Search NASA⌕ Search

SEARCH · Search NASA

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Recent Developments of Thermal Protection Materials to Enable Lower Cost Space Missions

Introduction: Starting with the Commercial Crew Program, a new paradigm has emerged at NASA. Rather than designing rockets and spacecrafts for every mission optimized to achieve science, NASA has begun to use a service-based model and utilizing public-private partnership in developing the vehicles that can bring broader benefits as well as lower the cost for NASA missions. Commercial companies own and operate those vehicles. This allows NASA to not design missions from the bottom up, and has cost, risk, and schedule savings implications. On the other side, the constraints require meeting the requirements in terms of mass, volume, power, etc. By leveraging NASA developed technologies, commercial companies can quickly demonstrate the commercial mission concept, and, through technology transfer, adopt needed technology to address supply chain problems. A downside is that the technology has to be sufficiently mature to be transferred by NASA, which means that it requires significant investment, expertise, and time to develop. Space entities are focused on rapid development with an emphasis on manufacturing and integration innovation with reduced cost and schedule and quick entrance into the market. Thermal Protection Systems (TPS) are mission critical, but their development takes years, and involve access to arc jets or unique test facilities. Therefore, their development is both risky and investment heavy. NASA ARC developed several new TPS materials over the last decade (C-PICA, HEEET, 3MDCP, 3DMAT, ADEPT woven TPS) and brought them to high TPS maturity, making them enablers for commercials space missions from LEO, Lunar Sample Return, Mars, and Venus missions. LEO missions are relevant to future Mars missions due to the comparable entry conditions. External Partners' Missions: C-PICA is a recent improvement on NASA’s heritage PICA lightweight TPS ablator. C-PICA is now considered an enabling technology for New Frontiers and other NASA missions. C-PICA was infused into several missions from external partners. Varda Space Industries’ Winnebago-1 spacecraft successfully returned to Earth from LEO on Feb. 21st, 2024, using a C-PICA heatshield. Inversion Space’s Ray vehicle will test both ARC’s C-PICA and SIRCA TPS materials on a LEO return mission later in 2024. The Kentucky Re-Entry Probe Experiment (KREPE) is another example of a low-cost flight experiment to demonstrate the use of small entry capsules to gather data with three instrumented Kentucky Re-entry and Universal Payload System (KRUPS) capsules. NASA Arc provided C-PICA and Soft-PICA for two of the next KRUPS capsules scheduled to re-enter Earth from the ISS later in 2024. Finally, Rocket Lab’s low-cost mission to Venus, scheduled to launch in December 2024, will search for habitable conditions in Venus’ cloud layer, making use of NASA ARC provided HEEET insulation layer heat shield, and SIRCA backshell TPS materials. Future NASA Missions: NASA’s ability to help commercial missions can lead to future low-cost missions for several reasons: Competition encourages lower cost; technology maturation is now done at an integrated system level; and a common design architecture between commercial and scientific applications requires no specialized engineering design. From an engineering perspective, both of these commercial LEO capsules aforementioned are capable of a Mars entry; the commercial payload mut be replaced with as science payload. Finally, several NASA mission concepts, that could be candidates for future SIMPLEx program calls, such as VATMOS-SR and Nephele, both proposing to target the Venusian atmosphere, would make use of the HEEET insulation layer TPS for part of their heat shield.

TPS materials↗

Recent Developments of Thermal Protection Materials to Enable Lower Cost Space Missions

Introduction: Starting with the Commercial Crew Program, a new paradigm has emerged at NASA. Rather than designing rockets and spacecrafts for every mission optimized to achieve science, NASA has begun to use a service-based model and utilizing public-private partnership in developing the vehicles that can bring broader benefits as well as lower the cost for NASA missions. Commercial companies own and operate those vehicles. This allows NASA to not design missions from the bottom up, and has cost, risk, and schedule savings implications. On the other side, the constraints require meeting the requirements in terms of mass, volume, power, etc. By leveraging NASA developed technologies, commercial companies can quickly demonstrate the commercial mission concept, and, through technology transfer, adopt needed technology to address supply chain problems. A downside is that the technology has to be sufficiently mature to be transferred by NASA, which means that it requires significant investment, expertise, and time to develop. Space entities are focused on rapid development with an emphasis on manufacturing and integration innovation with reduced cost and schedule and quick entrance into the market. Thermal Protection Systems (TPS) are mission critical, but their development takes years, and involve access to arc jets or unique test facilities. Therefore, their development is both risky and investment heavy. NASA ARC developed several new TPS materials over the last decade (C-PICA, HEEET, 3MDCP, 3DMAT, ADEPT woven TPS) and brought them to high TPS maturity, making them enablers for commercials space missions from LEO, Lunar Sample Return, Mars, and Venus missions. LEO missions are relevant to future Mars missions due to the comparable entry conditions. External Partners' Missions: C-PICA is a recent improvement on NASA’s heritage PICA lightweight TPS ablator. C-PICA is now considered an enabling technology for New Frontiers and other NASA missions. C-PICA was infused into several missions from external partners. Varda Space Industries’ Winnebago-1 spacecraft successfully returned to Earth from LEO on Feb. 21st, 2024, using a C-PICA heatshield. Inversion Space’s Ray vehicle will test both ARC’s C-PICA and SIRCA TPS materials on a LEO return mission later in 2024. The Kentucky Re-Entry Probe Experiment (KREPE) is another example of a low-cost flight experiment to demonstrate the use of small entry capsules to gather data with three instrumented Kentucky Re-entry and Universal Payload System (KRUPS) capsules. NASA Arc provided C-PICA and Soft-PICA for two of the next KRUPS capsules scheduled to re-enter Earth from the ISS later in 2024. Finally, Rocket Lab’s low-cost mission to Venus, scheduled to launch in December 2024, will search for habitable conditions in Venus’ cloud layer, making use of NASA ARC provided HEEET insulation layer heat shield, and SIRCA backshell TPS materials. Future NASA Missions: NASA’s ability to help commercial missions can lead to future low-cost missions for several reasons: Competition encourages lower cost; technology maturation is now done at an integrated system level; and a common design architecture between commercial and scientific applications requires no specialized engineering design. From an engineering perspective, both of these commercial LEO capsules aforementioned are capable of a Mars entry; the commercial payload mut be replaced with as science payload. Finally, several NASA mission concepts, that could be candidates for future SIMPLEx program calls, such as VATMOS-SR and Nephele, both proposing to target the Venusian atmosphere, would make use of the HEEET insulation layer TPS for part of their heat shield.

TPS materials↗

Status and specifications of a Project X front-end accelerator test facility at Fermilab

This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility. Fermilab's future involves new facilities to advance the intensity frontier. In the early 2000's, the vision was a pulsed, superconducting, 8 GeV linac capable of injecting directly into the Fermilab Main Injector. Prototyping the front-end of such a machine started in 2005 under a program named the High Intensity Neutrino Source (HINS). While the HINS test facility was being constructed, the concept of a new, more versatile accelerator for the intensity frontier, now called Project X, was forming. This accelerator comprises a 3 GeV CW superconducting linac with an associated experimental program, followed by a pulsed 8 GeV superconducting linac to feed the Main Injector synchrotron. The CW Project X design is now the model for Fermilab's future intensity frontier program. Although CW operation is incompatible with the original HINS front-end design, the installation remains useful for development and testing many Project X components.

43 PARTICLE ACCELERATORS↗

Geothermal Exploration Case Studies on OpenEI (Presentation)

The U.S. Geological Survey (USGS) resource assessment (Williams et al., 2008) outlined a mean 30 GWe of undiscovered hydrothermal resource in the western United States. One goal of the U.S. Department of Energy's (DOE) Geothermal Technology Office (GTO) is to accelerate the development of this undiscovered resource. DOE has focused efforts on helping industry identify hidden geothermal resources to increase geothermal capacity in the near term. Increased exploration activity will produce more prospects, more discoveries, and more readily developable resources. Detailed exploration case studies akin to those found in oil and gas (e.g. Beaumont and Foster, 1990-1992) will give developers central location for information gives models for identifying new geothermal areas, and guide efficient exploration and development of these areas. To support this effort, the National Renewable Energy Laboratory (NREL) has been working with GTO to develop a template for geothermal case studies on the Geothermal Gateway on OpenEI. In 2012, the template was developed and tested with two case studies: Raft River Geothermal Area (http://en.openei.org/wiki/Raft_River_Geothermal_Area) and Coso Geothermal Area (http://en.openei.org/wiki/Coso_Geothermal_Area). In 2013, ten additional case studies were completed, and Semantic MediaWiki features were developed to allow for more data and the direct citations of these data. These case studies are now in the process of external peer review. In 2014, NREL is working with universities and industry partners to populate additional case studies on OpenEI. The goal is to provide a large enough data set to start conducting analyses of exploration programs to identify correlations between successful exploration plans for areas with similar geologic occurrence models.

15 GEOTHERMAL ENERGY↗

Magnetic Analysis of a Single-Aperture 11T Nb3Sn Demonstrator Dipole for LHC Upgrades

The planned upgrade of the LHC collimation system foresees additional collimators to be installed in the dispersion suppressor areas around points 2, 3, and 7. The necessary longitudinal space for the collimators could be provided by replacing some 8.33-T 15-m-long NbTi LHC main dipoles with shorter 11-T Nb3Sn dipoles compatible with the LHC lattice and main systems. To demonstrate this possibility, in 2011 Fermilab and CERN started a joint R&D program with the goal of building a 5.5-m-long tw in-aperture dipole prototype suitable for installation in the LHC by 2014. The first step of this program is the development of a 2-m-long single-aperture demonstration dipole with the nominal field of 11 T at the LHC nominal current of ~11.85 kA and 60-m m bore with ~20% margin. This paper presents the results of magnetic analysis of the single-aperture Nb3Sn demonstrator dipole for the LHC collimation system upgrade.

43 PARTICLE ACCELERATORS↗

Dark Energy and Modified Gravity

Despite two decades of tremendous experimental and theoretical progress, the riddle of the accelerated expansion of the Universe remains to be solved. On the experimental side, our understanding of the possibilities and limitations of the major dark energy probes has evolved; here we summarize the major probes and their crucial challenges. On the theoretical side, the taxonomy of explanations for the accelerated expansion rate is better understood, providing clear guidance to the relevant observables. We argue that: i) improving statistical precision and systematic control by taking more data, supporting research efforts to address crucial challenges for each probe, using complementary methods, and relying on cross-correlations is well motivated; ii) blinding of analyses is difficult but ever more important; iii) studies of dark energy and modified gravity are related; and iv) it is crucial that R&D for a vibrant dark energy program in the 2030s be started now by supporting studies and technical R&D that will allow embryonic proposals to mature. Understanding dark energy, arguably the biggest unsolved mystery in both fundamental particle physics and cosmology, will remain one of the focal points of cosmology in the forthcoming decade.

79 ASTRONOMY AND ASTROPHYSICS↗

Development and Demonstration of Monitoring Strategies and Technologies -Modern2020 Project - 19317

The Modern2020 project aims at providing the means for developing and implementing an effective and efficient repository operational monitoring program, taking into account the requirements of specific national programs. The work allows advanced national radioactive waste disposal programs to design monitoring systems suitable for deployment when repositories start operating in the next decade and supports less developed programs and other stakeholders by illustrating how the national context can be taken into account in designing dedicated monitoring programs tailored to their national needs. The work has been established to understand what should be monitored within the frame of the wider safety cases and to provide methodology on how monitoring information can be used to support decision-making and to plan for responding to monitoring results. Several developments on innovative repository monitoring techniques (wireless data transmission, alternative power supply sources, new sensors, geophysical methods) has been done from the proof of feasibility stage to the technology development and demonstration phase. Innovative technical solutions facilitate the integration and flexibility of required monitoring components to ease the final implementation and adaptation of the monitoring system. Full-scale in-situ demonstrations of innovative monitoring techniques were done in way to evaluate the performance of the state-of-the-art, the innovative techniques and their comparison with conventional ones. Finally, we will introduce the experiences of the local public stakeholders that have been involved in the Modern2020 project by focusing on the participation in practice of the Belgian, French, Finnish and Swedish local stakeholders, This paper provides an overview of the European Commission Horizon2020 Modern2020 project's main goals and progress to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Towards Automated Generation of Chiplet-Based Systems

The Software Defined Architectures (SODA) Synthesizer is an open-source compiler-based tool able to automatically generate domain-specialized systems targeting Application- Specific Integrated Circuits (ASICs) or Field Programmable Gate Arrays (FPGAs) starting from high-level programming. SODA is composed of a high-level frontend, SODA-OPT, which leverages the multilevel intermediate representation (MLIR) framework to interface with productive programming tools (e.g., machine learning frameworks), identify kernels suitable for acceleration, and perform high-level optimizations, and of a state-of-the-art high-level synthesis backend, Bambu from the PandA framework, to generate custom accelerators. One specific application of the SODA Synthesizer is the generation of accelerators to enable ultra-low latency inference and control on autonomous systems for scientific discovery (e.g., electron microscopes, sensors in particle accelerators, etc.). This talk will discuss ongoing work on the SODA synthesizer to enable no-human-in-the-loop generation and design space exploration of the chiplets for highly specialized artificial intelligence accelerators. Connecting these highly specialized chiplets to general-purpose cores or programmable accelerators will allow to quickly deploy autonomous systems for scientific discovery.

Limaye, Ankur M.↗

HIGH-LEVEL CONTROL SYSTEM IN C#

We have started upgrading the control room programs for the injector at the Advanced Light Source (ALS). We chose to program in C* exclusively on the .NET Framework to create EPICS client programs on Windows Vista PCs. This paper reports the status of this upgrade project.

43 PARTICLE ACCELERATORS↗

Acting Globally: Potential Carbon Emissions Mitigation Impacts from an International Standards and Labelling Program

This paper presents an analysis of the potential impacts of an international initiative designed to support and promote the development and implementation of appliances standards and labelling programs throughout the world. As part of previous research efforts, LBNL developed the Bottom Up Energy Analysis System (BUENAS), an analysis framework that estimates impact potentials of energy efficiency policies on a global scale. In this paper, we apply this framework to an initiative that would result in the successful implementation of programs focused on high priority regions and product types, thus evaluating the potential impacts of such an initiative in terms of electricity savings and carbon mitigation in 2030. In order to model the likely parameters of such a program, we limit impacts to a five year period starting in 2009, but assume that the first 5 years of a program will result in implementation of 'best practice' minimum efficiency performance standards by 2014. The 'high priority' regions considered are: Brazil, China, the European Union,India, Mexico and the United States. The products considered are: refrigerators, air conditioners, lighting (both fluorescent and incandescent), standby power (for consumer electronics) and televisions in the residential sector, and air conditioning and lighting in commercial buildings. In 2020, these regions and enduses account for about 37percent of global residential electricity and 29percent of electricity in commercial buildings. We find that 850Mt of CO2 could be saved in buildings by 2030 compared to the baseline forecast.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Breaking the Vicious Start-Stop-Restart Cycle

NASA's history is built on a foundation of can-do strength, while pointing to the Apollo Moon missions in the 1960s and 1970s as its apex a sentiment that often overshadows the potential in store. The chronicle of America s civil space adventure is scattered with programs that got off to good starts with adequate resources and vocal political support but that never made it past a certain milestone review, General Accountability Office report, or Congressional budget appropriation. Over the decades since the fielding of the Space Shuttle in the early 1980s, a start-stop-restart cycle has intervened due to many forces. Despite this impediment, the workforce has delivered feats such as the International Space Station and numerous Shuttle and science missions, which reflect a trend in the early days of the Exploration Age that called for massive infrastructure and matching capital allocations. In the new millennium, the aerospace industry must respond to transforming economic climates, the public will, national agendas, and international possibilities relative to scientific exploration beyond Earth's orbit. Two pressing issues workforce transition and mission success are intertwined. As this briefing will show, U.S. aerospace must confront related workforce development and industrial base issues head on to take space exploration to the next level. This briefing also will formulate specific strategies to equip space engineers to move beyond the seemingly constant start-stop-restart mentality to plan and execute flight projects that actually fly.

Singer, Christopher E.↗

RENEW v3.2 user's manual, maintenance estimation simulation for Space Station Freedom Program

RENEW is a maintenance event estimation simulation program developed in support of the Space Station Freedom Program (SSFP). This simulation uses reliability and maintainability (R&M) and logistics data to estimate both average and time dependent maintenance demands. The simulation uses Monte Carlo techniques to generate failure and repair times as a function of the R&M and logistics parameters. The estimates are generated for a single type of orbital replacement unit (ORU). The simulation has been in use by the SSFP Work Package 4 prime contractor, Rocketdyne, since January 1991. The RENEW simulation gives closer estimates of performance since it uses a time dependent approach and depicts more factors affecting ORU failure and repair than steady state average calculations. RENEW gives both average and time dependent demand values. Graphs of failures over the mission period and yearly failure occurrences are generated. The averages demand rate for the ORU over the mission period is also calculated. While RENEW displays the results in graphs, the results are also available in a data file for further use by spreadsheets or other programs. The process of using RENEW starts with keyboard entry of the R&M and operational data. Once entered, the data may be saved in a data file for later retrieval. The parameters may be viewed and changed after entry using RENEW. The simulation program runs the number of Monte Carlo simulations requested by the operator. Plots and tables of the results can be viewed on the screen or sent to a printer. The results of the simulation are saved along with the input data. Help screens are provided with each menu and data entry screen.

Bream, Bruce L.↗

Getting to First Flight: Equipping Space Engineers to Break the Start-Stop-Restart Cycle

The National Aeronautics and Space Administration s (NASA s) history is built on a foundation of can-do strength, while pointing to the Saturn/Apollo Moon missions in the 1960s and 1970s as its apex a sentiment that often overshadows the potential that lies ahead. The chronicle of America s civil space agenda is scattered with programs that got off to good starts with adequate resources and vocal political support but that never made it past a certain milestone review, General Accountability Office report, or Congressional budget appropriation. Over the decades since the fielding of the Space Shuttle in the early 1980s, a start-stop-restart cycle has intervened due to many forces. Despite this impediment, the workforce has delivered engineering feats such as the International Space Station and numerous Shuttle and science missions, which reflect a trend in the early days of the Exploration Age that called for massive infrastructure and matching capital allocations. In the new millennium, the aerospace industry must respond to transforming economic climates, the public will, national agendas, and international possibilities relative to scientific exploration beyond Earth s orbit. Two pressing issues - workforce transition and mission success - are intertwined. As this paper will address, U.S. aerospace must confront related workforce development and industrial base issues head on to take space exploration to the next level. This paper also will formulate specific strategies to equip space engineers to move beyond the seemingly constant start-stop-restart mentality to plan and execute flight projects that actually fly.

Singer, Christopher E.↗

Prospects for an Accelerator Program in Mexico Focused on Photon Science

Recent interest in developing an accelerator-based light source in Mexico has driven several actions by the Division of Particles and Fields in Mexico, and by the electron accelerator community in the United States. We report on activities over the past two years that are very encouraging and offer a variety of possibilities to start the development of an accelerator program in Mexico. A suggested path towards this goal that would eventually lead to building, commissioning and operating a third or fourth generation light source will also be presented

43 PARTICLE ACCELERATORS↗

Propulsion Technology Development for Sample Return Missions Under NASA's ISPT Program

The In-Space Propulsion Technology (ISPT) Program was tasked in 2009 to start development of propulsion technologies that would enable future sample return missions. Sample return missions could be quite varied, from collecting and bringing back samples of comets or asteroids, to soil, rocks, or atmosphere from planets or moons. The paper will describe the ISPT Program s propulsion technology development activities relevant to future sample return missions. The sample return propulsion technology development areas for ISPT are: 1) Sample Return Propulsion (SRP), 2) Planetary Ascent Vehicles (PAV), 3) Entry Vehicle Technologies (EVT), and 4) Systems/mission analysis and tools that focuses on sample return propulsion. The Sample Return Propulsion area is subdivided into: a) Electric propulsion for sample return and low cost Discovery-class missions, b) Propulsion systems for Earth Return Vehicles (ERV) including transfer stages to the destination, and c) Low TRL advanced propulsion technologies. The SRP effort will continue work on HIVHAC thruster development in FY2011 and then transitions into developing a HIVHAC system under future Electric Propulsion for sample return (ERV and transfer stages) and low-cost missions. Previous work on the lightweight propellant-tanks will continue under advanced propulsion technologies for sample return with direct applicability to a Mars Sample Return (MSR) mission and with general applicability to all future planetary spacecraft. A major effort under the EVT area is multi-mission technologies for Earth Entry Vehicles (MMEEV), which will leverage and build upon previous work related to Earth Entry Vehicles (EEV). The major effort under the PAV area is the Mars Ascent Vehicle (MAV). The MAV is a new development area to ISPT, and builds upon and leverages the past MAV analysis and technology developments from the Mars Technology Program (MTP) and previous MSR studies.

Anderson, David J.↗

New In-pile Instrumentation to Support Fuel Cycle Research and Development

New and enhanced nuclear fuels are a key enabler for new and improved reactor technologies. For example, the goals of the next generation nuclear plant (NGNP) will not be met without irradiations successfully demonstrating the safety and reliability of new fuels. Likewise, fuel reliability has become paramount in ensuring the competitiveness of nuclear power plants. Recently, the Office of Nuclear Energy in the Department of Energy (DOE-NE) launched a new direction in fuel research and development that emphasizes an approach relying on first principle models to develop optimized fuel designs that offer significant improvements over current fuels. To facilitate this approach, high fidelity, real-time, data are essential for characterizing the performance of new fuels during irradiation testing. A three-year strategic research program is proposed for developing the required test vehicles with sensors of unprecedented accuracy and resolution for obtaining the data needed to characterize three-dimensional changes in fuel microstructure during irradiation testing. When implemented, this strategy will yield test capsule designs that are instrumented with new sensor technologies for the Advanced Test Reactor (ATR) and other irradiation locations for the Fuel Cycle Research and Development (FC R&D) program. Prior laboratory testing, and as needed, irradiation testing, of these sensors will have been completed to give sufficient confidence that the irradiation tests will yield the required data. Obtaining these sensors must draw upon the expertise of a wide-range of organizations not currently supporting nuclear fuels research. This document defines this strategic program and provides the necessary background information related to fuel irradiation testing, desired parameters for detection, and an overview of currently available in-pile instrumentation. In addition, candidate sensor technologies are identified in this document, and a list of proposed criteria for ranking these technologies. A preliminary ranking of candidate technologies is performed to illustrate the path forward for developing real-time instrumentation that could provide the required data for the FC R&D program. This draft document is a starting point for discussion with instrumentation experts and organizations. It is anticipated that the document will be used to stimulate discussions on a wide-range of sensor technologies and to gain consensus with respect to the path forward for accomplishing the goals of this research program.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Titan/Centaur T/C-1 post flight evaluation report

The first Titan/Centaur launch vehicle, TC-1, was launched from the Eastern Test Range Complex 41 at 09:48:01.46 hours Eastern Daylight Time on February 11, 1974. The vehicle carried a dynamic mass model of the Viking spacecraft and a SPHINX spacecraft, intended to study high voltage interactions in space. This launch was a Proof Flight of a vehicle con- figuration integrating the Air Force Titan booster and the NASA Centaur upper stage. It also was the first flight of the Centaur Standard Shroud developed for the Titan/Centaur. The countdown for the launch proceeded normally except for an additional 45 minute hold which was required to resolve a question concerning interpretation of booster hydraulic system data. The launch window opened at 09:03:00 hours Eastern Daylight Time. The vehicle was launched o on a flight azimuth of 105°. The Titan boost phase of flight was satisfactory. Solid Motor operation, Stage I and Stage II operation were normal. Venting of the Centaur Standard Shroud during ascent was successful and shroud separation and jettison was accomplished without incident. At the completion of the Titan Stage II burn, the Centaur successfully separated from the Titan. At this time, the Centaur main engines were sequenced through the first planned starting cycle but failed to achieve steady state operation. The vehicle flight control system, not sensing vehicle acceleration, commanded engine shutdown, and recycled, as programmed, through a back-up engine start attempt. The second engine start attempt was also unsuccessful. The flight control system then placed the vehicle in a coast-phase mode and the vehicle continued downrange in free fall. The vehicle was destroyed by Range Safety when the impact point was approximately 2200 nautical miles downrange, 12 minutes, 28.5 seconds after liftoff.

S. V. Szabo, Jr.↗

Achieving Maximum Integration Utilizing Requirements Flow Down

A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.

Archiable, Wes↗