Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Assessing dose variance from immobilization devices in VMAT head and neck treatment planning: A retrospective case study analysis

Immobilization devices serve several purposes in radiation oncology including improved positional reproducibility and decreased patient movement. If immobilization device beam attenuation is unaccounted for in the treatment planning process, planning target volume (PTV) coverage can be compromised. A retrospective case study was performed to evaluate beam attenuation from head and neck (HN) immobilization devices in volumetric-modulated arc therapy using the Eclipse treatment planning system and the Anisotropic Analytical Algorithm. Three facilities retrospectively evaluated 15 patients with various HN carcinomas. A test plan was created from each patient's existing plan in Eclipse to include immobilization devices in the dose calculation. Plan comparisons were performed using dose-volume histograms, which assessed the maximum dose, percentage of the PTV that received 95% of the prescription dose (V{sub 95}), and dose covering 100% of the PTV (D{sub 100}). The test plan normalization values were then adjusted to match the original PTV coverage. The maximum dose difference calculated ranged from 0.3% to 4.1%. The absolute difference in V{sub 95} coverage between the HN and the test plans ranged from 0.4% to 2.3%. The difference in the D{sub 100} was more statistically significant, reporting a range of 1.2% to 71.4%. Finally, to achieve the same PTV coverage as observed in the HN plan, an adjustment to the normalization value was needed, which required a change ranging from 0.1 to 7.7. Attenuation from immobilization devices, when unaccounted for, can cause a misrepresentation of the dose delivered to the PTV. It is not a standardized practice among institutions to include immobilization devices within the body contour for dose calculations. However, with the increasing use of volumetric-modulated arc therapy for treatment of the HN region, precision is of the utmost importance, and inclusion of immobilization devices should be standardized.

61 RADIATION PROTECTION AND DOSIMETRY↗

Scaling Studies for Advanced High Temperature Reactor Concepts, Final Technical Report: October 2014—December 2017

Computer simulations of nuclear reactor thermal-hydraulic phenomena are often used in the design and licensing of nuclear reactor systems. In order to assess the accuracy of these computer simulations, computer codes and methods are often validated against experimental data. This experimental data must be of sufficiently high quality in order to conduct a robust validation exercise. In addition, this experimental data is generally collected at experimental facilities that are of a smaller scale than the reactor systems that are being simulated due to cost considerations. Therefore, smaller scale test facilities must be designed and constructed in such a fashion to ensure that the prototypical behavior of a particular nuclear reactor system is preserved. The work completed through this project has resulted in scaling analyses and conceptual design development for a test facility capable of collecting code validation data for the following high temperature gas reactor systems and events— 1. Passive natural circulation core cooling system, 2. pebble bed gas reactor concept, 3. General Atomics Energy Multiplier Module reactor, and 4. prismatic block design steam-water ingress event. In the event that code validation data for these systems or events is needed in the future, significant progress in the design of an appropriate integral-type test facility has already been completed as a result of this project. Where applicable, the next step would be to begin the detailed design development and material procurement. As part of this project applicable scaling analyses were completed and test facility design requirements developed. Conceptual designs were developed for the implementation of these design requirements at the Oregon State University (OSU) High Temperature Test Facility (HTTF). The original HTTF is based on a ¼-scale model of a high temperature gas reactor concept with the capability for both forced and natural circulation flow through a prismatic core with an electrical heat source. The peak core region temperature capability is 1400°C. As part of this project, an inventory of test facilities that could be used for these experimental programs was completed. Several of these facilities showed some promise, however, upon further investigation it became clear that only the OSU HTTF had the power and/or peak temperature limits that would allow for the experimental programs envisioned herein. Thus the conceptual design and feasibility study development focused on examining the feasibility of configuring the current HTTF to collect validation data for these experimental programs. In addition to the scaling analyses and conceptual design development, a test plan was developed for the envisioned modified test facility. This test plan included a discussion on an appropriate shakedown test program as well as the specific matrix tests. Finally, a feasibility study was completed to determine the cost and schedule considerations that would be important to any test program developed to investigate these designs and events.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SU-F-T-456: Tomotherapy MLC Synchronization and Leaf Open Time Measurements Using ArcCheck

Purpose: To develop a practical method for routine QA of the MLC of a Tomotherapy unit using ArcCheck. Methods: Two standard test plans were used in this study. One was a helical test, in which the central leaves No. 32 and 33 opened simultaneously for 277.8ms at projections centered at 0°, 120° and 240° gantry angles. The other test plan was a static test with the gantry angle set at 0°, 45°, 90° and 135° respectively and leaves No. 32 and 33 opened sequentially for total 20s which was further divided into eleven or ten segments at each beam angle. The ArcCheck was isocentrically set up and adjusted for couch sag. Movie files which took a snapshot exposure every 50ms were recorded. The start/stop time of leaf open was decided by the ramp-up/ramp-down of the detectors. Results: The percentage differences between measured and planned leaf open time were calculated to be within 0.5% in all the tests. In static test, if leaves are synchronized perfectly, the sum of the two detectors’ signals after normalization should equal one when the leaves are in transition. Our results showed mean values of 0.982, 0.983, 0.978 and 0.995 at static gantry angle 0°, 45°, 90° and 135° respectively. Conclusion: A method for estimating the Tomotherapy binary MLC leaf open time using ArcCheck is proposed and proved to be precise enough to verify the planned leaf open time as small as 277.8ms. This method also makes the observation and quantification of the synchronization of leaves possible.

60 APPLIED LIFE SCIENCES↗

OECD MCCI project long-term 2-D molten core concrete interaction test design report, Rev. 0. September 30, 2002.

The Melt Attack and Coolability Experiments (MACE) program at Argonne National Laboratory addressed the issue of the ability of water to cool and thermally stabilize a molten core-concrete interaction when the reactants are flooded from above. These tests provided data regarding the nature of corium interactions with concrete, the heat transfer rates from the melt to the overlying water pool, and the role of noncondensable gases in the mixing processes that contribute to melt quenching. As a follow-on program to MACE, The Melt Coolability and Concrete Interaction Experiments (MCCI) project is conducting reactor material experiments and associated analysis to achieve the following two technical objectives: (1) resolve the ex-vessel debris coolability issue through a program that focuses on providing both confirmatory evidence and test data for the coolability mechanisms identified in MACE integral effects tests, and (2) address remaining uncertainties related to long-term two-dimensional molten core-concrete interactions under both wet and dry cavity conditions. Achievement of these two objectives will demonstrate the efficacy of severe accident management guidelines for existing plants, and provide the technical basis for better containment designs for future plants. In terms of the first program objective, the Small-Scale Water Ingression and Crust Strength (SSWICS) test series has been initiated to provide fundamental information on the ability of water to ingress into cracks and fissures that form in the debris during quench, thereby augmenting the otherwise conduction-limited heat transfer process. A test plan for Melt Eruption Separate Effects Tests (MESET) has also been developed to provide information on the extent of crust growth and melt eruptions as a function of gas sparging rate under well-controlled experiment conditions. In terms of the second program objective, the project Management Board (MB) has approved startup activities required to carry out experiments to address remaining uncertainties related to long-term two-dimensional molten core-concrete interaction. In particular, for both wet and dry cavity conditions, there is uncertainty insofar as evaluating the lateral vs. axial power split during a core-concrete interaction due to a lack of experiment data. As a result, there are differences in the 2-D cavity erosion predicted by codes such as MELCOR, WECHSL, and COSACO. The first step towards generating this data is to produce a test plan for review by the Project Review Group (PRG). The purpose of this document is to provide this plan.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SAPHIRE 8 Software Quality Assurance Oversight

The software quality assurance oversight consists of updating and maintaining revision control of the SAPHIRE 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, SDP Interface Training Manual, and the SAPHIRE 8, "New Features and Capabilities Overview".

42 ENGINEERING↗

Data Summary Report Small Scale Melter Testing of HLW Algorithm Glasses: Matrix 1 Tests

Eight tests using different HLW feeds were conducted on the DM100-BL to determine the effect of variations in glass properties and feed composition on processing rates and melter conditions (off-gas characteristics, glass processing, foaming, cold cap, etc.) at constant bubbling rate. In over seven hundred hours of testing, the property extremes of glass viscosity, electrical conductivity, and T 1% , as well as minimum and maximum concentrations of several major and minor glass components were evaluated using glass compositions that have been tested previously at the crucible scale. Other parameters evaluated with respect to glass processing properties were +/-15% batching errors in the addition of glass forming chemicals (GFCs) to the feed, and variation in the sources of boron and sodium used in the GFCs. Tests evaluating batching errors and GFC source employed variations on the HLW98-86 formulation (a glass composition formulated for HLW C-106/AY-102 waste and processed in several previous melter tests) in order to best isolate the effect of each test variable. These tests are outlined in a Test Plan that was prepared in response to the Test Specification for this work. The present report provides summary level data for all of the tests in the first test matrix (Matrix 1) in the Test Plan. Summary results from the remaining tests, investigating minimum and maximum concentrations of major and minor glass components employing variations on the HLW98-86 formulation and glasses generated by the HLW glass formulation algorithm, will be reported separately after those tests are completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

October 2019 SAPHIRE 8 Software Quality Assurance Oversight Status Report

The software quality assurance oversight consists of updating and maintaining revision control of the System Analysis Program for Hands-on Integrated Reliability Evaluations (SAPHIRE) Version 8 quality assurance program documentation and of monitoring revision control of the SAPHIRE Version 8 source code. This report summarizes the oversight efforts through description of the revision control system (RCS) setup, operation and contents. Documents maintained under revision control include the Acceptance Test Plan (ATP), Configuration Management Plan, Quality Assurance Plan, Software Project Plan, Requirements Traceability Matrix (RTM), System Test Plan, Significance Determination Process (SDP) Interface Training Manual, and the SAPHIRE 8 “New Features and Capabilities Overview.” These documents are referred to and can be transmitted upon request of the Nuclear Regulatory Commission (NRC) Contracting Officer’s Representative (COR).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

WSF Biodiesel Demonstration Project Final Report

In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research and analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and engines. Each test vessel did experience a microbial growth bloom that produced a build up of material in the fuel purifiers similar to material witnessed in the 2004 fuel test. A biocide was added with each fuel shipment and the problem subsided. In January of 2009, the WSF successfully completed an eleven month biodiesel fuel test using approximately 1,395,000 gallons of biodiesel blended fuels. The project demonstrated that biodiesel can be used successfully in marine vessels and that current ASTM specifications are satisfactory for marine vessels. Microbial growth in biodiesel diesel interface should be monitored. An inspection of the engines showed no signs of being negatively impacted by the test.

09 BIOMASS FUELS↗

ChargeX Prescribed Testing Program at CharIN June 2024 Testival: Outcomes & Future Recommendations

In June 2024, the ChargeX Consortium developed an optional prescribed testing program for electric vehicle (EV) and electric vehicle supply equipment (EVSE) manufacturers that attended the CharIN Testival as testers. There were two driving purposes of this program; to introduce a new hybrid approach to testing events with both ad-hoc and prescribed testing offered, and to demonstrate the test cases and structure effectiveness of the EV-EVSE Interoperability Test Plan (EEITP) document developed within the ChargeX Testing Task Force. This program contained eight test scenarios to be performed during the final 30-minutes of a 90-minute testing slot with details like purpose, setup, pass criteria, etc. included within a written test plan document. A $2,000 rebate was offered to those who participated, and a ChargeX moderation force was present to collect EV and EVSE meta data, testing meta data, and testing results.

33 ADVANCED PROPULSION SYSTEMS↗

Preparing for Human Missions to Mars: The role of ISS and Artemis as Analogs for Research and Technology Testing

The hazards of spaceflight to the human system are present in in varying degrees on different spaceflight platforms: altered gravity, isolation and confinement, distance from Earth, radiation, and hostile closed environments. A strategic view of the fidelity of hazards experienced on different platforms can shape the testing plans for human research and technology demonstration related to crew health and performance. Working across the international partnership, the International Space Station (ISS) is planning periods of modified operations to improve the fidelity of Mars simulations. To understand transit durations as an independent variable, a series of 1-year, 6-month and 30-45 day missions are being planned on ISS. Standard measurements across ISS missions of different durations, lunar missions and ground analogs offers the opportunity to distinguish different hazards and their effects in the context of the relevance to future mission concepts. The ISS partnership is planning for additional test cases that are aligned with Mars mission plans. (1) Evaluating crew performance capabilities when transitioning to gravity after long durations in microgravity representative of a Mars transit. (2) Simulating crew medical care under Mars-like autonomous operations. (3) Identification and testing of operations under communications delay and autonomy expected for Mars missions and the linked effects on behavioral health and performance of the crew. Artemis missions serve as a valuable analogs for Mars surface operations, with partial gravity and deep space radiation hazards, but with crewmembers that are probably more physically capable than their counterparts would be after a Mars transit. Getting unobtrusive data from early Artemis missions, and knowledge gained from operational experience as Artemis operations develop can improve engineering design, medical requirements and countermeasures, and ultimately ensure mission success on Mars. Linking Mars architectures with the plans and capabilities for ISS and Artemis allows us to plan to most operationally relevant tests of crew health and performance on current spaceflight missions to inform planning for future missions to Mars. By using human spaceflight platforms as well as ground simulation in an integrated way, the international community can improve exploration readiness, develop countermeasures and reduce risks of future human space missions.

International Space Station↗

Design document for shuttle task 501. Shuttle carrier aircraft transceiver console (SED 36115353-301)

The flight data for the space shuttle orbiter (SSO) is transmitted via S band to a transceiver in the shuttle carrier aircraft (SCA) for relay to the ground during the mated portion of the approach and landing test (ALT). The transceiver is mounted in the SCA transceiver console for shuttle task 501 testing. This document defines the requirements for the SCA transceiver console, the design description, test plan for the console prior to installating the spacecraft equipment in the console, and the test plan for acceptance tests.

Doland, G. D.↗

Deep Vadose Zone Treatability Test for the Hanford Central Plateau: Interim Post-Desiccation Monitoring Results, Fiscal Year 2014

Over decades of operation, the U.S. Department of Energy (DOE) and its predecessors have released nearly 2 trillion L (450 billion gal.) of liquid into the vadose zone at the Hanford Site. Much of this discharge of liquid waste into the vadose zone occurred in the Central Plateau, a 200 km 2 (75 mi 2 ) area that includes approximately 800 waste sites. Some of the inorganic and radionuclide contaminants in the deep vadose zone at the Hanford Site are at depths below the limit of direct exposure pathways, but may need to be remediated to protect groundwater. The Tri-Party Agencies (DOE, U.S. Environmental Protection Agency, and Washington State Department of Ecology) established Milestone M 015 50, which directed DOE to submit a treatability test plan for remediation of technetium-99 (Tc-99) and uranium in the deep vadose zone. These contaminants are mobile in the subsurface environment and have been detected at high concentrations deep in the vadose zone, and at some locations have reached groundwater. Testing technologies for remediating Tc-99 and uranium will also provide information relevant for remediating other contaminants in the vadose zone. A field test of desiccation is being conducted as an element of the DOE test plan published in March 2008 to meet Milestone M 015 50. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 3 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.

54 ENVIRONMENTAL SCIENCES↗

Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examination facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Online Resource for Flight Test Safety Planning

A viewgraph presentation describing an online database for flight test safety techniques is shown. The topics include: 1) Goal; 2) Test Hazard Analyses; 3) Online Database Background; 4) Data Gathering; 5) NTPS Role; 6) Organizations; 7) Hazard Titles; 8) FAR Paragraphs; 9) Maneuver Name; 10) Identified Hazard; 11) Matured Hazard Titles; 12) Loss of Control Causes; 13) Mitigations; 14) Database Now Open to the Public; 15) FAR Reference Search; 16) Record Field Search; 17) Keyword Search; and 18) Results of FAR Reference Search.

Lewis, Greg↗

Results for Gamma-Ray Spectroscopy Characterization of Residual Radioactivity on Personal Protective Clothing

In early 2019, Health Physics Services (HPS) personnel put together a test plan to use the shielded gamma-ray spectroscopy instruments in the Health Physics Services Technical Laboratory (HPSTL) to perform a series of measurements on laundered personal protective clothing used in radiological areas at the Savannah River Site (SRS). That test plan describes the methodology used to determine the quantities of laundry to be obtained from operational facilities, the methods for quality control checking the instruments throughout the measurement period, and the physical arrangement of samples in the counting shields. The test plan is documented in SRNS-J6700-2019-00037 (Reference 1).

61 RADIATION PROTECTION AND DOSIMETRY↗

Test and Chemistry Plan for MEDE Treatment of Fermi-1 Blanket Materials

There exists approximately 34 metric tons of Fermi-1 nuclear power reactor blanket assemblies at the Idaho National Laboratory (INL). Contained in this material is about 365 kg of sodium metal. In 2000, the Final Environmental Impact Statement for the Treatment and Management of Sodium-Bonded Spent Nuclear Fuel was issued. In the EIS, the No Action Alternative was preferred for the Fermi-1 blanket material. Under the No Action Alternative, two options were analyzed: • Continued storage until 2035 or until development of a new or currently less mature technology to treat all or part of the sodium-bonded material. • Direct disposal of the sodium-bonded material in high-integrity cans. This report with document how the Melt-Drain-Evaporate (MEDE) process, developed by Argonne National Laboratory (ANL), can be used to treat full-length Fermi-1 blanket material to remove the sodium, eliminate the hazards associated with that metal, all while minimizing the effort needed. Previous work by ANL showed the process worked very well with chopped, shorter segments of this material. If successful, the removal of the sodium from the material may allow the Fermi-1 blanket material to be disposed via existing or future planned disposal pathways for similar materials. This document presents the test plan for the evaluation of sodium removal from intact Fermi-1 reactor blanket materials by the MEDE process. This test plan establishes the objectives for such testing, which includes the anticipated outcomes, a summary of the testing parameters, and an overview of the testing process. This test plan does not provide technical direction or work control guidance; that is the role of a Laboratory Instruction (LI) that will be issued to govern the work.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Development of Design Standards and Guidelines for Electromagnetic Compatibility and Lightning Protection for Spacecraft Utilizing Composite Materials

This final report presents information concerning technical accomplishments by Tec-Masters, Inc. (TMI) for this contract effort. This effort included the accomplishment and/or submission by TMI of the following items: (1) Literature Survey Report, Electrical Properties of Non-Metallic Composites by Mr. Hugh W. Denny; (2) Interim Report, Composite Materials - Conductivity, Shielding Effectiveness, and Current Carrying Capability by Mr. Ross W. Evans; (3) Fault Current Test Plan by Mr. Ross W. Evans (4) Fault Current Test Procedure by Mr. Ross W. Evans (5) Test Report, Fault Current Through Graphite Filament Reinforced Plastic, NASA CR-4774, Marshall Space Flight Center, Alabama, September 1996, by Mr. Ross W. Evans; (6) Test Plan, Lightning Effects on Composite Materials by Mr. Ross W. Evans; (7) Test Report, Lightning Effects on Composite Materials, NASA CR-4783, Marshall Space Flight Center, Alabama, February 1997, by Mr. Ross W. Evans; (8) Design Guidelines for Shielding Effectiveness, Current Carrying Capability, and the Enhancement of Conductivity of Composite Materials, NASA CR-4784, Marshall Space Flight Center, Alabama, September 1996, by Mr. Ross W. Evans. These items are not attached but are considered to be a part of this final report. Efforts on two additional items were accomplished at no increase in cost to NASA/MSFC. These items consisted of updating the 'MSFC EMC Design and Interference Control Handbook,' and revising the 'Design Guidelines for Shielding Effectiveness, Current Carrying Capability, and the Enhancement of Conductivity of Composite Materials.'

Camp, Dennis W.↗