Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Issues in life support and human factors in crew rescue from the ISS

The design and development of crew emergency response systems, particularly to provide an unplanned emergency return to Earth, requires an understanding of crew performance challenges in space. The combined effects of psychological and physiological adaptation during long-duration missions will have a significant effect on crew performance in the unpredictable and potentially life-threatening conditions of an emergency return to Earth. It is therefore important that the systems to be developed for emergency egress address these challenges through an integrated program to produce optimum productivity and safety in times of utmost stress. Fundamental to the success of the CRV is the Environmental Control and Life Support System (ECLSS), which provides the necessary conditions for the crew to survive their return mission in a shirtsleeve environment. This article will discuss the many issues in the design of an ECLSS system for CRV and place it in the context of the human performance challenges of the mission.

Rescue Work↗

Software Surrogate

In 1994, Blackboard Technology received a NASA Phase I SBIR award entitled "A Blackboard-Based Framework for Mixed-Initiative, Crewed- Space-System Applications." This research continued in Phase II at JSC, where a generic architecture was developed in which a software surrogate serves as the operator's representative in the fast-paced realm of nearly autonomous, intelligent systems. This SBIR research effort addressed the need to support human-operator monitoring and intervention with intelligent systems such as those being developed for NASA's crewed space program.

Source record↗

Systems Engineering and Integration for Technology Programs

The Architecture, Habitability & Integration group (AH&I) is a system engineering and integration test team within the NASA Crew and Thermal Systems Division (CTSD) at Johnson Space Center. AH&I identifies and resolves system-level integration issues within the research and technology development community. The timely resolution of these integration issues is fundamental to the development of human system requirements and exploration capability. The integration of the many individual components necessary to construct an artificial environment is difficult. The necessary interactions between individual components and systems must be approached in a piece-wise fashion to achieve repeatable results. A formal systems engineering (SE) approach to define, develop, and integrate quality systems within the life support community has been developed. This approach will allow a Research & Technology Program to systematically approach the development, management, and quality of technology deliverables to the various exploration missions. A tiered system engineering structure has been proposed to implement best systems engineering practices across all development levels from basic research to working assemblies. These practices will be implemented through a management plan across all applicable programs, projects, elements and teams. While many of the engineering practices are common to other industries, the implementation is specific to technology development. An accounting of the systems engineering management philosophy will be discussed and the associated programmatic processes will be presented.

Kennedy, Kruss J.↗

Parachute Drag Model

DTV-SIM is a computer program that implements a mathematical model of the flight dynamics of a missile-shaped drop test vehicle (DTV) equipped with a multistage parachute system that includes two simultaneously deployed drogue parachutes and three main parachutes deployed subsequently and simultaneously by use of pilot parachutes. DTV-SIM was written to support air-drop tests of the DTV/parachute system, which serves a simplified prototype of a proposed crew capsule/parachute landing system.

Cuthbert, Peter↗

Human Exploration of the Solar System by 2100

It has been suggested that the U.S., in concert with private entities and international partners, set itself on a course to accomplish human exploration of the solar system by the end of this century. This is a strikingly bold vision intended to revitalize the aspirations of HSF in service to the security, economic, and scientific interests of the nation. Solar system distance and time scales impose severe requirements on crewed space transportation systems, however, and fully realizing all objectives in support of this goal will require a multi-decade commitment employing radically advanced technologies - most prominently, space habitats capable of sustaining and protecting life in harsh radiation environments under zero gravity conditions and in-space propulsion technologies capable of rapid deep space transits with earth return, the subject of this paper. While near term mission destinations such as the moon and Mars can be accomplished with chemical propulsion and/or high power SEP, fundamental capability constraints render these traditional systems ineffective for solar system wide exploration. Nuclear based propulsion and alternative energetic methods, on the other hand, represent potential avenues, perhaps the only viable avenues, to high specific power space transport evincing reduced trip time, reduced IMLEO, and expanded deep space reach. Here, very long term HSF objectives for solar system wide exploration are examined in relation to the advanced propulsion technology solution landscape including foundational science, technical/engineering challenges, and developmental prospects.

Transportation↗

Crew Office Evaluation of a Precision Lunar Landing System

A representative Human System Interface for a precision lunar landing system, ALHAT, has been developed as a platform for prototype visualization and interaction concepts. This facilitates analysis of crew interaction with advanced sensors and AGNC systems. Human-in-the-loop evaluations with representatives from the Crew Office (i.e. astronauts) and Mission Operations Directorate (MOD) were performed to refine the crew role and information requirements during the final phases of landing. The results include a number of lessons learned from Shuttle that are applicable to the design of a human supervisory landing system and cockpit. Overall, the results provide a first order analysis of the tasks the crew will perform during lunar landing, an architecture for the Human System Interface based on these tasks, as well as details on the information needs to land safely.

Major, Laura M.↗

The Role of System Compatibility and Cabin Environmental Impact Assessment in Environmental Control and Life Support System Design and Flight Operations

Contamination of a crewed spacecraft's cabin environment leading to ECLS system functional capability and operational margin degradation or loss can have an adverse effect on NASA's space exploration mission figures of merit-safety, mission success, effectiveness, and affordability. Experience gained during the International Space Station program has shown the vital role that evaluating ECLS system compatibility and cabin environmental impact serves as a passive trace contaminant control tool which can provide guidance to crewed spacecraft system and payload developers relative to designing for minimum risk. As well, such evaluations can aid in guiding containment design, developing flight rules and procedures suitable for protecting the ECLS system and cabin environment, and defining contamination event remediation approaches. The approach to evaluating ECLS system compatibility and cabin environmental impact developed during the ISS program is presented and its role in future exploration spacecraft design is discussed.

Peery, Jay L.↗

Return to Flight: Crew Activities Resource Reel 1 of 2

The crew of the STS-114 Discovery Mission is seen in various aspects of training for space flight. The crew activities include: 1) STS-114 Return to Flight Crew Photo Session; 2) Tile Repair Training on Precision Air Bearing Floor; 3) SAFER Tile Inspection Training in Virtual Reality Laboratory; 4) Guidance and Navigation Simulator Tile Survey Training; 5) Crew Inspects Orbital Boom and Sensor System (OBSS); 6) Bailout Training-Crew Compartment; 7) Emergency Egress Training-Crew Compartment Trainer (CCT); 8) Water Survival Training-Neutral Buoyancy Lab (NBL); 9) Ascent Training-Shuttle Motion Simulator; 10) External Tank Photo Training-Full Fuselage Trainer; 11) Rendezvous and Docking Training-Shuttle Engineering Simulator (SES) Dome; 12) Shuttle Robot Arm Training-SES Dome; 13) EVA Training Virtual Reality Lab; 14) EVA Training Neutral Buoyancy Lab; 15) EVA-2 Training-NBL; 16) EVA Tool Training-Partial Gravity Simulator; 17) Cure in Place Ablator Applicator (CIPAA) Training Glove Vacuum Chamber; 16) Crew Visit to Merritt Island Launch Area (MILA); 17) Crew Inspection-Space Shuttle Discovery; and 18) Crew Inspection-External Tank and Orbital Boom and Sensor System (OBSS). The crew are then seen answering questions from the media at the Space Shuttle Landing Facility.

Source record↗

Power Management for Space Advanced Life Support

Space power systems include the power source, storage, and management subsystems. In current crewed spacecraft, solar cells are the power source, batteries provide storage, and the crew performs any required load scheduling. For future crewed planetary surface systems using Advanced Life Support, we assume that plants will be grown to produce much of the crew's food and that nuclear power will be employed. Battery storage is much more costly than nuclear power capacity and so is not likely to be used. We investigate the scheduling of power demands by the crew or automatic control, to reduce the peak power load and the required generating capacity. The peak to average power ratio is a good measure of power use efficiency. We can easily schedule power demands to reduce the peak power from its maximum, but simple scheduling approaches may not find the lowest possible peak to average power ratio. An initial power scheduling example was simple enough for a human to solve, but a more complex example with many intermittent load demands required automatic scheduling. Excess power is a free resource and can be used even for minor benefits.

Jones, Harry↗

Verification and Validation of Requirements on the CEV Parachute Assembly System Using Design of Experiments

The Crew Exploration Vehicle Parachute Assembly System (CPAS) project conducts computer simulations to verify that flight performance requirements on parachute loads and terminal rate of descent are met. Design of Experiments (DoE) provides a systematic method for variation of simulation input parameters. When implemented and interpreted correctly, a DoE study of parachute simulation tools indicates values and combinations of parameters that may cause requirement limits to be violated. This paper describes one implementation of DoE that is currently being developed by CPAS, explains how DoE results can be interpreted, and presents the results of several preliminary studies. The potential uses of DoE to validate parachute simulation models and verify requirements are also explored.

Schulte, Peter Z.↗

Orion Multi-Purpose Crew Vehicle (MPCV) Capsule Parachute Assembly System (CPAS) Wake Deficit Wind Tunnel Testing

During descent after re-entry into the Earth's atmosphere, the Orion CM deploys its drogue parachutes at approximately Mach 0.7. Accurately predicting the dynamic pressure experienced by the drogue parachutes at deployment is critical to properly designing the parachutes. This NASA Engineering and Safety Center assessment was designed to provide a complete set of flowfield measurements on and around an idealized Orion Crew Module shape with the most appropriate wind tunnel simulation of the Orion flight conditions prior to parachute deployment. This document contains the details of testing and the outcome of the assessment.

Ross, James C.↗

Summary of Propulsion System Needs in Support of Project Constellation

In January 2004, the President of the United States established the Vision for Space Exploration (VSE) to return man to the moon and ultimately to extend manned space travel to Mars. This paper will summarize the manned space flight liquid propulsion system needs in support of Project Constellation over the next 10 years. It will include all engine needs to return man to the moon. An overview of engines currently under contract, those baselined but not yet under contract, and those engine needs that hav.e yet to be initiated. Project Constellation includes the components as shown Figure 1. Liquid propulsion systems supporting the manned portion of these elements include the following: the Crew Exploration Vehicle named Orion (crew module reaction control system (CMRCS), service module Orion Main Engine (OME), service module auxiliary RCS, and service module reaction control system (SMRCS)), the Crew Launch Vehicle named Ares 1 (J2X upper stage, first stage roll control system, second stage reaction control system, and the Ares I-X roll control system), the Heavy Lift Launch Vehicle named Ares V (RS68B first stage booster, J-2X upper stage, roll control systems, and the Earth Departure Stage (EDS) (powered by the same Ares V Upper Stage J-2X), and the Lunar Lander named Altair with both descent and ascent stages (lunar orbit insertion and descent main engine, ascent main engine, and attitude control systems for both stages). In addition, there may be additional engine needs for early demonstrators, but those will not be speculated on as part of this paper. Also, other portions of the VSE architecture, including the planned Orion abort demonstrations and the Lunar Precursor Robotic Program, are not addressed here as they either use solid motors or are focused on unmanned precursor missions.

Sumrall, Phil↗

Architectures and Evaluation for Adjustable Control Autonomy for Space-Based Life Support Systems

In the past five years, a number of automation applications for control of crew life support systems have been developed and evaluated in the Adjustable Autonomy Testbed at NASA's Johnson Space Center. This paper surveys progress on an adjustable autonomous control architecture for situations where software and human operators work together to manage anomalies and other system problems. When problems occur, the level of control autonomy can be adjusted, so that operators and software agents can work together on diagnosis and recovery. In 1997 adjustable autonomy software was developed to manage gas transfer and storage in a closed life support test. Four crewmembers lived and worked in a chamber for 91 days, with both air and water recycling. CO2 was converted to O2 by gas processing systems and wheat crops. With the automation software, significantly fewer hours were spent monitoring operations. System-level validation testing of the software by interactive hybrid simulation revealed problems both in software requirements and implementation. Since that time, we have been developing multi-agent approaches for automation software and human operators, to cooperatively control systems and manage problems. Each new capability has been tested and demonstrated in realistic dynamic anomaly scenarios, using the hybrid simulation tool.

Malin, Jane T.↗

Informatics and Decision Support Technology Roadmap

The purpose is to identify shortfalls/gaps, shortfall/gap closure strategies, and candidate investments to mature Informatics and Decision Support technologies in support of M2M Program risk mitigation activities, enable and enhance crew insight to system performance, decision making, and computer-human interaction. In this first publication, scope of the Informatics and Decision Support Roadmap is limited to Deep Space Crew Displays and Audio Systems. Future publications will expand scope to other capabilities.

Geraldo Cisneros↗

The orbiter air data system

Air data parameters are required during Orbiter atmospheric entry for use by the autoguidance, navigation, and flight control systems, and for crew displays. Conventional aircraft calibrations of the Orbiter air data system were not practicable for the Space Shuttle, therefore extensive wind tunnel testing was required to give confidence in the preflight calibrations. Many challenges became apparent as the program developed; in the overall system design, in the wind tunnel testing program, in the implementation of the air data system calibration, and in the use of the flight data to modify the wind tunnel results. These challenges are discussed along with the methods used to solve the problems.

Hillje, E. R.↗

Modeling a Wireless Network for International Space Station

This paper describes the application of wireless local area network (LAN) simulation modeling methods to the hybrid LAN architecture designed for supporting crew-computing tools aboard the International Space Station (ISS). These crew-computing tools, such as wearable computers and portable advisory systems, will provide crew members with real-time vehicle and payload status information and access to digital technical and scientific libraries, significantly enhancing human capabilities in space. A wireless network, therefore, will provide wearable computer and remote instruments with the high performance computational power needed by next-generation 'intelligent' software applications. Wireless network performance in such simulated environments is characterized by the sustainable throughput of data under different traffic conditions. This data will be used to help plan the addition of more access points supporting new modules and more nodes for increased network capacity as the ISS grows.

Alena, Richard↗

The Future of in-Situ Sequencing-Based Microbial Monitoring: Development of a Shelf-Stable Method for Artemis and Beyond

Microbial monitoring onboard the International Space Station (ISS) is essential for assessing the efficiency of the Environmental Control and Life Support Systems (ECLSS) and providing insight into potential risk to both crew and spacecraft. Historically, this monitoring required the need to culture organisms onboard, return these cultures to Earth, and then complete the identifications, a process that would take months. Over the past decade, and through numerous payloads, advances in molecular biology have enabled in-flight microbial identifications using nanopore sequencing. The swab-to-sequencer method resulting from these efforts was transitioned from research to operations for microbial monitoring under the Crew Health Care Systems (CHeCS) BioMole. Collectively, these accomplishments have propelled the swab-to-sequencer method to be selected as the Microbial Surface Monitor (MSM) for Gateway, as well as a payload on Artemis IV. However, the lack of cold stowage availability for Artemis requires modifications to the entire method due to the thermal instability of the reagents required for sample preparation. To achieve this, new development, optimization, and validations were undertaken. Key considerations included enzyme concentration, buffer compatibility, and equal or enhanced sensitivity and specificity. At each step, thorough side-by-side comparisons with the current ISS method were performed. The development of a robust shelf-stable method will ensure continued sequencing-based microbial monitoring for Artemis and beyond, providing data in near real-time, enhancing risk response time, and yielding clear insight into the microbiome of spacecraft.

Christian G Mena↗

Synthetic Biologic Membrane

The International Space Station (ISS) is a test bed for the technologies that will be used to travel to Mars and beyond. The lessons learned from operating the ISS provide valuable direction to future research and technology development programs. One of the most critical and complicated subsystems on ISS is the life support system. The life support system keeps the crew alive by recycling both air and water. The ISS water recycling system has been operating since 2009 and one of the main lessons learned is that reliability is a key technology performance metric. In the long run reliability is a key cost driver and is a critical factor in insuring crew safety. For long duration missions such as the exploration of Mars, where resupply of spare parts from Earth is difficult if not impossible, reliability is even more important. This presentation will cover research into improving the reliability of ISS systems. It will discuss research into the development of a biomimetic membrane materials that provides self-regeneration capabilities for water recycling systems. It will also cover research into past failures of the ISS water recycling system caused by astronaut bone loss and the build-up of trace contaminates in the cabin.

Biology↗