A Unified Metric for Fast Frequency Response in Low-Inertia Power Systems: Preprint

Future power system with more inverter-based resources (IBRs) is vulnerable to the frequency-decline contingency. Fast frequency response (FFR) provided by IBRs is a good candidate to arrest the frequency excursion. Diverse types of FFRs have been integrated into the power system. Without a unified quantification of FFRs, it is hard for the grid operators to fully leverage the FFR capabilities of IBRs. This work introduces potential unified metrics of prevailing FFRs. We utilized the metric-to-frequency (M2F) mapping to validate the accuracy of the metrics. The results show the proposed metric to be simple yet accurate.

effective inertia↗

Blockchain for Fault-Tolerant Grid Operations

Distribution system fault/failure has a direct impact on customers. Distribution systems are not designed with the contingency of one or more elements failing as the transmission system, however, distribution systems are more likely to have faults in comparison to transmission and generation systems. Most of the distribution systems have a radial design with the protection system assumption of unidirectional power flow. The radial design results in the disconnection of customers for any given component failure. The rapid deployment of distributed energy resources conflicts with the assumption of unidirectional power flow. To maintain/improve the distribution system fault tolerance for a grid with high penetration of distributed energy resources requires improvement. Blockchain can add value to improve fault-tolerant grid operations. That can be achieved using blockchain’s core features of distributed consensus-based decision-making process and immutability. In the process of preparing for an event or system restoration, there is a need for reliable data and system situational awareness. The system situational awareness enables accurate planning for possible scenarios and system restoration after an event, an area where blockchain’s distributed architecture can help. The value of blockchain for a fault-tolerant grid operation is elaborated with three use cases: 1) fault location, isolation, and service restoration; 2) topology identification; and 3) data configuration. These use cases demonstrate how blockchain-based architecture can facilitate bridging the vulnerabilities of the existing implementation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effectiveness of Redundant Communications Systems in Maintaining Operational Control of Small Unmanned Aircraft

NASA has been researching prototype technologies for an Unmanned Aircraft System (UAS) Traffic Management (UTM) system to facilitate enabling of safe and efficient civilian low-altitude airspace and UAS operations, in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for beyond visual line-of-sight (BVLOS) operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 will build on the earlier TCLs and focus on technologies and requirements for operations in higher-density urban areas for tasks such as news gathering, package delivery and for managing large-scale contingencies. This paper describes a communications test conducted in TCL3 and discusses insights gained from the test. In the test, operators were directed to equip UAS with redundant Command and Control (C2) communications systems, send a maneuver command to Unmanned Aircraft (UA) via the primary system, then verify execution of the sent command. This exercise was repeated with each redundant system. The test was designed to assess effectiveness of redundant C2 systems in maintaining operational control of UA. Several UAS were configured with varying arrangements to achieve redundancy, including two identical radio modems using the same frequency band, WiFi and Long-Term Evolution (LTE) cellular modems, etc. From the test, digital data such as time maneuver command sent, time maneuver verified, etc., were collected. Descriptions of methods to detect loss of C2 communications and contingency steps for such event were collected and assessed. The final paper will include a detailed analysis of the collected data leading to the following insights. First, effectiveness of redundant C2 systems depends on several factors, such as operational environment and communications service availability. For example, use of two identical point-to-point radio to connect operator and UA on the same frequency band can be effective in mitigating radio malfunction when operating in an environment where possibility of Radio Frequency (RF) interference is low, such as over open plains. However, the same arrangement may not be effective where high level of RF transmissions in broad spectrum ranges can be expected, such as over or near urban areas. For redundant systems that consist of external communications services, such as cellular and satellite communications network, redundancy is maintained only in the areas where more than one services are available. Therefore, UAS operators should have the means to plan for and monitor the performance of external communications services they are relying on to control UA. Second, communications performance needs, such as the minimum data transfer rate and the maximum tolerable latency, should be assessed to reflect the potential hazard that can come from loss of UA control. For example, UA operations over desolate area pose less hazard to people than operations over densely populated area and performance need for the former would be less than the latter.

Jung, Jaewoo↗

A Customizable Metric to Provide a Comprehensive Picture of the Mobility Potential of a Location

Accessibility in a geo-spatial context refers to the ease of reaching a variety of opportunities from a given location. Accessibility theories (and resulting metrics) have traditionally focused on quantifying access to specific opportunities (such as jobs), or focused on specific modes (such as car, bike, etc.). Such approaches often fall short of providing a comprehensive picture of the true accessibility potential of a location as a combination of multiple modes to multiple types of destinations. Addressing this drawback, a novel metric labeled the ‘Mobility Energy Productivity (MEP) Metric’ was developed at the National Renewable Energy Laboratory to quantify the mobility potential of a location to connect people to goods, services, and employment using a variety of modes, while accounting for time, energy, and affordability. The MEP metric has been integrated with advance travel behavior models to compute the changes in mobility potential for various future scenarios, such as introduction of automated vehicles, and/or electric vehicles—but does so at the aggregate, or average-citizen level. The MEP in its initial iteration is not customized to the particular socio-economic contingents, or even to an individual whose modal availability or pattern of trip making may substantially differ from the average. Addressing this gap, this research effort extends the MEP framework from a static state to a more tailored and dynamic state, one in which an individual, or group can customize the metric for their unique characteristics, such as modes, activity patterns, and time-of-day preferences. The extended MEP metric framework can now be integrated to assess the customized mobility energy productivity of an individual.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Crew Exploration Vehicle (CEV) Potable Water System Verification Description

The Crew Exploration Vehicle (CEV), also known as Orion, will ferry a crew of up to six astronauts to the International Space Station (ISS), or a crew of up to four astronauts to the moon. The first launch of CEV is scheduled for approximately 2014. A stored water system on the CEV will supply the crew with potable water for various purposes: drinking and food rehydration, hygiene, medical needs, sublimation, and various contingency situations. The current baseline biocide for the stored water system is ionic silver, similar in composition to the biocide used to maintain quality of the water transferred from the Orbiter to the ISS and stored in Contingency Water Containers (CWCs). In the CEV water system, the ionic silver biocide is expected to be depleted from solution due to ionic silver plating onto the surfaces of the materials within the CEV water system, thus negating its effectiveness as a biocide. Since the biocide depletion is expected to occur within a short amount of time after loading the water into the CEV water tanks at the Kennedy Space Center (KSC), an additional microbial control is a 0.1 micron point of use filter that will be used at the outlet of the Potable Water Dispenser (PWD). Because this may be the first time NASA is considering a stored water system for longterm missions that does not maintain a residual biocide, a team of experts in materials compatibility, biofilms and point of use filters, surface treatment and coatings, and biocides has been created to pinpoint concerns and perform testing to help alleviate those concerns related to the CEV water system. Results from the test plans laid out in the paper presented to SAE last year (Crew Exploration Vehicle (CEV) Potable Water System Verification Coordination, 2008012083) will be detailed in this paper. Additionally, recommendations for the CEV verification will be described for risk mitigation in meeting the physicochemical and microbiological requirements on the CEV PWS.

Peterson, Laurie↗

Impact of Open Communication Networks on Load Frequency Control with Plug-in Electric Vehicles by Cyber-Physical Dynamic Co-Simulation: Preprint

With the increasing electrification of the transportation sector, vehicle to grid (V2G) control technologies are promising to improving system frequency stability. However, these control technologies might require non-traditional communication supports. This paper investigates the impacts of electric vehicles (EVs) V2G on power system frequency regulation considering communication variations through transmission-distribution-communication (TDC) dynamic simulation. The simulation model is built based on our previously developed open-source transmission-and-distribution (T&D) dynamic co-simulation framework. Here, we add the communication variation functions (i.e. delay and packet loss) to complete the TDC simulation framework. In the case studies, practical communication variation scenarios are considered when the system experiencing an N-1 generation trip contingency. The considered scenarios include communication delay and packet loss using both homogeneous and heterogeneous assumptions. The delay and packet loss rate are the same in all communication channels in the homogeneous case but varies in the heterogeneous case. The results show the communication delay has an obvious impact on the frequency recovery compared to the communication packet drop. The impacts of the standard deviations of communication delay time and packet drop rate are not significant. The outcomes of this work can help improve the EV frequency regulation services and provide robust and effect supports to the grid.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Wildfire Risk Evaluation Framework for Grid Operations and Planning

The United States (US) environmental protection agency's (EPA's) climate change indicators for wildfires show a long-term trend of increased annual wildfire activity, larger wildfire size, and more variable dynamics in wildfire behavior. This has caused more frequent preemptive public safety power shutoff (PSPS) events in the regions with recognized high wildfire risk. These preemptive power shutoffs attempt to prevent the ignition of a wildfire but it nonetheless renders the transmission line non-operational, which often sheds load of downstream communities. As wildfires and PSPS events become more frequent, it is crucial to find the communities most at risk of load shedding. To that end, this paper proposes the wildfire risk evaluation of the system (WiRES) framework, which is a performance-based framework that translates extreme weather-related and PSPS event probabilities into a cumulative probability of a non-operational transmission line. This study also provides a geospatial visualization tool that breaks down the entire western electrical coordinating council (WECC) region into 50 km grid cells which can be used to 1) filter out transmission lines with higher than a threshold outage probability, and 2) graphically discover the affected regions and their biophysical and socioeconomic metrics. %such as the social vulnerability index, population density, gross domestic product, etc. Lastly, an impact assessment study is conducted which connects the results of the proposed framework to python and powerworld-based contingency analysis to highlight the applicability of the framework.

Wildfire, Resilience, Extreme Events, Grid Reslien↗

Feedback Optimization of Incentives for Distribution Grid Services

Energy prices and net power injection limitations regulate the operations in distribution grids and typically ensure that operational constraints are met. Nevertheless, unexpected or prolonged abnormal events could undermine the grid's functioning. During contingencies, customers could contribute effectively to sustaining the network by providing services. Herein this paper proposes an incentive mechanism that promotes users' active participation by essentially altering the energy pricing rule. The incentives are modeled via a linear function whose parameters can be computed by the system operator (SO) by solving an optimization problem. Feedback-based optimization algorithms are then proposed to seek optimal incentives by leveraging measurements from the grid, even in the case when the SO does not have a full grid and customer information. Numerical simulations on a standard testbed validate the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spacely's rockets: Personnel launch system/family of heavy lift launch vehicles

During 1990, numerous questions were raised regarding the ability of the current shuttle orbiter to provide reliable, on demand support of the planned space station. Besides being plagued by reliability problems, the shuttle lacks the ability to launch some of the heavy payloads required for future space exploration, and is too expensive to operate as a mere passenger ferry to orbit. Therefore, additional launch systems are required to complement the shuttle in a more robust and capable Space Transportation System. In December 1990, the Report of the Advisory Committee on the Future of the U.S. Space Program, advised NASA of the risks of becoming too dependent on the space shuttle as an all-purpose vehicle. Furthermore, the committee felt that reducing the number of shuttle missions would prolong the life of the existing fleet. In their suggestions, the board members strongly advocated the establishment of a fleet of unmanned, heavy lift launch vehicles (HLLV's) to support the space station and other payload-intensive enterprises. Another committee recommendation was that a space station crew rotation/rescue vehicle be developed as an alternative to the shuttle, or as a contingency if the shuttle is not available. The committee emphasized that this vehicle be designed for use as a personnel carrier, not a cargo carrier. This recommendation was made to avoid building another version of the existing shuttle, which is not ideally suited as a passenger vehicle only. The objective of this project was to design both a Personnel Launch System (PLS) and a family of HLLV's that provide low cost and efficient operation in missions not suited for the shuttle.

Source record↗

Contingency Operations during Failure of Inertial Attitude Acquisition Due to Star Tracker Blinding for Three-Axes-Stabilized Interplanetary Spacecraft

The three interplanetary ESA missions Mars-Express, Rosetta and Venus-Express (launched 2003, 2004 and 2005 resp.) are three-axes stabilized spacecraft (s/c) that estimate their inertial attitude (i.e. the attitude of the s/c w.r.t. the inertial frame) using measurements from a redundant set of star trackers (STR). Each s/c is equipped with four reaction wheels, a reaction control system based on thrusters and a redundant set of ring laser gyroscopes (gyros). The STR h/w layout of the three s/c is identical whereas there is a difference in the star pattern recognition algorithm of Rosetta which uses five neighbouring stars around a central star instead of star triads. The Rosetta algorithm has been implemented to cope with the presence of false stars which are expected to be seen during operations around the comet. The attitude acquisition capability from lost in space is different also in terms of AOCMS: The survival mode of Rosetta which is entered upon STR failure is presented. The AOCMS of Mars- and Venus-Express manages temporary STR outages during sky occultation by the planet not even by using redundancy. Though, a blinding of both STR during cruise lasting for the order of days confronts the ground operators with the limits of the AOCMS design. The operations and analyses that have been planned and partially been performed to compensate for the outage of the STR are demonstrated for Mars-Express. The caution measures taken before Venus orbit insertion of Venus-Express are detailed.

Keil, Joachim↗

Testing of Advanced Capabilities to Enable In-time Safety Management and Assurance for Future Flight Operations

In order to refine an initial Concept of Operations, explore Concepts of Use, and expose/validate requirements for future In-Time Aviation Safety Management Systems (IASMS), testing architectures were created, along with a set of capabilities and underlying information exchange protocols. These systems were conceived and developed based on hazards associated with two envisioned urban area flight domains: (1) highly autonomous small uncrewed aerial systems (sUAS) operating at low altitudes, and (2) highly autonomous air taxis. The initial scope of this development is described in [1]; this report provides an update, focusing on the subsequent developments and test activities. As stated in [1], it is important to note that there are many capabilities already in use by the industry (or soon to be in use) that will play critical roles in future IASMS designs. Those reported here were developed to address a gap in the current state-of-the-art regarding specific hazards/risks, and/or to allow for investigation of the interplay between and across hazard types — particularly regarding how overall safety risk can be reduced or managed effectively. Results of testing and development activities are organized by the operational phase wherein a particular capability would be employed (i.e., preflight, in-flight, and post-flight/off-line). Pre-flight: A set of capabilities were developed to help mitigate safety risk prior to flight (e.g., during flight and mission planning). Results of testing summarize (1) validation activities to raise the Technology Readiness Level (TRL) and (2) evaluation activities where the capabilities were applied to flight/mission planning procedures and used by operators/pilots. For the latter, flight plans were automatically assessed, and operators/pilots were notified of hazardous flight segments so as to enable adjustment of the flight plan and re-evaluation, and/or to better inform go/no-go decisions. Capabilities addressed hazards associated with power consumption, third-party risk, wind, navigation system performance, radiofrequency interference, and proximity to geo-spatial threats (e.g., buildings, trees, and no-fly zones). In-flight: Flight experiments tested capabilities that detect and respond to hazards encountered during flight. In the first series, safety hazards were monitored and assessed onboard, and system-generated mitigation maneuvers were recorded (but not acted upon by the vehicle). In the second series, mitigation maneuver commands directed the aircraft in response to safety hazards (i.e., auto-mitigation). The sUAS used for testing is described in full, as is the test architecture, which included commercial avionics, research avionics, and onboard software designed to detect, assess, and respond to hazards. The onboard system was designed as a run-time assurance framework, consistent with [2] and supportive of both supervisory and automated modes. The primary functions included: real-time risk assessment (RTRA), auto-pilot monitoring, constraint monitoring, and contingency select/triggering. RTRA performs integrated risk assessment considering data from several hazard-related monitors (e.g., battery, motors, navigation, communications, population density, and loss-of-control). Post-flight/off-line: Data monitored and recorded during flights can enable IASMS capabilities that execute after flights have completed (or “off-line”). These include: (1) the ability to identify anomalies and trends that may only be observable when comparing data spanning a number of similar flights; (2) the ability to update and validate pre-flight and in-flight capabilities and any underlying models to improve their performance; (3) the ability to report anomalies/off-nominals that may indicate design changes or maintenance actions are needed; and (4) the ability for humans involved in operations to report safety-relevant observations to help in understanding the flight data and/or the operational context of a flight. Progress on three such capabilities is summarized; the first investigates anomaly detection given a limited set of flight logs and applies an approach previously used for space operations. The second explores what could be identified using a larger set of flight logs, including from web-based forums where flight logs are posted by sUAS autopilot users. The third creates a new means of collecting information on UAS incidents and accidents via the Aviation Safety Reporting System (ASRS).

sUAS↗

lmprovements and Path Forward for Regulatory Acceptance of SAS4A/SASSYS-1

In the U.S., a key component of the commercialization of advanced reactors is completion of a license application, which must ultimately be approved by the Nuclear Regulatory Commission (NRC). The NRC’s approval of the license application is contingent on, among other things, satisfactory demonstration of the design basis and response to transient and accident scenarios using accepted codes and methods. This effort seeks to improve the regulatory acceptability of the SAS4A/SASSYS-1 advanced reactor design and safety analysis system software by identifying and addressing gaps in the SAS4A/SASSYS-1 documentation basis that support software qualification and dedication. The software’s unique capabilities to assess inherent fast spectrum feedback effects and passive safety features, which facilitate assessment of key safety metrics, position it as a key licensing tool in the field of sodium-cooled fast reactors (SFR).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

2013↗

Optimal Propellant Maneuver Flight Demonstrations on ISS

In this paper, first ever flight demonstrations of Optimal Propellant Maneuver (OPM), a method of propulsive rotational state transition for spacecraft controlled using thrusters, is presented for the International Space Station (ISS). On August 1, 2012, two ISS reorientations of about 180deg each were performed using OPMs. These maneuvers were in preparation for the same-day launch and rendezvous of a Progress vehicle, also a first for ISS visiting vehicles. The first maneuver used 9.7 kg of propellant, whereas the second used 10.2 kg. Identical maneuvers performed without using OPMs would have used approximately 151.1kg and 150.9kg respectively. The OPM method is to use a pre-planned attitude command trajectory to accomplish a rotational state transition. The trajectory is designed to take advantage of the complete nonlinear system dynamics. The trajectory choice directly influences the cost of the maneuver, in this case, propellant. For example, while an eigenaxis maneuver is kinematically the shortest path between two orientations, following that path requires overcoming the nonlinear system dynamics, thereby increasing the cost of the maneuver. The eigenaxis path is used for ISS maneuvers using thrusters. By considering a longer angular path, the path dependence of the system dynamics can be exploited to reduce the cost. The benefits of OPM for the ISS include not only reduced lifetime propellant use, but also reduced loads, erosion, and contamination from thrusters due to fewer firings. Another advantage of the OPM is that it does not require ISS flight software modifications since it is a set of commands tailored to the specific attitude control architecture. The OPM takes advantage of the existing ISS control system architecture for propulsive rotation called USTO control mode1. USTO was originally developed to provide ISS Orbiter stack attitude control capability for a contingency tile-repair scenario, where the Orbiter is maneuvered using its robotic manipulator relative to the ISS. Since 2005 USTO has been used for nominal ISS operations.

Bhatt, Sagar↗

DATA COLLECTION, QUALITY ASSURANCE, AND ANALYSIS PLAN FOR THE 2008/2009 HYDROGEN AND FUEL CELLS KNOWLEDGE AND OPINIONS SURVEYS

The 2008/2009 Knowledge and Opinions Survey, conducted for the Department of Energy's Hydrogen Program will measure the levels of awareness and understanding of hydrogen and fuel cell technologies within five target populations: (1) the general public, (2) students, (3) personnel in state and local governments, (4) potential end users of hydrogen fuel and fuel cell technologies in business and industry, and (5) safety and code officials. The ultimate goal of the surveys is a statistically valid, nationally based assessment. Distinct information collections are required for each of the target populations. Each instrument for assessing baseline knowledge is targeted to the corresponding population group. While many questions are identical across all populations, some questions are unique to each respondent group. The biggest data quality limitation of the hydrogen survey data (at least of the general public and student components) will be nonresponse bias. To ensure as high a response rate as possible, various measures will be taken to minimize nonresponse, including automated callbacks, cycling callbacks throughout the weekdays, and availability of Spanish speaking interviewers. Statistical adjustments (i.e., sampling weights) will also be used to account for nonresponse and noncoverage. The primary objective of the data analysis is to estimate the proportions of target population individuals who would respond to the questions in the various possible ways. Data analysis will incorporate necessary adjustments for the sampling design and sampling weights (i.e., probability sampling). Otherwise, however, the analysis will involve standard estimates of proportions of the interviewees responding in various ways to the questions. Sample-weight-adjusted contingency table chi-square tests will also be computed to identify differences between demographic groups The first round of Knowledge and Opinions Surveys was conducted in 2004. Analysis of these surveys produced a baseline assessment of technical knowledge about hydrogen and fuel cells and a statistically valid description of opinions about safety and potential usage in the United States. The current surveys will repeat the process used in 2004. In addition the 2008/2009 survey results will be compared with the 2004 baseline results to assess changes in knowledge levels and opinions. In 2011/2012, the surveys will be repeated, and changes in knowledge and opinions will again be assessed. The information gained from these surveys will be used to enhance and update the DOE Hydrogen Program's education efforts.

08 HYDROGEN↗

Frontiers in the Economics of Widespread, Long-Duration Power Interruptions: Proceedings from an Expert Workshop

The costs to electric utility customers from short-term, limited geographic-scale power disruptions have been studied for many years. However, there is increasing interest among regulators, policy-makers, and utilities in developing and implementing methods for analyzing interruptions that are of longer duration (days, weeks, or longer) and of a larger geographic scope (entire metropolitan areas or regions which may extend across multiple service territories). A 2017 report from the U.S. National Academies of Sciences, Engineering, and Medicine indicated the importance of “develop[ing] comprehensive studies to assess the value to customers of improved reliability and resilience…during large-area, long-duration blackouts.” As a contribution toward fulfilling this recommendation, the U.S. Department of Energy’s (DOE) Office of Electricity’s Transmission Permitting and Technical Assistance Division, in partnership with Lawrence Berkeley National Laboratory (LBNL), convened a workshop to identify research needs and discuss potential avenues for methodological advances in the economics of widespread, long-duration power interruptions. The workshop was organized around six key themes in the economics of widespread, long-duration interruptions. LBNL conducted a competitive solicitation for white papers on these themes, and the authors selected were leading experts in academia, industry, and the non-profit sector. They were tasked with assessing the state of knowledge on particular topics, and identifying research needs and promising directions to expand it. These topics included definitions of resilience and reliability; regional economic modeling approaches; uncertainty quantification; data challenges and opportunities; contingent valuation survey techniques; and reduced-form analytical tools for assessing the impacts of power interruptions of this scale. The authors of the six white papers presented their findings at the workshop, titled “Frontiers in the Economics of Widespread, Long-Duration Power Interruptions,” and held in Washington, D.C., on March 6, 2018. Each paper was the subject of its own session, with the presentations followed by comments by assigned discussants, and in turn a general discussion of the papers, their findings, and the issues they raised. In addition to the authors, discussants, and LBNL and DOE staff, the workshop participants comprised government, industry, and academic thought leaders from across the country.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Large-scale simulation-based parametric analysis of an optimal precooling strategy for demand flexibility in a commercial office building

Achieving success with grid-interactive efficient buildings (GEBs) is closely tied to the utilization of flexible loads. A valuable strategy involves the implementation of precooling techniques before high-demand events, such as peak hours, by adjusting zone air temperature setpoints. This leads to a reduction in thermal loads and peak electricity demand during these times, as the building’s thermal mass stores and subsequently releases thermal energy. However, the effectiveness of the pre-cooling optimization is highly contingent on specific conditions such as building thermal properties, weather conditions, utility rate structure, HVAC equipment sizing, etc. Therefore, investigating the impacts of these condition-specific factors is crucial, especially when considering precooling strategies that utilize thermal mass in commercial buildings. In this paper, we first devised a novel heuristic control approach that incorporates parameterized optimal precooling thermostat schedules to enhance demand flexibility in a commercial office building. Subsequently, we conducted a thorough performance evaluation of this control strategy. Here, the optimal thermostat schedule was parameterized using three optimization variables: the precooling start time, the precooling end time, and the precooling temperature setpoint. Utilizing the DOE medium-sized office building as the virtual testbed, we showed that the parameterized schedule effectively approximates model predictive control and requires drastically reduced computational overhead. In addition, we investigated the impact of different influencing factors on the optimal precooling strategy. These factors include building thermal mass, outdoor air conditions, and energy price profiles. Using high-performance computing, we simulated a total of 225 scenarios, consisting of three levels of thermal mass, five typical outdoor air temperature profiles, and fifteen time-of-use price plans. The results demonstrate that optimal thermostat scheduling could save substantial energy cost in medium-sized office buildings with heavy thermal mass but with some energy penalty. Although the potential for cost savings is lower in buildings with low and medium thermal mass, the energy penalty remains consistent in all three thermal mass scenarios. The study also highlights the need to account for zone diversity and recognize that a one-size-fits-all-zone setpoint schedule may not be suitable for all zones and can lead to unnecessary energy wastage. Furthermore, the results highlight that while outdoor air conditions play a role in cost and energy performance, the cooling load exerts a more immediate and substantial influence on cost savings in precooling strategies. Although cost savings are comparable under certain conditions with the same cooling load, observed deviations in energy penalty indicate potential disparities in the efficiency of the HVAC system during the load-shifting process. In addition, the duration of peak pricing and the ratio between peak and off-peak times exhibit clear correlations with cost savings and energy consumption, aligning with intuitive expectations. These findings offer valuable insights for optimizing precooling strategies in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗