Search NASA⌕ Search

SEARCH · Search NASA

Results for “Vehicle modeling and simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

527 records · Page 30

Pluto's Ultraviolet Spectrum, Surface Reflectance, and Airglow Emissions

During the New Horizons spacecraft’s encounter with Pluto, the Alice ultraviolet spectrograph conducted a series of observations that detected emissions from both the interplanetary medium (IPM) and Pluto. In the direction of Pluto, the IPM was found to be 133.4 ± 0.6 R at Lyα, 0.24 ± 0.02 R at Lyβ, and <0.10 R at He i 584 Å. We analyzed 3900 s of data obtained shortly before closest approach to Pluto and detect airglow emissions from H i, N i, N ii, N{sub 2}, and CO above the disk of Pluto. We find Pluto’s brightness at Lyα to be 29.3 ± 1.9 R, in good agreement with preencounter estimates. The detection of the N ii multiplet at 1085 Å marks the first direct detection of ions in Pluto’s atmosphere. We do not detect any emissions from noble gases and place a 3σ upper limit of 0.14 R on the brightness of the Ar i 1048 Å line. We compare preencounter model predictions and predictions from our own airglow model, based on atmospheric profiles derived from the solar occultation observed by New Horizons, to the observed brightness of Pluto’s airglow. Although completely opaque at Lyα, Pluto’s atmosphere is optically thin at wavelengths longer than 1425 Å. Consequently, a significant amount of solar far-UV light reaches the surface, where it can participate in space weathering processes. From the brightness of sunlight reflected from Pluto, we find the surface has a reflectance factor (I/F) of 17% between 1400 and 1850 Å. We also report the first detection of a C{sub 3} hydrocarbon molecule, methylacetylene, in absorption, at a column density of ∼5 × 10{sup 15} cm{sup −2}, corresponding to a column-integrated mixing ratio of 1.6 × 10{sup −6}.

79 ASTRONOMY AND ASTROPHYSICS↗

Evaluation of Techniques for Vegetation Removal from UAV-Based Photogrammetric DSM near WIPP Land Withdrawal Act Boundary, NM

The Waste Isolation Pilot Plant is located within New Mexico's karst landscape and is the United States' only deep geologic radioactive waste repository which isolates transuranic waste from defense activities underground in a bedded salt formation. Characteristic karst topography in this region is made up of material (such as limestone) that can be dissolved by water over a long period of time, and includes features such as springs, surface streams, sinking streams, caves, and sinkholes. Karst features can potentially impact the integrity of the waste repository in the future and compromise WIPP's performance, particularly when coupled with incompatible land-use activities within the Land Withdrawal Act (LWA) boundary as well as increased water withdrawals outside the LWA. In order to better capture the ground surface topography to support hydrology modeling efforts, the U.S. DOE has enlisted FIU to develop a high-resolution digital elevation model (DEM). In a previous field study, a high-resolution digital surface model (DSM) of an adjacent representative site, Basin 6, was developed by photogrammetry using aerial images captured with unmanned aerial vehicles. The DSM generated was based on point clouds representing the entire landscapes, including points of terrain, vegetation and infrastructure. These above-ground features need to be removed to create a DSM/DEM with good representation of the bare ground. In recent years, many techniques including both pre- and post-processing of DSMs, were developed for vegetation removal with varied success. This research focuses on applying and comparing various vegetation removal methods using point clouds generated of the Basin 6 pilot study area. The 3D RGB-based point cloud classification using Python scripts was a modification of the procedure by Themistocleous (2019). The method using Liblas classifies the point cloud three-dimensionally, whereas the method by Themistocleous (2019) is two-dimensional. The preliminary result of the method using Liblas, however, still had a large amount of vegetation remaining compared to the Pix4D Machine Learning method. The vegetation layer remains highly visible in the DEMs processed using the vegetation indices as opposed to the Pix4D Machine Learning method, which produces a DEM where mostly bare ground is seen. Further modifications to the input parameters are required to improve the vegetation vs. bare ground classification using this approach. The next step will be to improve the method using Liblas and to also test other vegetation removal methods found in the literature review to compare them against the two described here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Direct DC-Link Control for 7.2 kV Three-Port Low-Inertia Solid-State Transformer With Active Power Decoupling

Promising for applications including renewable energy and electric vehicle fast charging, a medium-voltage (MV) solid-state transformer (SST) typically has multiple modules series stacked, which requires the modules to be single phase. One critical issue of the single-phase SST is the double-line-frequency power ripple. Traditionally, large passives are used to buffer the ripple, resulting in significantly increased volume and cost. This article for the first time proposes active power decoupling (APD) for the SST and a predictive direct DC-link control method, using a current-source single-stage SST as an example. An electrolytic capacitor-less buffer port is used to absorb the ripple, which tolerates up to a 30% voltage ripple for small capacitance. The APD SST control is challenging. First, the current-source SST realizes isolation, DC link, and multiport in a single stage. Second, different from conventional SSTs or APD converters, the low-inertia DC link in this SST has a 40% switching ripple, which is difficult to stabilize. To address the control challenge, a direct DC-link control architecture and a predictive control method are proposed. Simulation and experimental results verify the proposed control method on an MV SiC modular soft-switching solid-state transformer (M-S4T) prototype. Here, the proposed APD reduces the SST volume by 53.8%. Importantly, the proposed concept is not limited to the M-S4T but is generic to other SSTs or APD converters.

14 SOLAR ENERGY↗

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗

Evaluation of H-Canyon Ventilation Exhaust Tunnel Inspection at the Savannah River Site - 20052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program [1] provides a process to inspect, evaluate, and document the conditions of passive safety related structural systems and components, their degradation mechanisms and their impact on the safety envelope. The Structural Integrity Program performs periodic visual inspections to confirm the systems and components can perform their safety function and recommend corrective actions before the function is compromised. The H-Canyon Exhaust Tunnel is part of the H-Canyon Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The underground reinforced concrete Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel to perform the inspection. Unlike active systems that can be subjected to physical testing to confirm capability, qualification calculations, including modeling, is performed to assess passive design feature capabilities relative to operational, accident and natural phenomena hazards events. Input for these calculations come from knowledge of field conditions, design drawings and conservative assumptions. The knowledge of field conditions comes from concrete and soil testing activities as well as inspection data. The use of cameras on crawlers to obtain inspection data and how that data is used in qualification calculations is the focus of this discussion. Remote Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras, prior to Calendar Year 2003 (CY2003). Since CY2003, six camera equipped crawlers have been used. Crawlers have evolved and improved by incorporating lessons learned from the previous inspections. The latest 2019 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System and captured images that were previously unseen, thus providing key visual data for the Structural Integrity Program report [2]. The inspection data serves as 1) input to qualification calculations, 2) validates current conditions remain bounded by qualification calculations, and 3) documents a record of change over time. This data is vital for the effective evaluation of the tunnel structure and aids with predicting the life cycle service life safety envelope to protect the public, environment, and facility worker. The goal of the 2019 deployment was to use a more robust vehicle to ensure travel over obstacles, perform the inspection with higher resolution cameras, and have the ability to elevate the cameras to view surfaces previously obscured by abandon-in-place ducts in the tunnel. The inspection information will serve to strengthen the input basis for qualification calculations, versus using excessive conservative calculation assumptions. This 2019 inspection was compared with previous crawler visual evidence to identify change over time to project remaining service life and confirm field conditions remain bounded by qualification calculations. The results of the 2019 Exhaust Tunnel inspection continue to improve and provide a firm basis to make sound engineering judgements regarding tunnel capability and approaches in projecting remaining service life with an aging system and component. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗