Corrosion Effects of Calcium Chloride Injection for Mercury Control on the Pollution Control Equipment
In response to the Clean Air Mercury Rule (CAMR) of 2005, Black Hills Power (BHP) initiated testing of a calcium chloride (CaCl{sub 2}) injection method in their Wygen 1 (Gillette, WY) coal-fired power plant to help lower mercury emissions. In 2006, Babcock & Wilcox (B&W) was contracted to test their CaCl{sub 2} technology in-situ by adding a CaCl{sub 2} solution onto the raw, pre-pulverized coal during normal operation of Wygen 1. Follow-up tests were conducted by BHP in 2007. Data were collected from these two time periods and analyzed by a collaborative investigation team from Western Research Institute (WRI) and the University of Wyoming (UW) to see if there were any effects on the current air pollution control systems. During a CaCl{sub 2} injection period in 2007, corrosion was monitored in the flue and recycle ash system by placing corrosion coupons in strategic locations to test if corrosion was enhanced by the CaCl{sub 2} injection. While the CaCl{sub 2} produced a reduction in stack mercury levels, there was some evidence of beneficial impacts on the removal of SO{sub 2} from the flue gas during CaCl{sub 2} injection. Data on NOx remained inconclusive. It was also discovered that corrosion was enhanced significantly in the Spray Drier Absorber (SDA) vessel and corresponding outlet ductwork during CaCl{sub 2} injections. Further studies are being carried out in the field and lab to better understand the corrosive effects of CaCl{sub 2} to help formulate operation controls to manage the increased corrosion rates.