Forecast-based stochastic optimization for a load powered by wave energy
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
It is noted that current reliability analysis tools differ not only in their solution techniques, but also in their approach to model abstraction. The analyst must be satisfied with the constraints that are intrinsic to any combination of solution technique and model abstraction. To get a better idea of the nature of these constraints, three reliability analysis tools (HARP, ASSIST/SURE, and CAME) were used to model portions of the Integrated Airframe/Propulsion Control System architecture. When presented with the example problem, all three tools failed to produce correct results. In all cases, either the tool or the model had to be modified. It is suggested that most of the difficulty is rooted in the large model size and long computational times which are characteristic of Markov model solutions.
The Advanced Test Reactor (ATR) at INL measures reactor power through various methods, two of them being thermal and Nitrogen-16 (N-16) activity. Water power calculator (WPC) is a thermal power system that measures flow and temperature to determine thermal quadrant powers. The N-16 system utilizes a beta detector that outputs Nitrogen activation levels to calculate lobe power through an algorithm called Lobe Power Calculation and Indication system (LPCIS). The LPCIS utilizes the N-16 system and the WPC system to determine reactor core power levels. The WPC provides accurate calculations of quadrant and total reactor thermal power. With the use of WPC measurements, thermal-to-N-16 (T2N) power ratios are produced to determine if the two indication systems agree on core power. Relative magnitude equations are used to utilize N-16 coefficients and multipliers to improve the indications of the LPCIS. These correct indications are crucial for maintaining safety limits because operators rely on this information for decision making. Currently, the LPCIS system uses linear equations and matrices to calculate lobe power through multipliers and coefficients. Advancements in technology and system upgrades have increased the accuracy of power readings by making the system more dynamic. The new proposed coefficient and multiplier method implements a cycle specific and physics-based model intended for changing coefficients during operation. This calibration experiment focused on power splitting, outer shim and neck shim, as well as fuel burning into the reactor digital acquisition system (RDAS) weighting factors. Results demonstrated that the physics learning method yields a smaller error margin inside of the desired power range for the data set 166-A. Continuing to improve the physics-based model will help improve the power accuracy of the LPCIS system.
The scale factor for the use of power plants of a certain type refers to the fraction of their use in the overall energy balance of the system. Energy production by wind power plants depends directly on the wind conditions in a particular location and is stochastic in character. Increasing the fraction of these installations in the overall balance of a system also requires an increase in the power reserve capacity. Here the time a power system remains in the power deficit zone is estimated as a function of the fraction of wind power plants in the system structure. Two approaches to the placement of wind power units within a power system are compared– individual components and a system of a set of components. It is concluded that even within a small power system, combining geographically distributed components with favorable and unfavorable wind conditions into a system can have a positive effect on all the components within certain ranges of the scale factor.
Transient stability assessment (TSA) is a cornerstone for resilient operations of todays interconnected power grids. This paper is a confluence of quantum computing, data science and machine learning to potentially address the power system TSA issue. Here, we devise a quantum TSA (QTSA) method to enable scalable and efficient data-driven transient stability prediction for bulk power systems, which is the first attempt to tackle the TSA issue with quantum computing. Our contributions are three-fold: 1) A high expressibility, low-depth (HELD) quantum circuit is designed for accurate and noise-resilient TSA; 2) A quantum natural gradient descent algorithm is developed for efficient HELD circuit training; 3) A systematical analysis on QTSAs performance under various quantum factors is per-formed. QTSA underpins a foundation of quantum-enabled and data-driven power grid stability analytics. It renders the intractable TSA straightforward and effortless in the Hilbert space, and therefore provides stability information for power system operations. Extensive experiments on quantum simulators and real quantum computers verify the accuracy, noise-resilience, scalability and universality of QTSA.
This submission includes System Content Models with data following manufacture for the Verdant Power TriFrame, Gen5 Kinetic Hydropower System (KHPS) Turbines, and Balance of Plant (BOP). The TriFrame installs 3 Gen5 KHPS Turbines. The BOP system controls the turbines and interconnects the TriFrame to shoreline with supervisory control and data acquisition (SCADA).
New Technologies for Power System Operation and Analysis considers the very latest developments in renewable energy integration and system operation, including electricity markets and wide-area monitoring systems and forecasting. Helping readers quickly grasp the essential information needed to address renewable energy integration challenges, this new book looks at basic power system mathematical models, advanced renewable integration and system optimizations from transmission and distribution system sides. Sections cover wind, solar, gas and petroleum, making this a useful reference for all engineers interested in power system operation.
Increasing wind and solar penetration and low natural gas prices have reduced electricity prices in competitive power markets in recent years, while also increasing the relative importance of ancillary services in balancing short-term net load variability. As a result, ancillary service markets are providing a valuable alternative revenue stream for many market participants. Yet the price dynamics in these markets are still not very well understood. In this work, we incorporate unit-level ancillary service offer prices and quantities into a production cost model and examine how prices for frequency regulation are impacted by relatively extreme perturbations of several system parameters. Initial offers are first estimated on the basis of limited available public data and are then iteratively calibrated against historic market outcomes. Through a case study of the PJM Interconnection, we find that doubling the natural gas price increases the average annual regulation price by 36%, while replacing all coal generation with natural gas decreases the average price by 42%. Increasing the wind penetration from 2% to 30% in isolation increases the average regulation price by 32%, while further doubling the regulation requirement results in an 84% increase. These price increases can be mitigated by introducing additional battery storage capacity or by increasing offer quantities from hydro and thermal units. Finally, we discuss a number of modeling challenges that are faced when incorporating ancillary services into traditional production cost models. These include poor data availability, inconsistent product definitions across markets, and complex market rules.
Marshall Space Flight Center (MSFC) has been funding development of intelligent software models to benefit payload ground operations for nearly a decade. Experience gained from simulator development and real-time monitoring and control is being applied to engineering design, testing, and operation of the First Material Science Research Rack (MSRR-1). MSRR-1 is the first rack in a suite of three racks comprising the Materials Science Research Facility (MSRF) which will operate on the International Space Station (ISS). The MSRF will accommodate advanced microgravity investigations in areas such as the fields of solidification of metals and alloys, thermo-physical properties of polymers, crystal growth studies of semiconductor materials, and research in ceramics and glasses. The MSRR-1 is a joint venture between NASA and the European Space Agency (ESA) to study the behavior of different materials during high temperature processing in a low gravity environment. The planned MSRR-1 mission duration is five (5) years on-orbit and the total design life is ten (IO) years. The MSRR-1 launch is scheduled on the third Utilization Flight (UF-3) to ISS, currently in February of 2003). The objective of MSRR-1 is to provide an early capability on the ISS to conduct material science, materials technology, and space product research investigations in microgravity. It will provide a modular, multi-user facility for microgravity research in materials crystal growth and solidification. An intelligent software model of MSRR-1 is under development and will serve multiple purposes to support the engineering analysis, testing, training, and operational phases of the MSRR-1 life cycle development. The G2 real-time expert system software environment developed by Gensym Corporation was selected as the intelligent system shell for this development work based on past experience gained and the effectiveness of the programming environment. Our approach of multi- uses of the simulation model and its intuitive graphics capabilities is providing a concurrent engineering environment for rapid prototyping and development. Operational schematics of the MSRR-1 electrical, thermal control, vacuum access, and gas supply systems, and furnace inserts are represented graphically in the environment. Logic to represent first order engineering calculations is coded into the knowledge base to simulate the operational behavior of the MSRR-1 systems. An example of engineering data provided includes electrical currents, voltages, operational power, temperatures, thermal fluid flow rates. pressures, and component status indications. These type of data are calculated and displayed at appropriate instrumentation points, and the schematics are animated to reflect the simulated operational status of the MSRR-1. The software control functions are also simulated to represent appropriate operational behavior based on automated control and response to commands received by the crew or ground controllers. The first benefit of this simulation environment is being realized in the high fidelity engineering analysis results from the electrical power system G2 model. Secondly, the MSRR-1 simulation model will be embedded with a hardware mock-up of the MSRR-1 to provide crew training on MSRR-1 integrated payload operations. G2 gateway code will output the simulated instrumentation values, termed as telemetry, in a flight-like data stream so that the crew has realistic and accurate simulated MSRR-1 data on the flight displays which will be designed for crew use. The simulation will also respond appropriately to crew or ground initiated commands, which will be part of normal facility operations. A third use of the G2 model is being planned; the MSRR-1 simulation will be integrated with additional software code as part of the test configuration of the primary onboard computer, or Master Controller, for MSRR-1. We will take advantage of the G2 capability to simulate the flight like data stream to test flight software responses and behavior. A fourth use of the G2 model will be to train the Ground Support Personnel that will monitor the MSRR-1 systems and payloads while they are operating aboard the ISS. The intuitive, schematic based environment will provide an excellent foundation for personnel to understand the integrated configuration and operation of the MSRR-1, and the anticipated telemetry feedback based on operational modes of the equipment. Expert monitoring features will be enhanced to provide a smart monitoring environment for the operators. These features include: (1) Animated, intuitive schematic-based displays which reflect telemetry values, (1) Real-time plotting of simulated or incoming sensor values, (3) High/Low exception monitoring for analog data, (4) Expected state monitoring for discrete data, (5) Data trending, (6) Automated malfunction procedure execution to diagnose problems, (7) Look ahead capability to planned MSRR-1 activities in the onboard timeline. And finally, the logic to calculate telemetry values will be deactivated, and the same environment will interface to the incoming data for the real-time telemetry stream to schematically represent the onboard hardware configuration. G2 will be the foundation for the real-time monitoring and control environment. In summary, our MSRR-1 simulation model spans many elements of the life cycle development of this project: Engineering Analysis, Test and Checkout, Training of Crew and Ground Personnel, and Real-time monitoring and control. By utilizing the unique features afforded by an expert system development environment, we have been able to synergize a powerful tool capable of addressing our project needs at every phase of project development.
This paper studies the Power System Stochastic Storage Problem (PSSSP), a novel application in power restoration which consists of deciding how to store power system components throughout a populated area to maximize the amount of power served after disaster restoration. The paper proposes an exact mixed-integer formulation for the linearized DC power flow model and a general column-generation approach. Both formulations were evaluated experimentally on benchmarks using the electrical power infrastructure of the United States and disaster scenarios generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. The results show that the column-generation algorithm produces near-optimal solutions quickly and produces orders of magnitude speedups over the exact formulation for large benchmarks. Moreover, both the exact and the column-generation formulations produce significant improvements over greedy approach and hence should yield significant benefits in practice.
Modernization of the power system in a way that ensures a sustainable energy system is arguably one of the most pressing concerns of our time. Buildings are important components in the power system. First, they are the main consumers of electricity and secondly, they do not have constant energy demand. Conventionally, electricity has been difficult to store and should be consumed as it is generated. Therefore, maintaining the demand and supply is critical in the power system. However, to reduce the complexity of power models, buildings (i.e., end-use loads) are traditionally modeled and represented as aggregated “dumb” nodes in the power system. This means we lack effective detailed whole building energy models that can support requirements and emerging technologies of the smart power grid. To gain greater insight into the relationship between building energy demand and power system performance, it is important to constitute a co-simulation framework to support detailed building energy modeling and simulation within the power system to study capabilities promised by the modern power grid. This paper discusses ongoing work at Pacific Northwest National Laboratory and presents underlying tools and framework needed to enable co-simulation of building, building energy systems and their control in the power system to study applications such as demand response, grid-based HVAC control, and deployment of buildings for ancillary services. The optimal goal is to develop an integrated modeling and simulation platform that is flexible, reusable, and scalable. Results of this work will contribute to future building and power system studies, especially those related to the integrated ‘smart grid’. Results are also expected to advance power resiliency and local (micro) scale grid studies where several building and renewable energy systems transact energy directly. This paper also reviews some applications that can be supported and studied using the framework introduced to understand their implications before they can be successfully implemented in the power system.
As of May 2019, all RDE test hardware and test operations were completed for this program. Over 700 hot fire tests were conducted at 4 facilities with 7 RDE assemblies, with the data available for future analysis. In particular, measured static and dynamic pressure and computational fluid dynamics (CFD) provided basis for pressure gain combustion (PGC) analysis of the Engineering Scale RDE. It was demonstrated via measurements and CFD that a carefully designed diffuser can recover some total pressure of the highly oscillatory RDE exhaust. In general, the isolator/injector is largest contributor of pressure losses; however a low loss design was demonstrated that improves significantly on previous natural-gas/air RDEs. Also, a tailored injector and mixing technique was demonstrated that allowed NG-air RDE operation with overall equivalence ratio of less than 0.6. CFD models by AR, the UofM and Purdue University were extensively used throughout the program to refine diffuser design for improved pressure recovery, to simulate injection and mixing, to estimate turbine interaction, to estimate combustor pressure gain anchored with test data and to provide input to other design and analytical tasks. CFD analyses were completed for many of the configurations tested at Purdue with the 13.4” RDE including the shark fin and low area ratio isolators. Results were compared favorably to available hot fire test particle image velocimetry (PIV) measurements and wave speeds. The results of these CFD analyses suggest a modest pressure gain of 33% with a sufficiently low area ratio isolator. A thermodynamic power plant system model was set up which utilizes an RDE combustor. The performance of the RDE combustor module was scaled based on measurements from the Engineering Scale RDE tests with low loss injector and tailored fuel flow. This combined model indicates potential for significant plant efficiency improvement. The successful tailored fuel injection test result with lower than .6 equivalence ratio has implication that a power plant can use a RDE combustor configuration where all the air flows through the combustion zone thereby not requiring a bypass mixer. In this configuration, the results of the natural gas combined cycle (NGCC) plant system indicate net efficiency of 66.4%.
Hydropower is expected to play an important role in maintaining grid reliability and flexibility as the share of of variable renewable energy increases. While the current hydropower operational models have been studied and used widely, they haven't been updated for decades to meet new performance standards. For example, current steady state and dynamic models often neglect hydrological conditions, which may lead to unrealistic expectations when relying on hydropower for energy and ancillary services. To study this impact, a multi-timescale hydrological model was created by leveraging the National Renewable Energy Laboratory-developed Multi-timescale Integrated Dynamics and Scheduling (MIDAS) tool. Using MIDAS, we compare the impact of considering hydrological conditions in a day-ahead unit commitment (DAUC) schedule on the reduced 240-bus Western Interconnect (WI) test system under winter and summer case studies. We show that neglecting current hydrological conditions of hydropower plants in power system models can lead to an overestimation of hydropower capabilities, which could lead to power balancing issues. For example, power system DAUC simulation results of our reduced test system show that in the case where hydrological conditions are not considered in the model, an approximate 31% overestimation of hydropower capabilities occurs in the summer case and approximately 60% occurs in the winter case compared to what is available. Additionally, results show an underestimation of WI day-ahead power system generation costs by approximately $54M - $80M in the weekly summer scenario and $116M - $126M in the weekly winter scenario. This analysis helps to underscore the importance of considering hydrological data in power system operational studies.
This study investigates the joint water–power system resilience of an irrigation district in southeastern Idaho. Irrigation districts face difficulties in the delivery of water to farmers under drought conditions, during equipment failures, or unplanned infrastructure disruptions. The resilience of interconnected water and power systems can be better analyzed and understood through an integrated approach, using a model that connects the dependencies between the two halves of the system. Using a multi-agent system model capturing both water and power system components, as well as their linkages, we capture the interdependencies of these systems and highlight opportunities for improvement when faced with disruptions. Through simulation scenarios, we examine the system resilience using system performance, quantified as the percentage of met demand of the power and water system, when subjected to drought water year, an unforeseen water demand increase, power outage and dam failure. Scenario results indicate that the effects of low flow years are mostly felt in the power system; unexpected increases in water demand marginally impact irrigation system performance; dams and pumps present vulnerabilities of the system, causing substantial unmet demand during disruptions. Noting the interdependencies between the water–power system halves while leveraging an integrated simulation allows for an insightful analysis of the system impacts during disruptions.
Natural disasters often result in failures of transportation network components and blackouts that imperil the wellbeing of vulnerable populations. In response to these events, resilience hubs have been proposed as a pre-disaster planning strategy to improve access to critical services. This paper introduces an optimization-based approach to locate and configure electric power-generating resilience hubs considering the possibility of failures in transportation and electric power systems. The model's objective is to identify hub locations and configurations that maximize transportation accessibility to the hubs and maximize the satisfaction of basic energy needs through hub-generated electric power. Besides a budget constraint, the model accounts for limits on the levels of hub energy generation vis-à-vis community energy demands, and on the transportation network distance of communities to hubs. Three heuristics are presented for the proposed planning problem. The first heuristic is a genetic algorithm (GA) with problem-specific solution generation procedures. The other two heuristics implement greedy search techniques. Numerical experiments were conducted, using data from rural Puerto Rico, to illustrate the application of the proposed model and heuristics, and examine their performance. In the numerical experiments, the GA heuristic found better solutions than the greedy heuristics. Additionally, design solutions consisting of spatially dispersed hubs with low energy generation capacity were better than solutions with spatially concentrated high-capacity hubs. Lastly, across a wide range of hub demand scenarios, only a small number of candidate hub locations consistently ranked among the best locations for establishing a hub.
This poster describes how the power system switchgear and power system protection for WPPs should be carefully designed to be compatible with the operation of conventional synchronous generators connected to the same grid.
Not Available
China has committed to achieve net carbon neutrality by 2060 to combat global climate change, which will require unprecedented deployment of negative emissions technologies, renewable energies (RE), and complementary infrastructure. At terawatt-scale deployment, land use limitations interact with operational and economic features of power systems. To address this, we developed a spatially resolved resource assessment and power systems planning optimization that models a full year of power system operations, sub-provincial RE siting criteria, and transmission connections. Our modeling results show that wind and solar must be expanded to 2,000 to 3,900 GW each, with one plausible pathway leading to 300 GW/yr combined annual additions in 2046 to 2060, a three-fold increase from today. Over 80% of solar and 55% of wind is constructed within 100 km of major load centers when accounting for current policies regarding land use. Large-scale low-carbon systems must balance key trade-offs in land use, RE resource quality, grid integration, and costs. Under more restrictive RE siting policies, at least 740 GW of distributed solar would become economically feasible in regions with high demand, where utility-scale deployment is limited by competition with agricultural land. Effective planning and policy formulation are necessary to achieve China’s climate goals.