Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Validating and Verifying Biomathematical Models of Human Fatigue

Airline pilots experience acute and chronic sleep deprivation, sleep inertia, and circadian desynchrony due to the need to schedule flight operations around the clock. This sleep loss and circadian desynchrony gives rise to cognitive impairments, reduced vigilance and inconsistent performance. Several biomathematical models, based principally on patterns observed in circadian rhythms and homeostatic drive, have been developed to predict a pilots levels of fatigue or alertness. These models allow for the Federal Aviation Administration (FAA) and commercial airlines to make decisions about pilot capabilities and flight schedules. Although these models have been validated in a laboratory setting, they have not been thoroughly tested in operational environments where uncontrolled factors, such as environmental sleep disrupters, caffeine use and napping, may impact actual pilot alertness and performance. We will compare the predictions of three prominent biomathematical fatigue models (McCauley Model, Harvard Model, and the privately-sold SAFTE-FAST Model) to actual measures of alertness and performance. We collected sleep logs, movement and light recordings, psychomotor vigilance task (PVT), and urinary melatonin (a marker of circadian phase) from 44 pilots in a short-haul commercial airline over one month. We will statistically compare with the model predictions to lapses on the PVT and circadian phase. We will calculate the sensitivity and specificity of each model prediction under different scheduling conditions. Our findings will aid operational decision-makers in determining the reliability of each model under real-world scheduling situations.

fatigue↗

A comparison of the Shuttle remote manipulator system and the Space Station Freedom mobile servicing center

The Shuttle Remote Manipulator System is a mature system which has successfully completed 18 flights. Its primary functional design driver was the capability to deploy and retrieve payloads from the Orbiter cargo bay. The Space Station Freedom Mobile Servicing Center is still in the requirements definition and early design stage. Its primary function design drivers are the capabilities: to support Space Station construction and assembly tasks; to provide external transportation about the Space Station; to provide handling capabilities for the Orbiter, free flyers, and payloads; to support attached payload servicing in the extravehicular environment; and to perform scheduled and un-scheduled maintenance on the Space Station. The differences between the two systems in the area of geometric configuration, mobility, sensor capabilities, control stations, control algorithms, handling performance, end effector dexterity, and fault tolerance are discussed.

Taylor, Edith C.↗

Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

Smith, Janice F.↗

A Model-based Approach to Reactive Self-Configuring Systems

This paper describes Livingstone, an implemented kernel for a self-reconfiguring autonomous system, that is reactive and uses component-based declarative models. The paper presents a formal characterization of the representation formalism used in Livingstone, and reports on our experience with the implementation in a variety of domains. Livingstone's representation formalism achieves broad coverage of hybrid software/hardware systems by coupling the concurrent transition system models underlying concurrent reactive languages with the discrete qualitative representations developed in model-based reasoning. We achieve a reactive system that performs significant deductions in the sense/response loop by drawing on our past experience at building fast prepositional conflict-based algorithms for model-based diagnosis, and by framing a model-based configuration manager as a prepositional, conflict-based feedback controller that generates focused, optimal responses. Livingstone automates all these tasks using a single model and a single core deductive engine, thus making significant progress towards achieving a central goal of model-based reasoning. Livingstone, together with the HSTS planning and scheduling engine and the RAPS executive, has been selected as the core autonomy architecture for Deep Space One, the first spacecraft for NASA's New Millennium program.

Williams, Brian C.↗

IV&V Project Assessment Process Validation

The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

Driskell, Stephen↗

In-flight Testing of the Injection of the LISA Pathfinder Test Mass into a Geodesic

LISA Pathfinder is a technology demonstrator space mission, aimed at testing key technologies for detecting gravitational waves in space. The mission is the precursor of LISA, the first space gravitational waves observatory, whose launch is scheduled for 2034. The LISA Pathfinder scientific payload includes two gravitational reference sensors (GRSs), each one containing a test mass (TM), which is the sensing body of the experiment. A mission critical task is to set each TM into a pure geodesic motion, i.e. guaranteeing an extremely low acceleration noise in the sub-Hertz frequency bandwidth. The grabbing positioning and release mechanism (GPRM), responsible for the injection of the TM into a geodesic trajectory, was widely tested on ground, with the limitations imposed by the 1-g environment. The experiments showed that the mechanism, working in its nominal conditions, is capable of releasing the TM into free-fall fulfilling the very strict constraint imposed on the TM residual velocity, in order to allow its capture on behalf of the electrostatic actuation. However, the first in-flight releases produced unexpected residual velocity components, for both the TMs. Moreover, all the residual velocity components were greater than maximum value set by the requirements. The main suspect is that unexpected contacts took place between the TM and the surroundings bodies. As a consequence, ad hoc manual release procedures had to be adopted for the few following injections performed during the nominal mission. These procedures still resulted in non compliant TM states which were captured only after impacts. However, such procedures seem not practicable for LISA, both for the limited repeatability of the system and for the unmanageable time lag of the telemetry/telecommand signals (about 4400 s). For this reason, at the end of the mission, the GPRM was deeply tested in-flight, performing a large number of releases, according to different strategies. The tests were carried out in order to understand the unexpected dynamics and limit its effects on the final injection. Some risk mitigation maneuvers have been tested aimed at minimizing the vibration of the system at the release and improving the alignment between the mechanism and the TM. However, no overall optimal release strategy to be implemented in LISA could be found, because the two GPRMs behaved differently.

LISA↗

A Summary Of: Collecting Sleep, Circadian, Fatigue, and Performance Data in Complex Operational Environments

Sleep loss and circadian misalignment contribute to a meaningful proportion of operational accidents and incidents. Countermeasures and work scheduling designs aimed at mitigating fatigue are typically evaluated in controlled laboratory environments, but the effectiveness of translating such strategies to operational environments can be challenging to assess. This manuscript summarizes an approach for collecting sleep, circadian, fatigue, and performance data in a complex operational environment. We studied 44 airline pilots over 34 days while they flew a fixed schedule, which included a baseline data collection with 5 days of mid-morning flights, four early flights, four high-workload mid-day flights, and four late flights that landed after midnight. Each work block was separated by 3-4 days of rest. To assess sleep, participants wore a wrist-worn research-validated activity monitor continuously and completed daily sleep diaries. To assess the circadian phase, pilots were asked to collect all urine produced in four or eight hourly bins during the 24 h after each duty block for the assessment of 6-sulfatoxymelatonin (aMT6s), which is a biomarker of the circadian rhythm. To assess subjective fatigue and objective performance, participants were provided with a touchscreen device used to complete the Samn-Perelli Fatigue Scale and Psychomotor Vigilance Task (PVT) during and after each flight, and at wake-time, mid-day, and bedtime. Using these methods, it was found that sleep duration was reduced during early starts and late finishes relative to baseline. Circadian phase shifted according to duty schedule, but there was a wide range in the aMT6s peak between individuals on each schedule. PVT performance was worse on the early, high-workload, and late schedules relative to baseline. Overall, the combination of these methods was practical and effective for assessing the influence of sleep loss and circadian phase on fatigue and performance in a complex operational environment.

Arsintescu, Lucica↗

Milestone 4: Test plan for Reusable Hydrogen Composite Tank System (RHCTS). Task 3: Composite tank materials

This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.

Greenberg, H. S.↗

NASA Advisory Council Task Force on the Shuttle-Mir Rendezvous and Docking Missions

The NASA Advisory Council Task Force on the Shuttle-Mir rendezvous and docking convened on May 24 and 25, 1994. Based on the meetings, the Task Force made the following recommendations: at a minimum, the mission commander and payload commander for all subsequent Shuttle-Mir missions should be named at least 18 months in advance of the scheduled launch date; in order to derive early operational experience in advance of the first Mir docking mission, the primary objective of STS-63 should be Mir rendezvous and proximity operations; and if at all possible, the launch date for STS-63 should be moved forward.

Source record↗

Co-evolution for Problem Simplification

This paper explores a co-evolutionary approach applicable to difficult problems with limited failure/success performance feedback. Like familiar "predator-prey" frameworks this algorithm evolves two populations of individuals - the solutions (predators) and the problems (prey). The approach extends previous work by rewarding only the problems that match their difficulty to the level of solut,ion competence. In complex problem domains with limited feedback, this "tractability constraint" helps provide an adaptive fitness gradient that, effectively differentiates the candidate solutions. The algorithm generates selective pressure toward the evolution of increasingly competent solutions by rewarding solution generality and uniqueness and problem tractability and difficulty. Relative (inverse-fitness) and absolute (static objective function) approaches to evaluating problem difficulty are explored and discussed. On a simple control task, this co-evolutionary algorithm was found to have significant advantages over a genetic algorithm with either a static fitness function or a fitness function that changes on a hand-tuned schedule.

Haith, Gary L.↗

Additive Manufacturing of Low Cost Upper Stage Propulsion Components

NASA is currently developing Additive Manufacturing (AM) technologies and design tools aimed at reducing the costs and manufacturing time of regeneratively cooled rocket engine components. These Low Cost Upper Stage Propulsion (LCUSP) tasks are funded through NASA's Game Changing Development Program in the Space Technology Mission Directorate. The LCUSP project will develop a copper alloy additive manufacturing design process and develop and optimize the Electron Beam Freeform Fabrication (EBF3) manufacturing process to direct deposit a nickel alloy structural jacket and manifolds onto an SLM manufactured GRCop chamber and Ni-alloy nozzle. In order to develop these processes, the project will characterize both the microstructural and mechanical properties of the SLMproduced GRCop-84, and will explore and document novel design techniques specific to AM combustion devices components. These manufacturing technologies will be used to build a 25K-class regenerative chamber and nozzle (to be used with tested DMLS injectors) that will be tested individually and as a system in hot fire tests to demonstrate the applicability of the technologies. These tasks are expected to bring costs and manufacturing time down as spacecraft propulsion systems typically comprise more than 70% of the total vehicle cost and account for a significant portion of the development schedule. Additionally, high pressure/high temperature combustion chambers and nozzles must be regeneratively cooled to survive their operating environment, causing their design to be time consuming and costly to build. LCUSP presents an opportunity to develop and demonstrate a process that can infuse these technologies into industry, build competition, and drive down costs of future engines.

Protz, Christopher↗

Analysis and Evaluation of NASA's MK40B Six-Component TASK Balance

The paper discusses the physical characteristics NASA's MK40B TASK balance. It is NASA's newest TASK balance that was optimized for the testing of wind tunnel models in the NASA Ames 11-ft Transonic Wind Tunnel. The calibration data of the MK40B balance was obtained in Calspan's Automatic Balance Calibration System. A machine load schedule design was used for the calibration that was developed at the NASA Ames Balance Calibration Laboratory. The calibration data was analyzed using both the Non-Iterative Method and the Iterative Method. Then, the chosen regression models of the calibration data were assessed and compared using the percent contribution, the variance inflation factor, and the calibration load residuals. Interactions of single-component loads were also quantified. In addition, the bi-directional characteristics of the six gage outputs of the balance were assessed by applying a semi-empirical test that was developed at the Ames Balance Calibration Laboratory. It was concluded that four of the six gages of the balance have bi-directional characteristics. Finally, the accuracy of the load prediction equations of the balance was tested by applying the equations to independent check load data that was obtained at the NASA Ames Balance Calibration Laboratory. The standard deviation of the check load residuals met expectations. The check load data also confirmed that the interactions of the forward and aft normal forces on the axial force gage output are very small. - This paper is to be presented in the invited special session titled: "65 Years of TASK Wind Tunnel Balances - Past, Present, and Future".

wind tunnel balance↗

Estimating The Cost Of Developing Software

Software Cost Estimation Model program, SOFTCOST, developed to provide consistent automated resource-and-schedule mathematical model more formalized than guesswork model. Combines several software-cost models found in open literature into one comprehensive set of algorithms compensating for nearly 50 implementation factors relative to size of task, inherited baseline, organizational and system environment, and difficulty of task. Produces mean and variance estimates of software size, implementation productivity, recommended staff level, probable duration, amount of computer resources required, and amount and cost of software documentation. Written in Microsoft BASIC.

Tausworthe, Robert C.↗

Command and Control System Software Development

With the first launch of the National Aeronautics and Space Administration's Space Launch System heavy-lift expendable launch vehicle and Lockheed Martin's Orion Multi-Purpose Crew Vehicle scheduled for the year 2020, there exists a need to complete development of a new command and control system that will provide systems monitoring and launch control for NASA's Exploration Missions. One remaining task necessary for completion of this command and control system is to create and maintain comprehensive unit tests of the control system software packages. These tests should verify that the implementation of all required and desired functionality works as intended. This testing infrastructure is mostly in place, but the control system's open source automation server still reports software "bugs" (possible flaws or failures which may lead to unintended behavior) and intermittently failing unit tests. Since code correctness is of critical importance for human rated software systems, I was assigned to diagnose the root cause of failing unit tests, eliminate non-determinism in these tests, and fix bugs as reported by the automation server.

GUI↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Study of solid rocket motors for a space shuttle booster. Appendix D: Recovery and reuse 156-inch diameter solid rocket motor booster

The baseline for a space shuttle configuration utilizing two parallel-burn, 156-in.-diameter SRMs with three segments and techroll seal movable nozzles is presented. The concept and general economic benefits of SRM recovery are equally valid for the series-burn SRMs, provided that those SRMs are also designed for the same strength, stiffness, segmentation, and interchangeability as the present design, and that those SRMs are also recovered as individual units. Feasibility studies were initiated to investigate SRM recoverability. These studies were based upon recovery of the SRM boosters for the Titan 3C. Ground rules precluded SRM modification that required significant changes in motor qualification or schedule. Even with this restriction, the study determined that the recoverable booster concept was completely feasible, both technically and economically. Parachute recovery has been selected as the best method, principally because it can accomplish the task with a minimum development cost and time to achieve operational recovery status. This system affords the highest probability for achieving large cost reductions.

Source record↗

Factors affecting handling qualities of a lift-fan aircraft during steep terminal area approaches

The XV-5B lift-fan aircraft was used to explore the factors affecting handling qualities in the terminal area. A 10 deg ILS approach task was selected to explore these problems. Interception of the glide slope at 457.2 m, glide slope tracking, deceleration along the glide slope to a spot hover were considered. Variations in airplane deck angle, deceleration schedule, and powered-lift management were studied. The overall descent performance envelope was identified on the basis of fan stall, maximum comfortable descent rate, and controllability restrictions. The collective-lift stick provided precise glide slope tracking capability. The pilot preferred a deck-parallel attitude for which he used powered lift to control glide slope and pitch attitude to keep the angle of attack near zero. Workload was reduced when the deceleration schedule was delayed until the aircraft was well established on the glide slope, since thrust vector changes induced flight path disturbances.

Gerdes, R. M.↗

Behavioral networks as a model for intelligent agents

On-going work at NASA Langley Research Center in the development and demonstration of a paradigm called behavioral networks as an architecture for intelligent agents is described. This work focuses on the need to identify a methodology for smoothly integrating the characteristics of low-level robotic behavior, including actuation and sensing, with intelligent activities such as planning, scheduling, and learning. This work assumes that all these needs can be met within a single methodology, and attempts to formalize this methodology in a connectionist architecture called behavioral networks. Behavioral networks are networks of task processes arranged in a task decomposition hierarchy. These processes are connected by both command/feedback data flow, and by the forward and reverse propagation of weights which measure the dynamic utility of actions and beliefs.

Sliwa, Nancy E.↗