Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous time system estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

532 records · Page 30

Center for Efficiency in Sustainable Energy Systems

The main goal of the Center for Efficiency in Sustainable Energy Systems is to produce a methodology that evaluates a variety of energy systems. Task I. Improved Energy Efficiency for Industrial Processes: This task, completed in partnership with area manufacturers, analyzes the operation of complex manufacturing facilities to provide flexibilities that allow them to improve active-mode power efficiency, lower standby-mode power consumption, and use low cost energy resources to control energy costs in meeting their economic incentives; (2) Identify devices for the efficient transformation of instantaneous or continuous power to different devices and sections of industrial plants; and (3) use these manufacturing sites to demonstrate and validate general principles of power management. Task II. Analysis of a solid oxide fuel cell operating on landfill gas: This task consists of: (1) analysis of a typical landfill gas; (2) establishment of a comprehensive design of the fuel cell system (including the SOFC stack and BOP), including durability analysis; (3) development of suitable reforming methods and catalysts that are tailored to the specific SOFC system concept; and (4) SOFC stack fabrication with testing to demonstrate the salient operational characteristics of the stack, including an analysis of the overall energy conversion efficiency of the system. Task III. Demonstration of an urban wind turbine system: This task consists of (1) design and construction of two side-by-side wind turbine systems on the YSU campus, integrated through power control systems with grid power; (2) preliminary testing of aerodynamic control effectors (provided by a small business partner) to demonstrate improved power control, and evaluation of the system performance, including economic estimates of viability in an urban environment; and (3) computational analysis of the wind turbine system as an enabling activity for development of smart rotor blades that contain integrated sensor/actuator/controller modules to enhance energy capture and reduce aerodynamic loading and noise by way of virtual aerodynamic shaping. Accomplishments: Task I. Improved Energy Efficiency for Industrial Processes: We organized an energy management training session held on February 22, 2011, which was advertised through a regional manufacturing association to provide wide-ranging notification. Over two dozen companies were represented a the seminar, ranging from heavy manufacturing businesses with $5,000,000 per year energy expenses, to small, light manufacturing facilities. Task 2. Landfill Fuel Cell Power Generation Solid Oxide Fuel Cells (SOFCs) were constructed and evaluated as a means of obtaining electrical energy from landfill gas. Analysis of landfill gas. Attempts at collecting gas samples at the landfill and evaluating them on campus were still unsuccessful. Even a Teflon® sample bag would lose its H2S content. Evaluation of Gas Clean-up We consider this a confirmation of the CO2 effect on the solubility of H2S in water making much less sulfide available for the photocatalyst. It also means that another method should be employed to clean up landfill gas. Nonetheless, composition of impurities in landfill gas was reduced sufficiently to allow successful operation of the test fuel cell. Comparison to a PEM fuel cell system. If a PEMFC were to be operated with landfill gas as the fuel, the gas would have to be treated for sulfur removal, and then processed in a reformer large enough to drive the equilibrium far toward the products, so that negligible CO would flow into the fuel cell. Analysis of a fuel cell running on landfill gas. Using a Gow-Mac gas chromatograph with a thermal conductivity detector, unambiguous determination of CO can be made, at least as a primary constituent Task 3: Task 3 Plasma Controlled Turbine Blades Wind Turbine Selection. After carefully reviewing the various model available in the market the team selected the ARE 110 (2.5kW). The ARE 110 provides a very long life with little maintenance due to their relatively low rotational speeds (low RPM). The turbines large swept area (10.2ms2/110sq.ft), high-efficiency blades, purpose built alternator, and optimized power electronics ensure maximum energy capture from a wide range of wind speeds. Two wind turbines were installed side-by-side at the Melnick Hall site to compare their performance. Evaluate and Optimize Aerodynamically Enhanced Turbine Blades Due to delays in the installation of the wind turbines, no actual data was obtained within the contract period. At this time, the turbines are installed and operational at YSU with standard blades. We are in contact with Orbital Research and in discussion as to how best the required data can be obtained.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Evaluation of Hydrogen Production Feasibility for a Light Water Reactor in the Midwest

Increased electricity production from renewable energy resources coupled with low natural gas prices has caused existing light-water reactor (LWRs) to experience ever diminishing returns from the electricity market. Via partnership among Idaho National Laboratory (INL), The National Renewable Energy Laboratory (NREL), Argonne National Laboratory (ANL), Exelon, and Fuel Cell Energy a techno-economic analysis on the viability of retrofitting existing pressurized water reactors (PWRs) to produce hydrogen (H2) via high temperature steam electrolysis (HTSE) has been conducted. Such integration would allow nuclear facilities to expand into additional markets that may be more profitable in the long-term. To accommodate such an integration, a detailed analysis of HTSE process operation, requirements, and flexibility was conducted. Technical analysis includes proposed nuclear system control scheme modifications to allow dynamic operation of the HTSE via both thermal and electrical connection to the nuclear plant. High fidelity Modelica simulations showcase the viability of such control schemes. However, due to limited knowledge of solid oxide fuel cell (SOFC) stack degradation due to thermal gradients; thermal cycling of the HTSE was not included. Therefore, the control schemes proposed are only utilized to re-distribute steam at startup and only the portion of electricity utilized in the electrolyzers is cycled. From the detailed analysis of the nuclear integration and the HTSE process design, a comprehensive cost estimation was conducted in the APEA and H2A models to elucidate capital and operational costs associated with the production, compression, and distribution of hydrogen from a nuclear facility. Alongside this costing analysis, market analyses were conducted by NREL and ANL on the electric and hydrogen markets respectively in the PJM interconnect. Utilizing the electricity data market projections in the PJM interconnect from NREL and hydrogen demand/pricing projections from ANL a five variable sweep over component capacities, discount rates, and hydrogen pricing was completed using the stochastic framework RAVEN (Risk Analysis Virtual ENVironment) through its resource dispatch plugin HERON (Heuristic Energy Resource Optimization Network). Each combination of variables was evaluated stochastically four times over a seventeen year timespan from 2026-2042 (inclusive) to determine the most economically advantageous solution. Following the five variable sweep an optimization was conducted about the best sweep point to determine optimal component sizing and setpoints. Results suggest positive gain is achievable at all projected hydrogen market pricing levels and at all discount rates. However, exact component sizing and net returns vary based on these values and if incorrect sizing is selected; major net losses can occur. The optimal result occurred with set points as follows: high hydrogen prices, the largest possible HTSE unit in the sweep set at 7.47 kg/sec [645.4 tpd], a contractual hydrogen market agreement 7.29 kg/sec [629.8 tpd], and a hydrogen storage size 115,188 kg. The analysis suggested that with a discount rate of 8%, a ΔNPV = 1.2 billion over the seventeen year span can be achieved. The results illuminate that by operating in multiple markets the nuclear facility is capable of avoiding sale of electricity during times of low electricity market pricing, while maintaining the ability to capitalize on the high electricity market pricing. It should be noted that the analysis conducted in this report is a differential cash flow analysis and as such does not present profit levels. Instead it highlights the net benefit between building and competing in the hydrogen market utilizing nuclear facilities and conducting business as usual in the electricity markets. Additionally, results presented in this report exhibit conservatism due to four key assumptions: Given the limited knowledge on SOFC stack degradation due to thermal gradients the high temperature steam electrolysis plant is not allowed to thermally cycle. This limitation decreases electricity generation capacity in the nuclear plant, reducing capacity payments and the maximum output to the electrical grid. This analysis considers building a separate hydrogen pipeline for use in the nuclear facility. Research is currently being conducted to determine if existing natural gas pipelines can accommodate direct hydrogen injection. If hydrogen can be integrated into existing natural gas pipelines then a capital savings of ~$19,000,000 per kg/sec [1 kg/sec = 86.4 tpd] of installed HTSE capacity could be realized. Fast transients in the electric grid are typically served by flywheels and electric batteries. With electrolysis only operation the nuclear plant can flex its electricity just as quickly. However, for this analysis, the ancillary services market has been neglected. Should the nuclear plant have the ability to operate in the ancillary services market during periods when it is producing hydrogen, an additional substantial income stream that would increase overall system profitability could be considered. Subsidies for non-emitting generation technologies are not introduced in the cash flow analysis, but instead are completed assuming zero subsidies. Profitability is based solely on electricity pricing. Electric pricing is assumed to never go negative. Instead, it is assumed overall system curtailment by the Independent System Operator (ISO) will occur in such a manner that pricing remains at or above zero. This assumption inflates the “business as usual” scenario, thus decreasing the ΔNPV calculated. If negative pricing scenarios continue to occur as they do today, one would expect a further increase in ΔNPV. Overall, results advocate that, through market diversification, nuclear power plants have the potential to substantially increase current profit margins, increase market penetration, and ultimately solidify their place as a mainstay in energy production.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluating the Effectiveness of an Ultrasonic Acoustic Deterrent in Reducing Bat Fatalities at Wind Energy Facilities

This project was designed to use thermal video cameras and fatality monitoring to evaluate the effectiveness of an ultrasonic acoustic deterrent (UAD) on bat activity and mortality, respectively. Our goals were to redesign the UAD device and installation infrastructure, determine the placement on wind turbines to optimize safety, compatibility and functionality, and to compare the mortality among the following conditions: Control (deterrents off and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Deterrent (deterrents on and turbines feathered up to the manufacturer’s cut-in speed of 3.5 m/s), Curtailment (deterrents off and turbines feathered up to 5/ m/s), and combination (deterrents on and turbines feathered up to 5 m/s). The project was divided into a Feasibility Study and Comparative Study. The objectives for the Feasibility Study were to develop an installation strategy, redesign a previous iteration of a UAD to improve performance and weatherization, and test the effectiveness of the deterrents on bat activity. The Feasibility Study was intended to work out potential issues using a relatively small number of devices prior to manufacturing and installing numerous devices for a larger-scale comparative study. The division of the project into these separate studies was based on previous experience and the challenges of assessing the capabilities of an untested UAD. During the initial development and manufacturing of the UAD, NRG Systems decided to use a piezoelectric transducer rather than an electrostatic transducer, which was used by a previous device (i.e. Deaton UAD). NRG Systems conducted lab testing (i.e., IP67 or Ingress Protection) to ensure no water or dust ingress. In addition, shock/drop trials and variations in temperature exposure were conducted as part of the reliability testing. NRG Systems also developed a communications system to allow for continuous performance monitoring of the UADs. For the Feasibility Study, we installed 6 UADs on each of 2 Gamesa G90 2-MW wind turbines (Turbine 14 and 8) at the South Chestnut Wind Energy Facility, Pennsylvania and monitored activity under control and treatment (i.e. Deterrent) conditions using thermal video monitoring. There are two major sources of variation in bat activity (beyond the anticipated treatment effect): 1) environment around the turbines might inherently favor more activity at one than the other; 2) weather conditions on any given night or within season difference (e.g., migration later during the study period) might favor more activity on some nights than on other nights. Because we could only monitor two turbines on any night, we sought to control the potential influences of these two sources by alternating the turbine on which deterrents were activated each night. If there were no loss of data due to technical failures, this design would result in an equal number of deterrent and control nights at each turbine through the monitoring period, balancing the effects of both sources of variation. We compared the time bats spent and the number of events that occurred in overlapping cameras FOV as an indicator of risk, since 80% of the overlapping FOV of the cameras was in the RSA. Equipment failures, majority due to lightning, resulted in only 17 nights with useable data, with unbalanced treatment assignment within turbines and uneven distribution of treatment assignment throughout the observational period. This resulted in a confounding of treatment assignment and seasonal change. Deterrent treatment was measured at Turbine 14 on only 2 of the first 8 usable nights (spanning the period from 8/18-9/17), whereas 6 times on Turbine 8. From 9/18-927, deterrent was on at Turbine 14 on 6 of the remaining 10 nights, and 4 on Turbine 8. We recorded a total of 1,057 bats and observed a reduction in number of events and duration of events at the UAD-activated turbine when it was Turbine 14. When Turbine 8 had the UAD activated, we observed no difference in number or duration of events. Variation between turbines is not unusual and can cause issues when study designs have no true replication, i.e., multiple turbines per treatment. Within-turbine differences suggested a trend for reduced activity when UADs were activated, particularly for Turbine 14. These results may be caused by the overall higher bat activity at Turbine 8 and confounding of treatment assignment and seasonal trends. We mapped 58 bat events in 3-dimensional space (3D), 30 and 28 events during control and treatment conditions, respectively. We observed bats crossing the rotor plane under both control and treatment conditions and observed a total of 40 confirmed or near-collisions (i.e., target close to blade but no visual confirmation of a strike) out of a total of 1,491 medium and high confidence bat observations (880 control, 611 at treatment). Twice as many collisions/possible collisions were observed during control conditions. Given the challenges with the equipment and potential confounding of the data (i.e., different activity levels at the two wind turbines), we were unable to determine whether this initial turbine placement and orientation was optimal. Given no new information on how best to install the devices, we elected to use the same placement and orientation for the comparative study. For the Comparative Study, the objectives were to investigate the relative mortality rates among 4 treatments. We searched the area within 90 m of each turbine daily to recover the highest number of fresh fatalities possible. We were unable to detect a clear reduction in mortality from deterrents alone for any individual species. Surprisingly, mortality rate of the eastern red bat (Lasiurus borealis) was estimated to be 1.3–4.2 times as much when turbines were operating normally and UADs were on than when UADs were off. Reduction in mortality of all bat species combined due to curtailment of turbines was estimated to be between 0%–38%. This effect was nullified when, in addition to curtailment, UADs were on, with 95% confidence interval ranging from a 45% reduction to a 36% increase in mortality. This was likely due to the large proportion of eastern red bats in the total carcass population. Mortality of all low-frequency echolocating bats combined (i.e. hoary bat [L. cinereus], big brown bat [Eptesicus fuscus], silver-haired bat [Lasionycteris noctivagans]) relative to control was lower when curtailed (95% CI: 0%–74%), but the addition of UADs had no detectable effect (95%CI: 13%–79%). The combined treatment reduced mortality in silver-haired bats relative to control by 11%–99%, compared to curtailment (81% reduction–67% increase) or deterrent (82% reduction–67% increase) alone. Because silver-haired bats comprised a large proportion of low-frequency calling bats found during this study, a similar effect was seen for that group. The higher mortality observed for eastern red bats at UAD compared to control could have been caused by several factors, such as the effective range of the UAD, particularly at higher frequencies, behavior, positioning of the devices on the nacelle, or a combination of these. We used 3D thermal videography to compare control and UAD bat behavior from two turbines using a total of 203 3D bat-tracks across 34 nights. We recorded a similar number of bat-tracks between treatment groups, with 51% and 49% for control and UAD, respectively. Due to potential differences in bat behavior around spinning vs stationary turbine blades, we examined UAD effectiveness separately for non-operating turbines (feathered below cut-in speed of 3.5 m/s) and operating (normal operation above wind speed of 3.5 m/s). We found a higher proportion of bat-tracks at operating turbines (82%) compared to non-operating turbines (18%), although this does not account for overall time turbines were operating versus not. At non-operating turbines the UAD appears to be effective at reducing the amount of time, flight length, and number of passes through the rotor plane, compared to control. In addition, we found bats approached turbines similarly between control and treatment turbines, with 61% of control and 63% of UAD bat-tracks originating leeward of the hub. In contrast, at operating turbines, we saw little change in bat behavior in response to UADs. For example, we found an increase in the average duration of bat-tracks between non-operating and operating turbines for UAD but at control turbines we found average duration decreased once turbines became operational. Both control and UAD had a high proportion of bat-tracks that crossed the rotor plane (i.e., collision risk) originate from the windward side when turbines were operational 65% to 92%, respectively. Given that the UAD devices closest to the blades were orientated parallel to the blades, its possible bats were not exposed to the signal until they were close to the turbine blades, as suggested by the slightly higher mean duration within 5 meters of the blades for UAD turbines. Future research should consider concentrating UAD intensity on the areas of risk (i.e. blades) with enough buffer to allow bats to react to the sound before entering the rotor-swept area (RSA). In addition, investigating the potential of installing UAD units windward of the turbine blades (e.g. a hub-mounted UAD), particularly since even under control conditions, a relatively high proportion (65%) of crosses through the blade plane originated windward. 3D thermal videography provided valuable information on future testing strategies (e.g. device placement, UAD orientation) to improve UAD effectiveness when bats are at risk (i.e., operating wind turbines). Across the entire project we experienced issues with the operation and communication with the UADs. Most of the issues occurred during the Feasibility Study and were resolved prior to the Comparability Study. Additional challenges surfaced during the Comparability Study but were remedied immediately and are thought to have little impact on the results. We had logistical constraints at the project that limited our ability use traditional methods in our camera calibration. Several calibrations showed inaccurate scales, which may have been related to inadequate spatial coverage of “points” in the camera calibration volume. Because we were using actual video recordings of bats at a wind turbine, the behavior of bats could have concentrated “points” in specific areas of the turbine (i.e. leeward of nacelle), and limited “points” in other areas, resulting in camera calibration issues. We have plans to address these inconsistencies and improving the software and related methodologies by early 2020.

17 WIND ENERGY↗

Combined Heat and Power Systems Technology Development and Demonstration 370 kW High Efficiency Microturbine

The C370 Program was awarded in October 2010 with the ambitious goal of designing and testing the most electrically efficient recuperated microturbine engine at a rated power of less than 500 kW. The aggressive targets for electrical efficiency, emission regulatory compliance, and the estimated price point make the system state-of-the-art for microturbine engine systems. These goals will be met by designing a two stage microturbine engine identified as the low pressure spool and high pressure spool that are based on derivative hardware of Capstone’s current commercially available engines. The development and testing of the engine occurred in two phases. Phase I focused on developing a higher power and more efficient engine, that would become the low pressure spool which is based on Capstone’s C200 (200kW) engine architecture. Phase II integrated the low pressure spool created in Phase I with the high pressure spool, which is based on Capstone’s C65 (65 kW) commercially available engine. Integration of the engines, based on preliminary research, would allow the dual spool engine to provide electrical power in excess of 370 kW, with electrical efficiency approaching 42%. If both of these targets were met coupled with the overall CHP target of 85% total combined heating and electrical efficiency California Air Resources Board (CARB) level emissions, and a price target of $600 per kW, the system would represent a step change in the currently available commercial generation technology. Phase I of the C370 program required the development of the C370 low pressure spool. The goal was to increase the C200 engine power by a minimum of 25% — 250 kW — and efficiency from 32% to 37%. These increases in the C200 engine output were imperative to meet the power requirements of the engine when both spools were integrated. An additional benefit of designing and testing the C370 low pressure spool was the possibility of developing a stand-alone product for possible commercialization. The low pressure spool design activity focused on an aeropath derivative of the current C200 engine. The aeropath derivative included changes to the compressor section —compressor and inducer — and to the turbine nozzle. The increased power also necessitated a larger, more powerful generator and generator controller to support the increased power requirements. These two major design changes were completed by utilizing both advanced 3D modeling and computational fluid dynamics modelling. After design, modeling, and analysis, the decision was made to acquire and integrate the components for testing. The second task of Phase I was to integrate and test the components of the low pressure spool to validate power and efficiency. Acquisition of the components for the low pressure spool was completed utilizing Capstone’s current supplier base. Utilization of Capstone’s supply base for integration of the test article would allow — if the decision was made —expedited commercialization of the product. After integration of the engine components, the engine was tested and evaluated for performance and emissions. Test data analysis confirmed that the engine met all power and efficiency requirements and did so while maintaining CARB level emissions. The emissions were met without the use of any post processing or catalyst. After testing was completed, the DOE authorized — via a milestone review — proceeding to Phase II: the development of the integrated C370 engine. The C370 high pressure spool design activity required significant changes to the C65 engine architecture. The engine required a high power density generator, completely redesigned compressor stage, turbine section, recuperator, controls architecture, and intercooler stage asThe two most critical design challenges were the turbine section (the nozzle and turbine) and the controls architecture. The design and analysis of all of the components was completed and integrated into a system model. The system model — after numerous iterations — indicated that, once integrated, the engine will meet or exceed all system requirements. Unfortunately, the turbine section’s life requirements remain a technical challenge and will require continued refinement of the bi-metallic turbine wheel design and manufacturing approach to meet the life requirement at theses high temperatures. The current controls architecture requires substantial effort to develop a system capable of handling the high-speed, near real-time controls requirement, but it was determined not to be a technical roadblock for the project. The C370 Program has been a significant effort with state-of-the-art technical targets. The targets have pushed Capstone’s designers to the limits of current technology. The program has been fortunate to see many successes: the successful testing of the low pressure spool (C250), the development of new material processes, and the implementation of new design practices. The technology and practices learned during the program will be utilized in Capstone’s current product lines and future products. The C370 Program has been a resounding success on many fronts for the DOE and for Capstone.

none↗

Diagnostics: Chapter 8 of the special issue: on the path to tokamak burning plasma operation

This chapter presents the activity conducted by the ITPA topical group (TG) on Diagnostics over about the last 15 years. Following a general introduction of the ITER Diagnostics led by their measurement roles, the document is organized in several subchapters detailing the design support, research and development activity conducted by each of the specialist working groups (WGs) of the TG. Please note that the magnetic diagnostics were supported at the TG without a specific WG. Their status is included in the general introduction. In the following some highlights of the subchapter’s contents are provided. Recent advances in ITER first wall (FW) diagnostics for the measurements of plasma-metallic wall interaction in support of the ITER research plan are reported. An InfraRed imaging Video Bolometer for ITER has been developed and tested on several tokamaks to measure the radiated power loss. A laser-induced breakdown spectroscopy (LIBS) technique which utilizes a pulsed laser beam to ablate locally by forming a crater, will measure local tritium inventory in the FW material. Real-time Residual Gas Analyzers will measure the neutral gas composition in a divertor port and an equatorial port during plasma operation. Due to the full metallic FW environment, the plasma-wall interaction in ITER will face several challenges such as the compromised radiated power and divertor heat flux measurements by reflection. Ray tracing and analysis codes have been developed to eliminate and correct the effects of reflection in the measurements. The characteristics of the reflecting surfaces depending on the roughness and angle of the incidence have been measured by dedicated experiments, and the results were applied to the reflection elimination. For the measurement of the metallic impurity radiation induced by eroded metallic atoms, a vacuum ultraviolet spectrometer has been developed and tested. An extensive thermonuclear diagnostic suite will be required to support the operation of ITER and the planned experimental program for future burning plasma experiments. Due to the harsh environmental conditions, the implementation of diagnostic systems in ITER is a major challenge. These conditions include high levels of neutron and gamma fluxes, neutron heating, particle bombardment. Therefore, the selection and design of diagnostic systems must take into account a number of phenomena previously unseen in diagnostic design. For this reason, the measurement of neutrons and confined or lost fast ions, with particular emphasis on alpha particles, is critical to ITER. The diagnostics associated with these measurements will be important for future plasma-burning experiments at ITER. The high neutron emission and very large plasma size in ITER make neutron diagnostics the main diagnostic method used to measure plasma parameters such as fusion power, fusion power density, ion temperature, energy of fast ions and their spatial distributions in the plasma core. Active spectroscopy techniques are methods where a neutral particle beam is injected into the plasma and information on plasma parameters is extracted from the measurement of line emission resulting from the beam-plasma interaction, either by plasma ions or by beam atoms. Spatial localization is achieved by crossing the beamline and multiple observation lines. The ITER plasma will be a high temperature, moderately dense, fully ionized collisional plasma. The plasma facing surfaces are principally metallic being fashioned from beryllium or tungsten but many other elements, arising from either structural or from operational needs, may enter this plasma. The energy range of the emitted photons range from meV (infra-red) to multi keV (x-rays) and originate from all areas of the plasma volume. The primary role of passive emission diagnostics is to identify what is in the plasma from spectral signatures. Extracting quantitative information from these measurements such as impurity content, ion temperature, rotation, degree of detachment and radiated power depends on calibrated instruments, a physics model of the atomic and molecular processes and plasma transport and an analysis workflow that takes into account environmental effects such as reflections. The particular needs for ITER have prompted a multi-machine, many-year effort to address all these aspects and this chapter reviews the work on diagnostic design, experiments and new analysis techniques. An overview of the laser diagnostics to be implemented on ITER is also provided in this paper. This includes descriptions of the Thomson scattering in the core, edge and divertor regions, polarimetry and interferometry diagnostics used for measuring plasma density and also measurements of helium density in the divertor using Laser Induced Flourescence. Techniques which can allow improvements on current measurements are also addressed in particular expanding poloidal polarimetry measurements to measure field fluctuations and proposed use of dispersion interferometery which has a number of advantages over existing methods. This paper identifies particular areas where further research and testing on existing tokamaks is useful even at this advanced stage to inform the design of diagnostics for ITER. Outstanding areas of concern for the implementation of laser diagnostics, in particular with a view to reliable operation are identified. An overview of the latest developments of microwave diagnostic systems and techniques is given. The primary focus is the contributions for ITER—the next step burning plasma experiment—which is supplemented by describing recent progress of techniques applicable for fusion experiments beyond ITER. The contributions are intentionally kept concise, and are being supplemented by a rich list of references for further studies. Radiation induced effects are receiving continuous and well-deserved attention of the ITER diagnostic community and they are in many cases one of the primary design drivers of the ITER diagnostic systems. The paper summarizes recent progress in this area focusing primarily on the ITER diagnostics but in some cases provides also outlook for the possible solutions for even more demanding radiation environment of fusion reactors beyond ITER. Despite advancements in the area of modeling and simulation of various radiation induced effects, experimental testing in a nuclear environment as close as possible to the target one is still seen as unavoidable for proper qualification of particular diagnostic functional elements. Recent advancement within three diagnostic areas: optical diagnostics, magnetics and bolometers is covered. Encouraging results on qualification of silica glass vacuum window assemblies are presented. In the area of magnetic sensors, progress of irradiation tests performed on ITER in-vessel LTCC inductive sensors is presented with outlook for novel technological approaches to inductive sensors utilizing thick printing and photolithography technologies being highlighted. Summary of advancements in the area of steady state magnetic field sensors based on Hall effect is given. New results of neutron irradiation test of the ITER borosilicate glass inserts for vacuum electrical feedthroughs are summarized finding negligible swelling at target level of neutron fluence. Off-line irradiation tests of fiber optic current sensors for plasma current measurement demonstrated that both for gamma doses up to 5 MGy and a total neutron fluence up to 10 15 cm −2 , radiation induced changes are still compatible with required measurement accuracy on ITER. The ITER bolometers are given as an example how considering radiation effects may influence the diagnostic design. Finally, outlook for future main R&D directions is outlined. All optical and laser-based diagnostics in ITER will be using mirrors to guide plasma radiation toward detectors, cameras and sensors. In the hostile plasma, radiation and particle environment the optical characteristics of diagnostic mirrors will degrade directly affecting the entire performance of involved diagnostic systems. An assessment of factors affecting mirror performance is provided. Among the prime adverse factors are deposition of plasma impurities, sputtering of mirror surface and steam ingress in the vicinity of mirrors. Within the International Tokamak Physics Activity with active support by ITER central team and domestic agencies, the structured research and development (R&D) program on mitigation of risks for diagnostic mirrors is underway. Within this program the mirror material development, the passive mitigation of mirror degradation by using diagnostic ducts and shutters along with an active mirror recovery program comprising the in-situ mirror cleaning and calibration is underway. Recent developments in diagnostic mirror R&D are described in this Chapter along with an example of their implementation of R&D solutions in ITER Infrared Thermography diagnostic. An assessment of still open engineering and physics questions, considerations on mirror risks during an early phase of ITER operation are given along with an overview of diagnostic mirror evolution in the late ITER operation stage toward the demonstration fusion power plant. Several crucial areas of diagnostic R&D outlined in ITER Research Plan are addressed. The basic control groups in a fusion reactor can be broken-down in five categories: (1) plasma position, magnetic configuration, and plasma current control, (2) profile control and confinement optimization, (3) MHD control and suppression, (4) edge dissipation control, radiation and plasma exhaust control and (5) break-down optimization. These categories are coupled via the physics (a control action in one domain will affect the other domains) and via shared actuators (e.g. ECRH for impurity accumulation avoidance, current density distribution control and MHD suppression). Consequently, a supervisory control system should determine the priority of the various control tasks, their couplings, and the interfaces with the safety and interlock system. For the systematic development of the various controllers taking the complexity of the plasma and the control system into account, a model-based approach is required. A short historical overview is given of the developments in systems and control theory and control engineering with special emphasis on those developments that are most relevant for Nuclear Fusion research and operation. An overview is given of the state of the field of fusion plasma control for the control categories. It will be shown how synthetic diagnostics are being developed in ITER and how they are used in diagnostic design and design validation and how they can be in model-based controller synthesis using relatively simple models. In modern control methods, multiple diagnostics are used to constrain relatively simple models. The constrained models provide an estimate for the state. This opens the route to state controllers, such as model predictive control. A major challenge in nuclear fusion research is the coherent combination of data from heterogeneous diagnostics and modeling codes for machine control and safety as well as physics studies. Measured data from different diagnostics often provide information about the same subset of physical parameters. Additionally, information provided by some diagnostics might be needed for the analysis of other diagnostics. A joint analysis of complementary and redundant data allows, e.g. to improve the reliability of parameter estimation, to increase the spatial and temporal resolution of profiles, to obtain synergistic effects, to consider diagnostics interdependencies and to find and resolve data inconsistencies. Physics-based modeling and parameter relationships provide additional information improving the treatment of ill-posed inversion problems. A coherent combination of all kind of available information within a probabilistic framework allows for improved data analysis results. The concept of integrated data analysis (IDA) in the framework of Bayesian probability theory is outlined and contrasted with conventional data analysis. Components of the probabilistic approach are summarized and specific ingredients beneficial for data analysis at fusion devices are discussed.

ITER↗

Liquefaction of Forest Biomass to "Drop-in" Hydrocarbon Biofuels

The overall goal of the project was to demonstrate solvent liquefaction as a viable path to stable intermediates for subsequent upgrading to fuel blendstocks. Iowa State University (ISU) utilized technology developed by Chevron to produce “green crude” via continuous biomass liquefaction to bio-oil without catalyst or reducing gas, then upgraded the crude to drop-in hydrocarbon liquid transportation fuels. Original benchmarks for the project included conversion of biomass to bio-oil at a yield of 50% or more, produce bio-oil with oxygen content below 20 wt%, and recycle a portion of the bio-oil product for use as solvent, displacing initial hydrocarbon solvent. Initial testing and technology development was completed by Chevron using a custom Small Continuous Liquefaction Unit (SCLU) operated in “once-through” mode. In this system, liquid product and solid residual/char was collected together and required both off-line solids removal and product separation. This unit was disassembled and major components incorporated into a redesigned solvent liquefaction system at ISU capable of processing biomass at rates up to 1 kg/h. Online, continuous solids separation and bio-oil recovery/separation systems were successfully implemented. Online solids removal using an acetone injection to aid in separation achieved over 99% solids removal efficiency, and acetone recovery of greater than 97% was achieved. The gas stripping system developed for the separation of medium wood oil (MWO) for the recycle stream from the heavy wood oil (HWO) product stream was also successful in recovering approximately 93 wt% of the initial solvent from the biomass-derived products. Due to the generation of fine particulate and the high molecular weight of the HWO which both negatively affect the ability to separate the product oil, solvent recycle was not fully implemented in the system. The biomass used in this project is loblolly pine forest residue. The solvent was a blend of two hydrocarbon liquids. The majority of the solvent was comprised of commercially available naphthalene-depleted heavy aromatic solvent. The hydrogen donor solvent was a proprietary cut of light cycle oil (LCO) that was hydrotreated. As much as 25 wt% of the solvent mixture was comprised of the hydrotreated LCO. Higher blend ratios were limited by the economics of providing hydrogen to the process in this manner. Two cases were evaluated for technical feasibility on the SCLU. These are 1. Simulated phenolic solvent recycle and 2. Hydrocarbon-rich solvent processing. The simulated phenolic solvent recycle case was based on an idealistic solvent mixture where only 5% makeup or hydrogen donor solvent entered the system. The resulting solvent mixture at steady state was estimated to be 75 wt% depleted hydrogen donor, 20 wt% biomass derived phenolic monomers, and 5 wt% HLCO. This case resulted in the highest bio-oil organic yield observed in the project of 66.7 wt% on a solvent-less, dry biomass basis and relatively low oxygen content of 12%. Additionally, these conditions deconstructed the biomass so well, that extremely fine particulate was generated such that 5 micron barrier filters were unable to remove the material. Offline addition of acetone, centrifugation and acetone removal were required in order to remove the particulate prior to fractionation with the stripping column. The resulting HWO had a high molecular weight and was therefore very viscous in nature, remaining solid at room temperature. Additionally, the column was unable to sustainably strip enough MWO to close the recycle loop balance while maintaining flowability of product oil exiting the column. It was determined that additional HLCO would be required at the front of the process to decrease product viscosity both by dilution and additional hydrogen transfer into the HWO product oil. The hydrocarbon rich mixture was the preferred mixture for a majority of the project and featured a 25% donor or HLCO content and 75% depleted hydrogen donor mix. A series of three tests were conducted using this mixture and serve as the basis for a paper detailing the system. While the online acetone injection system for high pressure solids removal was demonstrated early on using this mixture, difficulty controlling process flows led to the use of an atmospheric stirred tank filtration system. At these high donor solvent levels, the product stream easily partitioned with sufficient MWO to close the recycle loop balance. Additionally, this mixture produced HWO product oil at just over 55% yield, <5% oxygen content, and a reasonable viscosity at room temperature. A 56 hour campaign was conducted with the ISU pilot to produce a large enough batch of HWO product oil to conduct upgrading experiments at Chevron’s Richmond, CA facility. Benchtop hydrotreating units were used to conduct long-duration hydrogenation/hydrogenolysis reactions in order to provide yield data and help validate assumptions made in the TEA model. Resulting products featured an oxygen content of <1%, near the detectability limit. Hydrocracking simulations were also performed, and a distribution of heavy wood oil to refinery products was determined. These distributions are based on a database of commercial and pilot plant operation used by Chevron to estimate product yield from novel inputs based on the input physical and chemical characteristics. While multi-week benchtop hydrotreating tests were successfully conducted without fouling, analysis and testing of the heavy wood oil suggest it may be better suited for hydrocracking. Metals content in the heavy wood oil would likely create catalyst fouling over time and reduce lifetime of hydrotreating catalysts. Yields and product partitioning were also more favorable from hydrocracking compared to those from hydrotreating.

09 BIOMASS FUELS↗

New York Marcellus Shale: Industry boom put on hold

Key catalysts for Marcellus Shale drilling in New York were identified. New York remains the only state in the nation with a legislative moratorium on high-volume hydraulic fracturing, as regulators and state lawmakers work to balance the advantages of potential economic benefits while protecting public drinking water resources and the environment. New York is being particularly careful to work on implementing sufficiently strict regulations to mitigate the environmental impacts Pennsylvania has already seen, such as methane gas releases, fracturing fluid releases, flowback water and brine controls, and total dissolved solids discharges. In addition to economic and environmental lessons learned, the New York Department of Environmental Conservation (DEC) also acknowledges impacts to housing markets, security, and other local issues, and may impose stringent measures to mitigate potential risks to local communities. Despite the moratorium, New York has the opportunity to take advantage of increased capital investment, tax revenue generation, and job creation opportunities by increasing shale gas activity. The combination of economic benefits, industry pressure, and recent technological advances will drive the pursuit of natural gas drilling in New York. We identify four principal catalysts as follows: Catalyst 1: Pressure from Within the State. Although high-volume hydraulic fracturing has become a nationally controversial technology, shale fracturing activity is common in every U.S. state except New York. The regulatory process has delayed potential economic opportunities for state and local economies, as well as many industry stakeholders. In 2010, shale gas production accounted for $18.6 billion in federal royalty and local, state, and federal tax revenues. (1) This is expected to continue to grow substantially. The DEC is under increased pressure to open the state to the same opportunities that Alabama, Arkansas, California, Colorado, Kansas, Louisiana, Montana, New Mexico, North Dakota, Ohio, Oklahoma, Pennsylvania, South Dakota, Texas, Utah, West Virginia, and Wyoming are pursuing. Positive labor market impacts are another major economic draw. According to the Revised Draft SGEIS on the Oil, Gas and Solution Mining Regulatory Program (September 2011), hydraulic fracturing would create between 4,408 and 17,634 full-time equivalent (FTE) direct construction jobs in New York State. Indirect employment in other sectors would add an additional 29,174 FTE jobs. Furthermore, the SGEIS analysis suggests that drilling activities could add an estimated $621.9 million to $2.5 billion in employee earnings (direct and indirect) per year, depending upon how much of the shale is developed. The state would also receive direct tax receipts from leasing land, and has the potential to see an increase in generated indirect revenue. Estimates range from $31 million to $125 million per year in personal income tax receipts, and local governments would benefit from revenue sharing. Some landowner groups say the continued delay in drilling is costing tens of thousands of jobs and millions of dollars in growth for New York, especially in the economically stunted upstate. A number of New York counties near Pennsylvania, such as Chemung, NY, have experienced economic uptick from Pennsylvania drilling activity just across the border. Chemung officials reported that approximately 1,300 county residents are currently employed by the drilling industry in Pennsylvania. The Marcellus shale boom is expected to continue over the next decade and beyond. By 2015, gas drilling activity could bring 20,000 jobs to New York State alone. Other states, such as Pennsylvania and West Virginia, are also expected to see a significant increase in the number of jobs. Catalyst 2: Political Reality of the Moratorium. Oil and gas drilling has taken place in New York since the 19th century, and it remains an important industry with more than 13,000 currently active wells. The use of hydraulic fracturing in particular has been employed for decades. Yet, as technological advancements have enabled access to gas in areas where drilling is not common practice, public concern has ballooned. Opponents argue that more oversight is necessary to protect the environment and public health, while supporters believe the industry is already adequately regulated. Although it is important for New York to complete a thorough environmental and regulatory review, an extended ban could lead to litigation by property owners who have been stripped of the ability to lease their mineral rights. Other states are moving forward by implementing legislative guidelines or rules created by commissions to ensure that resources are developed safely. One of the most controversial issues in other states to date has revolved around the public disclosure of chemical additives in drilling fluid. While the industry is hesitant to reveal trade secrets, the public and many officials want the security of knowing what chemicals are pumped into the ground. Industry transparency could help mitigate the public concern and controversy that is delaying a lift of the moratorium. Currently, at least five other states have set chemical disclosure rules. Arkansas, Michigan, Montana, Texas, and Wyoming require disclosure of the chemical components of drilling fluid. Colorado has the most stringent rules, requiring not just the disclosure of the additives but of their concentrations as well. As more states continue to allow hydraulic fracturing, New York will likely lift the moratorium and instead implement more stringent regulations that help to alleviate public concern surrounding hydraulic fracturing. This will allow the state to safely pursue the expansive opportunities offered by the Marcellus shale without falling behind economically. Catalyst 3: Energy and Infrastructure Benefits. Natural gas provides a key source of energy in the Northeast. The DEC estimates the Marcellus shale gas resource potential to be between 168-516 Tcf. Even at the low end of this range, Marcellus alone could supply seven years of total U.S. energy consumption, and it would provide a local resource for New York. One report suggests that savings from lower natural gas costs would result in an average annual savings of $926 per household. (4) Industry growth is leading to lower natural gas and electric power prices, while decreasing reliance on Liquid Natural Gas (LNG) imports and enhancing domestic energy security. This makes development of the resources an even more attractive commitment to New York. In addition, the natural gas business is predominantly regional in scope. Drilling companies would be required to build new pipelines for gas development in New York, therefore State regulators face valuable ancillary benefits of natural gas development such as infrastructure improvements. Catalyst 4: Technology Improvements. Lastly, the moratorium itself does not prevent the use of alternative drilling technologies, such as non-hydraulic fracturing, for shale gas production. Developers are already using new systems in Texas and Canada, as well as in France where hydraulic fracturing is banned country-wide. Commercial viability of these new technologies could ultimately provide an alternative to jumpstart shale drilling in New York if necessary. The potential benefits from development of the Marcellus shale in New York are undeniable, though regulators are still working to balance the need to stimulate the economy with environmental protection and public health. Since closing the public comment period in January, the DEC has signaled that much more work is needed, making no promises to near-term completion. While, neighboring states are feeling the economic benefits of drilling, the political environment and the recession continues adding pressure to the process in New York state.

03 NATURAL GAS↗

Global Methane Budget 2000–2020

Abstract. Understanding and quantifying the global methane (CH4) budget is important for assessing realistic pathways to mitigate climate change. CH4 is the second most important human-influenced greenhouse gas in terms of climate forcing after carbon dioxide (CO2), and both emissions and atmospheric concentrations of CH4 have continued to increase since 2007 after a temporary pause. The relative importance of CH4 emissions compared to those of CO2 for temperature change is related to its shorter atmospheric lifetime, stronger radiative effect, and acceleration in atmospheric growth rate over the past decade, the causes of which are still debated. Two major challenges in quantifying the factors responsible for the observed atmospheric growth rate arise from diverse, geographically overlapping CH4 sources and from the uncertain magnitude and temporal change in the destruction of CH4 by short-lived and highly variable hydroxyl radicals (OH). To address these challenges, we have established a consortium of multidisciplinary scientists under the umbrella of the Global Carbon Project to improve, synthesise, and update the global CH4 budget regularly and to stimulate new research on the methane cycle. Following Saunois et al. (2016, 2020), we present here the third version of the living review paper dedicated to the decadal CH4 budget, integrating results of top-down CH4 emission estimates (based on in situ and Greenhouse Gases Observing SATellite (GOSAT) atmospheric observations and an ensemble of atmospheric inverse-model results) and bottom-up estimates (based on process-based models for estimating land surface emissions and atmospheric chemistry, inventories of anthropogenic emissions, and data-driven extrapolations). We present a budget for the most recent 2010–2019 calendar decade (the latest period for which full data sets are available), for the previous decade of 2000–2009 and for the year 2020. The revision of the bottom-up budget in this 2025 edition benefits from important progress in estimating inland freshwater emissions, with better counting of emissions from lakes and ponds, reservoirs, and streams and rivers. This budget also reduces double counting across freshwater and wetland emissions and, for the first time, includes an estimate of the potential double counting that may exist (average of 23 Tg CH4 yr−1). Bottom-up approaches show that the combined wetland and inland freshwater emissions average 248 [159–369] Tg CH4 yr−1 for the 2010–2019 decade. Natural fluxes are perturbed by human activities through climate, eutrophication, and land use. In this budget, we also estimate, for the first time, this anthropogenic component contributing to wetland and inland freshwater emissions. Newly available gridded products also allowed us to derive an almost complete latitudinal and regional budget based on bottom-up approaches. For the 2010–2019 decade, global CH4 emissions are estimated by atmospheric inversions (top-down) to be 575 Tg CH4 yr−1 (range 553–586, corresponding to the minimum and maximum estimates of the model ensemble). Of this amount, 369 Tg CH4 yr−1 or ∼ 65 % is attributed to direct anthropogenic sources in the fossil, agriculture, and waste and anthropogenic biomass burning (range 350–391 Tg CH4 yr−1 or 63 %–68 %). For the 2000–2009 period, the atmospheric inversions give a slightly lower total emission than for 2010–2019, by 32 Tg CH4 yr−1 (range 9–40). The 2020 emission rate is the highest of the period and reaches 608 Tg CH4 yr−1 (range 581–627), which is 12 % higher than the average emissions in the 2000s. Since 2012, global direct anthropogenic CH4 emission trends have been tracking scenarios that assume no or minimal climate mitigation policies proposed by the Intergovernmental Panel on Climate Change (shared socio-economic pathways SSP5 and SSP3). Bottom-up methods suggest 16 % (94 Tg CH4 yr−1) larger global emissions (669 Tg CH4 yr−1, range 512–849) than top-down inversion methods for the 2010–2019 period. The discrepancy between the bottom-up and the top-down budgets has been greatly reduced compared to the previous differences (167 and 156 Tg CH4 yr−1 in Saunois et al. (2016, 2020) respectively), and for the first time uncertainties in bottom-up and top-down budgets overlap. Although differences have been reduced between inversions and bottom-up, the most important source of uncertainty in the global CH4 budget is still attributable to natural emissions, especially those from wetlands and inland freshwaters. The tropospheric loss of methane, as the main contributor to methane lifetime, has been estimated at 563 [510–663] Tg CH4 yr−1 based on chemistry–climate models. These values are slightly larger than for 2000–2009 due to the impact of the rise in atmospheric methane and remaining large uncertainty (∼ 25 %). The total sink of CH4 is estimated at 633 [507–796] Tg CH4 yr−1 by the bottom-up approaches and at 554 [550–567] Tg CH4 yr−1 by top-down approaches. However, most of the top-down models use the same OH distribution, which introduces less uncertainty to the global budget than is likely justified. For 2010–2019, agriculture and waste contributed an estimated 228 [213–242] Tg CH4 yr−1 in the top-down budget and 211 [195–231] Tg CH4 yr−1 in the bottom-up budget. Fossil fuel emissions contributed 115 [100–124] Tg CH4 yr−1 in the top-down budget and 120 [117–125] Tg CH4 yr−1 in the bottom-up budget. Biomass and biofuel burning contributed 27 [26–27] Tg CH4 yr−1 in the top-down budget and 28 [21–39] Tg CH4 yr−1 in the bottom-up budget. We identify five major priorities for improving the CH4 budget: (i) producing a global, high-resolution map of water-saturated soils and inundated areas emitting CH4 based on a robust classification of different types of emitting ecosystems; (ii) further development of process-based models for inland-water emissions; (iii) intensification of CH4 observations at local (e.g. FLUXNET-CH4 measurements, urban-scale monitoring, satellite imagery with pointing capabilities) to regional scales (surface networks and global remote sensing measurements from satellites) to constrain both bottom-up models and atmospheric inversions; (iv) improvements of transport models and the representation of photochemical sinks in top-down inversions; and (v) integration of 3D variational inversion systems using isotopic and/or co-emitted species such as ethane as well as information in the bottom-up inventories on anthropogenic super-emitters detected by remote sensing (mainly oil and gas sector but also coal, agriculture, and landfills) to improve source partitioning. The data presented here can be downloaded from https://doi.org/10.18160/GKQ9-2RHT (Martinez et al., 2024).

54 ENVIRONMENTAL SCIENCES↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗