASA

Results for “SATELLITE MANEUVER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Propulsion Technology Assessment: Science & Enabling Technologies to Explore the Interstellar Medium

As part of a larger effort led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system's heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025 to 2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/s2 and 0.664 mm/s2, were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s2 and 2 mm/s2, were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA's Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 sq km/s2 for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Monte Carlo Analysis as a Trajectory Design Driver for the TESS Mission

The Transiting Exoplanet Survey Satellite (TESS) will be injected into a highly eccentric Earth orbit and fly 3.5 phasing loops followed by a lunar flyby to enter a mission orbit with lunar 2:1 resonance. Through the phasing loops and mission orbit, the trajectory is significantly affected by lunar and solar gravity. We have developed a trajectory design to achieve the mission orbit and meet mission constraints, including eclipse avoidance and a 30-year geostationary orbit avoidance requirement. A parallelized Monte Carlo simulation was performed to validate the trajectory after injecting common perturbations, including launch dispersions, orbit determination errors, and maneuver execution errors. The Monte Carlo analysis helped identify mission risks and is used in the trajectory selection process.

trajectory↗

Monte Carlo Analysis as a Trajectory Design Driver for the Transiting Exoplanet Survey Satellite (TESS) Mission

The Transiting Exoplanet Survey Satellite (TESS) will be injected into a highly eccentric Earth orbit and fly 3.5 phasing loops followed by a lunar flyby to enter a mission orbit with lunar 2:1 resonance. Through the phasing loops and mission orbit, the trajectory is significantly affected by lunar and solar gravity. We have developed a trajectory design to achieve the mission orbit and meet mission constraints, including eclipse avoidance and a 30-year geostationary orbit avoidance requirement. A parallelized Monte Carlo simulation was performed to validate the trajectory after injecting common perturbations, including launch dispersions, orbit determination errors, and maneuver execution errors. The Monte Carlo analysis helped identify mission risks and is used in the trajectory selection process.

monte carlo↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

Led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system's heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025-2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/sq s and 0.664 mm/sq s were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s2 and 2 mm/sq s, were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA's Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 km2/sq s for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

The Importance of Semi-Major Axis Knowledge in the Determination of Near-Circular Orbits

Modem orbit determination has mostly been accomplished using Cartesian coordinates. This usage has carried over in recent years to the use of GPS for satellite orbit determination. The unprecedented positioning accuracy of GPS has tended to focus attention more on the system's capability to locate the spacecraft's location at a particular epoch than on its accuracy in determination of the orbit, per se. As is well-known, the latter depends on a coordinated knowledge of position, velocity, and the correlation between their errors. Failure to determine a properly coordinated position/velocity state vector at a given epoch can lead to an epoch state that does not propagate well, and/or may not be usable for the execution of orbit adjustment maneuvers. For the quite common case of near-circular orbits, the degree to which position and velocity estimates are properly coordinated is largely captured by the error in semi-major axis (SMA) they jointly produce. Figure 1 depicts the relationships among radius error, speed error, and their correlation which exist for a typical low altitude Earth orbit. Two familiar consequences are the relationship Figure 1 shows are the following: (1) downrange position error grows at the per orbit rate of 3(pi) times the SMA error; (2) a velocity change imparted to the orbit will have an error of (pi) divided by the orbit period times the SMA error. A less familiar consequence occurs in the problem of initializing the covariance matrix for a sequential orbit determination filter. An initial covariance consistent with orbital dynamics should be used if the covariance is to propagate well. Properly accounting for the SMA error of the initial state in the construction of the initial covariance accomplishes half of this objective, by specifying the partition of the covariance corresponding to down-track position and radial velocity errors. The remainder of the in-plane covariance partition may be specified in terms of the flight path angle error of the initial state. Figure 2 illustrates the effect of properly and not properly initializing a covariance. This figure was produced by propagating the covariance shown on the plot, without process noise, in a circular low Earth orbit whose period is 5828.5 seconds. The upper subplot, in which the proper relationships among position, velocity, and their correlation has been used, shows overall error growth, in terms of the standard deviations of the inertial position coordinates, of about half of the lower subplot, whose initial covariance was based on other considerations.

Carpenter, J. Russell↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

As part of a larger effort led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA’s George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system’s heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025 to 2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/s(exp 2) and 0.664 mm/s(exp 2), were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s(exp 2) and 2 mm/s(exp 2), were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA’s Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 km(exp 2)/s(exp 2) for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Low-Earth Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Flight Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle as a secondary payload mounted inside the launch vehicle adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere the top of the payload adaptor was ejected to expose the LOFTID vehicle, then the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the reentry vehicle, and finally performed a collision avoidance maneuver to prevent the Centaur from re-contacting the LOFTID after atmospheric entry. The LOFTID vehicle maintained the design attitude and spin rate from separation to atmospheric entry, roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID vehicle entered the atmosphere over Alaska at >8km/sec and decelerated as designed demonstrating stable flight from hypersonic entry through subsonic parachute deployment. On-board visible light cameras captured the reactions of the heatshield through all phases of flight and co-located infrared light cameras captured the temperature distribution of the aft side of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This presentation will discuss aeroshell response to the atmospheric entry. The visible light cameras captured mechanical response of the IS to the loads applied in the different phases of entry. Events seen on the visible light cameras correlate with the response of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although some-what lower in most locations. This data will allow the improvement of the aeroshell modeling tools predictive capability. Post-flight inspection of the aeroshell after splash down and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past 15 years of HIAD technology development performed as de-signed at large scale, a scale which cannot be replicated in ground test facilities. The HIAD supported the LOFTID vehicle high in the water after touching down under parachute and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the LOFTID after splash down. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 12 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was vented prior to impact. The LOFTID aeroshell was an unqualified success and has opened up opportunities for commercial application.

LOFTID Aeroshell Flight Performance↗

Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle as a secondary payload mounted inside the launch vehicle adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere the top of the payload adaptor was ejected to expose the LOFTID vehicle, then the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the reentry vehicle, and finally performed a collision avoidance maneuver to prevent the Centaur from re-contacting the LOFTID after atmospheric entry. The LOFTID vehicle maintained the design attitude and spin rate from separation to atmospheric entry, roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID vehicle entered the atmosphere over Alaska at >8km/sec and decelerated as designed demonstrating stable flight from hypersonic entry through subsonic parachute deployment. On-board visible light cameras captured the reactions of the heatshield through all phases of flight, and co-located infrared light cameras captured the temperature distribution of the aft side of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This paper will discuss aeroshell response to the atmospheric entry. The visible light cameras captured mechanical response of the deployable aeroshell to the loads applied in the different phases of entry. Events seen on the visible light cameras correlate with the response of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although somewhat lower in most locations. This data will allow the improvement of the aeroshell modeling tools predictive capability. Post-flight inspection of the aeroshell after splash down and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past 15 years of HIAD technology development performed as designed at large scale, a scale which cannot be replicated in ground test facilities. The HIAD supported the LOFTID vehicle high in the water after touching down under parachute and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the LOFTID after splash down. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 24 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was vented prior to impact.

Entry Descent Landing Atmospheric Entry Deployable↗

Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) reentry vehicle (RV)as a secondary payload mounted inside the launch vehicle (LV) adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun-synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere, the top of the payload adaptor was ejected to expose the LOFTID RV. Next, the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID RV to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the LOFTID RV, and finally performed a divert maneuver to prevent the Centaur from re-contacting the LOFTID RV after atmospheric entry. The LOFTID RV maintained the design attitude and spin rate from separation to atmospheric entry, a duration of roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID RV entered the atmosphere over Alaska at >8km/sec and decelerated as designed, demonstrating aerodynamically stable flight from hypersonic entry through subsonic parachute deployment. On-board visible-spectrum cameras captured the physical response of the heatshield through all phases of flight. Co-located infrared cameras captured the temperature distribution of the aftside of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This paper will document aeroshell’s response to the atmospheric entry. The visible-spectrum cameras captured mechanical response of the deployable aeroshell to the loads encountered in the different phases of entry. Events seen on the visible-spectrum cameras correlate with the measurements of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although somewhat lower in most locations. This data will enable enhancement of HIAD predictive capability. Post-flight inspection of the aeroshell after splashdown and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past two decades of HIAD technology development performed as expected at large scale, a scale which cannot be replicated in ground test facilities. The LOFTID RV remained high in the water after touching down under parachute, and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the vehicle after splashdown. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 24 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was purposely vented prior to splashdown.

HIAD↗

Galileo: Challenges enroute to Jupiter

The Galileo spacecraft is now on its three-year direct Earth-to-Jupiter transfer trajectory. Jupiter arrived (Probe entry) is scheduled for 2:05 pm PST, December 7, 1995. The Galileo Probe will be the first human-made object to enter the atmosphere of an outer planet, while the Orbiter will be the first artificial satellite of an outer planet. A two-year Jupiter orbital mission is planned. Following launch on October 18, 1989, Galileo spent just over three years executing its Venus-Earth-Earth Gravity Assist (VEEGA) mission phase to achieve the heliocentric energy necessary to reach Jupiter. Midway through its Earth-to-Earth leg, on October 29, 1991, Galileo became the first spacecraft to encounter an asteroid. Six months earlier in April 1991, the spacecraft's high-gain antenna (HGA) failed to deploy properly. The special guidance, navigation, and control (GN&C) problems associated with a 20-month campaign of maneuvers to free the stuck antenna and successfully perform the asteroid encounter without it are described. The overall mission and spacecraft status are also reported.

O'Neil, William J.↗

Unscheduled Lunar Observations for Radiometric Characterization of VIIRS Reflective Solar Bands

Regularly scheduled lunar observations are a major component of the on-orbit calibration of the Suomi National Polar-Orbiting Partnership (SNPP) Visible Infrared Imaging Radiometer Suite (VIIRS) reflective solar bands (RSB). With a few exceptions, these scheduled lunar observations have been performed with the same phase angles ranging from -51.5° to -50.5°. In addition to these observations that require a roll maneuver, the VIIRS instruments also view the Moon via its space-view port without a roll maneuver, covering a wide range of phase angles. In this paper, we present techniques used to derive the radiometric gain for the VIIRS RSB using unscheduled lunar observations that are made over a range of phase angles. An empirical correction to account for residual phase angle dependencies is derived from on-orbit SNPP VIIRS unscheduled lunar events and is successfully applied to estimate the radiometric gain that shows good agreement with the gains derived from the scheduled lunar events as well as those derived from the solar diffuser. In addition to the follow-on VIIRS instrument on the NOAA-20 satellite, three more VIIRS instruments are scheduled to be launched in the next decade. The methodologies developed in this work are expected to be applied to unscheduled lunar events from other VIIRS instruments to support their on-orbit RSB calibration.

VIIRS↗

Absolute Intercalibration of Spaceborne Microwave Radiometers

Absolute calibration of spaceborne microwave radiometer observations consists of accurate determination of antenna cold space spillover, cross-polarization contamination, and nonlinearity coefficients of the receivers. We deem the GMI sensor to be the most accurate calibrated spaceborne microwave radiometer due to its unique calibration design features and its carefully planned orbit maneuvers. We demonstrate how to transfer the GMI calibration to other spaceborne radiometers, whose operations have sufficient time overlap with GMI. Specifically, we show results for WindSat and AMSR2. The sensor intercalibration is based on brightness temperature matchups between GMI and the other instruments over both open ocean and rainforest scenes. To assess the calibration accuracy, we compare the intercalibrated brightness temperatures with radiative transfer model calculations. In addition, we provide in situ validation results for wind speed and water vapor retrievals from the intercalibrated sensors. The intercalibration methodology allows for the creation of a multidecadal climate data record from passive microwave satellite observations. Significance Statement Creating a long-term climate data record of satellite observations of ocean winds, water vapor, and other variables requires careful and accurate calibration of the various sensors that are used. In particular, it is important to achieve the best possible consistency between the measurements from all the different instruments. This is a challenging task as the configuration and accuracy of these instruments can differ widely. The purpose of our paper is to demonstrate and validate the basic methodology for performing this intercalibration. The backbone of our method is data observed by a well-calibrated sensor that measures the passive microwave emission from Earth’s surface and atmosphere. We show how to transfer its calibration standard to other sensors.

Katherine Wentz↗

Design of satellite flexibility experiments

A preliminary study has been completed to begin development of a flight experiment to measure spacecraft control/flexible structure interaction. The work reported consists of two phases: identification of appropriate structural parameters which can be associated with flexibility phenomena, and suggestions for the development of an experiment for a satellite configuration typical of near-future vehicles which are sensitive to such effects. Recommendations are made with respect to the type of data to be collected and instrumentation associated with these data. The approach consists of developing the equations of motion for a vehicle possessing a flexible solar array, then linearizing about some nominal motion of the craft. A set of solutions are assumed for array deflection using a continuous normal mode method and important parameters are exposed. Inflight and ground based measurements are distinguished. Interrelationships between these parameters, measurement techniques, and input requirements are discussed which assure minimization of special vehicle maneuvers and optimization of data to be obtained during the normal flight sequence.

Kaplan, M. H.↗

Ultrasail

Ultrasail is a complete sail system for the launch, deployment, stabilization and control of very large solar sails enabling reduced mission times for interplanetary and deep space spacecraft. Ultrasail is an innovative, non-traditional approach to propulsion technology achieved by combining propulsion and control systems developed for formation-flying microsatellites with an innovative solar sail architecture to achieve sq km-class controllable sail areas, sail subsystem area densities of 1 gm per sq m, and thrust levels equivalent to 400 kW ion thruster systems used for comparable deep space missions. Ultrasail can conceivably even achieve outer planetary rendezvous, a deep space capability now reserved for high-mass nuclear and chemical systems. Ultrasail is a Delta IV-launched multi-blade spin-stabilized system with blade lengths as long as 50 km, reminiscent of the MacNeal Heliogyro. The primary innovation is the near-elimination of sail supporting structures by attaching the sail tip to a rigid formation-flying microsatellite truss which deploys the sail blade, and which then articulates the blade to provide attitude control, including spin stabilization and precession of the spin axis. These tip microsatellites are controlled by a solar-powered 3-axis microthruster system (electric or cold gas) to maintain proper sail film tension during deployment and spin-up. The satellite mass also provides a stabilizing centrifugal force on the blade while in rotation. Understanding the dynamics of individual blades is key to the overall dynamics of Ultrasail. Forces and torques that must be modeled include those due to solar pressure, those generated by the microsatellite at the blade tip and by torques applied at the blade root. Centrifugal forces also play a significant role in the deployment and maintenance of the sail configuration. To capture the dynamics of the overall system, the equations of motion for the blades have been derived. Using these differential equations, a control law will be derived to maneuver Ultrasail. This law involves the pitching of the individual blades thereby moving the distribution of the radiation pressure on each individual blade and inducing a resultant torque on the system. The direction of the angular momentum vector and its rate of precession can be controlled through the pitch angle of the blades. The Ultrasail trajectory is also being studied. Optimal or near-optimal trajectories are being generated to showcase Ultrasail performance. Various missions, e.g. outer planet and solar polar missions for observation of the Sun, are currently being investigated to demonstrate the performance enhancements generated by Ultrasail technology. Calculus-of-variations-based optimization software is used to produce optimal Ultrasail trajectories. The performance of these trajectories is being compared to optimal results generated with other propulsion models, including chemical propulsion, ion propulsion, and competing solar sail concepts. Results of these studies will quantify the performance of Ultrasail compared to existing solar sail concepts for high energy missions.

Burton, R.↗

Tracking Historical NASA EVA Training: Lifetime Surveillance of Astronaut Health (LSAH) Development of the EVA Suit Exposure Tracker (EVA SET)

During a spacewalk, designated as extravehicular activity (EVA), an astronaut ventures from the protective environment of the spacecraft into the vacuum of space. EVAs are among the most challenging tasks during a mission, as they are complex and place the astronaut in a highly stressful environment dependent on the spacesuit for survival. Due to the complexity of EVA, NASA has conducted various training programs on Earth to mimic the environment of space and to practice maneuvers in a more controlled and forgiving environment. However, rewards offset the risks of EVA, as some of the greatest accomplishments in the space program were accomplished during EVA, such as the Apollo moonwalks and the Hubble Space Telescope repair missions. Water has become the environment of choice for EVA training on Earth, using neutral buoyancy as a substitute for microgravity. During EVA training, an astronaut wears a modified version of the spacesuit adapted for working in water. This high fidelity suit allows the astronaut to move in the water while performing tasks on full-sized mockups of space vehicles, telescopes, and satellites. During the early Gemini missions, several EVA objectives were much more difficult than planned and required additional time. Later missions demonstrated that "complex (EVA) tasks were feasible when restraints maintained body position and underwater simulation training ensured a high success probability".1,2 EVA training has evolved from controlling body positioning to perform basic tasks to complex maintenance of the Hubble Space Telescope and construction of the International Space Station (ISS). Today, preparation is centered at special facilities built specifically for EVA training, such as the Neutral Buoyancy Laboratory (NBL) at NASA's Johnson Space Center ([JSC], Houston) and the Hydrolab at the Gagarin Cosmonaut Training Centre ([GCTC], Star City, outside Moscow). Underwater training for an EVA is also considered hazardous duty for NASA astronauts. This activity places astronauts at risk for decompression sickness and barotrauma as well as various musculoskeletal disorders from working in the spacesuit. The medical, operational and research communities over the years have requested access to EVA training data to better understand the risks. As a result of these requests, epidemiologists within the Lifetime Surveillance of Astronaut Health (LSAH) team have compiled records from numerous EVA training venues to quantify the exposure to EVA training. The EVA Suit Exposure Tracker (EVA SET) dataset is a compilation of ground-based training activities using the extravehicular mobility unit (EMU) in neutrally buoyant pools to enhance EVA performance on orbit. These data can be used by the current ISS program and future exploration missions by informing physicians, researchers, and operational personnel on the risks of EVA training in order that future suit and mission designs incorporate greater safety. The purpose of this technical report is to document briefly the various facilities where NASA astronauts have performed EVA training while describing in detail the EVA training records used to generate the EVA SET dataset.

Laughlin, Mitzi S.↗

Geoscience Laser Altimeter System (GLAS) Loop Heat Pipes: An Eventual First Year On-Orbit

Goddard Space Flight Center's Geoscience Laser Altimeter System (GLAS) is the sole scientific instrument on the Ice, Cloud and land Elevation Satellite (ICESat) that was launched on January 12, 2003 from Vandenberg AFB. A thermal control architecture based on propylene Loop Heat Pipe technology was developed to provide selectable/stable temperature control for the lasers and other electronics over the widely varying mission environment. Following a nominal LHP and instrument start-up, the mission was interrupted with the failure of the first laser after only 36 days of operation. During the 5-month failure investigation, the two GLAS LHPs and the electronics operated nominally, using heaters as a substitute for the laser heat load. Just prior to resuming the mission, following a seasonal spacecraft yaw maneuver, one of the LHPs deprimed and created a thermal runaway condition that resulted in an emergency shutdown of the GLAS instrument. This paper presents details of the LHP anomaly, the resulting investigation and recovery, along with on-orbit flight data during these critical events.

Grob, E.↗

Manned maneuvering unit applications for automated rendezvous and capture

Automated Rendezvous and Capture (AR&C) is an important technology to multiple National Aeronautics and Space Administration (NASA) programs and centers. The recent Johnson Spacecraft Center (JSC) AR&C Quality Function Deployment (QFD) has listed on-orbit demonstration of related technologies as a near term priority. Martin Marietta has been evaluating use of the Manned Maneuvering Unit (MMU) for a low cost near term on-orbit demonstration of AR&C technologies such as control algorithms, sensors, and processors as well as system level performance. The MMU Program began in 1979 as the method of repairing the Space Shuttle (STS) Thermal Protection System (the tiles). The units were not needed for this task, but were successfully employed during three Shuttle flights in 1984: a test flight was flown in in February as proof of concept, in April the MMU participated in the Solar Max Repair Mission, and in November the MMU's returned to space to successfully rescue the two errant satellites, Westar and Palapa. In the intervening years, the MMU simulator and MMU Qualification Test Unit (QTU) have been used for Astronaut training and experimental evaluations. The Extra-Vehicular Activities (EVA) Retriever has used the QTU, in an unmanned form, as a free-flyer on the Johnson Space Center (JSC) Precision Air Bearing Floor (PABF). Currently, the MMU is undergoing recertification for flight. The two flight units were removed from storage in September, 1991 and evaluation tests were performed. The tests demonstrated that the units are in good shape with no discrepancies that would preclude further use. The Return to Flight effort is currently clearing up recertification issues and evaluating the design against the present Shuttle environments.

Brehm, Donald L.↗

Orbital Maneuvering Vehicle - New capability

The Orbital Maneuvering Vehicle (OMV) program is reviewed with reference to the current status of the program, vehicle description, and mission capabilities. The OMV, which will be available in 1991, will be able to economically deliver and retreive spacecraft from orbits beyond the practical limits of the Shuttle. It will be capable of meeting the present needs of the Space Transportation System and its payloads and the future space activities associated with the Space Station. In addition to the inherent capability of the OMV, it can be enhanced by the addition of special purpose mission kits to meet special mission needs, such as servicing, refueling, and recovery of tumbling satellites.

Huber, William G.↗