Search NASA⌕ Search

SEARCH · Search NASA

Results for “LIBRATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Preparing General Mission Analysis Tool for Operational Maneuver Planning of the Advanced Composition Explorer Mission

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

mission design↗

NASA SEXTANT Mission Operations Architecture

The Station Explorer for X-Ray Timing and Navigation (SEXTANT) mission is a technology demonstration enhancement to the Neutron Star Interior Composition Explorer (NICER) mission, a NASA Astrophysics Explorer Mission of Opportunity to the International Space Station (ISS) that was launched in June of 2017. The NICER instrument is a precision pointing X-ray telescope that times pulsar sourced photon arrivals which the SEXTANT mission uses to perform autonomous onboard X-ray Pulsar Navigation (XNAV). By comparing the detected time of arrival of X-ray photons to a reference of expected pulsar timing models, one can infer a range and range rate measurement based on light time delay. Since both timing and orientation information comes from a celestial source, this technology could provide a GPS-like navigation capability available throughout our Solar System and beyond. Applications that XNAV can support include outer planet and interstellar missions, manned missions, libration orbit missions, and current infrastructure such as the Deep Space Network (DSN). The SEXTANT team successfully completed a first demonstration of in-space and autonomous XNAV in November 2017. NICER and SEXTANT have separate teams, with NICER being the primary team with its own science objectives. Operational modes for both missions must have concurrent and independent components as well as an integrated ground system. This paper describes on the operational infrastructure and successful operations for performing X-ray Pulsar Navigation with the Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) demonstration. This paper first details the infrastructure implemented, then the concept of operations, and finally the operations for the SEXTANT demonstration and lessons learned.

Ground Systems↗

NASA Station Explorer for X-Ray Timing and Navigation Technology (SEXTANT) Mission Operations Architecture

"The Station Explorer for X-Ray Timing and Navigation (SEXTANT) mission is a technology demonstrationenhancement to the Neutron Star Interior Composition Explorer (NICER) mission, a NASA AstrophysicsExplorer Mission of Opportunity to the International Space Station (ISS) that was launched in June of 2017.The NICER instrument is a precision pointing X-ray telescope that provides measurements of neutron stars,which the SEXTANT mission uses to perform autonomous onboard X-ray Pulsar Navigation (XNAV) by usingmilli-second pulsars (MSPs), a category of neutron stars, as timing sources for navigation. By comparing thedetected time of arrival of X-ray photons to a reference of expected pulsar lightcurve timing models, one caninfer a range and range rate measurement based on light time delay. Since both timing and orientationinformation comes from a celestial source, this technology could provide a GPS-like navigation capabilityavailable throughout our Solar System and beyond. Applications that XNAV can support include outer planetand interstellar missions, manned missions, libration orbit missions, and current infrastructure such as the DeepSpace Network (DSN). The SEXTANT team successfully completed a rst demonstration of in-space andautonomous XNAV in November 2017. NICER and SEXTANT have separate teams, with NICER being theprimary team with its own science objectives. Operational modes for both missions must have concurrent andindependent components as well as an integrated ground system. Within this joint mission pro le, SEXTANToperations requires an infrastructure and cadence that is exible to handle concurrent science operations fromthe NICER team, independent autonomous navigation demonstrations, and events within the extensive ISSoperations environment. This paper rst details the infrastructure implemented and its concept of operations.It then describes the operations for the SEXTANT demonstration and lessons learned."

Yu, Wayne H.↗

Perturbations, TTVs & the (Un)reliability of Ephemerides of Kepler Planets

Fractional uncertainties quoted for orbital periods of the vast majority of planet candidates listed in recent Kepler catalogs are $<10^{-5}$, with values $\sim 10^{-6}$ (corresponding to 2 minutes per 4 years) being typical. These small uncertainties suggest ephemeris predictions for most Kepler planets are robust for decades to come. Tabulated periods list formal uncertainties in the mean times between midpoints of successive transits during the time interval in which transits were observed. However, transit timing variations (TTVs) produce errors in estimates of some planets’ orbital periods that need to be accounted for in certain dynamical investigations and ephemeris predictions. Periodic TTVs with timescales short compared to the interval of Kepler observations largely average out and do not produce significant errors in estimates of orbital periods. TTVs with timescales comparable to the interval of Kepler observations have been fit for dozens of Kepler planet candidates to estimate long-term average orbital periods (Holczer et al. 2016, ApJS 225, 9), and more detailed dynamical models have been used to estimate long-term average periods of a small number of well-studied planets. Most Kepler planets that show large TTVs are near mean-motion orbital resonances with other planets. The largest effect for planets moderately close to two-body resonances are due to rotation of the forced eccentricity vector by resonant perturbations; the timescale for this precession is typically short, so the variations tend to average out. Libration of planets locked in resonances typically occurs on timescales longer than the Kepler baseline, but few Kepler planets appear to be resonantly-locked. The more general but smaller (during the era of Kepler observations) effect is caused by secular precession of the planets' free eccentricities usually has a period much longer than the baseline of the Kepler observations, so it is not accounted for in estimates of mean periods or uncertainties. This precession causes a discrepancy between Kepler era mean orbital period and long-term mean orbital period can exist even for planets having TTVs that are too small to be observable during the epoch of Kepler observations.

Kepler↗

Analysis of Alternative Jettison Design Concepts for Deep-space Missions

The management of waste generated onboard spacecraft during future long-duration, deep-space missions will require different solutions from those currently implemented on the International Space Station, which consist exclusively of collecting, storing, and returning the waste to Earth. Alternative options for managing spacecraft waste are to process it for recycling and recovering resources, and to jettison it overboard. The waste generated during a deep-space mission is derived mainly from spacecraft logistics supplies, food and beverage residues, personal or scientific items used by the crew, and unused spare components. Uncontained and unprocessed trash is a health hazard and a habitat volume liability, which makes onboard long-term storage a nonviable option. Jettison of solid, processed waste appear, on the other hand, to be an effective solution for crewed deep-space missions, leading not only to volume reduction and habitat safening, but also to considerable mass savings in the spacecraft’s propulsion system. However, the disposal of trash overboard also creates a navigation hazard for spacecraft and the risk of collisions with planetary bodies. This paper investigates alternative jettison design concepts for L2 libration orbit, Mars conjunction-class, and Mars opposition-class missions.

Jurek Parodi↗

Exploring Transfers Between Earth-Moon Halo Orbits via Multi-Objective Reinforcement Learning

Multi-Reward Proximal Policy Optimization, a multi-objective deep reinforcement learning algorithm, is used to examine the design space of low-thrust trajectories for a SmallSat transferring between two libration point orbits in the Earth-Moon system. Using Multi-Reward Proximal Policy Optimization, multiple policies are simultaneously and efficiently trained on three distinct trajectory design scenarios. Each policy is trained to create a unique control scheme based on the trajectory design scenario and assigned reward function: a unique combination of weights scaling competing objectives that guide the spacecraft to the target mission orbit, incentivize faster flight times, and penalize propellant mass usage. Then, the policies are evaluated on the same set of perturbed initial conditions in each scenario to generate the propellant mass usages, flight times, and state discontinuities from a reference trajectory for each control scheme. This solution space of low-thrust trajectories for a SmallSat is used to examine the multi-objective trade space for the trajectory design scenario. By autonomously constructing the solution space, insights into the required propellant mass, flight time, and transfer geometry are rapidly achieved.

Christopher J Sullivan↗

Simulation of formation flight near Lagrange points for the TPF Mission

In this paper, we focus on an orbit near the L***2***. Lagrange point. Our work in the study of the feasibility of formation flight near the Lagrange points indicates that 1) formation flight near L***2*** is dynamically possible for the TPF Mission and 2) linear control around a nonlinear baseline libration orbit near L***2*** is adequate for the TPF Mission.

TPF↗

Simulation of formation flight near Lagrange Points for the TPF Mission

The formation flight problem near the Lagrange points is of great interest. Recent work in the study of the feasibility of formation flight near the Lagrange points indicates that 1.) Formation flight near L2 is dynamically possible for the TPF Mission; and 2. Linear control around a nonlinear baseline libration orbit near L2 is adequate for the TPF Mission. This paper provides simulations which validate these conclusions.

TPF↗

Mission analysis for the EM-1 CubeSats EQUULEUS and OMOTENASHI

EQUULEUS is a Lunar L2 orbiter and a 6-Unit CubeSat by JAXA and the University of Tokyo. OMOTENASHI is a 6-Unit CubeSat by JAXA, the world’s smallest Lunar lander. EQUULEUS and OMOTENASHI are among the 13 secondary payloads selected by NASA to be launched with Exploration Mission-1 in 2019. Despite their limited size and cost, EQUULEUS and OMOTENASHI are challenging missions, especially in terms of trajectory design and control. EQUULEUS exploits the Earth-Sun-Moon chaotic dynamics and enter a libration point orbit around the L2 of the Earth-Moon system, using a new water propulsion system with low thrust and little propellant. This “Orbit Control Experiment” is one of the main objectives of the mission. OMOTENASHI executes a semi-hard landing that requires breaking the spacecraft to a stop just a few-hundred meters above the Moon’s surface. Both missions present new and unique challenges, where the design of the nominal trajectory is mainly driven by the constrains on orbital control capabilities, and operational and robustness considerations. This paper presents the current baselines, and give an overview of the new techniques developed for their design.

Oshima, Kenta↗

Europa Lander Trajectory Design Using Lissajous Staging Orbits

Lissajous orbits and approximation of their invariant manifolds are used to generate landing trajectories to the surface of Europa. Each lissajous is discretized into individual revolutions that each resemble a periodic orbit. The unstable manifolds of each individual revolution propagated forward in time generate more surface coverage than manifolds of simple libration point orbits such as halo or Lyapunov orbits. The stable manifolds propagated backwards in time from the individual lissajous revolutions provide direct connections to the last phase of a moon tour. The strategy developed produces ballistic landing trajectories with a wide surface coverage, and allows for the decoupling of the landing and moon tour phase by using the lissajous as an intermediate staging orbit. The multiple revolutions of the lissajous, multiple departure times along each revolution, multiple quasi periodic options at each energy, and multiple energies of the lissajous family provide many degrees of freedom in the design process.

McElarth, Timothy P.↗

Connecting resonant trajectories to a Europa capture through Lissajous staging orbits

The current interest in studying the surface of Europa in search of biosignatures demands efficient strategies in mission design to reach this distant world. An affordable strategy is to use a low energy moon tour, which has natural access to the moon via the L2 gateway. Staging around this libration point allows to decouple the approaching moon tour and the landing trajectory, which enables the option of designing each phase separately. Furthermore, a staging step frees the landing time from the capture phase, adding an additional degree of freedom. Lissajous orbits are the dynamical structures used for these staging orbits. In this paper, the possible ballistic connections between the resonances from the moon tour and Lissajous orbits are studied, including the different geometries that allow for time phasing control.

Anderson, Rodney L.↗

The NASA OBPG 2020 On-Orbit Calibration of SNPP VIIRS for Ocean Color Applications

The NASA Ocean Biology Processing Group (OBPG) has continued monitoring the SNPP VIIRS on-orbit calibration for bands M1-M11 over its mission to optimize the calibration for ocean color applications. The OBPG has recently implemented several changes to the calibration scheme: using solar-derived f-factors to detrend the lunar observations; using long-term exponentials of time as basis vectors (along with libration angles) for radiometric fits to any resulting lunar temporal drifts; deriving gain adjustments to the solar f-factors from these exponentials; and deriving gain adjustments due to modulated RSRs outside of the solar/lunar calibration using TOA reference spectra. These calibration changes minimize the impact of uncertainties in any one component of the calibration on the derived f-factors. The final f-factors incorporate VIIRS solar diffuser measurements, h-factor BRDF corrections, lunar-derived gains, and modulated RSR gains. The combined BRDF corrections, lunar gain adjustments, and mRSR gain adjustments define effective h-factors for each band. The improvements in the on-orbit calibration are validated by evaluation of globally-derived anomaly plots of remote sensing reflectance for the ocean color bands. The ultimate goal of the OBPG calibration effort is incorporation of a consistent SNPP VIIRS ocean color data set into the NASA multi-mission ocean color climate data record.

VIIRS↗

A High-fidelity Performance and Sensitivity Analysis of X-ray Pulsar Navigation in Near-Earth and Cislunar Orbits

Millisecond X-ray pulsars are rapidly rotating neutron stars that emit broadband electromagnetic radiation, including X-rays. These emissions can appear as pulsations to distant observers with long-term stabilityrivaling laboratory atomic clocks. The concept of using X-ray pulsars for navigation, commonly referred to as XNAV, has a long history in the research literature. Notably, in 2017, NASA’s Station Explorer for X-ray Timing and Navigation (SEXTANT) mission,a technology enhancement to the Neutron Star Interior Composition Explorer, made a successful on-orbit demonstration of XNAV on the International Space Station (ISS) in Low-Earth-Orbit. This paper investigates the performance of XNAV in Earth and lunar regimes using a new high-fidelity XNAV analysis tool that builds on tools developed for SEXTANT and uses recent updates to the Goddard Enhanced Onboard Navigation System flight software. Specifically, we study the use of XNAV in an ISS-like orbit for comparison with SEXTANT results, in a highly-inclined geosynchronous orbit, and in an Earth-Moon L1 libration point Near Rectilinear Halo Orbit similar to that proposed for the planned lunar Gateway space station. This paper provides a high-level description of the XNAV analysis tool, baseline predicted performance results, selected sensitivity analyses, and conclusions.

Luke B Winternitz↗

Exploring Transfers Between Earth-Moon Halo Orbits via Multi-Objective Reinforcement Learning

Multi-Reward Proximal Policy Optimization, a multi-objective deep reinforcement learning algorithm, is used to examine the design space of low-thrust trajectories for a SmallSat transferring between two libration point orbits in the Earth- Moon system. Using Multi-Reward Proximal Policy Optimiza- tion, multiple policies are simultaneously and efficiently trained on three distinct trajectory design scenarios. Each policy is trained to create a unique control scheme based on the trajectory design scenario and assigned reward function: a unique combination of weights scaling competing objectives that guide the spacecraft to the target mission orbit, incentivize faster flight times, and penalize propellant mass usage. Then, the policies are evaluated on the same set of perturbed initial conditions in each scenario to generate the propellant mass usages, flight times, and state discontinuities from a reference trajectory for each control scheme. This solution space of low-thrust trajectories for a SmallSat is used to examine the multi-objective trade space for the trajectory design scenario. By autonomously constructing the solution space, insights into the required propellant mass, flight time, and transfer geometry are rapidly achieved.

Mashiku, Alinda K.↗

JWST REAL-TIME MID-COURSE CORRECTION MANEUVER MONITORING CONTINGENCY PREPARATION

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Wayne Yu↗

Orbit Determination for the James Webb Space Telescope During Launch and Early Orbit

The NASA James Webb Space Telescope (JWST) mission successfully launched on December 25, 2021, at 12:20 UTC. This paper details several novel challenges encountered in the orbit determination (OD) of JWST during the launch and early orbit. The first OD solution used only 6.5 hours of tracking data, much less than the 24 hours of data usually required for libration orbiters on an outbound trajectory. In addition, the observatory area exposed to solar radiation pressure changed through a series of sunshield deployments while concurrent momentum unloads and attitude telemetry outages occurred. This paper covers how the Flight Dynamics Team (FDT) prepared for these challenges, how these challenges were handled on-orbit, and the performance of the resulting OD solutions.

Orbit Determination↗

JWST Real-Time Mid-Course Correction Maneuver Monitoring Contingency Preparation

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Toni Santacroce↗