Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2020

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Indefinite Delivery Indefinite Quantity (IDIQ) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal facilities. In formation was extracted from 195 measurement and verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost Estimate for a Proposed GDF Suez LNG Testing Program

At the request of GDF Suez, a Rough Order of Magnitude (ROM) cost estimate was prepared for the design, construction, testing, and data analysis for an experimental series of large-scale (Liquefied Natural Gas) LNG spills on land and water that would result in the largest pool fires and vapor dispersion events ever conducted. Due to the expected cost of this large, multi-year program, the authors utilized Sandia's structured cost estimating methodology. This methodology insures that the efforts identified can be performed for the cost proposed at a plus or minus 30 percent confidence. The scale of the LNG spill, fire, and vapor dispersion tests proposed by GDF could produce hazard distances and testing safety issues that need to be fully explored. Based on our evaluations, Sandia can utilize much of our existing fire testing infrastructure for the large fire tests and some small dispersion tests (with some modifications) in Albuquerque, but we propose to develop a new dispersion testing site at our remote test area in Nevada because of the large hazard distances. While this might impact some testing logistics, the safety aspects warrant this approach. In addition, we have included a proposal to study cryogenic liquid spills on water and subsequent vaporization in the presence of waves. Sandia is working with DOE on applications that provide infrastructure pertinent to wave production. We present an approach to conduct repeatable wave/spill interaction testing that could utilize such infrastructure.

03 NATURAL GAS↗

Determinants of enrollment in public incentive programs for forest management and their effect on future programs for woody bioenergy: evidence from Virginia and Texas

Several federal- and state-sponsored programs, including cost-sharing arrangements, tax incentives, and technical assistance programs, are available to forestland owners, aiming to encourage desired forest management practices and outcomes. However, enrollment rates in such programs are low, and trends of forestland parcelization hint at an even smaller enrollment rate in the future. Therefore, it is important to understand how socioeconomic attributes of forestland owners and past experience with such programs affect the likelihood of enrollment in public incentive programs. Among others, this will help us provide tailored information to forestland owners who are less likely to use these opportunities through extension and outreach programs. Towards this end, we conducted a survey of 1800 forestland owners in Virginia and Texas. Our recursive partitioning, logistic regression, and Cochran–Armitage trend test results suggest that forestland owners who are less likely to enroll in such programs have relatively smaller forestland acreage, a lower level of education, and shorter land ownership tenure. We also find that forestland owners with experience in public incentive programs tend to attach higher importance to potential programs, including those that do not directly benefit them. Furthermore, we also identify threshold values for explanatory variables such as acreage and tenure length.

54 ENVIRONMENTAL SCIENCES↗

Computer program optimizes design of nuclear radiation shields

Computer program, OPEX 2, determines minimum weight, volume, or cost for shields. Program incorporates improved coding, simplified data input, spherical geometry, and an expanded output. Method is capable of altering dose-thickness relationship when a shield layer has been removed.

Lahti, G. P.↗

Options and Risk for Qualification of Electric Propulsion System

Electric propulsion vehicle systems envelop a wide range of propulsion alternatives including solar and nuclear, which present unique circumstances for qualification. This paper will address the alternatives for qualification of electric propulsion spacecraft systems. The approach taken will be to address the considerations for qualification at the various levels of systems definition. Additionally, for each level of qualification the system level risk implications will be developed. Also, the paper will explore the implications of analysis verses test for various levels of systems definition, while retaining the objectives of a verification program. The limitations of terrestrial testing will be explored along with the risk and implications of orbital demonstration testing. The paper will seek to develop a template for structuring of a verification program based on cost, risk and value return. A successful verification program should establish controls and define objectives of the verification compliance program. Finally the paper will seek to address the political and programmatic factors, which may impact options for system verification.

Bailey, Michelle↗

A cost benefit evaluation of the LANDSAT follow-on program

Results are presented of a benefit and cost study for the LANDSAT Follow-on system with a thematic mapper. The analysis shows that the present worth of the benefits exceeds the present worth of the costs by a factor between 6.5 and 13 using a 10 percent discount rate and an infinite horizon for both. This study focuses only on major, demonstrated applications, conservatively evaluated. No benefits have been included except where a definite need for the information has been shown, a mechanism for disseminating the information has been defined, a technical capability has been demonstrated, and a defendable method of evaluating the economic worth has been developed. This approach has meant that certain applications with definite promise and substantial likely benefits could not be evaluated or assigned any benefits. Mention is made of these areas, however, either in the appropriate subject chapter or in the final chapter on non-quantified benefits.

Source record↗

Retrospective Benefit-Cost Evaluation of U.S. DOE Wind Energy R&D Program: Impact of Selected Energy Technology Investments

This benefit-cost analysis focuses on the DOE Wind Energy Program's public sector R&D investments and returns. The analysis accounts for the program's additionality – that is, comparing what has happened as a result of the program to what would have happened without it. The analysis does not address the return on the investments of private companies ("private returns"). Public returns on the program's investments from 1976 to 2008 are identified and analyzed using retrospective analysis.

17 WIND ENERGY↗

Cost analysis of atmosphere monitoring systems

A methodology was developed to predict realistic relative cost of life support systems and to define areas of major cost impacts in the development cycle. Emphasis was given to tailoring the cost data for usage by program planners and designers. Cost estimates can be completed using the developed equations for varying degrees of equipment refinement, as well as comparative costs between different functional methods. Cost analysis of two leading atmosphere monitoring systems, namely the mass spectrometer and the gas chromatograph, is discussed. A summary of the approach used in developing the cost estimating techniques is presented. Included are the cost estimating techniques, the development of cost estimating relationships, and the atmosphere monitoring system cost estimates.

Yakut, M. M.↗

Decision Point 3 of Statement of Project Objectives (SOPO) “Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems”

Air Products is carrying out a scope of work under Phase 5 of the ITM Oxygen Cooperative Agreement to design, build, and operate a ceramic membrane fabrication facility (the -CerFabII) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the -ITM Oxygen Development FacilityII), and to perform supporting development tasks in materials development and engineering development toward industrial, carbon capture and sequestration applications. Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 3 (DP3), which pertains to the status of all Tasks within Phase 5 and most notably the project status of the CerFab (Task 30) prior to authorization of funds for equipment purchase and construction of the facility. The intent of the DP3 is to provide the opportunity for DOE-NETL to review the status of these tasks and to make recommendations on forward project direction, including a recommendation to pass into Budget Period 8. In the area of Materials Development, Air Products has specified a high pressure dilatometer system which will enable measurements of material expansion of ITM ceramic compounds at very high oxygen partial pressures consistent with CCS applications. Under Task 28.2, subcontractor Ceramatec has made significant progress since DP2 in materials selection and process development and improvement for advanced architecture module fabrication. Ceramatec has determined a materials specification, and has selected a process for making the material. Ceramatec has further developed and selected the process for applying the membrane to unsintered advanced architecture wafers with a Two Step process. Ceramatec has built submodules meeting leak rate specifications and intact 1-TPD modules compromised of advanced architecture components. Equipment and processes required for implementation of the advanced architecture design in the CerFab have been identified and are included in the Task 30 scope of equipment supply. Under Task 29.0, Air Products has developed conceptual ideas for implementation of ITM Oxygen in a 2000 TPD test unit. These concepts are proposed for scale up of the ITM technology to large scale with reduced commercial risk. Under Task 30, Air Products and Ceramatec have collaborated to re-design the CerFab process with the advanced architecture wafer production process as primary, and laid out the new process in the Tooele building; the required process equipment have been specified. The project team updated the project cost and schedule estimates, including all environmental permit schedules. The team also re-assessed project risk and costs for the commissioning and operating phases of the program. Newly projected costs for the CerFab, for which details are provided here as attachments, indicate a savings of approximately $100,000 relative to the original estimate at the time of Phase 5 contract definitization. However, an assessment of risks associated with the equipment, process, and operations of the CerFab indicate that approximately $2.9 million of costs should be expected to address various issues in the project. In addition, $1.6 million of additional spending is expected relative to the original estimate to operate the facility during Task 30.2. Air Products proposes a plan to re-direct funds from Tasks 28, 29, and 31 to Task 30 as necessary to allow the CerFab to meet the Phase 5 program objectives.

Armstrong, Phillip↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Efficient species identification for Pacific salmon genetic monitoring programs

Abstract Genetic monitoring of Pacific salmon in the Columbia River basin provides crucial information to fisheries managers that is otherwise challenging to obtain using traditional methods. Monitoring programs such as genetic stock identification (GSI) and parentage‐based tagging (PBT) involve genotyping tens of thousands of individuals annually. Although rare, these large sample collections inevitably include misidentified species, which exhibit low genotyping success on species‐specific Genotyping‐in‐Thousands by sequencing (GT‐seq) panels. For laboratories involved in large‐scale genotyping efforts, diagnosing non‐target species and reassigning them to the appropriate monitoring program can be costly and time‐consuming. To address this problem, we identified 19 primer pairs that exhibit consistent cross‐species amplification among salmonids and contain 51 species informative variants. These genetic markers reliably discriminate among 11 salmonid species and two subspecies of Cutthroat Trout and have been included in species‐specific GT‐seq panels for Chinook Salmon, Coho Salmon, Sockeye Salmon, and Rainbow Trout commonly used for Pacific salmon genetic monitoring. The majority of species‐informative amplicons (16) were newly identified from the four existing GT‐seq panels, thus demonstrating a low‐cost approach to species identification when using targeted sequencing methods. A species‐calling script was developed that is tailored for routine GT‐seq genotyping pipelines and automates the identification of non‐target species. Following extensive testing with empirical and simulated data, we demonstrated that the genetic markers and accompanying script accurately identified species and are robust to missing genotypic data and low‐frequency, shared polymorphisms among species. Finally, we used these tools to identify Coho Salmon incidentally caught in the Columbia River Chinook Salmon sport fishery and used PBT to determine their hatchery of origin. These molecular and computing resources provide a valuable tool for Pacific salmon conservation in the Columbia River basin and demonstrate a cost‐effective approach to species identification for genetic monitoring programs.

Robinson, Zachary L.↗

Cost goals

Cost goal activities for the point focusing parabolic dish program are reported. Cost goals involve three tasks: (1) determination of the value of the dish systems to potential users; (2) the cost targets of the dish system are set out; (3) the value side and cost side are integrated to provide information concerning the potential size of the market for parabolic dishes. The latter two activities are emphasized.

Hoag, J.↗

Space Station Freedom operations costs

Measures to reduce the operation costs of the Space Station which can be implemented in the design and development stages are discussed. Operational functions are described in the context of an overall operations concept. The provisions for operations cost responsibilities among the partners in the Space Station program are presented. Cost estimating methodologies and the way in which operations costs affect the design and development process are examined.

Accola, Anne L.↗

An assessment of the benefits of the use of NASA developed fuel conservative technology in the US commercial aircraft fleet

Cost and benefits of a fuel conservative aircraft technology program proposed by NASA are estimated. NASA defined six separate technology elements for the proposed program: (a) engine component improvement (b) composite structures (c) turboprops (d) laminar flow control (e) fuel conservative engine and (f) fuel conservative transport. There were two levels postulated: The baseline program was estimated to cost $490 million over 10 years with peak funding in 1980. The level two program was estimated to cost an additional $180 million also over 10 years. Discussions with NASA and with representatives of the major commercial airframe manufacturers were held to estimate the combinations of the technology elements most likely to be implemented, the potential fuel savings from each combination, and reasonable dates for incorporation of these new aircraft into the fleet.

Source record↗

Design and evaluation of low-cost laminated wood composite blades for intermediate size wind turbines: Blade design, fabrication concept, and cost analysis

As part of a program to reduce wind turbine costs, an evaluation was conducted of a laminated wood composite blade for the Mod-OA 200 kW wind turbine. The effort included the design and fabrication concept for the blade, together with cost and load analyses. The blade structure is composed of laminated Douglas fir veneers for the primary spar and nose sections, and honeycomb cored plywood panels for the trailing edges sections. The attachment of the wood blade to the rotor hub was through load takeoff studs bonded into the blade root. Tests were conducted on specimens of the key structural components to verify the feasibility of the concept. It is concluded that the proposed wood composite blade design and fabrication concept is suitable for Mod-OA size turbines (125-ft diameter rotor) at a cost that is very competitive with other methods of manufacture.

Lieblein, S.↗

LANL's Waste Management Transportation Program [Slides]

Los Alamos National Laboratory (LANL) has developed a safe, compliant, and cost-effective transportation program that moves over 5,000 m3 of regulated waste off site each fiscal year. This program handles all waste types including universal waste, New Mexico Special Waste, TSCA and RCRA wastes, low level and mixed low-level wastes, and TRU and MTRU wastes. This program allows for the treatment and disposal of hazardous wastes while maintaining the protection of people, facilities, and the environment This program provides critical support to a wide variety of missions across the laboratory site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗