Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Enhancing performance assessments using the ASCEM tool-set - 15222

The Office of Soil and Groundwater Remediation within the U.S. Department of Energy's Office of Environmental Management (EM) is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is an open source and modular computing framework that incorporates new advances and tools for predicting contaminant fate and transport in natural and engineered systems. ASCEM integrates modeling tools into a common work-flow that facilitates integrated approaches to modeling and site characterization, and enables robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project includes collaboration with end users engaged in performance assessments and subsurface simulation. Two working groups are engaged in performance assessment activities at the Hanford Site and Savannah River Site (SRS). The Hanford Site working group is focused on evaluating an alternative conceptual model that includes fine-scale heterogeneities. The baseline conceptual model for the performance assessment includes the large-scale stratigraphy at the site. The working group is applying the ASCEM tool-set to develop and evaluate alternative conceptual models and evaluate the effect of heterogeneities on long-term transport under rainfall-driven conditions. Because the heterogeneous models require long compute times due to increased model complexity, the simulations are implemented on a high-performance computing platform to reduce simulation times. The ASCEM Akuna work-flow enables efficient organization, simulation execution, and processing and visualization of results. Current performance assessments for waste tank closure at the SRS are limited to two-dimensional axi-symmetric representations. The SRS working group is collaborating with the site contractor to address technical review issues by resolving fine-scale tank features and simulating three-dimensional flow with Richards equation for selected closure scenarios using the ASCEM simulator, Amanzi. The Akuna tool-set is being applied to support model setup, sensitivity analysis, uncertainty quantification, and visualization. Both of the ASCEM working groups are addressing issues that cannot readily be evaluated with the existing tools. In these efforts, ASCEM is being used to provide technical underpinnings for ongoing performance assessments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Three-dimensional modeling: communicating risk to inform site cleanup priorities - 15238

Three-dimensional waste site models are being created at the Department of Energy's Hanford Site in southeastern Washington State as an important visualization tool for risk communication and remediation planning. When concluded, the user will have a detailed, three-dimensional subsurface view of waste sites, pipelines and facilities located in the Central Plateau portion of the site with respect to a hydrogeologic solids model of the area. This will enhance communication between the site contractor and primary points of contact, such as the government and the public. It will also allow users to plan for future projects to be completed on-site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational plant lifetime assessment - UK national nuclear laboratory experience - 15366

Inspection and monitoring of the condition of key plant assets at the Sellafield Site is an important task in helping to enable the continued operation of the reprocessing and waste management facilities. This takes place within a range of environments, from non-active areas to highly active black cells where no man-access is possible. NNL staff work closely with the plant operators and other contractors in carrying out inspection and monitoring tasks, and have a particular expertise in the black cell environments where increased challenges exist. As plants age more work is required in order to underpin ongoing operations and understand the operational lifetime of key assets in order to achieve maximum throughput and utilisation. This paper discusses how expertise in a variety of different technical disciplines is combined in order to both understand and extend the operational life of the Highly Active (HA) evaporators at Sellafield, and a small number of further similar examples are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Siting considerations for a deep borehole disposal facility - 15403

This paper describes considerations for siting and designing a facility for deep borehole disposal of spent nuclear fuel (SNF) and/or high-level radioactive waste (HLW). Technical considerations include geological, hydrogeochemical, and geophysical characteristics that are related to the suitability of the site for deep drilling and borehole construction, waste emplacement activities, waste isolation (seals and surrounding geology), and long-term safety of the deep borehole disposal system. Logistical factors to be considered include: local or regional availability of drilling contractors (equipment, services, and materials) capable of drilling a large-diameter hole to approximately 5,000 m depth; construction of surface facilities and waste handling and emplacement equipment; legal and regulatory requirements associated with drilling, operation, and post-closure; and access to transportation systems. Social and political considerations include the distance from population centers and the support or opposition of local and state entities and other stakeholders to the facility and its operations. These technical, logistical, and socio-political factors are examined in the context of a consent-based siting process for a deep disposal borehole, which would be the first phase in developing an operating facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE nuclear safety research and development program - 15413

A corporate Nuclear Safety Research and Development (NS R and D) Program has been established by the U.S. Department of Energy (DOE), managed by the Office of Nuclear Safety in DOE's Office of Environment, Health, Safety and Security (EHSS). Among the objectives of the program are the identification, support, and dissemination of the results of R and D to address cross-cutting nuclear safety issues relevant to the design, construction, and operation of DOE civilian and defense nuclear facilities. Most of the projects supported by the NSR and D Program are selected from responses to an annual Call for Proposals, which is distributed to the National Nuclear Security Administration (NNSA) and DOE Program Offices, and to the contractors operating DOE and NNSA nuclear facilities. Additional NSR and D projects have been initiated by the Office of Nuclear Safety to support the Office's mission of developing DOE nuclear safety policy. The Office of Nuclear Safety continues to work closely with NNSA and DOE program offices to expand the number and scope of NSR and D projects, and to look for opportunities to collaborate with other organizations to identify and study nuclear safety issues relevant to DOE's nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization of GIS technology to support development of flow and contaminant fate and transport models at US DOE sites - 15457

U.S. Department of Energy (DOE) sites have accumulated years of data and millions of spatial and temporal records related to the hydrological cycle, contaminant transport, and parameters of remediation technologies. In addition, numerical models which use field monitoring data to help understand flow and transport produce gigabytes of computed spatial and temporal data for each computation node. There is a need therefore for an advanced spatial data structure that can be used to address the management, processing, and analysis of spatial and temporal numerical modeling data derived from multiple sources. This can be accomplished using a geo-database. The development of an ArcSDE geo-database facilitates the centralized storage, backup, accessibility, organization, and management of model configuration and computed simulation data, putting it into a structured, coherent, and logical computer-supported system. GIS data processing and automation would enable faster and hence more complex analyses of field test data. The Applied Research Center (ARC) at Florida International University (FIU) has provided analysis of flow and transport for several watersheds at DOE's Oak Ridge Reservation (ORR), including East Fork Poplar Creek (EFPC), Upper EFPC in the Y-12 National Security Complex area (Y-12 NSC) and White Oak Creek (WOC). Integrated surface and subsurface flow, fate and transport models were developed to provide analysis of contaminant patterns within each watershed. In addition, digital monitoring data available from the Oak Ridge Environmental Information System (OREIS) related to mercury (Hg) contamination and remediation within these watersheds was used for calibration and verification of the model. Experimental studies were also carried out which provided kinetic and equilibrium data about important parameters related to Hg transport, speciation and methylation/demethylation kinetics within the watershed. Geographic Information Systems (GIS) technology was employed to support the modeling work through storage and geo-processing of spatial and temporal data required by the models and to produce hydrogeological maps for visualization. An ArcGIS geo-database was developed for centralized storage and management of experimental and computed model data and its capabilities were extended over the years using tools such as ModelBuilder combined with Python scripting to automate repetitive tasks, perform statistical analyses and generate maps and reports. The hydrologic geo-database model developed possesses a structure that enables linkage with scalable hydrologic modeling tools/applications to model hydrologic systems, and in this case, enables the testing of the potential impacts of various remediation scenarios on the ORR watersheds. The ArcSDE geo-database can also be used to automate and simplify the process of calling stored GIS and time series data. This geo-database can serve as a tool for contaminant flow and transport analyses which require large amounts of high-quality spatial and temporal data in order to ensure reliability and validity of modeling results. The existing geo-database structure developed for the hydrological modeling at ORR was designed to be replicable for application at other DOE sites. An investigation of downloadable free/open source GIS software along with required security protocols to facilitate online querying of the database was also conducted to determine methods by which project-derived data can be more easily shared with other project stakeholders such as DOE personnel and site contractors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress of the enhanced Hanford single shell tank (SST) integrity project - 15497

To improve understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the US DOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matter experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The change package identified two phases of work for SST integrity. The initial phase was focused on efforts to envelope the integrity of the tanks. The initial phase was divided into two primary areas of investigation: structural integrity and leak integrity. If necessary, based on the outcome from the initial work, second phase would be focused on further definition of the integrity of the tanks and liners. Combined these two phases are designed to support the formal integrity assessment of the Hanford SSTs in 2018 by an Independent Qualified Registered Engineer. As the initial phase of this work completes in early 2015, this paper summarizes the project formation and status the work of the past few years associated the implementation of the Phase one recommendations. Work in the initial phase to further define the DOE's understanding of the structural integrity SSTs involved preparing a modern Analysis of Record (AOR) using finite element analysis. Structural analyses of the SSTs have been conducted since 1957, but these analyses used analog calculations, less rigorous models, or focused on individual structures. As such, an integrated understanding of all of the SSTs has not been developed to modern expectations. In support of this effort, other activities addressed the visual inspection of tank internal conditions and the collection of concrete core samples from the tanks, including a full height tank sidewall core, for analysis of current mechanics properties. The work on the liner leak integrity has examined leaks from 25 tanks with known liner failures. Individual leak assessments were developed for each tank to identify the leak cause and location and estimate historic leak rates. A common cause/failure analysis study was performed to take data from individual tanks to look for trends in the causes of failure. A separate activity is being conducted to examine the propensity for corrosion in select SSTs with aggressive waste layers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effective Stakeholder Communications in a Changing Budgetary Environment - 15541

Effective communications allow stakeholders to maintain trust and avoid misunderstandings by building relationships that foster better teamwork, more informed decision making, and faster problem-solving. This presentation and accompanying paper will feature a case study on the Liquid Waste program of Savannah River Remediation LLC (SRR) at the Savannah River Site (SRS) in South Carolina exemplifying its effective communication strategies with stakeholders and its partnership approaches to deliver consistent, constructive, and concise communications with stakeholders. Furthermore, this presentation proposes for consideration new models for communication with stakeholders regarding funding across DOE waste cleanup sites. This presentation also proposes a model for consideration instituting a competitive set-aside incentive program for DOE contractors to foster further efficiency, innovation, and measurable progress. The set-aside pool of funding would reward DOE site's on tangible measurable benefits such as progress in meeting milestones, furthering specific environmental risk reducing life-cycle costs. Reduced budgetary funding can lead to much consternation for stakeholders, potentially causing a breakdown of years of hard-earned trust and jeopardizing future cleanup efforts. Therefore, organizations should pro-actively work together to develop a strategy to communicate effectively with stakeholders in order to assuage stakeholder concerns, mitigate risks, and continue to carry out its mission. In the face of funding reductions, effective communication can help promote better understanding by providing more information to help stakeholders understand DOE's funding allocation for each site. Furthermore, providing a set-aside competitive program could further incentivize innovation and reward progress. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford single-shell tank sidewall coring Project - 15548

As part of an enhanced Single-Shell Tank (SST) integrity project, Washington River Protection Solutions, the US DOE Hanford site Tank Operations Contractor, established an expert panel to provide recommendations for implementation of the project. In one of the main areas of interest, structural integrity, the panel recommended obtaining and testing a vertical core from the entire depth of the sidewall for SSTs that have leaked and have been operated at high temperatures for extended periods. Due to concerns over handling contaminated samples, the panel later recommended that the evaluation focus only on thermal degradation. SST 241-A-106 was selected as the best choice for sidewall coring based on heat exposure and other factors. During site preparation activities, nondestructive testing and evaluation of the exposed tank dome and sidewall was performed using impact echo, spectral analysis of surface waves, and sonic echo/impulse response acoustic wave test methods. Good results were observed in the tests performed on the dome, but results were inconclusive for the full wall height due to signal damping. Results indicated that no cracking was predicted in the upper wall. Sidewall coring of tank A-106 was completed over two weeks in May 2014. Over 38 feet of concrete core was successfully removed, to a depth approximately halfway through the tank footing. Nondestructive and destructive physical testing of the concrete core specimens was successfully performed and included visual examination and determination of transverse and longitudinal resonant frequency and dynamic modulus of elasticity; pulse velocity; static modulus of elasticity; Poisson's ratio; and compressive strength. The testing indicated favorable results with values generally greater, and in many cases significantly greater, than expected in comparison with the values originally specified and those used in the current structural analysis of record. Petrographic analysis was performed to assess the quality and condition of the concrete and the extent of any deterioration or deleterious reactions occurring within the concrete, and determined that the concrete within the examined core segments is in overall good condition, with a minor amount of microcracking and minor evidence of deleterious mechanisms that do not appear to have significantly affected the overall quality and integrity of the concrete. The results of the testing performed on the concrete core removed from the sidewall of SST 241-A-106 do not reveal any deficiencies with the structural integrity of the tank. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Low-Activity Waste Direct Feed Capability in the Waste Treatment and Immobilization Plant Project - 15594

The current design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility. The U.S. Department of Energy (DOE) has developed a strategic, phased approach to completing the WTP Project, beginning with feeding some liquid waste from the tank farms to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. To accomplish this, the DOE Office of River Protection (ORP) will construct a new capability outside WTP to remove cesium and solids from the liquid portion of the tank waste before transferring that waste to the LAW Facility. This new capability, referred to as the Low-Activity Waste Pretreatment System, is outside WTP and not included in the project's scope. The primary driver for the Direct-Feed LAW (DFLAW) approach is to enable commissioning of the LAW Facility for low-activity waste processing before the PT and High-Level Waste Facilities are complete and operational. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the High-Level Waste Facility must be refined and modified. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. In February 2014, ORP requested the WTP contractor to develop separate contract modification proposals for completing: (1) the LAW Facility, Balance of Facilities, and Analytical Laboratory work scope in the current contract through hot commissioning in a manner to accommodate a phased start of the WTP mission; and (2) initial planning and design for incorporating a permanent capability to accommodate DFLAW in the WTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Authorization to proceed with production engineering for the waste treatment and immobilization plant's high-level waste facility - 15595

The U.S. Department of Energy restricted certain engineering, procurement, and construction work on the Waste Treatment and Immobilization Plant's (WTP) Pretreatment Facility, and to a lesser degree the High-Level Waste (HLW) Facility in 2012 and early 2013 because of the impact of unresolved technical issues on the facility design, and a misalignment between the facility design and nuclear safety basis. The U.S. Department of Energy, Office of River Protection (ORP) needed a way to minimize project management risk, while continuing limited critical path construction work for the HLW Facility and resolving the technical and safety basis issues. ORP developed a process to systematically address and resolve the technical, management, and quality issues that led DOE to restrict HLW Facility production activities in 2012 and 2013. This process provided for a phased resumption of HLW engineering, procurement, and construction activities on an incremental basis and a final decision for release to full production. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the HLW Facility design. The decision to proceed with production engineering in the HLW Facility, representing the first of two decision points, was based on significant progress in resolving HLW technical issues and improving work processes to align the HLW design and safety basis. Full release for HLW equipment procurements and construction is forthcoming based on conditions that must be fully satisfied and demonstrated during a transition period expected to continue for the next few years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Individuals Who Build Solutions Across Boundaries for Environmental Remediation and Nuclear Waste Disposal - 16204

This paper profiles individuals who shifted from developing solutions primarily from within one organization to across multiple organizations for decisions requiring input from multiple parties. These individuals are engineers and scientists who work as government employees or government contractors. This paper contains six areas of discussion: 1. Why individuals build solutions across organizational boundaries, 2. The results they achieve, 3. Supporting skills and personal characteristics, 4. Means to build solutions across boundaries, 5. How they enlist others to participate, and 6. The importance of a catalyst. This paper is based on three sources of information. The primary source are interviews with nine engineers and scientists with direct experience building solutions across organizational boundaries in the fields of environmental remediation or nuclear energy/waste management and disposal. The second source are selected research studies. The third source is the author's experience both as a government employee and a consultant. The author's hope is that this paper will strengthen people's desire and ability to engage multiple parties in decisions requiring their input. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Importance of Getting it Right - Lessons from the Failure and Subsequent Approval of the LLWR Environmental Safety Case - 16691

The Low Level Waste Repository (LLWR) in the UK submitted an Environmental Safety Case in 2002 which was rejected by the Environment Agency 3 years later. Almost a decade after the rejection, the LLWR submitted a completely different document which was approved in November 2015. This paper looks at the lessons learned from the failed submission and documents the strategy employed by the Site's new contractor to overcome both the challenging technical issues that led to the initial rejection and overcome the resistance to long term disposal by the local community. It will describe the journey it has taken to move from a flawed safety case, to a technically sound safety case, to one that is approved by the regulator, and accepted by the community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Potential NCS issue process - A method to screen emerging issues

The Potential NCS Issue (PNI) Process is a newly developed methodology that allows for the screening of new information potentially adverse to nuclear criticality safety. The PNI Process allows for transparency of possible emerging issues with both contractor management and on-site regulators. Sources of PNI include the -1) discovery of potential errors, inaccuracy, or omission in an effective criticality safety evaluation, -2) field conditions not accounted for in an effective evaluation, and -3) a potential inadequacy in a supporting calculation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

International Governmental Collaboration on Best Practice in Aging Infrastructure Management - 18027

Legacy nuclear sites in the US, UK and Canada are all facing a similar challenge of completing their operational and cleanup missions in parallel in a safe, efficient and cost-effective manner. Compounding the challenge is the fact that many important facilities are old with a significant level of deferred maintenance/capital needs, resulting in the need for a strategic approach to infrastructure management to ensure that maintenance and capital funding is directed at the highest priority items and that neither operations nor ongoing Decontamination and Decommissioning (D and D) activities are compromised. To help address this challenge, a Technical Information Exchange meeting was held in Ottawa, Canada in early June 2017 which brought together responsible parties from; - Government agencies including the UK Nuclear Decommissioning Authority (NDA), US Department of Energy Environmental Management (DOE EM), US National Nuclear Security Administration (NNSA), Atomic Energy of Canada Ltd (AECL) and Canadian Department of Defense - Implementers and other Government entities including Savannah River National Laboratory, Idaho National Laboratory and Canadian Nuclear Laboratories (CNL) - Associations including representation on behalf of the Institute of Asset Management and; - Contractors including Mission Support Alliance, Mott McDonald, and Longenecker and Associates The objective of this meeting was to share information about respective 'best practices' and to begin to develop common approaches to the prioritization and management of aging infrastructure investment across the organizations. The exchange focused on identifying common critical issues which were discussed through a series of presentations and small group discussions. The outcome from the meeting was an improved understanding by all participants of the latest approaches being applied to Infrastructure Asset Management and the formation of four International Working Groups which now meet on a regular (4-6 week) basis to share lessons learned and to develop international best practice in their area of interest. This paper details; - the issues and challenges that were identified during the meeting - how these were assimilated and distilled into discrete areas to enable formation of specific Working Groups - progress made by the Working Groups to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing and Deployment of Remote Systems to Remove Highly Radioactive Soil at Hanford's 324 Building - 18043

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is in the process of procuring, testing and deploying remotely operated tools to safely remove highly contaminated soil from beneath the 324 Building on the Hanford Site in southeastern Washington State. The 324 Building operated for more than 40 years, completing a variety of high-dose engineering development and demonstration activities inside six hot cells that shielded the workers from the highly radioactive materials. Activities to decommission, decontaminate and demolish the facility began in 2008. In 2010, soil contamination was found in the soil under one of the hot cells, and building deactivation was paused to evaluate the soil contamination. Sampling efforts, using borehole technology, revealed significant under-building contamination with dose rates measuring has high as 130 Sv/hr (13,000 R/hr). The highly-contaminated soil has to be removed before traditional open air deactivation activities can continue. CHPRC completed proof of concept testing and built a full-scale test facility to demonstrate the effectiveness of three primary tools that will accomplish the floor and soil removal. The tools include a commercially available concrete saw, and a commercially available excavator arm that have been modified to operate remotely in the high-radiation environment within the hot-cell. In order to reduce the wear on the hot-cell overhead cranes, a remote operated rail and cart system has been designed to transport soil and debris out of the hot-cell to an airlock area where the waste will be separated, according to its level of radioactivity. A camera and light system has been designed to provide visual and audio coverage of the hot-cell area that will allow the operations to proceed from remote control stations. This paper will describe the primary remote operated equipment designed for the project and the challenges and processes for developing, testing and deploying the equipment necessary to excavate the soil from below the 324 Building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗