Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 541 records · Page 30

Chapter 3: Commercial and Industrial Lighting Controls Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

This Commercial and Industrial Lighting Controls Evaluation Protocol (the protocol) describes methods to account for energy savings resulting from programmatic installation of lighting control equipment in large populations of commercial, industrial, government, institutional, and other nonresidential facilities. This protocol does not address savings resulting from changes in codes and standards, or from education and training activities. When lighting controls are installed in conjunction with a lighting retrofit project, the lighting control savings must be calculated parametrically with the lighting retrofit project so savings are not double counted.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 2: Commercial and Industrial Lighting Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

The Commercial and Industrial Lighting Evaluation Protocol (the protocol) describes methods to account for gross energy savings resulting from the programmatic installation of efficient lighting equipment in large populations of commercial, industrial, and other nonresidential facilities. This protocol does not address savings resulting from changes in codes and standards, or from education and training activities. A separate Uniform Methods Project (UMP) protocol, Chapter 3: Commercial and Industrial Lighting Controls Evaluation Protocol, addresses methods for evaluating savings resulting from lighting control measures such as adding time clocks, tuning energy management system commands, and adding occupancy sensors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Light Water Reactor Sustainability Program Integrated Program Plan

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors. 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals. 3. Develop sustainable nuclear fuel cycles. 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Regulatory Risk Reduction for Advanced Reactor Technologies: FY 2017 Framework Modernization Proposals and Status

The regulatory framework governing the licensing of commercial nuclear power plants in the U.S. developed over recent decades with a strong emphasis towards assessing large light water reactor (LWR) safety. However, recent shifts in energy market needs and priorities has brought new and different types of nuclear technologies into consideration for applications that include but are not limited to electric power generation. In order to realize the benefits in efficiency, reliability and safety that advanced (non-LWR) can potentially offer, efforts are needed to modernize the existing regulatory framework to make technical licensing requirements more compatible with radically new nuclear technologies. To serve the needs of the energy market, this update should be performed on a schedule conducive to deployments projected to begin as early as 2025. Beginning in 2016, an initiative was launched to amend the U.S. nuclear power reactor licensing framework by making the technical requirements contained therein more generically compatible with non LWR technology. The Licensing Modernization Project (LMP) was established as an industry-led team of subject matter experts managed by Southern Company Services and supported through a cost sharing arrangement with the U.S. Department of Energy (DOE). Technical and programmatic coordination for the effort was also provided by the Nuclear Energy Institute (NEI), the Licensing Department of the Advanced Reactor Technologies (ART) Program located at the Idaho National Laboratory (INL), and others.

42 ENGINEERING↗

Integrated simulations for fusion research in the 2030's time frame (white paper outline)

This white paper presents the rationale for developing a community-wide capability for whole-device modeling, and advocates for an effort with the expectation of persistence: a long-term programmatic commitment, and support for community efforts. Statement of 2030 goal (two suggestions): (a) Robust integrated simulation tools to aid real-time experimental discharges and reactor designs by employing a hierarchy in fidelity of physics models. (b) To produce by the early 2030s a capability for validated, predictive simulation via integration of a suite of physics models from moderate through high fidelity, to understand and plan full plasma discharges, aid in data interpretation, carry out discovery science, and optimize future machine designs. We can achieve this goal via a focused effort to extend current scientific capabilities and rigorously integrate simulations of disparate physics into a comprehensive set of workflows.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Arc Parameter Modeling (Arc Breakdown Experiments and Modeling: Confined Geometries and Alternate Gap Materials)

Sandia Nationa.l Laboratories (SNL) and The Boeing Company (Boeing) collaborated on this PTS to develop the capability to predict thermal and electrical characteristics of short arcs that may appear in equipment subjected to transient currents of hundreds or thousands of amperes. The final tasks of this CRADA included experiments and computer simulations used to investigate the effect of an arc breakdown between two planar electrodes and confined by various potting materials. The arc is generated by a current waveform with a rise of 8 μs and a 20 μs fall time. Voltage, current and light emissions are recorded. The developing shock wave is observed with an optical fiber embedded in the potting material and recorded using a photonic Doppler velocimetry (PDV) diagnostic system. The experiments were modeled using the ALEGRA-MHD simulation code and comparisons are made between the experiments and simulations. This product contains Protected CRADA Information which was produced December 2015 under CRADA No. 1651. l 5 and is not to be further disclosed for a period of 5 years from the date it was produced except as expressly provided for in the CRADA. Further dissemination only as authorized by the originating partners: the Boeing Company and Sandia National Laboratories Radiation Sciences Center, or higher U.S. Department of Energy programmatic authority. Please note that the project leads from both SNL and Boeing have all retired or left for other reasons at the time of the creation of this document. The final project manager collected information for this document from the final proposal and the final report.

36 MATERIALS SCIENCE↗

Conceptual Biorefinery Design and Research Targeted for 2022: Hydrothermal Liquefacation Processing of Wet Waste to Fuels

The Department of Energy Bioenergy Technologies Office (BETO) invests in research and development of new pathways for commercially viable conversion of biomass into drop-in ready transportation fuels, fuel blendstocks and products. The primary emphasis has been on terrestrial and algae feedstocks, but more recently BETO has begun to explore the potential of wet wastes for biofuel production, with focus on wastewater residuals, manure, food waste, and fats, oils and grease. A recent resource analysis estimates that 77 million dry tons per year of these wastes are generated annually, 65% of which are underutilized for any beneficial purpose. Approximately 14 million dry tons of the total resource is wastewater residuals (sludge and biosolids) generated at the nation’s wastewater treatment plants (WWTPs). Conversion of this resource into transportation fuels could significantly contribute to the creation of a new domestic bioenergy and bioproduct industry, while providing an economically and environmentally sustainable alternative for current waste disposal practices. Hydrothermal liquefaction (HTL) is a process that uses hot, pressurized water in the condensed phase to convert biomass to a thermally stable oil product, also known as “biocrude”, which can then be thermo-catalytically upgraded to hydrocarbon fuel blendstocks. HTL is conceptually simple, has a high carbon efficiency, and can be applied to a wide range of wet feedstocks at similar processing conditions. The purpose of this report is to document the conceptual design, economics and supporting data for a sludge-to-fuel pathway via HTL and biocrude upgrading. The configuration includes a HTL plant that is co-located with a WWTP and a larger scale biocrude upgrading plant for production of hydrocarbon fuel blendstocks. Experimental data from bench scale testing of a 1:1 mixture of primary:secondary sludges are used to establish the economic and technical assumptions for the analysis. The design represents a goal case for the pathway, targeting performance that is anticipated to be achievable by 2022 with further research and development. The year 2022 is BETO’s target year for verification of hydrocarbon biofuel pathways. As this analysis represents a goal case, assumed values of several design parameters represent improvements in the technology relative to what has currently been demonstrated in the laboratory. While HTL is fairly well developed and may therefore be ready for commercialization prior to 2022, there are specific advancements addressed in this analysis that are necessary to enhance performance compared to what has been demonstrated to date. In addition, an important aspect to the pathway is the upgrading of biocrude to fuel blendstock, an area that has received much less attention and requires significant research to validate the goal case performance parameters. The estimated plant gate minimum fuel selling price for fuel blendstock from sludge HTL and upgrading is $3.46/gasoline gallon equivalent (gge). This price is within the tolerance (+$0.49/gge) of BETO’s $3/gge programmatic cost target and illustrates that fuel blendstocks generated from HTL of sludge and centralized biocrude upgrading have the potential to be competitive with fossil fuels. This analysis illustrates the feasibility of HTL for point-of-generation conversion of waste feedstock at a scale 1/20th that of the standard lignocellulosic biorefinery scale typically used in BETO design cases. The relevance of this work reaches beyond wastewater treatment sludge to lay the groundwork for application to other distributed wet wastes and blends that together represent a significant resource of underutilized biomass.

09 BIOMASS FUELS↗

University of Texas Safeguards by Design Problem Statement

This document describes the problem statement that students at the University of Texas will use for their senior level capstone design class. The purpose of this project is to introduce students to Safeguards by Design concepts as part of their capstone design course at the culmination of their degree program. This work is supported by Los Alamos National Laboratory with FY17 and FY18 programmatic funding from the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), through the Office of Defense Nuclear Nonproliferation (DNN), Office of International Nuclear Safeguards (INS), Next Generation Safeguards Initiative (NGSI), Human Resource Development Program, Safeguards by Design Project.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Double-shell target fabrication workshop-2016 report

On June 30, 2016, over 40 representatives from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), General Atomics (GA), Laboratory for Laser Energetics (LLE), Schafer Corporation, and NNSA headquarter attended a double-shell (DS) target fabrication workshop at Livermore, California. Pushered-single-shell (PSS) and DS metalgas platforms potentially have a large impact on programmatic applications. The goal of this focused workshop is to bring together target fabrication scientists, physicists, and designers to brainstorm future PSS and DS target fabrication needs and strategies. This one-day workshop intends to give an overall view of historical information, recent approaches, and future research activities at each participating organization. Five topical areas have been discussed that are vital to the success of future DS target fabrications, including inner metal shells, foam spheres, outer ablators, fill tube assembly, and metrology.

36 MATERIALS SCIENCE↗

The Multidisciplinary Drifting Observatory for the Study of Arctic Climate (MOSAIC) Atmosphere Science Plan

Arctic climate change is amplified relative to global change, and is embodied by a dramatic decline in the perennial sea-ice pack. These cryospheric transitions carry significant implications for regional resource development, geopolitics, and global climate patterns. Indeed, the changing arctic cryosphere is considered a grand challenge for global climate research. Arctic change, and its linkages with the global system, must be understood. Additionally, there is a growing stakeholder community that requires improved sea-ice forecasting for many applications. To make progress on these important issues requires developing a detailed, process-level understanding of the coupled climate system that can help to address the numerous deficiencies in numerical model representations of the Arctic. Such an understanding is only possible by making targeted, interdisciplinary measurements within the central arctic sea-ice environment. The Multidisciplinary drifting Observatory for the Study of Arctic Climate (MOSAiC) initiative has been developed in response to these great challenges. It comprises three parts: 1) An intensive, icebreaker-based observatory that will freeze in, and drift with, the arctic sea ice for a full annual cycle making interdisciplinary measurements in the atmosphere, sea ice, upper ocean, and biosphere; 2) A distributed network of targeted, autonomous measurements to characterize spatial variability on model grid-box scales; and 3) Coordinated, multiscale analysis and modeling activities. MOSAiC is a major, international effort that will involve participation of many different agencies and entities. The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility is uniquely positioned to play a critical role in this initiative by providing a comprehensive instrument suite to characterize the atmosphere and its interactions with the sea-ice surface. ARM will deploy its second Mobile Facility (AMF2) and Mobile Aerosol Observing System (MAOS) at the MOSAiC central observatory as it drifts through the central Arctic for a 13-month campaign starting in September 2019. Sea-ice is an integrator of energy fluxes in the coupled arctic climate system; thus, atmosphere-ice-ocean processes impacting the flow of energy through this system in all seasons are the primary target of MOSAiC. The broader, collaborative MOSAiC initiative will allow for many interdisciplinary studies along this theme. ARM’s involvement will target specific areas related to the atmosphere and atmosphere-surface interactions that are critically under-observed in the Arctic, are leading contributors to model uncertainties in the region, and are programmatically important to DOE research and modeling programs. The guiding science themes for this project include: (1) The surface energy budget of sea ice; (2) Clouds and precipitation; (3) Aerosols; and (4) The atmospheric boundary layer. Many fundamental issues concerning these themes are lacking in observational constraints, particularly in the arctic winter and through consecutive seasons. For example, little is known about the energy budget of first-year sea ice, the annual cycle of central arctic aerosol concentrations, the spatial organization of cloud-precipitation systems relative to sea-ice heterogeneity, the winter boundary-layer evolution, or cloud-surface coupling processes over sea ice. The proposed ARM observations will be groundbreaking in many ways, and will ultimately have a dramatic impact on the arctic research community and its ability to represent coupled arctic processes in numerical models.

North Slope of alaska, Arctic sea ice, Barrow, Arc↗

FY14 Laboratory Directed Research and Development Annual Report

This report summarizes progress from the Laboratory Directed Research and Development (LDRD) program during fiscal year 2014. In addition to the programmatic and financial overview, the report includes progress reports from 419 individual R&D projects in 16 categories. Information for 176 projects in their final year is presented in a more comprehensive format, while for those 243 in their pre-final years, only an abstract is presented herein.

99 GENERAL AND MISCELLANEOUS↗

Science and Engineering Team Repository Selection and Validation

The National Nuclear Security Administration’s Office of Nuclear Smuggling Detection and Deterrence (NSDD), Science and Engineering Team (SET) has engaged Brookhaven National Laboratory (BNL) in the selection, development and management of a knowledge management platform. This platform will serve as a repository for programmatic documents, data, and other relevant files. In support of this effort, BNL implemented a sixteen-month process to ensure the selection of the most relevant and user-friendly repository from among several commercially available and open source options.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SRNL 2017 LDRD Annual Report

Fiscal Year (FY) 2017 marked the twelfth year of Savannah River National Laboratory’s (SRNL’s) Laboratory Directed Research and Development (LDRD) program and the largest year to date. When the program began in FY06, just two years after SRNL becoming the DOE’s 17th national lab, it began with a modest authorized collection rate of just under 1.5%. It grew from there each year, reaching 4% in FY11. FY17 marked the first increase in the authorized collection rate since FY11, increasing from 4% to 5%. This increase highlights the value placed on this important program, which provides the discretionary funding needed to develop ideas for future programmatic growth in our key business areas of environmental stewardship, national security, nuclear materials management, and secure energy manufacturing, as well as develop and maintain our core competencies. The LDRD program leverages the unique capabilities of SRNL to yield foundational scientific research and development (R&D) essential to our core business areas, while aligning optimally and continuously with SRNL’s Strategic Plan and providing long-term benefits to DOE and the National Nuclear Security Administration (NNSA), other customers, and stakeholders. As can be seen in the “By the Numbers” summary, this program also plays an important role in sustaining staff excellence with high participation by students, post-docs, and early-career staff. Over 75% of the projects in FY17 included contributions from early-career or post-doctoral staff.

99 GENERAL AND MISCELLANEOUS↗

Enhancing GADRAS Source Term Inputs for Creation of Synthetic Spectra

The Gamma Detector Response and Analysis Software (GADRAS) team has enhanced the source term input for the creation of synthetic spectra. These enhancements include the following: allowing users to programmatically provide source information to GADRAS through memory, rather than through a string limited to 256 characters; allowing users to provide their own source decay database information; and updating the default GADRAS decay database to fix errors and include coincident gamma information.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Final Report for the Contractor Readiness Assessment of the Transient Reactor Test Facility Resumption of Transient Testing Activity at the Idaho National Laboratory

The purpose of this review was to verify readiness for the TREAT restart of transient testing activity at the INL and inform the startup authorization authority decision-making for startup authorization by providing a deliberate and managed determination of the state of readiness preparation and determination of whether operations can be performed safely. Verification of readiness included assuring that equipment operability, procedure viability, and personnel knowledge, skills, and performance are adequate for operations. Because the TREAT (including restart of transient testing activity) is a hazard category-2 nuclear facility and because reactor operation and transient testing activities were suspended for programmatic and funding reasons in excess of a year, DOE O 425.1D required that both a contractor and DOE RA be satisfactorily completed prior to startup of the TREAT and restart of transient testing activity. To this end, DOE directed that a CRA and federal RA be conducted. The CRA IP defined the depth of the CRA through the objectives and CRADs, delineated in Appendix A of the IP; established roles and responsibilities for CRA team activities; and established processes, practices, and protocols for preparation, conduct, documentation, and reporting of the CRA. The approaches and methodologies identified in the IP were used to verify that the BEA management team has established SSCs, developed personnel capabilities and competencies, and implemented safety features, programs, and procedures in a manner that provides reasonable assurance for adequate protection of workers, the public, and the environment in preparation for and execution of the TREAT restart of transient testing activity. This CRA was intended to confirm that (1) the facility is in a state of readiness to safely conduct operations in accordance with the safety basis; and (2) the management control programs are in place to ensure safe operations can be sustained. This equated to mature implementation of the integrated safety management (ISM) in conjunction with implementation of the individual facility authorization basis. This CRA was structured to verify the readiness to conduct restart of transient testing activity safely, and that facility programs were in place to support the restart of transient testing activity.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Accident-Tolerant Fuel Performance and Reliability for Aggressive iPWR/SMR Operation

This project will develop a process that evaluates the whole-core operational and safety performance of a reactor-and-fuel combination by integrating core-wide three-dimensional neutronics with Moose/Bison and Peregrine multi-physics fuel performance assessments using explicit time and space dependent fuel rod operational power histories generated in the whole-core analysis. Demonstration of the process will target large contemporary PWRs with traditional UO2 fuel and Zircaloy cladding to establish a baseline analysis, while the innovative application of this project will extend the developed process to evaluate operational and safety performance, via reactor physics and fuel performance analyses, of key emerging/leading concepts of enhanced Accident Tolerant Fuels (ATFs) within increasingly aggressive operational scenarios such as loadfollow maneuvers in PWRs and long-cycle rodded and unborated operation in small modular reactors (SMRs). The ATFs to be considered include standard UO2 fuel pellets cladded with advanced iron-based alloys (FeCrAl) as well as particle-based Fully Ceramic Microencapsulated (FCM) fuels with FeCrAl or Zircaloy cladding, but the process being developed and demonstrated could ultimately be applied to any candidate ATF concept in a light water reactor. In fact, given that ATF R&D priorities are in a dynamic state, the scope related to ATFs will be targeted for the second half of this three-year project so to provide some opportunity to strengthen the programmatic alignment of this project with the DOE Fuels Campaign, by identifying the most promising and relevant ATFs at that time for further evaluation, while the early part of the project will focus upon fine-tuning the process herein developed and upon generating the baseline analyses against which a larger scope of ATF concepts can be compared.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Licensing Modernization Project for Advanced Reactor Technologies: FY 2018 Project Status Report

The promise of new nuclear technology and the future of commercial power in the United States (U.S.) are linked to the existence of an efficient and safety-focused regulatory review and licensing process. With an appropriate regulatory framework, reactor suppliers and regulators can design, license, build, and export advanced reactor units more effectively and efficiently and thereby help meet the growing need for clean and reliable energy. To help address the challenge of maintaining compatibility between the regulatory environment and new commercial nuclear plant designs, the U.S. Department of Energy (DOE) is supporting an industry-led effort called the Licensing Modernization Project (LMP). This cost-shared initiative, started in 2016 and scheduled to continue through mid-2019, targets amendment to key elements of the U.S. nuclear power reactor regulatory framework to specifically address licensing barriers in advanced-reactor concepts. The project is focused on updating guidance for certain technical licensing requirements that are largely incompatible with non-light-water reactors (non-LWR) and establish a new pathway for design-safety evaluations and license-application development. Upon completion, the project will have created a new pathway, founded on modern probabilistic assessment techniques, that offers developers, suppliers, regulators, and owner/operatorowner-operators greater clarity and assurance in design and licensing decisions. The LMP employs a team of advanced reactor technology and licensing subject matter experts working closely with U.S. regulators, affected industries, and interested members of the public. The project is managed by Southern Company and supported through a cost share arrangement with DOE. Technical contributions are also provided to the project from the Idaho National Laboratory (INL) Regulatory Development area, the Nuclear Energy Institute (NEI), and the U.S. Nuclear Regulatory Commission (NRC). The LMP identified a suite of high priority issues that provided significant uncertainty within the regulated non-LWR community. It was determined that much of this uncertainty could be retired by issuing updated licensing guidance founded on safety performance demonstrations and modern probabilistic methodologies. The success criteria for the project were established as: • Generate sets of technology inclusive (TI), risk-informed, and performance-based (TI-RIPB) technical requirements, recommendations, and proposals that could be reviewed, amended, and adopted for use by both NRC staff and industry. The proposals would create an optional-use regulatory framework without imposing additional (i.e., mandatory) requirements. • Support LMP the recommended updates of LMP such that they can be finalized, endorsed by NRC, and used by applicants within 5 years. This also supports the DOE advanced- reactor development and deployment goal of completing licensing reviews for technically mature non-LWR concepts sufficient to allow construction to proceed by the early 2030’s. • Further overall programmatic objectives established by DOE’s Gateway for Accelerated Innovation in Nuclear (GAIN) initiative by resolving technology-inclusive policy issues that adversely impact regulatory reviews, siting, permitting, and/or licensing of non-LWRs. This would provide significantly more regulatory certainty for advanced reactor developers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2017 BEA Self-Assessment Report for Idaho National Laboratory

This report provides Battelle Energy Alliance’s (BEA) self-assessment of performance for the period of October 1, 2016, through September 30, 2017, as evaluated against the goals, performance objectives, and notable outcomes defined in the Fiscal Year (FY) 2017 Performance Evaluation and Measurement Plan (PEMP). BEA took into consideration and consolidated all input provided from internal and external sources (e.g., Contractor Assurance System [CAS], program and customer feedback, external and independent reviews, and Department of Energy [DOE] Idaho Operations Office [ID] quarterly PEMP reports and Quarterly Evaluation Reports). After considering the information related to performance during the rating period, including feedback from the Office of Nuclear Energy (NE), Idaho Operations Office (ID), and other programmatic sponsors, BEA has self-assessed the Laboratory’s performance at a grade of A, an adjectival rating of “Excellent.” Table 1 documents BEA’s assessment of performance to the goals and individual performance Objectives. Table 2 documents completion of the Notable Outcomes. A more-detailed assessment of performance for each individual performance objective is documented in the closeout reports (see the PEMP reporting system). Table 3 includes an update to “Performance Challenges” as reported in the FY 2016 Self-Assessment Report.

99 GENERAL AND MISCELLANEOUS↗