Spectro-Microscopy Studies of Atmospheric Particles

Our project investigated composition and physical properties of individual atmospheric particles collected in field campaigns organized by the DOE Atmospheric Systems Research and Atmospheric Radiation Measurement (ASR/ARM) programs, such as the Green Ocean Amazon (GoAmazon, 2014/5), the Holistic Interactions of Shallow Clouds, Aerosols, and Land-Ecosystems (HI-SCALE, 2016/7), the Aerosol and Cloud Experiment in the Eastern North Atlantic (ACE-ENA, 2017/8), the Aerosol–Ice Formation Closure Pilot Study (AEROICESTUDY, 2019) and in additional small-scale supporting field experiments focused on the investigation of the light-absorbing (aka brown carbon) atmospheric particles. In these studies, we investigated the contribution of natural and anthropogenic sources to populations of atmospheric particles during representative atmospheric conditions; characterized particle composition and evaluated their hygroscopic properties and propensity to act as cloud condensation nuclei (CCN) and ice nuclei (IN); correlated typical particle-type and mixing state characteristics with real-time measurements in the areas of studies. We used multi-modal spectro-microscopy techniques to examine elemental and molecular composition, mixing state, size, and higher order morphology for individual particles. Specifically, we used computer-controlled scanning electron microscopy and X-ray microanalysis for quantitative analysis of particle elemental composition, and we used transmission electron microscopy to provide additional information on the distribution of different components within individual particles (particle heterogeneity). We used synchrotron-based scanning transmission X-ray microscopy for quantitative description of the mixing state and molecular bonding of carbon in particles. The particle composition, mixing state, and morphology from analyzed periods was then combined with the real-time ARM measurements of aerosol size distribution, CCN concentration, hygroscopicity, and aerosol bulk composition. Combined together, results of our studies allowed us to assess the major particle sources (biogenic vs. anthropogenic, primary vs secondary) and gain insight into the atmospheric processing of aerosol particles resulting from condensation, coagulation, oxidative aging, and cloud processing. In collaboration with other scientists involved in field campaigns, we carried out statistical analysis of particle properties and their source-specific contributions to regional aerosol loading under representative air mass, meteorological, and cloud conditions.

scanning transmission X-ray microscopy↗

The empire survey: systematic variations in the dense gas fraction and star formation efficiency from full-disk mapping of M51

We present the first results from the EMPIRE survey, an IRAM large program that is mapping tracers of high-density molecular gas across the disks of nine nearby star-forming galaxies. Here, we present new maps of the 3 mm transitions of HCN, HCO{sup +}, and HNC across the whole disk of our pilot target, M51. As expected, dense gas correlates with tracers of recent star formation, filling the “luminosity gap” between Galactic cores and whole galaxies. In detail, we show that both the fraction of gas that is dense, f{sub dense} traced by HCN/CO, and the rate at which dense gas forms stars, SFE{sub dense} traced by IR/HCN, depend on environment in the galaxy. The sense of the dependence is that high-surface-density, high molecular gas fraction regions of the galaxy show high dense gas fractions and low dense gas star formation efficiencies. This agrees with recent results for individual pointings by Usero et al. but using unbiased whole-galaxy maps. It also agrees qualitatively with the behavior observed contrasting our own Solar Neighborhood with the central regions of the Milky Way. The sense of the trends can be explained if the dense gas fraction tracks interstellar pressure but star formation occurs only in regions of high density contrast.

79 ASTRONOMY AND ASTROPHYSICS↗

Dry Storage of Research Reactor Spent Nuclear Fuel - 13321

Spent fuel from domestic and foreign research reactors is received and stored at the Savannah River Site's L Area Material Storage (L Basin) Facility. This DOE-owned fuel consists primarily of highly enriched uranium in metal, oxide or silicide form with aluminum cladding. Upon receipt, the fuel is unloaded and transferred to basin storage awaiting final disposition. Disposition alternatives include processing via the site's H Canyon facility for uranium recovery, or packaging and shipment of the spent fuel to a waste repository. A program has been developed to provide a phased approach for dry storage of the L Basin fuel. The initial phase of the dry storage program will demonstrate loading, drying, and storage of fuel in twelve instrumented canisters to assess fuel performance. After closure, the loaded canisters are transferred to pad-mounted concrete overpacks, similar to those used for dry storage of commercial fuel. Unlike commercial spent fuel, however, the DOE fuel has high enrichment, very low to high burnup, and low decay heat. The aluminum cladding presents unique challenges due to the presence of an oxide layer that forms on the cladding surface, and corrosion degradation resulting from prolonged wet storage. The removal of free and bound water is essential to the prevention of fuel corrosion and radiolytic generation of hydrogen. The demonstration will validate models predicting pressure, temperature, gas generation, and corrosion performance, provide an engineering scale demonstration of fuel handling, drying, leak testing, and canister backfill operations, and establish 'road-ready' storage of fuel that is suitable for offsite repository shipment or retrievable for onsite processing. Implementation of the Phase I demonstration can be completed within three years. Phases II and III, leading to the de-inventory of L Basin, would require an additional 750 canisters and 6-12 years to complete. Transfer of the fuel from basin storage to dry storage requires integration with current facility operations, and selection of equipment that will allow safe operation within the constraints of existing facility conditions. Examples of such constraints that are evaluated and addressed by the dry storage program include limited basin depth, varying fuel lengths up to 4 m, (13 ft), fissile loading limits, canister closure design, post-load drying and closure of the canisters, instrument selection and installation, and movement of the canisters to storage casks. The initial pilot phase restricts the fuels to shorter length fuels that can be loaded to the canister directly underwater; subsequent phases will require use of a shielded transfer system. Removal of the canister from the basin, followed by drying, inerting, closure of the canister, and transfer of the canister to the storage cask are completed with remotely operated equipment and appropriate shielding to reduce personnel radiation exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lab-Scale Development of a Solid Sorbent for CO 2 Capture Process for Coal-Fired Power Plants

It is increasingly clear that CO 2 capture and sequestration (CCS) must play a critical role in curbing worldwide CO 2 emissions to the atmosphere. Development of these technologies to cost-effectively remove CO 2 from coal-fired power plants is very important to mitigating the impact these power plants have within the world’s power generation portfolio. Currently, conventional CO 2 capture technologies, such as aqueous-monoethanolamine based solvent systems, are prohibitively expensive and if implemented could result in a 75 to 100% increase in the cost of electricity for consumers worldwide. Solid sorbent CO 2 capture processes – such as RTI’s 3rd Generation Solid Sorbent CO 2 Capture Process – are promising alternatives to conventional, liquid solvents. Supported amine sorbents – of the nature RTI has developed – are particularly attractive due to their potential for high CO 2 loadings, excellent stability over multiple cycles, reduced corrosivity/volatility and a potential to reduce the regeneration energy needed to carry out CO 2 capture. The remaining challenges for these sorbent processes have provided the framework for the project team’s research and development and target for advancing the technology beyond lab-scale testing. Previous work in this area has failed to adequately address various technology challenges such as sorbent stability and regenerability, sorbent scale-up, improved physical strength and attrition-resistance, proper heat management and temperature control, proper solids handling, as well as the proper coupling of process engineering advancements that are tailored for a promising sorbent technology. Under a cooperative agreement with the US Department of Energy, and part of NETL’s CO 2 Capture Program, RTI has led an effort to address and mitigate the challenges associated with solid sorbent CO 2 capture. The overall objective of this project was to mitigate the technical and economic risks associated with the performance and scale-up of solid sorbent-based CO 2 capture processes, enabling subsequent larger pilot demonstrations and ultimately commercial deployment. An integrated development approach has been a key focus of this project in which sorbent development, process development, and economic analyses have informed each of the other development processes. Development efforts have focused on developing novel hybrid solids-based CO 2 capture sorbents and improving their performance stability, refining process engineering and design, and evaluating the viability of the technology through detailed economic analyses. Sorbent advancements have led to a next generation, commercially-viable CO 2 capture sorbent exhibiting performance stability in various gas environments and a physically strong fluidizable form. The team has reduced sorbent production costs and optimized the production and scale-up of novel metal-organic framework (MOF) hybrid solids-based CO 2 capture sorbents, fluidizable sorbents. Refinement of the process engineering and design at the lab-scale research unit has demonstrated promising CO 2 capture performance in simulated coal-fired flue gas conditions. Long-term testing has informed the project team on the process conditions needed to operate a solids-based system for optimal performance. Data collected from all phases of testing has been used to develop a detailed techno-economic assessment of RTI’s technology. These detailed analyses show that RTI’s technology has significant economic advantages over current amine scrubbing and potential to achieve the DOE’s Carbon Capture Program’s goal of >90% CO 2 capture rate at a cost of almost $40/tonne CO 2 captured by 2025. Through this integrated technology development approach, the project team has advanced RTI’s 3rd generation CO 2 capture technology to TRL-3, according to the DOE/FE definitions for Technology Readiness Levels. At a broader level, this project has advanced the whole of the solid sorbent CO 2 capture field, with advancements in process engineering and design, technical risk mitigation, sorbent scale-up optimization, and an understanding of the commercial viability and applicability of solid sorbent CO 2 capture technologies for the U.S. existing fleet of coal-fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

PG&E WaveConnect Program (Final Report)

The PG&E WaveConnect project was intended to demonstrate the technical and economic viability of wave power in the open ocean adjacent to PG&E's service territory. WaveConnect was conceived as a multi-stage development process leading to long-term megawatt-scale wave power production. The first-stage tasks consisted of site selection, permitting, pilot plant design, and assessment of technology and commercial readiness. The second stage would have included development of infrastructure, undersea cabling, and deployment of wave energy conversion devices (WECs). In the third stage, the most promising WEC devices would have been deployed in larger quantities and connected to the grid. This report documents the findings of Stage One. Site Selection: After studying the wave energy potential, grid interconnection and other project infrastructure along the California coast, PG&E selected two sites: one near Eureka, called the Humboldt WaveConnect (HWC) project, and another near Vandenberg Air Force Base, called the Central Coast WaveConnect project (CCWC).

16 TIDAL AND WAVE POWER↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Optimization of distributed compute resources utilization in the CMS Global Pool

The CMS Submission Infrastructure is the primary system for managing computing resources for CMS workflows, including data processing, simulation, and analysis. It integrates geographically distributed resources from Grid, HPC, and cloud providers into federated pools managed by HTCondor and Glidein- WMS, for a total of around 500k CPU cores. This system dynamically manages workloads based on priorities defined by the collaboration. Additionally, CMS scheduling strategies must be flexible to handle multiple concurrent workloads while considering changing processing demands and resource availability from various providers.Efficient utilization of vast amounts of distributed compute resources is a key element for the success of the scientific programs of the LHC experiments. Optimizing the system is essential to maximize resource efficiency and fully utilize the distributed computing power. The CMS Submission Infrastructure team thus systematically investigates sources of inefficiency in workload scheduling to reduce their impact. In addition, a strategy of pilot overloading has been introduced to compensate for other inefficiency sources, thereby optimizing resource utilization and enhancing computational throughput.

Mascheroni, Marco [UC, San Diego (main)]↗

Final Report: Towards an Emergent Model of Technology Adoption for Accelerating the Diffusion of Residential Solar PV

This project sought to enable electric utilities in Texas to accelerate diffusion of residential solar photovoltaic (PV) by systematically identifying and targeting existing barriers to PV adoption. A core goal of the project was to develop an integrated research framework that combines survey research, econometric modeling, financial modeling, and implementation and evaluation of pilot projects to study the PV diffusion system. This project considered PV diffusion as an emergent system, with attention to the interactions between the constituent parts of the PV socio-technical system including: economics of individual decision-making; peer and social influences; behavioral responses; and information and transaction costs. We also conducted two pilot projects, which have yielded new insights into behavioral and informational aspects of PV adoption. Finally, this project has produced robust and generalizable results that will provide deeper insights into the technology-diffusion process that will be applicable for the design of utility programs for other technologies such as home-energy management systems and plug-in electric vehicles. When we started this project in 2013 there was little systematic research on characterizing the decision-making process of households interested in adopting PV. This project was designed to fill that research gap by analyzing the PV adoption process from the consumers' decision-making perspective and with the objective to systematically identifying and addressing the barriers that consumers face in the adoption of PV. The two key components of that decision-making process are consumers' evaluation of: (i) uncertainties and non-monetary costs associated with the technology and (ii) the direct monetary cost-benefit. This project used an integrated approach to study both the non-monetary and the monetary components of the consumer decision-making process.

14 SOLAR ENERGY↗

Nevada National Security Site V3XA Spherical Explosive Confinement Vessel Awareness Package

This report summarizes the plans and activities that will facilitate shipment of the V3XA experimental spheres (a.k.a., Nevada Spheres) from the Nevada National Security Site (NNSS) to the Idaho National Laboratory’s (INL) Advanced Mixed Waste Treatment Project (AMWTP). The spheres require shipment to INL to be segmented, characterized, and repackaged for ultimate disposal at the Waste Isolation Pilot Plant (WIPP). The NNSS does not currently have the facilities or safety basis to perform these activities. The INL has the facilities, the INL M&O contractor owns an 8-120B cask, and AMWTP has a WIPP Waste Acceptance Criteria approved characterization program. The NNSS has shipped other legacy transuranic waste to INL for WIPP certified characterization in the past.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced LAW Glass Correlation - Phase 1

About 50 million gallons of high-level mixed waste is currently stored in underground tanks at the United States Department of Energy’s (DOE’s) Hanford site in the State of Washington. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will provide DOE’s Office of River Protection (ORP) with a means of treating this waste by vitrification for subsequent disposal. The tank waste will be separated into low- and high-activity waste fractions, which will then be vitrified respectively into Immobilized Low Activity Waste (ILAW) and Immobilized High Level Waste (IHLW) products. The ILAW product will be disposed in an engineered facility on the Hanford site while the IHLW product is designed for acceptance into a national deep geological disposal facility for high-level nuclear waste. The ILAW and IHLW products must meet a variety of requirements with respect to protection of the environment before they can be accepted for disposal. Acceptable glass formulations for vitrification of Hanford low activity waste (LAW) must meet a variety of product quality, processability, and waste loading requirements. To this end, The Vitreous State Laboratory (VSL) at The Catholic University of America (CUA) developed and tested a number of glass formulations during Part A, Part B1 and Part B2 of the WTP development program. The testing resulted in the selection of target glass compositions for the processing of eight of the Phase I LAW tanks. The selected glass compositions were tested at the crucible scale to confirm their compliance with ILAW performance requirements. Duramelter 100 (DM100) and LAW Pilot Melter tests were then conducted to demonstrate the viability of these glass compositions for LAW vitrification at high processing rates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of PanDA workload management system with Titan supercomputer at OLCF

The PanDA (Production and Distributed Analysis) workload management system (WMS) was developed to meet the scale and complexity of LHC distributed computing for the ATLAS experiment. While PanDA currently distributes jobs to more than 100,000 cores at well over 100 Grid sites, the future LHC data taking runs will require more resources than Grid computing can possibly provide. To alleviate these challenges, ATLAS is engaged in an ambitious program to expand the current computing model to include additional resources such as the opportunistic use of supercomputers. We will describe a project aimed at integration of PanDA WMS with Titan supercomputer at Oak Ridge Leadership Computing Facility (OLCF). The current approach utilizes a modified PanDA pilot framework for job submission to Titan’s batch queues and local data management, with light-weight MPI wrappers to run single threaded workloads in parallel on Titan’s multi-core worker nodes. It also gives PanDA new capability to collect, in real time, information about unused worker nodes on Titan, which allows precise definition of the size and duration of jobs submitted to Titan according to available free resources. This capability significantly reduces PanDA job wait time while improving Titan’s utilization efficiency. This implementation was tested with a variety of Monte-Carlo workloads on Titan and is being tested on several other supercomputing platforms.

97 MATHEMATICS AND COMPUTING↗

Flexible Stellarator Physics Facility

We propose to build a Flexible Stellarator Physics Facility to explore promising regions of the vast parameter space of disruption-free stellarator solutions for Fusion Pilot Plants (FPPs). The FESAC Long Range Plan recognized the quasi-symmetric stellarator as “the leading US approach to developing disruption-free, low-recirculating-power fusion configurations”. To deliver the ambitious Decadal Vision for Commercial Fusion Energy, we must establish a persuasive stellarator program in parallel to the tokamak one: the stellarator will prove to be a better path to a reactor if theoretical predictions are confirmed and novel optimization techniques and strategies work as desired. Since the release of the Long Range Plan in 2020, stellarators have arguably made the most significant advances of all fusion concepts. Groundbreaking results from W7-X demonstrated low neoclassical transport and the successful operation of the island divertor. Advances in theory and modeling now allow us to minimize turbulent transport, to achieve equilibria with precise quasisymmetry, to reduce neoclassical transport and fast ion loss to levels far below what has been previously achieved, and to minimize the effect of coil manufacturing errors. If realized, these advances will lead to cost-effective stellarator designs with confinement comparable to tokamaks but without the fundamental challenges of disruptions and current drive.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Leadership and Community Engagement in Chile: Deploying Net-Zero Technologies and Solutions

The report presents the 2023 Net Zero World Chile program results from activities of the the four program workstreams: 1) energy-system wide modeling LEAP modeling and analysis results including accelerated Net Zero scenarios with aggressive energy efficiency improvements, fuel switching, and electrification across demand sector; 2) district energy chapter provides thermal district energy systems modeling results of the Recoleta-Independencia pilot project and comparative analysis of district energy systems' potential versus competing technologies in Chile; 3) just transition action steps for the creation of a sister city relationship between Tocopilla and a US counterpart city; and 4) power decarbonization capacity building activities focused on the selection and adoption of grid-enhancing technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Zero Energy University Campuses: A 2018 Progress Update on Reaching Campus Energy Goals: Preprint

Many universities have aggressive energy-reduction and climate action plans. To reach these goals, leading universities have developed a suite of common energy-efficiency and renewable generation strategies. In this paper, we present a common set of approaches across the following areas: zero energy campus definitions and planning, best practices for including energy targets in new construction procurement contracts and design guidelines, implementing pilot new construction zero energy projects, aggressively implementing best-in-class laboratory energy-efficiency strategies, planning for and optimizing on-site and off-site renewable energy projects, and high-performance district energy systems. Best practices are compiled from various experiences, including programs funded by the U.S. Department of Energy, Energy Efficiency and Renewable Energy program. The summary of these best practices is to reduce campus energy use and then meet the remaining campus energy needs with renewable energy. The fivestep process to developing and implementing campus energy-reduction plans is described: 1) determine baseline energy consumption, 2) analyze technology options, 3) develop a plan and set priorities, 4) implement the plan, and 5) evaluate progress. The process follows a logical hierarchy of actions to evaluate options by energy sector and set specific targets. It encompasses all energy systems on campus, recognizing that campus-wide measures have increased potential for reducing energy use. Common strategies are explained along with examples and results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Zero Energy University Campuses: A 2018 Progress Update on Reaching Campus Energy Goals

Many universities have aggressive energy-reduction and climate action plans. To reach these goals, leading universities have developed a suite of common energy-efficiency and renewable generation strategies. In this paper, we present a common set of approaches across the following areas: zero energy campus definitions and planning, best practices for including energy targets in new construction procurement contracts and design guidelines, implementing pilot new construction zero energy projects, aggressively implementing best-in-class laboratory energy-efficiency strategies, planning for and optimizing on-site and off-site renewable energy projects, and high-performance district energy systems. Best practices are compiled from various experiences, including programs funded by the U.S. Department of Energy, Energy Efficiency and Renewable Energy program. The summary of these best practices is to reduce campus energy use and then meet the remaining campus energy needs with renewable energy. The fivestep process to developing and implementing campus energy-reduction plans is described: 1) determine baseline energy consumption, 2) analyze technology options, 3) develop a plan and set priorities, 4) implement the plan, and 5) evaluate progress. The process follows a logical hierarchy of actions to evaluate options by energy sector and set specific targets. It encompasses all energy systems on campus, recognizing that campus-wide measures have increased potential for reducing energy use. Common strategies are explained along with examples and results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an AC Module System: Final Technical Report

The GreenRay Inc. program focused on simplifying solar electricity and making it affordable and accessible to the mainstream population. This was accomplished by integrating a solar module, micro-inverter, mounting and monitoring into a reliable, 'plug and play' AC system for residential rooftops, offering the following advantages: (1) Reduced Cost: Reduction in installation labor with fewer components, faster mounting, faster wiring. (2) Maximized Energy Production: Each AC Module operates at its maximum, reducing overall losses from shading, mismatch, or module downtime. (3) Increased Safety. Electrical and fire safety experts agree that AC Modules have significant benefits, with no energized wiring or live connections during installation, maintenance or emergency conditions. (4) Simplified PV for a Broader Group of Installers. Dramatic simplification of design and installation of a solar power system, enabling faster and more efficient delivery of the product into the market through well-established, mainstream channels. This makes solar more accessible to the public. (5) Broadened the Rooftop Market: AC Modules enable solar for many homes that have shading, split roofs, or obstructions. In addition, due to the smaller building block size of 200W vs. 1000W, homeowners with budget limitations can start small and add to their systems over time. Through this DOE program GreenRay developed the all-in-one AC Module system with an integrated PV Module and microinverter, custom residential mounting and performance monitoring. Development efforts took the product from its initial concept, through prototypes, to a commercial product sold and deployed in the residential market. This pilot deployment has demonstrated the technical effectiveness of the AC Module system in meeting the needs and solving the problems of the residential market. While more expensive than the traditional central inverter systems at the pilot scale, the economics of AC Modules become more and more favorable as the product matures and is made in high volumes. GreenRay's early customers have been highly enthusiastic about the AC Module system benefits.

14 SOLAR ENERGY↗

Closure End States for Facilities, Waste Sites, and Subsurface Contamination

The United States (U.S.) Department of Energy (DOE) manages the largest groundwater and soil cleanup effort in the world. DOE’s Office of Environmental Management (EM) has made significant progress in its restoration efforts at sites such as Fernald and Rocky Flats. However, remaining sites, such as Savannah River Site, Oak Ridge Site, Hanford Site, Los Alamos, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, and West Valley Demonstration Project possess the most complex challenges ever encountered by the technical community and represent a challenge that will face DOE for the next decade. Closure of the remaining 18 sites in the DOE EM Program requires remediation of 75 million cubic yards of contaminated soil and 1.7 trillion gallons of contaminated groundwater, deactivation & decommissioning (D&D) of over 3000 contaminated facilities and thousands of miles of contaminated piping, removal and disposition of millions of cubic yards of legacy materials, treatment of millions of gallons of high level tank waste and disposition of hundreds of contaminated tanks. The financial obligation required to remediate this volume of contaminated environment is estimated to cost more than 7% of the to-go life-cycle cost. Critical in meeting this goal within the current life-cycle cost projections is defining technically achievable end states that formally acknowledge that remedial goals will not be achieved for a long time and that residual contamination will be managed in the interim in ways that are protective of human health and environment. Formally acknowledging the long timeframe needed for remediation can be a basis for establishing common expectations for remedy performance, thereby minimizing the risk of re-evaluating the selected remedy at a later time. Once the expectations for long-term management are in place, remedial efforts can be directed towards near-term objectives (e.g., reducing the risk of exposure to residual contamination) instead of focusing on long-term cleanup requirements. An acknowledgement of the long timeframe for complete restoration and the need for long-term management can also help a site transition from the process of pilot testing different remedial strategies to selecting a final remedy and establishing a long-term management and monitoring approach. This approach has led to cost savings and the more efficient use of resources across the Department of Defense complex and at numerous industrial sites across the U.S. Defensible end states provide numerous benefits for the DOE environmental remediation programs including cost-effective, sustainable long-term monitoring strategies, remediation and site transition decision support, and long-term management of closure sites.

environmental remediation↗

Closure End States for Facilities, Waste Sites, and Subsurface Contamination - 12543

The United States (U.S.) Department of Energy (DOE) manages the largest groundwater and soil cleanup effort in the world. DOE's Office of Environmental Management (EM) has made significant progress in its restoration efforts at sites such as Fernald and Rocky Flats. However, remaining sites, such as Savannah River Site, Oak Ridge Site, Hanford Site, Los Alamos, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, and West Valley Demonstration Project possess the most complex challenges ever encountered by the technical community and represent a challenge that will face DOE for the next decade. Closure of the remaining 18 sites in the DOE EM Program requires remediation of 75 million cubic yards of contaminated soil and 1.7 trillion gallons of contaminated groundwater, deactivation and decommissioning (D and D) of over 3000 contaminated facilities and thousands of miles of contaminated piping, removal and disposition of millions of cubic yards of legacy materials, treatment of millions of gallons of high level tank waste and disposition of hundreds of contaminated tanks. The financial obligation required to remediate this volume of contaminated environment is estimated to cost more than 7% of the to-go life-cycle cost. Critical in meeting this goal within the current life-cycle cost projections is defining technically achievable end states that formally acknowledge that remedial goals will not be achieved for a long time and that residual contamination will be managed in the interim in ways that are protective of human health and environment. Formally acknowledging the long timeframe needed for remediation can be a basis for establishing common expectations for remedy performance, thereby minimizing the risk of re-evaluating the selected remedy at a later time. Once the expectations for long-term management are in place, remedial efforts can be directed towards near-term objectives (e.g., reducing the risk of exposure to residual contamination) instead of focusing on long-term cleanup requirements. An acknowledgement of the long timeframe for complete restoration and the need for long-term management can also help a site transition from the process of pilot testing different remedial strategies to selecting a final remedy and establishing a long-term management and monitoring approach. This approach has led to cost savings and the more efficient use of resources across the Department of Defense complex and at numerous industrial sites across the U.S. Defensible end states provide numerous benefits for the DOE environmental remediation programs including cost-effective, sustainable long-term monitoring strategies, remediation and site transition decision support, and long-term management of closure sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗