Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

The eivaN: A forward-looking interactive orbital trajectory plotting tool for use with proximity operations (PROX OPS) and other maneuvers: Description and user's manual

The results of vehicle burns on-orbit are very difficult to anticipate because of nonlinearities in the equations of motion governing orbiting bodies. This confusion was noticed firsthand in prior experimentation. Out of plane motion is relatively simple as it is uncoupled from the other two degrees of freedom. However, in plane thrusts are more complex because the motions resulting from these inputs are coupled. An interactive planning device, eivaN, was developed to plot resulting trajectories, to provide a better comprehension of orbital mechanics effects, and to help the user to develop heuristics for on-orbit mission planning. The eivaN runs with Microsoft Excel on a Macintosh computer. It provides a forward looking display: burn parameters in the three orthogonal axes in addition to time inputted, and the resultant trajectory is then plotted. Position and velocity components for any burn at any user specified time are readily available. A new area of research related to the human factors of real time, on-orbit mission planning was identified and is currently being investigated.

Brody, Adam R.↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration (NASA) initiated plans to develop the Ares I and Ares V launch vehicles in 2005 to meet the mission objectives for future human exploration of space. Ares I is designed to provide the capability to deliver the Orion crew exploration vehicle (CEV) to low-Earth orbit (LEO), either for docking to the International Space Station (ISS) or docking with an Earth departure stage (EDS) and lunar lander for transit to the Moon. Ares V provides the heavy-lift capability to deliver the EDS and lunar lander to orbit. An integrated test plan was developed for Ares I that includes un-crewed flight validation testing and ground testing to qualify structural components and propulsion systems prior to operational deployment. The overall test program also includes a single development test flight conducted prior to the Ares I critical design review (CDR). Since the Ares V concept was formulated to maximize hardware commonality between the Ares V and Ares I launch vehicles, initial test planning for Ares V has considered the extensibility of test approaches and facilities from Ares I. The Ares V test plan was part of a successful mission concept review (MCR) in 2008.

Cockrell, Charles E.↗

The Challenge of Orbital Debris

Since the dawn of the Space Age more than 50 years ago, humans have been launching objects into the space environment faster than they have been removed by active means or natural decay. This has led to a proliferation of debris -- derelict satellites, discarded rocket upper stages, and pieces from satellite breakups -- in Earth orbit, especially in well-used orbital regimes. This talk will summarize the current knowledge of the debris environment and describe plans to address the challenges orbital debris raises for the future usability of near-Earth space. The talk will be structured around 4 categories: Measurements, Modeling, Shielding, and Mitigation. This will include discussions of the long-term prognosis of debris growth (i.e., the "Kessler Syndrome") as well as plans for active debris removal.

Matney, Mark↗

Robotic space simulation integration of vision algorithms into an orbital operations simulation

In order to successfully plan and analyze future space activities, computer-based simulations of activities in low earth orbit will be required to model and integrate vision and robotic operations with vehicle dynamics and proximity operations procedures. The orbital operations simulation (OOS) is configured and enhanced as a testbed for robotic space operations. Vision integration algorithms are being developed in three areas: preprocessing, recognition, and attitude/attitude rates. The vision program (Rice University) was modified for use in the OOS. Systems integration testing is now in progress.

Bochsler, Daniel C.↗

Automated maneuver planning using a fuzzy logic algorithm

Spacecraft orbital control requires intensive interaction between the analyst and the system used to model the spacecraft trajectory. For orbits with right mission constraints and a large number of maneuvers, this interaction is difficult or expensive to accomplish in a timely manner. Some automation of maneuver planning can reduce these difficulties for maneuver-intensive missions. One approach to this automation is to use fuzzy logic in the control mechanism. Such a prototype system currently under development is discussed. The Tropical Rainfall Measurement Mission (TRMM) is one of several missions that could benefit from automated maneuver planning. TRMM is scheduled for launch in August 1997. The spacecraft is to be maintained in a 350-km circular orbit throughout the 3-year lifetime of the mission, with very small variations in this orbit allowed. Since solar maximum will occur as early as 1999, the solar activity during the TRMM mission will be increasing. The increasing solar activity will result in orbital maneuvers being performed as often as every other day. The results of automated maneuver planning for the TRMM mission will be presented to demonstrate the prototype of the fuzzy logic tool.

Conway, D.↗

The Role of Anomalous Satellite-Fixed Accelerations in TOPEX/Poseidon Orbit Maintenance

Shortly after the launch of TOPEX/Poseidon on 10 August 1992 orbit determination indicated orbital decay levels approximately 60 times larger than could be explained by atmospheric drag. Outgassing, a complex process of molecular releases from satellite non-metallic parts, was the most likely source of these early decay rates. The high decay levels steadily declined during the first six weeks while a planned sequence of six orbit adjust maneuvers placed the satellite in the operational orbit to precisely overfly a predetermined repeat ground track. At the same time, on-going orbit trend analysis revealed the presence of residual along-track forces comparable to atmospheric drag which clearly exhibited a body-fixed origin. These anomalous forces cause either orbital decay or boost, depending on the satellite attitude and solar array articulation mode. As such, these along-track forces can either add to, or oppose, the resident orbital decay due to drag...

Bhat, R.S.↗

ERBS orbit ascent utilizing continuous low thrust maneuvers

The Earth Radiation Budget Satellite (ERBS) is a National Aeronautics and Space Administration (NASA) spacecraft whose purpose is to investigate the components of the earth's radiation budget. The ERBS was deployed in a 57 degree inclined, 352.2 kilometer altitude circular orbit by the NASA Space Transportation System (STS) on October 5, 1984. The spacecraft then ascended to its 603 kilometer, near-circular mission orbit by a series of continuous low-thrust maneuvers. The ERBS was the first free-flyer mission to rely on continuous low thrust to spiral from one circular orbit to another. Careful planning and monitoring of these maneuvers were essential to their successful execution. Errors in the prediction of the propulsion system performance or in burn duration would result in loss of contact with the spacecraft during a maneuver and could result in a premature end to the maneuver and difficulty in computing a definitive orbit.

Hoge, S. L.↗

The Pascal Discovery Mission: A Mars Climate Network Mission

The climate of Mars is a major focus of Mars exploration. With the loss of MCO, however, it remains uncertain how it will be achieved. We argue that a truly dedicated climate mission to Mars should have both orbital and landed components, and that these should operate simultaneously for at least 1 Mars year if not longer. Pascal is a Discovery mission that emphasizes the landed component. Its principal goal is to establish a network of 24 small weather stations on the surface of Mars that will operate for 2 Mars years, with an extended mission option for an additional 8 Mars years bringing the total mission lifetime up to 10 Mars years. The stations will collect hourly measurements of pressure, temperature, and optical depth. After delivering the probes to Mars, Pascal's carrier spacecraft will go into an elliptical orbit which will serve as a relay for the landers, and a platform for synoptic imaging. These simultaneous measurements from the surface and from orbit will allow us to characterize the planet's general circulation and its interaction with the dust, water, and CO2 cycles. During entry, descent, and landing, each of Pascal's 24 probes will also measure the temperature structure of the atmosphere and acquire images of the surface. These data will allow us to determine the global structure of the atmosphere between 15 and 130 km, and characterize the local terrain to help interpret the landed data. The descent images are part of Pascal's outreach program, as the probe camera system will be developed by faculty-supervised student project. The intent is to generate enthusiasm for the Pascal mission by directly involving students. Pascal will be launched on a Delta II-7925 in August of 2005. A type I trajectory will deliver Pascal to Mars in January of 2006. On approach, the three-axis stabilized carrier spacecraft will spring deploy the Pascal probes in 4 separate salvo's of 6 each. Global coverage is achieved with small time-of-arrival adjustments in between each salvo. Pascal's probes utilize an aeroshell, parachute, and crushable material for entry, descent and landing. On the surface, their long life and global coverage is enabled by a Micro Thermal Power Source with demonstrated heritage. After all probes are released, the carrier spacecraft will execute a small burn for insertion into an elliptical orbit. The long lifetime of the Pascal network was chosen in part to maximize the chances that orbital sounding, like that planned with MCO, would occur at some point during the mission. If Pascal is selected for launch in '05, this could occur if MCO-like science is reflown in the '05 opportunity or, if it is reflown in '03, the mission is extended to overlap with Pascal. The combination of temperature sounding from orbit, and surface pressure mapping from the surface will allow a direct determination of the full 3-D wind field for the first time.

Haberle, R. M.↗

The Pascal Discovery Mission: A Mars Climate Network Mission

The climate of Mars is a major focus of Mars exploration. With the loss of MCO, however, it remains uncertain how it will be achieved. We argue that a truly dedicated climate mission to Mars should have both orbital and landed components, and that these should operate simultaneously for at least I Mars year if not longer. Pascal is Discovery mission that emphasizes the landed component. Its principal goal is to establish a network of 24 small weather stations on the surface of Mars that will operate for 2 Mars years, with an extended mission option for an additional 8 Mars years bringing the total mission lifetime up to 10 Mars years. The stations will collect hourly measurements of pressure, temperature, and optical depth. After delivering the probes to Mars, Pascal's carrier spacecraft will go into an elliptical orbit which will serve as a relay for the landers, and a platform for synoptic imaging. These simultaneous measurements from the surface and from orbit will allow us to characterize the planet's general circulation and its interaction with the dust, water, and CO2 cycles. During entry, descent, and landing, each of Pascal's 24 probes will also measure the temperature structure of the atmosphere and acquire images of the surface. These data will allow us to determine the global structure of the atmosphere between 15 and 130 km, and characterize the local terrain to help interpret the landed data. The descent images are part of Pascal's outreach program, as the probe camera system will be developed by faculty-supervised student project. The intent is to generate enthusiasm for the Pascal mission by directly involving students. Pascal will be launched on a Delta 11-7925 in August of 2005. A type I trajectory will deliver Pascal to Mars in January of 2006. On approach, the three-axis stabilized carrier spacecraft will spring deploy the Pascal probes in 4 separate salvo's of 6 each. Global coverage is achieved with small time-of-arrival adjustments in between each salvo. Pascal's probes utilize an aeroshell, parachute, and crushable material for entry, descent and landing. On the surface, their long life and global coverage is enabled by a Micro Thermal Power Source with demonstrated heritage. After all probes are released, the carrier spacecraft will execute a small bum for insertion into an elliptical orbit. The long lifetime of the Pascal network was chosen in part to maximize the chances that orbital sounding, like that planned with MCO, would occur at some point during the mission. If Pascal is selected for launch in -05, this could occur if MCO-like science is reflown in the '05 opportunity or, if it is reflown in '03, the mission is extended to overlap with Pascal. The combination of temperature sounding from orbit, and surface pressure mapping from the surface will allow a direct determination of the full 3-D wind field for the first time.

Haberle, Robert M.↗

Evolution of the Lunar Network

The National Aeronautics and Space Administration (NASA) is planning to upgrade its network Infrastructure to support missions for the 21st century. The first step is to increase the data rate provided to science missions to at least the 100 megabits per second (Mbps) range. This is under way, using Ka-band 26 Gigahertz (GHz), erecting an 18-meter antenna for the Lunar Reconnaissance Orbiter (LRO), and the planned upgrade of the Deep Space Network (DSN) 34-meter network to support the James Webb Space Telescope (JWST). The next step is the support of manned missions to the Moon and beyond. Establishing an outpost with several activities such as rovers, colonization, and observatories, is better achieved by using a network configuration rather than the current method of point-to-point communication. Another challenge associated with the Moon is communication coverage with the Earth. The Moon's South Pole, targeted for human habitat and exploration, is obscured from Earth view for half of the 28-day lunar cycle and requires the use of lunar relay satellites to provide coverage when there is no direct view of the Earth. The future NASA and Constellation network architecture is described in the Space Communications Architecture Working Group (SCAWG) Report. The Space Communications and Navigation (SCAN) Constellation Integration Project (SCIP) is responsible for coordinating Constellation requirements and has assigned the responsibility for implementing these requirements to the existing NASA communication providers: DSN, Space Network (SN), Ground Network (GN) and the NASA Integrated Services Network (NISN). The SCAWG Report provides a future architecture but does not provide implementation details. The architecture calls for a Netcentric system, using hundreds of 12-meter antennas, a ground antenna array, and a relay network around the Moon. The report did not use cost as a variable in determining the feasibility of this approach. As part of the SCIP Mission Concept Review and the second iteration of the Lunar Architecture Team (LAT), the focus is on cost, as well as communication coverage using operational scenarios. This approach maximizes use of existing assets and adds capability in small increments. This paper addresses architecture decisions such as the Radio Frequency (RF) signal and network (Netcentric) decisions that need to be made and the difficulty of implementing them into the existing Space Network and DSN. It discusses the evolution of the lunar system and describes its components: Tracking and Data Relay Satellite System (TDRSS), Earth-based ground stations, Lunar Relay, and surface systems.

Gal-Edd, Jonathan↗

The Flexible Lunar Architecture for Exploration (FLARE): Designed for the Artemis-3 Moon 2024 Mission and Beyond

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for 7 to 14 days and then return them safely to Earth by 2024. This meets NASA’s internal 2024 lunar landing deadline directed by President Trump (Trump, 2017) and the “5-year” goal set forth by Vice President Pence (Pence, 2019). FLARE is an alternative to NASA’s Human Landing System reference architecture from the Design Analysis Cycle (DAC) #2 (NASA, 2019b). The minimum FLARE concept uses one Space Launch System launch, one Orion, one European Service Module (ESM), and one human lander to deliver four crew to the Moon for a minimum surface duration of 7 days and return them to Earth. FLARE adds a new capability, called the SpaceTug, based upon the mature and successful United Launch Alliance “Common” Centaur Upper Stage vehicle, with modifications. In FLARE, the SpaceTug provides propulsion needed to return the Orion+ESM from the Moon to Earth. The SpaceTug also provides propulsion to deliver the human lander Descent Element (DE) and Ascent Element (AE) separately to lunar orbit. The Orion+ESM then completes a rendezvous with the mated DE+AE in lunar orbit. FLARE also offers optional phases to the Moon 2024 mission. The SpaceTug can also deliver components of the planned Gateway - including the Power and Propulsion Element and the Habitation and Logistics Outpost - to lunar orbit; however, the planned FLARE destination is a Low Lunar Frozen Polar Orbit unlike the NASA DAC2 plan for a Near Rectilinear Halo Orbit. FLARE also provides an option to deliver precursor equipment - including a habitation module, crew mobility devices and an In-Situ Resource Utilization demonstration - to the lunar surface for enhanced crew exploration and science with the extended 14-day surface mission.

Commercial Launch Vehicles (CLV)↗

Juno Orbit Determination Experience During First Year At Jupiter

The Juno spacecraft successfully inserted into a polar orbit around Jupiter on 5- July-2016. Since the Jupiter Orbit Insertion (JOI) maneuver, Juno has completed six orbits around Jupiter. The mission plan at the time of JOI was for Juno to perform two 53.5-day capture orbits before executing a Period Reduction Maneuver (PRM) to place the spacecraft into its intended 14-day science orbit. This maneuver was canceled due to a concern with the propulsion system. As a result, the Juno spacecraft will remain in its longer orbit period for rest of its mission. This paper discusses the Navigation Team’s experience: the orbit determination strategy and how it changed due to the cancellation of the PRM, challenges fitting the data during perijove, and how we reconstructed the trajectory during Juno’s first year in orbit.

Thompson, Paul↗

Potential Biofilm Control Strategies for Extended Spaceflight Missions

Biofilms, surface-adherent microbial communities, are associated with microbial fouling and corrosion in terrestrial water-distribution systems. Biofilms are also present in human spaceflight, particularly in the Water Recovery System (WRS) on the International Space Station (ISS). The WRS is comprised of the Urine Processor Assembly (UPA) and the Water Processor Assembly (WPA) which together recycles wastewater from human urine and recovered humidity from the ISS atmosphere. These wastewaters and various process streams are continually inoculated with microorganisms primarily arising from the space crew microbiome. Biofilm-related fouling has been encountered and addressed in spacecraft in low Earth orbit, including ISS and the Russian Mir Space Station. However, planned future missions beyond low Earth orbit to the Moon and Mars present additional challenges, as resupplying spare parts or support materials would be impractical and the mission timeline would be in the order of years in the case of a mission to Mars. In addition, future missions are expected to include a period of dormancy in which the WRS would be unused for an extended duration. The concepts developed in this review arose from a workshop including NASA personnel and representatives with biofilm expertise from a wide range of industrial and academic backgrounds. Here, we address current strategies that are employed on Earth for biofilm control, including antifouling coatings and biocides and mechanisms for mitigating biofilm growth and damage. These ideas are presented in the context of their applicability to spaceflight and identify proposed new topics of biofilm control that need to be addressed in order to facilitate future extended, crewed, spaceflight missions.

Luis Zea↗

Minuteman 2 launched small satellite

The goal of LEOSat Industries' Spring 1994 project was to design a small satellite that has a strong technology demonstration or scientific justification and incorporates a high level of student involvement. The satellite is to be launched into low earth orbit by the converted Minuteman 2 satellite launcher designed by Minotaur Designs, Inc. in 1993. The launch vehicle shroud was modified to a height of 90 inches, a diameter of 48 inches at the bottom and 35 inches at the top for a total volume of 85 cubic feet. The maximum allowable mass of the payload is about 1100 lb., depending on the launch site, orbit altitude, and inclination. The satellite designed by LEOSat Industries is TerraSat, a remote-sensing satellite that will provide information for use in space-based earth studies. It will consist of infrared and ultraviolet/visible sensors similar to the SDI-developed sensors being tested on Clementine. The sensors will be mounted on the Defense Systems, Inc. Standard Satellite-1 spacecraft bus. LEOSat has planned for two satellites orbiting the Earth with trajectories similar to that of LANDSAT 5. The semi-major axis is 7080 kilometers, the eccentricity is 0, and the inclination is 98.2 degrees. The estimated mass of TerraSat is 145 kilograms and the estimated volume is 1.8 cubic meters. The estimated cost of TerraSat is $13.7 million. The projected length of time from assembly of the sensors to launch of the spacecraft is 13 months.

Chan, Sunny↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗

Networks consolidation program

The Networks Consolidation Program (NCP) goals were defined to include the planning, designing, and implementing of a single network of ground tracking stations. The proposed consolidated network is to make use of facilities that are now included in the Goddard Ground Spaceflight Tracking and Data Network as well as the existing JPL Deep Space Network. These facilities are to be combined and modified to provide a consolidated network capable of supporting the set of planetary and Highly Elliptical Earth Orbiter missions that are planned for the Tracking and Data Relay Satellite System era. The history of activities and events that led to the decision to consolidate the NASA ground tracking and data networks are traced. A summary of the management and planning activities that have taken place at the Jet Propulsion Laboratory, Goddard Space Flight Center, and at the NASA Headquarters Office of Space Tracking and Data Systems, with respect to the NCP, from the time of decision in October 1979 to the present, are discussed.

Yeater, M. L.↗

Mars Observer Lecture: Mars Orbit Insertion

The Mars Observer mission spacecraft was primarily designed for exploring Mars and the Martian environment. The Mars Observer was launched on September 25, 1992. The spacecraft was lost in the vicinity of Mars on August 21, 1993 when the spacecraft began its maneuvering sequence for Martian orbital insertion. This videotape shows a lecture by Suzanne R. Dodd, the Mission Planning Team Chief for the Mars Observer Project. Ms Dodd begins with a brief overview of the mission and the timeline from the launch to orbital insertion. Ms Dodd then reviews slides showing the trajectory of the spacecraft on its trip to Mars. Slides of the spacecraft being constructed are also shown. She then discusses the Mars orbit insertion and the events that will occur to move the spacecraft from the capture orbit into a mapping orbit. During the trip to Mars, scientists at JPL had devised a new strategy, called Power In that would allow for an earlier insertion into the mapping orbit. The talk summarizes this strategy, showing on a slide the planned transition orbits. There are shots of the Martian moon, Phobos, taken from the Viking spacecraft, as Ms Dodd explains that the trajectory will allow the orbiter to make new observations of that moon. She also explains the required steps to prepare for mapping after the spacecraft has achieved the mapping orbit around Mars. The lecture ends with a picture of Mars from the Observer on its approach to the planet.

Dodd, Suzanne R.↗