Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Resource Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

A simulation‐based integrated virtual testbed for dynamic optimization in smart manufacturing systems

Abstract In a manufacturing system, production control‐related decision‐making activities occur at different levels. At the process level, one of the main control activities is to tune the parameters of individual manufacturing equipment. At the system level, the main activity is to coordinate production resources and to route parts to appropriate workstations based on their processing requirement, priority indices, and control policy. At the factory level, the goal is to plan and schedule the processing of parts at different operations for the entire system in order to optimize certain objectives. Note that the results of such activities at different levels are closely coupled and affect the overall performance of the manufacturing system as a whole. Therefore, it is important to systematically integrate these control and optimization activities into one unified platform to ensure the goal of each individual activity is aligned with the overall performance of the system. In this paper, we develop a simulation‐based virtual testbed that implements dynamic optimization, automatic information exchange, and decision‐making from the process‐level, system‐level, and factory‐level of a manufacturing system into an integrated computation environment. This is demonstrated by connecting a Python‐based numerical computation program, discrete‐event simulation software (Simul8), and an optimization solver (CPLEX) via a third‐party master program. The application of this simulation‐based virtual testbed is illustrated by a case study in a machining shop.

Sun, Yuting↗

Stochastic Programming Approach for Resource Selection under Demand Uncertainty

Cost-efficient selection and scheduling of a subset of geographically distributed resources to meet the demands of a scientific workflow is a challenging problem. The problem is exacerbated by uncertainties in demand and availability of resources. In this paper, we present a stochastic optimization based framework for robust decision making in the selection of distributed resources over a planning horizon under demand uncertainty. We present a novel two-stage stochastic programming model for resource selection, and implement an L-shaped decomposition algorithm to solve this model. A Sample Average Approximation algorithm is integrated to enable stochastic optimization to solve problems with a large number of scenarios. Using the metric of stochastic solution, we demonstrate up to 30% cost reduction relative to solutions without explicit consideration of demand uncertainty for a 24-month problem. We also demonstrate up to 54% cost reduction relative to a previously developed solution for a 36-month problem. We further argue that the composition of resources selected is superior to solutions computed without explicit consideration of uncertainties. Given the importance of resource selection and scheduling of complex scientific workflows, especially in the context of commercial cloud computing, we believe that our novel stochastic programming framework will benefit many researchers as well as users of distributed computing resources.

scientific workflows, task scheduling, optimizatio↗

India 2030 Wind and Solar Integration Study (Interim Report)

India has established several targets for renewable energy capacity growth in the coming years, most notably the target of deploying 175 gigawatts (GW) of generation capacity from wind, solar, biomass, and small hydropower by 2022, and furthering that vision with India's Nationally Determined Contribution target of 40% renewable electricity capacity (including hydro) by 2030 (GOI 2015). Given the rapid and significant changes to India's power system to help meet these targets, the objective of this interim report is to understand the operational challenges for India's power grid in 2030. The primary contribution of this report is to establish a 2030 unit commitment and dispatch model of India's grid, with hourly temporal resolution, high spatial resolution of renewable energy resources, interstate transmission constraints, and unit-level generator characteristics. Annual simulations of 2030 operations demonstrate that a 22% annual penetration of wind and solar is manageable by India's grid. Most days in the year do not show signs of stress, and 99.97% of energy is served with the plans as presented. Average coal plant load factors are 70% for the year, up from relatively low plant load factors in recent years (Patel 2018). However, the results highlight specific challenges the grid may face during a small number of high-demand periods, resulting in unserved energy. The drivers behind the unserved energy suggest that this could be avoided with better coordination in scheduling. This report is part of a broader set of analyses under the Energy Transitions Commission (ETC), which includes collaborations with The Energy and Resources Institute (TERI), Climate Policy Initiative (CPI), and a broad stakeholder community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Hydro-terrestrial Modeling 2.0: Progress and Path Forward on Building a National Capability

It is the role of the U.S. federal government and its supporting agencies, including academia and future scientists, to ensure that its people have sustained and equitable freshwater services, as well as the critical knowledge necessary to make decisions about the future as it relates to freshwater services. Clear and consistent information and guidance from federal agencies is critical. Integrated Hydro-Terrestrial Modeling (IHTM), as a United States (U.S.) national capability, focuses on understanding, quantifying, and managing the replenishment of water supply through hydrologic cycle processes and their governing forces. To provide that information, we need enhanced IHTM capabilities that capitalize on the strengths of each U.S. governmental agency and its core mission. The first IHTM workshop was held in 2019, and its subsequent report was published in 2020. The U.S. Global Change Research Program (USGCRP) and member agencies held a second IHTM workshop (IHTM 2.0) from October 31 to November 2, 2023 in Reston, Virginia. The IHTM 2.0 workshop focused on the need to support a multiscale framework to accelerate research insights, better integrate operational and planning perspectives, and bridge national-to-regional capabilities to address major interdependent societal water challenges. The workshop was organized according to a “WHAT” and “HOW” framework, with the common underlying “WHY” being the integrated water resource challenges and the “WHO” defined through interagency and cooperating academic partners. The report provides a summary of plenary presentations and breakout discussions, and a road map that focuses on near-term activities.

99 GENERAL AND MISCELLANEOUS↗

DBMS UTILIZATION: A Corporate Information System (CIS) development approach

The Corporate Information System (CIS), an integrated information system intended to tie the corporation together as a functioning entity, is described. In addition to being a major upgraded automated data processing system, the CIS is a management philosophy which recognizes data as a valuable corporate resource and which distinguishes between data and selected data, or information. It further recognizes that different users need different kinds of information. Plans for CIS development are discussed. It will offer its users not just after-the-fact data, but timely information in a format that is meaningful and useful to the particular user, so that the information can be applied in planning, controlling, and decision making by all levels of management. In effect, CIS will help the corporation itself to function as a total, integrated system by typing together administrative activities through information exchange. The CIS supports the operational, tactical control, and strategic planning functions of the corporation. Operational functions are the day-to-day processing necessary to support the corporation's work, such as purchasing and payroll.

Rozett, P.↗

Mass and Volume Optimization of Space Flight Medical Kits

Resource allocation is a critical aspect of space mission planning. All resources, including medical resources, are subject to a number of mission constraints such a maximum mass and volume. However, unlike many resources, there is often limited understanding in how to optimize medical resources for a mission. The Integrated Medical Model (IMM) is a probabilistic model that estimates medical event occurrences and mission outcomes for different mission profiles. IMM simulates outcomes and describes the impact of medical events in terms of lost crew time, medical resource usage, and the potential for medically required evacuation. Previously published work describes an approach that uses the IMM to generate optimized medical kits that maximize benefit to the crew subject to mass and volume constraints. We improve upon the results obtained previously and extend our approach to minimize mass and volume while meeting some benefit threshold. METHODS We frame the medical kit optimization problem as a modified knapsack problem and implement an algorithm utilizing dynamic programming. Using this algorithm, optimized medical kits were generated for 3 mission scenarios with the goal of minimizing the medical kit mass and volume for a specified likelihood of evacuation or Crew Health Index (CHI) threshold. The algorithm was expanded to generate medical kits that maximize likelihood of evacuation or CHI subject to mass and volume constraints. RESULTS AND CONCLUSIONS In maximizing benefit to crew health subject to certain constraints, our algorithm generates medical kits that more closely resemble the unlimited-resource scenario than previous approaches which leverage medical risk information generated by the IMM. Our work here demonstrates that this algorithm provides an efficient and effective means to objectively allocate medical resources for spaceflight missions and provides an effective means of addressing tradeoffs in medical resource allocations and crew mission success parameters.

Monte Carlo Method↗

JPL Innovation Foundry

Space science missions are increasingly challenged today: in ambition, by increasingly sophisticated hypotheses tested; in development, by the increasing complexity of advanced technologies; in budgeting, by the decline of flagship-class mission opportunities; in management, by expectations for breakthrough science despite a risk-averse programmatic climate; and in planning, by increasing competition for scarce resources. How are the space-science missions of tomorrow being formulated? The paper describes the JPL Innovation Foundry, created in 2011, to respond to this evolving context. The Foundry integrates methods, tools, and experts that span the mission concept lifecycle. Grounded in JPL's heritage of missions, flight instruments, mission proposals, and concept innovation, the Foundry seeks to provide continuity of support and cost-effective, on-call access to the right domain experts at the right time, as science definition teams and Principal Investigators mature mission ideas from "cocktail napkin" to PDR. The Foundry blends JPL capabilities in proposal development and concurrent engineering, including Team X, with new approaches for open-ended concept exploration in earlier, cost-constrained phases, and with ongoing research and technology projects. It applies complexity and cost models, projectformulation lessons learned, and strategy analyses appropriate to each level of concept maturity. The Foundry is organizationally integrated with JPL formulation program offices; staffed by JPL's line organizations for engineering, science, and costing; and overseen by senior Laboratory leaders to assure experienced coordination and review. Incubation of each concept is tailored depending on its maturity and proposal history, and its highest leverage modeling and analysis needs.

mission development↗

Significance of Dynamic and Transient Analysis in the Design and Operation of Hybrid Energy Systems

Energy systems were historically designed and operated with a specific energy conversion objective, while managing loads and resources. In the recent years, the increased utilization of non-dispatchable renewable sources such as wind and solar has played a role in power quality and the reliability of power systems. In order to mitigate the risk associated with the non-dispatchable resources an integrated approach, such as Hybrid Energy Systems (HES), has to be taken, integrating the loads and resource management between the traditional thermal power plants and the non-dispatchable resources. As our electric energy becomes more diverse in its generation resources, the HES with its operational control system, its real-time view and its dynamic decisions making will become an essential part of the integrated energy systems and improve the overall grid reliability. The operational constraints of the energy sources on both the thermal power plants and the non-dispatchable resources in HES, plays a vital role in the planning and design stage. It is an established fact that the choice of energy source depends on the available natural resources and possible infrastructure. A critical component of decision-making depends on the complementary nature and controllability of the energy sources to supply the load demands with high reliability. Controllability of complex HES to achieve desired performance and flexibility is implemented via coordinated control systems while simultaneously generating electricity and other useful products such as useful heat or hydrogen. These systems are based on instrumentation, signal processing, control theory, and engineering system design. The entire HES along with the control systems are characterized by widely varying time constants. Hence, for a well-coordinated control and operation, we propose physics based modeling of the subsystems to assist in a dynamic and transient analysis. Dynamic and transient analysis in real and non-real time domain of the potential sources is capable of providing satisfactory results at the feasibility analysis stage. A simplified HES consisting of complementary energy sources is used to demonstrate the proposed approach. Suitable real time simulations to perform dynamic and transient analysis will be performed to verify results from the non-real time analysis. The role of such analyses, especially the real time dynamic and transient analysis for manual controls is elaborated. It is also discussed that faster than real time simulation will pave the future for controller rooms and hence manual control procedures. Multiple tools such as Real Time Simulator, Matlab®, Simulink®, PSCAD®, MOOSE, etc. are expected to be used for the HES analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards a framework of nuclear competencies

For the countries considering the introduction of a nuclear energy program, the management of human resources should be a part of the wider integrated management system in order to ensure long term safe and reliable operation. Nuclear energy strategy and approaches to human resources development should take into consideration such fundamental aspects as: development and implementation of a workforce plan, required competencies and qualifications, prerequisites for staffing a nuclear energy program, needed training programs and training facilities, qualification and training requirements. Development of common instruments that respond to the above needs and vision has lead to a new concept of European Credit System for Vocational Education and Training. The European Credit System for Vocational Education and Training (ECVET) is based on definition of 'learning outcomes ' in terms of knowledge, skills and competence, and on identification of portfolios of learning outcomes that allow an individual to prove competencies in a coherent manner. ECVET proposes a common understanding of basic definitions of education and training as well as of the new proposed concepts and it should be recognized by all employers in the EU. In this context, a number of 'Euratom Fission Training Schemes' (EFTS) have been launched in specific areas where a shortage of skilled professionals has been identified. In these schemes the competence building is the result of traditional education plus life-long learning, non-traditional learning, and other forms of educational experiences, relying, in particular, on border-less mobility to get acquainted with various sectors. Each particular Training Scheme should follow a similar path for the achievement of the designed learning outcomes (knowledge, skills, and attitudes). This path to the Training Scheme consists of different activities regarding: definition of training scheme learning outcomes and modules, assessment of prerequisites and student selection, student interview for development of individual training plan, start of the training activities under a specific training scheme. The introduction and recognition of ECVET will lead to a common taxonomy of competencies, and will provide also information about qualifications and units in numerical form, enabling mutual recognition of a training scheme. The description of the learning outcomes to be achieved for qualifying to a specific job profile may follow the analysis phase of the systematic approach to training (SAT). This would ensure a common tool, already used by all trainers. All these steps contribute to establishing of a framework of nuclear competencies recognized and accepted throughout member states. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Enhanced Power Grid Maintenance Planning and Quantum-Inspired Combinatorial Prospects

Efficient and reliable scheduling of maintenance for power generation and transmission infrastructure is essential for minimizing operational costs and ensuring grid stability. This paper introduces an integrated optimization framework for coordinated maintenance scheduling of generators and transmission lines under resource and reliability constraints. The model minimizes a composite cost function including maintenance and generation costs, as well as penalties for delayed maintenance, while satisfying N−1 security constraints, operational limits, and crew availability. Case studies on the IEEE 300-bus test system demonstrate the effectiveness of the proposed approach in producing feasible and cost-effective maintenance schedules. To address scalability and combinatorial complexity, the model is mapped into a Quadratic Unconstrained Binary Optimization (QUBO) problem, enabling exploration of solution approaches based on Quantum Imaginary Time Evolution (QITE). While the QUBO reformulation provides a foundation for future quantum-inspired optimization, this study focuses primarily on the development and demonstration of the classical optimization framework and illustrates the potential applicability of QITE in large-scale maintenance scheduling.

Chen, Yang [ORNL] (ORCID:0000000271693874)↗

Michigan resource inventories: Characteristics and costs of selected projects using high altitude color infrared imagery. Remote Sensing Project

The procedures and costs associated with mapping land cover/use and forest resources from high altitude color infrared (CIR) imagery are documented through an evaluation of several inventory efforts. CIR photos (1:36,000) were used to classify the forests of Mason County, Michigan into six species groups, three stocking levels, and three maturity classes at a cost of $4.58/sq. km. The forest data allow the pinpointing of marketable concentrations of selected timber types, and facilitate the establishment of new forest management cooperatives. Land cover/use maps and area tabulations were prepared from small scale CIR photography at a cost of $4.28/sq. km. and $3.03/sq. km. to support regional planning programs of two Michigan agencies. procedures were also developed to facilitate analysis of this data with other natural resource information. Eleven thematic maps were generated from Windsor Township, Michigan at a cost of $1,500 by integrating grid-geocoded land cover/use, soils, topographic, and well log data using an analytical computer program.

Enslin, W. R.↗

A development framework for distributed artificial intelligence

The authors describe distributed artificial intelligence (DAI) applications in which multiple organizations of agents solve multiple domain problems. They then describe work in progress on a DAI system development environment, called SOCIAL, which consists of three primary language-based components. The Knowledge Object Language defines models of knowledge representation and reasoning. The metaCourier language supplies the underlying functionality for interprocess communication and control access across heterogeneous computing environments. The metaAgents language defines models for agent organization coordination, control, and resource management. Application agents and agent organizations will be constructed by combining metaAgents and metaCourier building blocks with task-specific functionality such as diagnostic or planning reasoning. This architecture hides implementation details of communications, control, and integration in distributed processing environments, enabling application developers to concentrate on the design and functionality of the intelligent agents and agent networks themselves.

Adler, Richard M.↗

Long-Term Health Metric Development Effort

INTRODUCTION Probabilistic Risk Assessment (PRA) is a methodology applied when high-stakes decisions need to be made about complex systems. PRA often uses risk minimization to aid decision making, such as when establishing vehicle requirements or resource allocations. The NASA Human System Risk Board (HSRB) maintains the human spaceflight risk postures, many of which have in-mission medical outcomes, but the full risk set also includes performance and Long-Term Health (LTH) outcomes. An effort is underway to determine the dependencies between LTH risk outcomes and mission characteristics and to identify metrics for quantifying LTH outcomes. The LTH metrics will be incorporated into future PRA tools currently under development to support crew health and performance decision making. LONG-TERM HEALTH (LTH) RISK LTH risk encompasses the timeframe from immediately post-flight, through the rest of an astronaut’s career, through retirement, and until death. LTH outcomes include the time and interventions needed for the astronaut to return to preflight physiological states after experiencing spaceflight hazards and recovery from any in-mission medical events that persist into the post-flight timeframe. It includes chronic complications that may arise due to experiencing in-flight medical conditions or injuries and medical conditions that occur later in life with a higher probability of occurrence or with more severity because of their spaceflight exposure. Finally, LTH outcomes can also include a reduction in life expectancy due to spaceflight exposures. Eighteen of the HSRB risks contain an LTH component, each with a unique incidence rate and consequence severity. ON-GOING LTH METRIC DEVELOPMENT EFFORTS Based on guidance from a stakeholder workshop held on June 1, 2023, only LTH outcomes with causes tied to spaceflight experience that are significantly different from normal healthy aging and which can be affected by changes in in-mission resources are targeted for inclusion within the PRA modeling efforts. Current on-going efforts include a sensitivity analysis of potential in-flight medical conditions to determine which conditions may persist into post-flight and how the consequences may be affected by in-mission medical resources. Also underway is determination of differences in the time for a return to preflight physiological baselines when in-flight countermeasures are available versus when they are not. Analyses performed with publicly available astronaut data and collaborations with the Lifetime Surveillance of Astronaut Health team are being designed to understand which LTH outcomes differ significantly from natural healthy aging. Information exchanges are also occurring with LTH risk custodians to understand how they quantify outcomes. FUTURE PLANS Risk characteristics will be determined for each LTH risk that meets our inclusion criteria and the dependencies of their outcomes to in-mission resources and mission characteristics will be established. The individual risks will be integrated together into one or more high level LTH metrics for inclusion in the PRA tool, so that LTH risks can be considered along with in-mission risks during crew health and performance system decision support trade studies.

B. E. Lewandowski↗

2024 JISEA Annual Meeting: Session 1

This is the presentation for the 2024 JISEA Annual Meeting Session 1: Hard-to-Decarbonize Industries, which took place on February 26, 2024. The presentation includes slides from Chad Reese, Environmental Affairs Manager at the San Diego County Regional Airport Authority, on sustainability efforts at the San Diego International Airport; Jordan Lambert, Director of Ag Innovation at Colorado State University, on agricultural decarbonization; Ana Aday, Materials Science Researcher at NREL, on decarbonizing the cement and concrete industry; and Rolf Weberg, Director of the Natural Resource Research Institute at the University of Minnesota Duluth, on integrated industrial decarbonization.

agriculture decarbonization↗

Hydropower Flexibility and Environmental Tradeoffs Analysis

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordinating multiple tools, including water resources, ecological, and technical and economic power grid modeling, informs dam water releases. The case study, the Columbia River Basin multipurpose reservoir project, is operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. We integrated a production cost model, a water resource model, and decades of tribal knowledge to analyze the fish-friendly way of operating Columbia hydropower scheduling and grid impacts. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

Columbia River↗

Environmental Management System Plan

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.

99 GENERAL AND MISCELLANEOUS↗

Oak Ridge National Laboratory DOE Site Sustainability Plan (SSP) with FY 2013 Performance Data

Oak Ridge National Laboratory (ORNL) is both the largest science and energy laboratory of the US Department of Energy (DOE) and one of the oldest national laboratories still operating at its original site. These characteristics provide the Sustainable Campus Initiative (SCI) both a unique opportunity and a unique challenge to integrate sustainability into facilities and activities. As outlined in this report, SCI is leveraging the outcomes of ORNL’s DOE-sponsored research and development programs to maximize the efficient use of energy and natural resources across ORNL. Wherever possible, ORNL is integrating technical innovations into new and existing facilities, systems, and processes with a widespread approach to achieving Executive Order 13514. ORNL continues to pursue and deploy innovative solutions and initiatives to advance regional, national, and worldwide sustainability and continues to transform its culture and engage employees in supporting sustainability at work, at home, and in the community. Table 1 summarizes ORNL's FY 2013 performance and planned actions to attain future goals. ORNL has achieved numerous successes during FY 2013, which are described in detail throughout this document.

Nichols, Teresa A.↗