Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Technical aspects of the United States Space Station

The design and development of the Space Station are described. The proposed design of the Station is a dual keel configuration which will include manned facilities and unmanned free flying platforms. The Station is to be utilized as a space-based laboratory for basic research and observations, a depot for repair and servicing of spacecraft, a strorage area, and a manufacturing facility. International participation in the Space Station program and technological developments applicable for the Station are discussed. A diagram of the Space Station configuration and a Space Station development schedule are provided.

Herman, D. H.↗

Third International Symposium on Artificial Intelligence, Robotics, and Automation for Space 1994

The Third International Symposium on Artificial Intelligence, Robotics, and Automation for Space (i-SAIRAS 94), held October 18-20, 1994, in Pasadena, California, was jointly sponsored by NASA, ESA, and Japan's National Space Development Agency, and was hosted by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology. i-SAIRAS 94 featured presentations covering a variety of technical and programmatic topics, ranging from underlying basic technology to specific applications of artificial intelligence and robotics to space missions. i-SAIRAS 94 featured a special workshop on planning and scheduling and provided scientists, engineers, and managers with the opportunity to exchange theoretical ideas, practical results, and program plans in such areas as space mission control, space vehicle processing, data analysis, autonomous spacecraft, space robots and rovers, satellite servicing, and intelligent instruments.

Source record↗

International Space Station Major Constituent Analyzer On-Orbit Performance

The Major Constituent Analyzer is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic changeout, including the analyzer (ORU 02) and the verification gas assembly (ORU 08). The longest lasting ORU 02 was recently replaced after a record service length of 1033 days. The comparatively high performance duration may be attributable to a reduced inlet flow rate into the analyzer, resulting in increased ion pump lifetime; however, there may be other factors as well. A recent schedule slip for delivery of replacement verification gas led to a demonstration that the calibration interval could be extended on a short-term basis. An analysis of ORU 08 performance characteristics indicates that it is possible to temporarily extend the calibration interval from 6 weeks to 12 weeks if necessary.

Gardner, Ben D.↗

Thermal Analysis for Orbiter and ISS Plume Impingement on International Space Station

The NASA Reaction Control System (RCS) Plume Model (RPM) is an exhaust plume flow field and impingement heating code that has been updated and applied to components of the International Space Station (ISS). The objective of this study was to use this code to determine if plume environments from either Orbiter PRCS jets or ISS reboost and Attitude Control System (ACS) jets cause thermal issues on ISS component surfaces. This impingement analysis becomes increasingly important as the ISS is being assembled with its first permanent crew scheduled to arrive by the end of fall 2000. By early summer 2001 , the ISS will have a number of major components installed such as the Unity (Node 1), Destiny (Lab Module), Zarya (Functional Cargo Block), and Zvezda (Service Module) along with the P6 solar arrays and radiators and the Z-1 truss. Plume heating to these components has been analyzed with the RPM code as well as additional components for missions beyond Flight 6A such as the Propulsion Module (PM), Mobile Servicing System, Space Station Remote Manipulator System, Node 2, and the Cupola. For the past several years NASA/JSC has been developing the methodology to predict plume heating on ISS components. The RPM code is a modified source flow code with capabilities for scarfed nozzles and intersecting plumes that was developed for the 44 Orbiter RCS jets. This code has been validated by comparison with Shuttle Plume Impingement Flight Experiment (SPIFEX) heat flux and pressure data and with CFD and Method of Characteristics solutions. Previous analyses of plume heating predictions to the ISS using RPM have been reported, but did not consider thermal analysis for the components nor jet-firing histories as the Orbiter approaches the ISS docking ports. The RPM code has since been modified to analyze surface temperatures with a lumped mass approach and also uses jet-firing histories to produce pulsed heating rates. In addition, RPM was modified to include plume heating from ISS jets to ISS components where the jet coordinates are specified, together with the engine cant angle. These latter studies have been focused on the PM with plumes from its reboost and ACS jets impinging on various ISS components and also focused on the Japanese H2 Transfer Vehicle (HTV) with the plumes from its reboost engines impinging on the Cupola window. This paper will present plume heating and surface temperature results on a number of ISS components with and without jet-firing histories, evaluate post-flight data, and describe any potential thermal issues

Rochelle, William C.↗

Simulated Evaluation of Strategic Conflict Management Capabilities for Urban Air Mobility Operations

Urban Air Mobility (UAM) is a new air transportation service concept to carry passengers or cargo in metropolitan areas, leveraged by innovative aircraft and automation technologies. NASA has conducted a series of simulations to evaluate the UAM concept of operations and inform the development of airspace procedures and services for UAM operations. The latest set of simulations called “X5” were conducted to test a Provider of Services for UAM (PSU) prototype that NASA developed for UAM flight planning, strategic conflict management support, and data exchange between UAM operators. In these simulations, two strategic conflict management capabilities, Demand-Capacity Balancing (DCB) and Sequencing and Scheduling (S&S), were further investigated. This paper describes the system architecture designed for the X5 simulation activities, the sequence diagram for strategic conflict management, and the simulation environment in the Dallas/Fort Worth urban area. The simulation results based on several system performance metrics for evaluation show that a sequential application of DCB and S&S effectively works to distribute traffic demand and meet sequencing and spacing criteria by assigning ground delays, compared to the DCB only and S&S only cases.

Urban Air Mobility, Strategic Conflict Management,↗

Simulated Evaluation of Strategic Conflict Management Capabilities for Urban Air Mobility Operations

Urban Air Mobility (UAM) is a new air transportation service concept to carry passengers or cargo in metropolitan areas, leveraged by innovative aircraft and automation technologies. NASA has conducted a series of simulations to evaluate the UAM concept of operations and inform the development of airspace procedures and services for UAM operations. The latest set of simulations called “X5” were conducted to test a Provider of Services for UAM (PSU) prototype that NASA developed for UAM flight planning, strategic conflict management support, and data exchange between UAM operators. In these simulations, two strategic conflict management capabilities, Demand-Capacity Balancing (DCB) and Sequencing and Scheduling (S&S), were further investigated. This paper describes the system architecture designed for the X5 simulation activities, the sequence diagram for strategic conflict management, and the simulation environment in the Dallas/Fort Worth urban area. The simulation results based on several system performance metrics for evaluation show that a sequential application of DCB and S&S effectively works to distribute traffic demand and meet sequencing and spacing criteria by assigning ground delays, compared to the DCB only and S&S only cases.

Simulation↗

Atmospheric pressure ionisation - mass spectrometry for argon online monitoring in ASTRID

Safety, operability, waste transmutation and mastered investment costs are key issues for the development of generation IV reactors, especially sodium cooled fast reactors. To achieve a development scheduled around 2040, the nuclear energy division of CEA, France, is studying a prototype called ASTRID (Advanced Sodium Technological Reactor for Industrial Demonstration) which is in its conceptual design phase. To achieve a high level of maturity, In Service Inspection and Repair is very important, in particular fuel cladding failure detection. If such a failure occurs, fission products Xenon and Krypton are released. Their fast and sensitive detection is a challenge. The use of a commercial API-MS is evaluated in this work. Detection limits below 10 ppt have been measured for Kr 84 and for Xe 132. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Facilitating Staging-based Unstructured Mesh Processing to Support Hybrid In-Situ Workflows

In-situ and in-transit processing alleviate the gap between the computing and I/O capabilities by scheduling data analytics close to the data source. Hybrid in-situ processing splits data analytics into two stages: the data processing that runs in-situ aims to extract regions of interest, which are then transferred to staging services for further in-transit analytics. To facilitate this type of hybrid in-situ processing, the data staging service needs to support complex intermediate data representations generated/consumed by the in-situ tasks. Unstructured (or irregular) mesh is one such derived data representation that is typically used and bridges simulation data and analytics. However, how staging services efficiently support unstructured mesh transfer and processing remains to be explored. This paper investigates design options for transferring and processing unstructured mesh data using staging services. Using polygonal mesh data as an example, we show that hybrid in-situ workflows with staging-based unstructured mesh processing can effectively support hybrid in-situ workflows, and can significantly decrease data movement overheads.

data-driven↗

Space Shuttle payloads - An overview

A review is made of historical developments of NASA-launched payloads as a basis for projecting payload operations configured to fit the Shuttle's capabilities, and the impetus for new spacecraft and applications designs is discussed. Payloads have experienced a growth in size and weight, capacity and lifetime, and have increasingly featured more automation, microminiaturized circuitry, and data processing systems. Launches by the DoD and NASA have averaged about 20/yr. Spacecraft specifically configured for Shuttle launch have had to wait due to development schedule delays. Partial compensation has occurred by the use of the MMS, which fits into both the Delta nose cone and the Orbiter bay. The Landsat-4 and SMM are cited as examples. Successful demonstration of in-orbit servicing of satellites is required in order to attract spacecraft designers who will make full use of the Shuttle's capabilities. Finally, increased standardization of spacecraft shape, interfaces, and components is foreseeen.

Edgecombe, D. S.↗

GSFC IVS Technology Development Center Report

This report summarizes the activities of the Goddard Space Flight Center's (GSFC's) International Very Long Base Interferometry (VLBI) Service (IVS)Technology Development Center from the establishment of IVS to the end of 2000. The report forecasts activities planned for the year 2001. The GSFC IVS Technology Development Center (TDC) develops station software including the Field System (FS), scheduling software (SKED), hardware including tools for station timing and meteorology, scheduling algorithms, operational procedures, and provides a pool of individuals to assist with station implementation, check-out, upgrades, and training.

Himwich, Ed↗

Generalized Separation of an Object Jettisoned from the ISS

The International Space Station (ISS) Program faces unprecedented logistics challenges in both upmass and downmass. Some items employed on the ISS exterior present significant technical issues for a controlled de-orbit on either the shuttle or an expendable supply vehicle. Such manifest problems arise due to structural degradation, insufficient containment of hazardous pressures or contents, excessive size, or some combination of all of these factors. In addition, the mounting hardware and other flight service equipment to manifest the returned equipment must itself be launched, competing with other upmass. EVA techniques and equipment to successfully contain and secure such problematic equipment result in numerous significant risks to the spacewalking crews and cost and schedule risks to the program. The ISS Program office has therefore developed a policy that advises the jettison of the most problematic objects. Such jettisoned items join a small family of nearly co-planar orbital debris objects that threaten the ISS on several timescales, besides threatening all satellites with perigee below the ISS orbit and the general human population on Earth. This analysis addresses the governing physics and the ensuing risks when an object is jettisoned. It is shown that there are four time domains which must be considered, each with its own inherent problems, and that a ballistic solution is usually possible that satsfies all constraints in all domains.

Bacon, Jack↗

NASA Space Life Sciences

This slide presentation reviews the requirements that NASA has for the medical service of a crew returning to earth after long duration space flight. The scenarios predicate a water landing. Two scenarios are reviewed that outline the ship-board medical operations team and the ship board science reseach team. A schedule for the each crew upon landing is posited for each of scenarios. The requirement for a heliport on board the ship is reviewed and is on the requirement for a helicopter to return the Astronauts to the Baseline Data Collection Facility (BDCF). The ideal is to integrate the medical and science requirements, to minimize the risks and Inconveniences to the returning astronauts. The medical support that is required for all astronauts returning from long duration space flight (30 days or more) is reviewed. The personnel required to support the team is outlined. The recommendations for medical operations and science research for crew support are stated.

Hayes, Judith↗

NASA's Astronant Family Support Office

During the NASA‐Mir program of the 1990s and due to the challenges inherent in the International Space Station training schedule and operations tempo, it was clear that a special focus on supporting families was a key to overall mission success for the ISS crewmembers pre‐, in‐ and post‐flight. To that end, in January 2001 the first Family Services Coordinator was hired by the Behavioral Health and Performance group at NASA JSC and matrixed from Medical Operations into the Astronaut Office's organization. The initial roles and responsibilities were driven by critical needs, including facilitating family communication during training deployments, providing mission‐specific and other relevant trainings for spouses, serving as liaison for families with NASA organizations such as Medical Operations, NASA management and the Astronaut Office, and providing assistance to ensure success of an Astronaut Spouses Group. The role of the Family Support Office (FSO) has modified as the ISS Program matured and the needs of families changed. The FSO is currently an integral part of the Astronaut Office's ISS Operations Branch. It still serves the critical function of providing information to families, as well as being the primary contact for US and international partner families with resources at JSC. Since crews launch and return on Russian vehicles, the FSO has the added responsibility for coordinating with Flight Crew Operations, the families, and their guests for Soyuz launches, landings, and Direct Return to Houston post‐flight. This presentation will provide a summary of the family support services provided for astronauts, and how they have changed with the Program and families the FSO serves. Considerations for future FSO services will be discussed briefly as NASA proposes one year missions and beyond ISS missions. Learning Objective: 1) Obtain an understanding of the reasons a Family Support Office was important for NASA. 2) Become familiar with the services provided for astronauts and their families and how they changed with the Program and family needs.

Beven, Gary↗

Fracture Toughness Properties of Tritium Charged and Aged Stainless Steels: SRNL and SNL Collaboration Test Plan and 2018 Results

Forged stainless steels are used as the materials of construction for tritium reservoirs. During service, tritium diffuses into the reservoir walls and radioactively decays to helium-3. Tritium and decay helium cause a higher propensity for cracking which could lead to a tritium leak or failure of a tritium reservoir. Fracture toughness properties are needed for designing tritium reservoirs and evaluating the long-term effects of tritium on their structural properties. A key result of prior studies is that the long-term cracking resistance of stainless steels in tritium service depends greatly on the interaction between decay helium and the steels’ forged microstructure. Designers and modelers at Sandia National Laboratories (SNL) have identified key gaps in the data available on material performance in tritium. Thus, a collaborative plan and schedule of tests have been developed with SRNL and SNL to fill these gaps using a range of tensile test and fracture mechanics test geometries, at stockpile relevant temperatures. These studies target the fundamental deformation mechanisms and the influence of tritium-decay-helium on their behavior. This report outlines the goals of each program and describes the sample test matrices and experimental conditions. This report fulfills the requirements for a portion of the Enhanced Surveillance Campaign (ESC) FY19 Level 2 milestone 6725 to deliver an annual report on the aging studies of reservoir materials.

36 MATERIALS SCIENCE↗

ACTS Multibeam Communications Package - Technology for the 1990S

To maintain its competitive position in the 1990s, satellite communications must evolve to provide new services and to reduce the costs of supplying existing services. NASA's Advanced Communications Technology Satellite (ACTS) program is directed toward developing the technology base that will support this evolution. The ACTS communications payload is optimized for digital communications using a time-division multiple access format. Scanning spot-beam antennas provide high-performance on-demand service to the earth communication stations. On-board processing and switching allow full connectivity in a single-hop network architecture. ACTS employs Ka-band (30/20 GHz) links for communications traffic and includes techniques for mitigating rain fades. Scheduled to be launched by a Space Shuttle in 1992, ACTS will provide in-orbit technology verification and support experimental communications networks for up to four years.

Graebner, John C.↗

NASA Glenn 1-by 1-Foot Supersonic Wind Tunnel User Manual

This manual describes the NASA Glenn Research Center's 1 - by 1 -Foot Supersonic Wind Tunnel and provides information for customers who wish to conduct experiments in this facility. Tunnel performance envelopes of total pressure, total temperature, and dynamic pressure as a function of test section Mach number are presented. For each Mach number, maps are presented of Reynolds number per foot as a function of the total air temperature at the test section inlet for constant total air pressure at the inlet. General support systems-such as the service air, combustion air, altitude exhaust system, auxiliary bleed system, model hydraulic system, schlieren system, model pressure-sensitive paint, and laser sheet system are discussed. In addition, instrumentation and data processing, acquisition systems are described, pretest meeting formats and schedules are outlined, and customer responsibilities and personnel safety are addressed.

Seablom, Kirk D.↗

One Year Old and Growing: A Status Report on the International Space Station and Its Partners

The first elements of the International Space Station have been launched and docked together, and are performing well on-orbit. The Station is currently being operated jointly by NASA and Russian space organizations. In May 1999, the Space Shuttle was the first vehicle to dock to the International, Space Station. A crew of seven U.S. and Russian astronauts delivered 4000 pounds of supplies, made repairs to communications and battery systems, and installed external hardware during an EVA. The next module, the Russian Service Module, is due to join the orbital complex this year. This will initiate a period of rapid growth, with new modules and equipment continually added for the next five to six years, through assembly complete. The first crew is scheduled to begin permanent occupation of the International Space Station early next year. Hardware is being developed by Space Station partners and participants around the world and is largely on schedule for launch. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required. International crews are selected and in training. Coordination efforts continue with each of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved their own successes. This paper will discuss the status of the ISS partners and participants, their contributions and accomplished milestones, and upcoming events. It will also give a status report on the developments of the remainder of the ISS modules and components by each partner and participant. The ISS, the largest and most complicated peacetime project in history, is flying, and, with the help of all the ISS members, will continue to grow.

Bartoe, John-David F.↗

Energy Systems Test Area (ESTA) Pyrotechnic Operations: User Test Planning Guide

The Johnson Space Center (JSC) has created and refined innovative analysis, design, development, and testing techniques that have been demonstrated in all phases of spaceflight. JSC is uniquely positioned to apply this expertise to components, systems, and vehicles that operate in remote or harsh environments. We offer a highly skilled workforce, unique facilities, flexible project management, and a proven management system. The purpose of this guide is to acquaint Test Requesters with the requirements for test, analysis, or simulation services at JSC. The guide includes facility services and capabilities, inputs required by the facility, major milestones, a roadmap of the facility s process, and roles and responsibilities of the facility and the requester. Samples of deliverables, facility interfaces, and inputs necessary to define the cost and schedule are included as appendices to the guide.

Hacker, Scott↗