Search NASA⌕ Search

SEARCH · Search NASA

Results for “Permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Submittal of Solid Waste Management Units and Areas of Concern Annual Long-Term Monitoring and Maintenance Report for Calendar Year 2017

This SWMU and AOC Annual Long-Term Monitoring and Maintenance (LTMM) Report for Calendar Year 2017 (Annual LTMM Report) details the measures performed for 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) at Sandia National Laboratories/New Mexico (SNL/NM) in accordance with the requirements of the “Long-Term Monitoring and Maintenance [LTMM] Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit (Permit), which took effect February 26, 2015. This Annual LTMM Report does not present the measures for SWMU 76, Mixed Waste Landfill (MWL), as the applicable MWL reporting adheres to the approved MWL LTMM Plan, Section 4.8.1 and requires a separate annual report which will be submitted to the New Mexico Environment Department by June 30, 2018. Measures at these SWMUs and AOCs include surveillance of site conditions and maintenance of institutional controls. Conditions requiring maintenance or repair activities were identified at three of the inspected SWMUs and AOCs (SWMUs 45, 46, and 87) during the Permit-required annual site inspections. One SWMU identification sign located at SWMU 46 and two identification signs located at SWMU 87 were replaced due to weathered lettering. Evidence of erosion was observed at SWMU 45 during the annual site inspection; erosion controls will be implemented as needed to prevent the inadvertent exposure of hazardous wastes or hazardous waste constituents. SWMU 45 is located on the sloped border of Tijeras Arroyo south of Technical Area-IV. The erosion controls planned for the Tijeras Arroyo Escarpment will address not only SWMU 45, but also SWMUs 46 and 229 as a best management practice. SNL/NM personnel plan to complete this work in calendar year 2018. The status and progress of this project will be reported in the 2018 Annual SWMUs and AOCs Annual LTMM Report for Calendar Year 2018 to be submitted to the New Mexico Environment Department on March 31, 2019, as required by the Permit. Based upon the inspections performed and site conditions observed, the administrative and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Storm Water Pollution Prevention Plan TA-60 Material Recycling Facility

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Roads and Grounds Facility and Associated Sigma Mesa Staging Area

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan TA-60 Asphalt Batch Plant

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program CY 2018 Triennial Report of the Monitoring Well Inspection and Maintenance Program Y-12 National Security Complex Oak Ridge, Tennessee

This document is the Triennial Report for the Well Inspection and Maintenance Program of the Y-12 National Security Complex (Y-12) Groundwater Protection Program (GWPP) at U.S. Department of Energy (DOE) Y-12 and includes monitoring well inspections and well maintenance activities performed at Y-12 during calendar years (CYs) 2016 through 2018. This report formally documents well inspections completed by GWPP on active and inactive groundwater monitoring wells that are part of the Y-12 monitoring network and includes well inspections performed by URS|CH2M Oak Ridge, L.L.C. (UCOR), which administers the DOE Office of Environmental Management Y-12 Water Resources Restoration Program (WRRP). The WRRP includes wells that are utilized for the regulatory monitoring of Resource Conservation and Recovery Act (RCRA) post-closure permits and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Effectiveness and Records of Decision and Solid Waste Disposal Facility (Landfill) permits and includes monitoring wells located at the CERCLA Environmental Management Waste Management Facility. Beginning in 2018, UCOR terminated three of their RCRA post-closure permits and is monitoring the former RCRA-permitted facilities under CERCLA. Consequently, the number of monitoring wells in the Y-12 network that receive UCOR-performed inspections has decreased significantly.

54 ENVIRONMENTAL SCIENCES↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Southeast Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test at Citronelle Field, Mobile Co., AL Surface and Shallow Subsurface Monitoring

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is one of the United States’ largest demonstrations of CO 2 capture, transportation, injection, storage and monitoring using CO 2 derived from a coal-fired electric generating unit. This report summarizes the background and initial injection phase groundwater and soil flux monitoring results. The purpose of the groundwater monitoring program, as prescribed in the Underground Injection Control (UIC) permits is to assure that the project’s activities do not harm Underground Sources of Drinking Water (USDWs). In particular, the objective of the program is to monitor for the release of injected CO2 into groundwater aquifers at the project site. Three shallow USDW monitoring wells were installed as part of the groundwater monitoring program. In addition, a water supply well located near the project’s deep characterization well was utilized for monitoring. Seventeen metals, general chemistry and field parameters (e.g. pH, specific conductance, turbidity) were sampled three times prior to injection and quarterly during the injection period to date. Changes in groundwater geochemistry potentially attributable to a release of carbon dioxide into the USDW from the injection activities are decreasing pH and increasing TIC. The change in pH may also accompany the mobilization of certain metals within the groundwater, but the changes are likely site-specific, based on the natural aquifer mineralogy (Wilkin and Diguilio, 2010). At this time, no downward trends for pH and increasing trends for TIC have been statistically determined in the monitor wells. Valid detections exceeding both the UIC discharge limit and the range of background concentrations observed as of the N=11 event include: Exceedance of the UIC permit discharge limit of manganese at D-9-7 MW-2S and D-9-9 MW-1, and exceedance of the UIC permit discharge limit of iron at D-9-9 MW-1. In addition, a statistically significant increase of barium and manganese has been observed at D-9-9 MW-1. However, Additional lines of evidence (namely, expected shifts in TIC or pH, per the research cited above) to interpret the cause (e.g., potential carbon dioxide influence) of the statistically determined exceedances and/or increases are absent at this time. Quarterly groundwater sampling and analysis will continue throughout the project. The UIC permit requires that soil CO 2 flux shall be monitored at the land surface at the injection site and at nearby locations. Twelve locations were chosen for surveys including a mix of near wellbore and offset locations. To date, 24 surveys have taken place with 12 occurring prior to the onset of injection operations in August 2012. Soil CO 2 flux appears to positively covary with soil temperature. A notably high soil CO 2 flux value (21 µmol/m 2 /sec) was observed from the D-9-9 #2 chamber location during sampling event #24 (9/24/2014). As a result of this finding, the frequency of soil CO 2 flux monitoring events will be increased to twice-monthly until this anomaly can be confirmed or determined to be an outlier. Soil CO 2 flux monitoring will continue for the duration of the project.

01 COAL, LIGNITE, AND PEAT↗

SECARB-USA: Needs Assessment Framework for Storage Complexes (Task 2.1.b)

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization. Results show that the total cost of characterization prior to obtaining a permit is convergent, because the permit and modeling requirements drive projects to obtain the same types of data for all cases. The high cost data that control cost are 1) drilling, coring, core-testing, logging, sampling and testing a characterization well and 2) collection of a 3-D seismic survey to map reservoir and confining system properties over the area of the plume or the area of elevated pressure. In 5 of our case study sites we determined that one or both of these costs could be avoided because the needs are met by available data.

54 ENVIRONMENTAL SCIENCES↗

The motion of interconnected flexible bodies

The equations of motion for an arbitrarily interconnected collection of substructures are derived. The substructures are elastic bodies which may be idealized as finite element assemblies and are subject to small deformations relative to a nominal state. Interconnections between the elastic substructures permit large relative translations and rotations between substructures, governed by Pfaffian constraints describing the connections. Screw connections (permitting rotation about and translation along a single axis) eliminate constraint forces and incorporate modal coupling. The problem of flexible spacecraft simulation is discussed. Hurty's component mode approach is extended by permitting interconnected elastic substructures large motions relative to each other and relative to inertial space. The hybrid coordinate methods are generalized by permitting all substructures to be flexible (rather than only the terminal members of a topological tree of substructures). The basic relationships of continuum mechanics are developed.

Hopkins, A. S.↗

Confidence set inference with a prior quadratic bound

In the uniqueness part of a geophysical inverse problem, the observer wants to predict all likely values of P unknown numerical properties z = (z sub 1,...,z sub p) of the earth from measurement of D other numerical properties y(0)=(y sub 1(0),...,y sub D(0)) knowledge of the statistical distribution of the random errors in y(0). The data space Y containing y(0) is D-dimensional, so when the model space X is infinite-dimensional the linear uniqueness problem usually is insoluble without prior information about the correct earth model x. If that information is a quadratic bound on x (e.g., energy or dissipation rate), Bayesian inference (BI) and stochastic inversion (SI) inject spurious structure into x, implied by neither the data nor the quadratic bound. Confidence set inference (CSI) provides an alternative inversion technique free of this objection. CSI is illustrated in the problem of estimating the geomagnetic field B at the core-mantle boundary (CMB) from components of B measured on or above the earth's surface. Neither the heat flow nor the energy bound is strong enough to permit estimation of B(r) at single points on the CMB, but the heat flow bound permits estimation of uniform averages of B(r) over discs on the CMB, and both bounds permit weighted disc-averages with continous weighting kernels. Both bounds also permit estimation of low-degree Gauss coefficients at the CMB. The heat flow bound resolves them up to degree 8 if the crustal field at satellite altitudes must be treated as a systematic error, but can resolve to degree 11 under the most favorable statistical treatment of the crust. These two limits produce circles of confusion on the CMB with diameters of 25 deg and 19 deg respectively.

Backus, George E.↗

Magneto-inductive skin sensor for robot collision avoidance: A new development

Safety is a primary concern for robots operating in space. The tri-mode sensor addresses that concern by employing a collision avoidance/management skin around the robot arms. This rf-based skin sensor is at present a dual mode (proximity and tactile). The third mode, pyroelectric, will complement the other two. The proximity mode permits the robot to sense an intruding object, to range the object, and to detect the edges of the object. The tactile mode permits the robot to sense when it has contacted an object, where on the arm it has made contact, and provides a three-dimensional image of the shape of the contact impression. The pyroelectric mode will be added to permit the robot arm to detect the proximity of a hot object and to add sensing redundancy to the two other modes. The rf-modes of the sensing skin are presented. These modes employ a highly efficient magnetic material (amorphous metal) in a sensing technique. This results in a flexible sensor array which uses a primarily inductive configuration to permit both capacitive and magnetoinductive sensing of object; thus optimizing performance in both proximity and tactile modes with the same sensing skin. The fundamental operating principles, design particulars, and theoretical models are provided to aid in the description and understanding of this sensor. Test results are also given.

Chauhan, D. S.↗

DMFS: A Data Migration File System for NetBSD

I have recently developed dmfs, a Data Migration File System, for NetBSD. This file system is based on the overlay file system, which is discussed in a separate paper, and provides kernel support for the data migration system being developed by my research group here at NASA/Ames. The file system utilizes an underlying file store to provide the file backing, and coordinates user and system access to the files. It stores its internal meta data in a flat file, which resides on a separate file system. Our data migration system provides archiving and file migration services. System utilities scan the dmfs file system for recently modified files, and archive them to two separate tape stores. Once a file has been doubly archived, files larger than a specified size will be truncated to that size, potentially freeing up large amounts of the underlying file store. Some sites will choose to retain none of the file (deleting its contents entirely from the file system) while others may choose to retain a portion, for instance a preamble describing the remainder of the file. The dmfs layer coordinates access to the file, retaining user-perceived access and modification times, file size, and restricting access to partially migrated files to the portion actually resident. When a user process attempts to read from the non-resident portion of a file, it is blocked and the dmfs layer sends a request to a system daemon to restore the file. As more of the file becomes resident, the user process is permitted to begin accessing the now-resident portions of the file. For simplicity, our data migration system divides a file into two portions, a resident portion followed by an optional non-resident portion. Also, a file is in one of three states: fully resident, fully resident and archived, and (partially) non-resident and archived. For a file which is only partially resident, any attempt to write or truncate the file, or to read a non-resident portion, will trigger a file restoration. Truncations and writes are blocked until the file is fully restored so that a restoration which only partially succeed does not leave the file in an indeterminate state with portions existing only on tape and other portions only in the disk file system. We chose layered file system technology as it permits us to focus on the data migration functionality, and permits end system administrators to choose the underlying file store technology. We chose the overlay layered file system instead of the null layer for two reasons: first to permit our layer to better preserve meta data integrity and second to prevent even root processes from accessing migrated files. This is achieved as the underlying file store becomes inaccessible once the dmfs layer is mounted. We are quite pleased with how the layered file system has turned out. Of the 45 vnode operations in NetBSD, 20 (forty-four percent) required no intervention by our file layer - they are passed directly to the underlying file store. Of the twenty five we do intercept, nine (such as vop_create()) are intercepted only to ensure meta data integrity. Most of the functionality was concentrated in five operations: vop_read, vop_write, vop_getattr, vop_setattr, and vop_fcntl. The first four are the core operations for controlling access to migrated files and preserving the user experience. vop_fcntl, a call generated for a certain class of fcntl codes, provides the command channel used by privileged user programs to communicate with the dmfs layer.

Studenmund, William↗

Centrifuge Facility for the International Space Station Alpha

The Centrifuge Facility planned for the International Space Station Alpha has under-one considerable redesign over the past year, primarily because the Station is now viewed as a 10 year mission rather than a 30 year mission and because of the need to simply the design to meet budget constraints and a 2000 launch date. The basic elements of the Centrifuge Facility remain the same, i.e., a 2.5 m diameter centrifuge, a micro-g holding unit, plant and animal habitats, a glovebox and a service unit. The centrifuge will still provide the full range of artificial gravity from 0.01 a to 2 - as originally planned; however, the extractor to permit withdrawal of habitats from the centrifuge without stopping the centrifuge has been eliminated. The specimen habitats have also been simplified and are derived from other NASA programs. The Plant Research Unit being developed by the Gravitational Biology Facility will be used to house plants in the Centrifuge Facility. Although not as ambitious as the Centrifuge Facility plant habitat, it will provide much better environmental control and lighting than the current Shuttle based Plant Growth Facility. Similarly, rodents will be housed in the Advanced Animal Habitat being developed for the Shuttle program. The Centrifuge Facility and ISSA will provide the opportunity to perform repeatable, high quality science. The long duration increments available on the Station will permit multigeneration studies on both plants and animals which have not previously been possible. The Centrifuge Facility will accommodate sufficient number of specimens to permit statistically significant sampling of specimens to investigate the time course of adaptation to altered gravity environments. The centrifuge will for the first time permit investigators to use gravity itself as a tool to investigate fundamental processes, to investigate the intensity and duration of gravity to maintain normal structure and function, to separate the effects of micro-g from other 0 environmental factors and to examine artificial gravity as a potential countermeasure for the physical deconditioning observed during spaceflight.

Johnson, Catherine C.↗

Composite Thermal Switch

Lithium primary and lithium ion secondary batteries provide high specific energy and energy density. The use of these batteries also helps to reduce launch weight. Both primary and secondary cells can be packaged as high-rate cells, which can present a threat to crew and equipment in the event of external or internal short circuits. Overheating of the cell interior from high current flows induced by short circuits can result in exothermic reactions in lithium primary cells and fully charged lithium ion secondary cells. Venting of the cell case, ejection of cell components, and fire have been reported in both types of cells, resulting from abuse, cell imperfections, or faulty electronic control design. A switch has been developed that consists of a thin layer of composite material made from nanoscale particles of nickel and Teflon that conducts electrons at room temperature and switches to an insulator at an elevated temperature, thus interrupting current flow to prevent thermal runaway caused by internal short circuits. The material is placed within the cell, as a thin layer incorporated within the anode and/or the cathode, to control excess currents from metal-to-metal or metal-to-carbon shorts that might result from cell crush or a manufacturing defect. The safety of high-rate cells is thus improved, preventing serious injury to personnel and sensitive equipment located near the battery. The use of recently available nanoscale particles of nickel and Teflon permits an improved, homogeneous material with the potential to be fine-tuned to a unique switch temperature, sufficiently below the onset of a catastrophic chemical reaction. The smaller particles also permit the formation of a thinner control film layer (<50 m), which can be incorporated into commercial high-rate lithium primary and secondary cells. The innovation permits incorporation in current lithium and lithium-ion cell designs with a minimal impact on cell weight and volume. The composite thermal switch (CTS(TradeMark)) coating can be incorporated in either the anode or cathode or both. The coating can be applied in a variety of different processes that permits incorporation in the cell and electrode manufacturing processes. The CTS responds quickly and halts current flow in the hottest parts of the cell first. The coating can be applied to metal foil and supplied as a cell component onto which the active electrode materials are coated.

McDonald, Robert↗

Air Pollutant Emissions and Regulatory Implications of Co-Processing Raw Bio-Oil in U.S. Petroleum Refineries

Pyrolysis oil, often referred as bio-oil or biocrude, has attracted considerable attention because it has higher energy density and carbon content compared to the raw biomass. Using pyrolysis oil derived from low cost and underutilized biomass to produce renewable hydrocarbon fuels provides a viable link between the agriculture/forestry and (petro-) chemical industry. Co-processing bio-oil with vacuum gas oil (VGO) in petroleum refinery is appealing due to the relatively low capital requirement to retrofit refinery and the compatibility of fuel products with existing infrastructure. In order to implement co-processing, a petroleum refinery would need to consider several process modifications and therefore could be subject to varying levels of air permitting requirements based on bio-oil co-processing ratio, co-processing capacity in existing units, the amount of regulated pollutants expected to be emitted, among other factors. This analysis considers co-processing 5% (by weight) of raw bio-oil with VGO in the fluidized catalytic cracking (FCC) unit(s) in a petroleum refinery. We estimate the potential increase in emissions of regulated air pollutants resulting from the modifications required to implement bio-oil co-processing and evaluate the regulatory and permitting implications for three FCC size categories in the U.S. refineries, which could co-processes raw bio-oil to produce partially renewable transportation fuels. We also assess technically feasible emission control options petroleum refineries could adopt to avoid being subject to major source permitting requirements if the estimated increase in regulated air pollutant emission exceeds the applicable threshold for major modifications. Insights from our analysis can help overcome challenges and risks associated with timely obtaining air permits required to implement bio-oil co-processing in existing refineries. Our analysis also provides needed information for decision makers (e.g., local air quality agencies) to understand the potential air quality implications for retrofitting refineries to co-process bio-oil, particularly in areas with high concentration of petroleum refineries.

09 BIOMASS FUELS↗

Big Sky Regional Carbon Sequestration Partnership (Phase III Final Scientific/Technical Report)

The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.

54 ENVIRONMENTAL SCIENCES↗

Andra's strategy and approach for operational safety of French underground facility Cigeo - 15127

According to the French Act on radioactive waste of 28 June 2006, Andra shall design a reversible repository. In response to this demand, Andra is developing the industrial project namely 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. The previous safety cases of 2005, 2009 and 2012 give a sound basis to assess Cigeo's safety both for the operational and post-closure periods. Regarding operational safety, in this new stage of the project, the challenging issues for the preparation of the safety case are the following: - To adapt the various regulatory frameworks (nuclear and non-nuclear) to the underground facility - To design the underground facility and handling equipment's to reduce at first risks in the underground facility as such radioactive particles release, gas explosion, fire and co-activity and limit their consequence. - To establish waste acceptance criteria to be fulfilled by waste producers in line with operational safety and design options. The objective of the paper is to present the experience of Andra in operation safety of the underground facility of Cigeo. Operational safety for Cigeo is assessed as much as possible according to the existing French regulations and guidance for nuclear facilities. Indeed, compared to existing nuclear facilities, a geological repository is a specific case due to the existence of underground facilities with particularities such as: - ventilation management in a large scale underground facility, - fire risk management. As an input for the industrial design of Cigeo for operation, Andra defined a fire guidance and a specific reference safety guidance, based on the adaptation of the French nuclear regulatory texts for and when feasible to mines and tunnels regulatory texts and on its own experience gained through safety operational reports since 2005 and their reviews by the Safety Authority. - underground co-activity of nuclear operation with construction works. According to the common 'defense-in depth' principle for nuclear facilities, these guidelines for the industrial design of Cigeo for operation consider the successive levels of defense of: - Preventing the risk and its spreading by design and construction; - Detecting incidents and early fighting by design and operation dispositions (detection and control systems, survey procedure); - Controlling incidents and limiting of their consequences by safeguarding systems, specific procedures. At that stage, design options for Cigeo constitute an adequate response to the operational safety functions and requirements: - Two levels of containment are set up: the first one is ensured by the waste package, the second one is ensured from the surface facility to the disposal vaults by the transfer cask during the transfer of waste packages in the disposal vaults by the disposal vault itself and a nuclear ventilation with HEPA filter; - Favorable options for fire risk prevention and mitigation: transport system minimizing heat load (cable car for the transfer from the surface, electric transfer engines), twin access tunnels to ease fire-fighting and evacuation...; - Permanent complete physical separation of nuclear zone and construction zone (including ventilation systems). In practice, operation safety assessment of Cigeo, designed following the aforesaid reference safety guidelines, follows a common risk analysis (internal aggressions such as auxiliary losses, chemical and toxic risks, fall or collision, fire, human factors and external aggressions such as earthquake, air traffic, flooding) with the following steps: - Identification of the major risks and the design basis scenarios that have to be considered for dimensioning of the installations and the safety devices; - On the basis of these different situations, those who will have to be quantified are identified; one or more representative and envelop situations are chosen in order to evaluate robustness of the installation. Quantitative evaluation of these situations permits to: - identify the consequences on man, environment and installation, and in particular to gain confidence in the maintaining of the safety functions; - identify or define the technic and/or organisational dispositions classified as 'important elements for protection' (IEP); - Situations beyond dimensioning permit to verify the robustness of the installation. They permit, on one hand to identify possible complementary material or organisational dispositions; on the other hand, to define the 'hard core' i.e. structures, systems and components that permit to maintain the confinement function of radioactive substance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deactivation and Demolition (D and D) of the Toxic Substance Control Act (TSCA) Incinerator Oak Ridge, Tennessee - 19184

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In 1989, the U.S. Environmental Protection Agency (EPA) added the Oak Ridge Reservation to the National Priorities List of sites and facilities that pose a sufficient threat to human health or the environment to warrant cleanup. The U.S. Department of Energy is cleaning up the Oak Ridge Reservation under a Federal Facility Agreement with the EPA and the Tennessee Department of Environment and Conservation. Many types of waste have been managed and disposed as part of the multi-decade cleanup effort. One unique facility, the Toxic Substance Control Act (TSCA) Incinerator, was constructed at the Department of Energy's Est Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Incinerator was constructed in the mid-1980's and underwent a series of test burns and readiness reviews to obtain the necessary environmental permits and operating approvals from state and federal regulatory agencies. With these in place, the incinerator began routine operations in 1991. It was designed and permitted for receiving, sorting, storing, preparing, and thermally destroying low-level radioactive and RCRA mixed waste contaminated with PCBs. The incinerator was named after a law passed in 1976 that provides the U.S. Environmental Protection Agency with authority to require reporting, record-keeping, testing, and restrictions relating to chemical substances and/or mixtures. During its operating lifetime, the one-of-a-kind thermal treatment facility burned materials regulated under TSCA and the Resource Conservation and Recovery Act (RCRA), most notably radiologically-contaminated polychlorinated biphenyls (PCBs). The TSCA Incinerator met or exceeded environmental regulations and DOE requirements for the treatment of these types of wastes. After more than 18 years of operation and more than 35 million pounds of waste safely incinerated, the TSCA Incinerator shut down operations on December 2, 2009. The TSCA Incinerator has been called a national resource for DOE sites from coast to coast. As the only U.S. facility permitted to incinerate specialized types of wastes, it not only accepted material from the Oak Ridge Reservation but also other facilities across the nationwide DOE complex. Over the years, a dynamic team of hard working and talented people operated and maintained the facility under the most stringent environmental permits and site requirements. The facility has played a key role in the treatment of radioactive PCB and hazardous wastes (mixed wastes) from the Oak Ridge Reservation, as well as from other facilities across the DOE complex. Through its support to over 20 sites in the DOE complex, environmental waste from past and ongoing operations has been safely and permanently treated. In the years since it was shut down, deactivation workers have been preparing TSCA for demolition. This work scope included triple cleaning, rinsing of all production equipment and tanks to RCRA clean criteria, filling sumps, encapsulating PCB and radioactive contamination, removal of universal waste (asbestos. lead and mercury), draining and disposal of residual water in tanks and transfer piping, and removing and disposing of carbon vessels, which were part of the water management system. In 2018, the facility was successfully deactivated and demolished, permanently removing one of the most unique facilities in the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗