Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Probabilistic Blast Damage Modeling Uncertainties and Sensitivities

Blast overpressure is the predominant source of ground damage posed by potentially hazardous asteroid strikes. Estimates of the extent, severity, and likelihoods of potential blast damage regions will be one of the key metrics needed to mount civil defense or disaster response plans in the face of an impending impact. However, there are many inherent sources of uncertainty in evaluating the damage, both in characterizing the properties of the incoming object and in the approaches used to model the entry/impact and resulting damage, which make it difficult to produce a single ‘accurate’ or ‘best guess’ prediction of ground damage. The current 2021 PDC hypothetical impact scenario poses a particular challenge due to its short warning time. The need for rapid disaster response to prepare for an immanent impact, combined with lack of observational opportunities to refine basic knowledge about the object’s basic size and properties, make understanding the range and relative likelihood of consequences particularly critical. The potential damage caused by these blasts can be evaluated using a range of modeling and simulation approaches and levels of fidelity. Fast-running engineering-level models can be used to run large numbers of probabilistically sampled cases covering wide variations of uncertain properties or parameters. High-fidelity simulations, on the other hand, can capture more detailed/accurate blast physics, but can only be performed for a small selection of specific cases, requiring many assumptions to be made about the initial object and its unpredictable entry/breakup characteristics. In order to provide a more complete picture of the potential threat for effective disaster response, both types of analysis need to be employed together. In this approach, high-fidelity simulations are used to refine and anchor engineering models, and the probabilistic engineering models are used to evaluate broad parameters spaces and guide selection of the most pertinent simulation cases for a given scenario. This presentation expands upon the probabilistic asteroid impact risk assessments being performed as part of the 2021 PDC hypothetical impact exercise, focusing on key aspects of blast damage modeling uncertainties and sensitivities. We review the current modeling and simulation approaches employed in the current assessment, compare the relative levels of uncertainty stemming from each main element of the problem (i.e., knowledge of the asteroid properties, modeling of the atmospheric entry/breakup and airburst, and estimates of the ground damage from the resulting blasts waves), and highlight any notable trends and sensitivities for the current scenario case.

SMD↗

Geothermal probabilistic cost study

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model was used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents was analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance were examined.

Orren, L. H.↗

Probabilistic Modeling of the Renal Stone Formation Module

The Integrated Medical Model (IMM) is a probabilistic tool, used in mission planning decision making and medical systems risk assessments. The IMM project maintains a database of over 80 medical conditions that could occur during a spaceflight, documenting an incidence rate and end case scenarios for each. In some cases, where observational data are insufficient to adequately define the inflight medical risk, the IMM utilizes external probabilistic modules to model and estimate the event likelihoods. One such medical event of interest is an unpassed renal stone. Due to a high salt diet and high concentrations of calcium in the blood (due to bone depletion caused by unloading in the microgravity environment) astronauts are at a considerable elevated risk for developing renal calculi (nephrolithiasis) while in space. Lack of observed incidences of nephrolithiasis has led HRP to initiate the development of the Renal Stone Formation Module (RSFM) to create a probabilistic simulator capable of estimating the likelihood of symptomatic renal stone presentation in astronauts on exploration missions. The model consists of two major parts. The first is the probabilistic component, which utilizes probability distributions to assess the range of urine electrolyte parameters and a multivariate regression to transform estimated crystal density and size distributions to the likelihood of the presentation of nephrolithiasis symptoms. The second is a deterministic physical and chemical model of renal stone growth in the kidney developed by Kassemi et al. The probabilistic component of the renal stone model couples the input probability distributions describing the urine chemistry, astronaut physiology, and system parameters with the physical and chemical outputs and inputs to the deterministic stone growth model. These two parts of the model are necessary to capture the uncertainty in the likelihood estimate. The model will be driven by Monte Carlo simulations, continuously randomly sampling the probability distributions of the electrolyte concentrations and system parameters that are inputs into the deterministic model. The total urine chemistry concentrations are used to determine the urine chemistry activity using the Joint Expert Speciation System (JESS), a biochemistry model. Information used from JESS is then fed into the deterministic growth model. Outputs from JESS and the deterministic model are passed back to the probabilistic model where a multivariate regression is used to assess the likelihood of a stone forming and the likelihood of a stone requiring clinical intervention. The parameters used to determine to quantify these risks include: relative supersaturation (RS) of calcium oxalate, citrate/calcium ratio, crystal number density, total urine volume, pH, magnesium excretion, maximum stone width, and ureteral location. Methods and Validation: The RSFM is designed to perform a Monte Carlo simulation to generate probability distributions of clinically significant renal stones, as well as provide an associated uncertainty in the estimate. Initially, early versions will be used to test integration of the components and assess component validation and verification (V&V), with later versions used to address questions regarding design reference mission scenarios. Once integrated with the deterministic component, the credibility assessment of the integrated model will follow NASA STD 7009 requirements.

kidney stones↗

Probalistic Assessment of Radiation Risk for Solar Particle Events

For long duration missions outside of the protection of the Earth's magnetic field, exposure to solar particle events (SPEs) is a major safety concern for crew members during extra-vehicular activities (EVAs) on the lunar surface or Earth-to-moon or Earth-to-Mars transit. The large majority (~90%) of SPEs have small or no health consequences because the doses are low and the particles do not penetrate to organ depths. However, there is an operational challenge to respond to events of unknown size and duration. We have developed a probabilistic approach to SPE risk assessment in support of mission design and operational planning. Using the historical database of proton measurements during the past 5 solar cycles, the functional form of hazard function of SPE occurrence per cycle was found for nonhomogeneous Poisson model. A typical hazard function was defined as a function of time within a non-specific future solar cycle of 4000 days duration. Distributions of particle fluences for a specified mission period were simulated ranging from its 5th to 95th percentile. Organ doses from large SPEs were assessed using NASA's Baryon transport model, BRYNTRN. The SPE risk was analyzed with the organ dose distribution for the given particle fluences during a mission period. In addition to the total particle fluences of SPEs, the detailed energy spectra of protons, especially at high energy levels, were recognized as extremely important for assessing the cancer risk associated with energetic particles for large events. The probability of exceeding the NASA 30-day limit of blood forming organ (BFO) dose inside a typical spacecraft was calculated for various SPE sizes. This probabilistic approach to SPE protection will be combined with a probabilistic approach to the radiobiological factors that contribute to the uncertainties in projecting cancer risks in future work.

Kim, Myung-Hee Y.↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

Acute Radiation Risk and BRYNTRN Organ Dose Projection Graphical User Interface

The integration of human space applications risk projection models of organ dose and acute radiation risk has been a key problem. NASA has developed an organ dose projection model using the BRYNTRN with SUM DOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUM DOSE are a Baryon transport code and an output data processing code, respectively. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN. A GUI for the ARR and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. BRYNTRN code operation requires extensive input preparation. Only a graphical user interface (GUI) can handle input and output for BRYNTRN to the response models easily and correctly. The purpose of the GUI development for ARRBOD is to provide seamless integration of input and output manipulations for the operations of projection modules (BRYNTRN, SLMDOSE, and the ARR probabilistic response model) in assessing the acute risk and the organ doses of significant Solar Particle Events (SPEs). The assessment of astronauts radiation risk from SPE is in support of mission design and operational planning to manage radiation risks in future space missions. The ARRBOD GUI can identify the proper shielding solutions using the gender-specific organ dose assessments in order to avoid ARR symptoms, and to stay within the current NASA short-term dose limits. The quantified evaluation of ARR severities based on any given shielding configuration and a specified EVA or other mission scenario can be made to guide alternative solutions for attaining determined objectives set by mission planners. The ARRBOD GUI estimates the whole-body effective dose, organ doses, and acute radiation sickness symptoms for astronauts, by which operational strategies and capabilities can be made for the protection of astronauts from SPEs in the planning of future lunar surface scenarios, exploration of near-Earth objects, and missions to Mars.

Cucinotta, Francis A.↗

Importance Of Quality Control in Reducing System Risk, a Lesson Learned From The Shuttle and a Recommendation for Future Launch Vehicles

This paper presents lessons learned from the Space Shuttle return to flight experience and the importance of these lessons learned in the development of new the NASA Crew Launch Vehicle (CLV). Specifically, the paper discusses the relationship between process control and system risk, and the importance of process control in improving space vehicle flight safety. It uses the External Tank (ET) Thermal Protection System (TPS) experience and lessons learned from the redesign and process enhancement activities performed in preparation for Return to Flight after the Columbia accident. The paper also, discusses in some details, the Probabilistic engineering physics based risk assessment performed by the Shuttle program to evaluate the impact of TPS failure on system risk and the application of the methodology to the CLV.

Safie, Fayssal M.↗

Probability of failure and risk assessment of propulsion structural components

The probabilistic structural analysis method (PSAM) was developed to analyze the effects of fluctuating loads, variable material properties, and uncertain analytical models especially for high performance structures such as the Space Shuttle Main Engine turbopump blades. Risk is calculated after expensive service experience. However, probabilistic structural analysis provides a rational alternative method to quantify uncertainties in the structural performance and durability. NESSUS (Numerical Evaluation of Stochastic Structures Under Stress) was developed as a probabilistic structural analysis computer code which integrates finite element methods and reliability algorithms, capable to predicting the probability distributions of structural response variables such as stress, displacement, natural frequencies, and buckling loads. This computer code is detailed.

Shiao, Michael C.↗

Reliability and risk assessment of structures

Development of reliability and risk assessment of structural components and structures is a major activity at Lewis Research Center. It consists of five program elements: (1) probabilistic loads; (2) probabilistic finite element analysis; (3) probabilistic material behavior; (4) assessment of reliability and risk; and (5) probabilistic structural performance evaluation. Recent progress includes: (1) the evaluation of the various uncertainties in terms of cumulative distribution functions for various structural response variables based on known or assumed uncertainties in primitive structural variables; (2) evaluation of the failure probability; (3) reliability and risk-cost assessment; and (4) an outline of an emerging approach for eventual certification of man-rated structures by computational methods. Collectively, the results demonstrate that the structural durability/reliability of man-rated structural components and structures can be effectively evaluated by using formal probabilistic methods.

Chamis, C. C.↗

PROBABALISTIC RISK ANALYSIS AND THERMAL MARGIN PROCESS FOR AN INFLATABLE AEROSHELL

Atmospheric entry vehicle thermal protection systems (TPS) are margined due to the uncertainties that exist in entry aeroheating environments and the thermal response of the materials and structures. Traditional approaches typically over-margin TPS and offer very little insight into the risk of over-temperature during flight. A probabilistic margin process can be used to apply thermal margin to an aeroshell based on a rigorously calculated risk of failure. This probabilistic margin process allows engineers to make informed aeroshell design, entry-trajectory modifications, and risk trades while preventing excessive margin from being applied. This methodology can also be applied to other TPS applications, hot structures, and other engineering disciplines.

Steven A Tobin↗

Probabilistic Groundwater Modeling of the RDX Plume at Los Alamos National Laboratory to Support Risk Assessment - 20359

A plume of the contaminant hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) with concentrations greater than the New Mexico tap water drinking standard (9.66 ppb) is present in the regional aquifer near the southwestern boundary of Los Alamos National Laboratory (LANL). A risk assessment is performed for exposure to regional aquifer groundwater, with long-term predictions of RDX concentrations provided by a calibrated, probabilistic, numerical fate and transport model. The structure of the model is hierarchical, with the RDX Regional Aquifer (RA) groundwater model acting as the primary tool for analysis of downgradient RDX concentrations. The RA model is deeply informed by the conceptual site model (CSM) and is calibrated using site RDX concentration data and hydraulic head measurements, along with other analyses. The model is calibrated using data through December 2019. Where data are scarce other lines of evidence are used to inform inputs, including the multiphase RDX Vadose Zone (VZ) model and Pipe and Disk analytical screening tool. Model inputs are described with informative prior distributions using a robust approach to development that incorporates all available lines of evidence for every parameter used as an input to the RA model. Calibration is performed using a classical nonlinear optimization routine, which is then used to initialize a Bayesian calibration. The Bayesian calibration constrains the uncertainty in the classical calibration, ultimately providing posterior distributions for all model parameters. The challenges of the calibration include high-dimensional parameter space, including spatially heterogeneous hydraulic conductivities, comparatively sparse data, and low RDX concentrations. Posterior parameter distributions developed in the calibration process are then used for stochastic predictive model runs into the future. The result of the forward runs is spatially and temporally explicit estimates of head and concentration with uncertainty at all points in space and time. The probabilistic modeling approach presented here includes innovative computational and statistical methods that leverage high-performance computing (HPC) resources. It makes use of prior modeling work performed at the chromium plume site in the central LANL area, with extensive updates. The risk assessment will ultimately be used to support decision-making at the site, using multiple appropriately weighted sources of information, as well as uncertainty, sensitivity, and value-of-information analyses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Software risk estimation and management techniques at JPL

In this talk we will discuss how uncertainty has been incorporated into the JPL software model, probabilistic-based estimates, and how risk is addressed, how cost risk is currently being explored via a variety of approaches, from traditional risk lists, to detailed WBS-based risk estimates to the Defect Detection and Prevention (DDP) tool.

software risk↗

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY↗

Wildfire Risk Evaluation Framework for Grid Operations and Planning

The United States (US) environmental protection agency's (EPA's) climate change indicators for wildfires show a long-term trend of increased annual wildfire activity, larger wildfire size, and more variable dynamics in wildfire behavior. This has caused more frequent preemptive public safety power shutoff (PSPS) events in the regions with recognized high wildfire risk. These preemptive power shutoffs attempt to prevent the ignition of a wildfire but it nonetheless renders the transmission line non-operational, which often sheds load of downstream communities. As wildfires and PSPS events become more frequent, it is crucial to find the communities most at risk of load shedding. To that end, this paper proposes the wildfire risk evaluation of the system (WiRES) framework, which is a performance-based framework that translates extreme weather-related and PSPS event probabilities into a cumulative probability of a non-operational transmission line. This study also provides a geospatial visualization tool that breaks down the entire western electrical coordinating council (WECC) region into 50 km grid cells which can be used to 1) filter out transmission lines with higher than a threshold outage probability, and 2) graphically discover the affected regions and their biophysical and socioeconomic metrics. %such as the social vulnerability index, population density, gross domestic product, etc. Lastly, an impact assessment study is conducted which connects the results of the proposed framework to python and powerworld-based contingency analysis to highlight the applicability of the framework.

Wildfire, Resilience, Extreme Events, Grid Reslien↗

NRAP-Open-IAM: NRAP Open Source Integrated Assessment Model

Note: This is the last version (a2.6.1) of NRAP-Open-IAM released during NRAP Phase II in 2022. The latest version of NRAP-Open-IAM is available here: https://edx.netl.doe.gov/dataset/phase-iii-nrap-open-iam NRAP-Open-IAM is an open-source software product that enables quantification of containment effectiveness and leakage risk at storage sites in the context of system uncertainties and variability. NRAP-Open-IAM represents the next-generation in a line of systems-based computational models developed for quantitative geological carbon storage (GCS) risk assessment. The model comprises a set of reduced-order and analytical models of various components of the GCS system, potential leakage pathways, receptors of concern including impact to groundwater resources and the atmosphere, a framework to support stochastic simulation, time stepping, uncertainty quantification, other analytical functionality for scenario and risk-performance evaluation, and a basic graphical user interface to support scenario development, data input simulation definition, and basic post-processing and results display. As the NRAP Open-IAM functionality continues to evolve, we continue to add to its capability to develop quantitative, probabilistic, and time-dependent profiles of the evolution of risk at a GCS site and evaluate the influence of uncertain parameters on uncertainty in predicted risk. It can be used to quantify the dynamics of reservoir saturation plume and pressure-affected area, for evaluation of the area of potential groundwater impact (i.e., Area of Review) and monitoring requirements to support cost and regulatory analysis, and for consideration of different post-injection site care and closure scenarios. This submission contains the current version of NRAP-Open-IAM available for evaluation and testing. To use the NRAP-Open-IAM, download the source code (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/4c24a3da-3b40-4ffe-9892-c807ae9f8760) then open the NRAP-Open-IAM user's guide (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669) to read more about the tool. Installation instructions for Windows, Mac, and Linux can be found in the "installers" folder of the extracted NRAP-Open-IAM folder and describe setup of environment (e.g., Python libraries) needed for proper work of the tool. Test of installation can be done by running "python openiam_setup_tests.py" in the "setup" folder. The installation test also runs a test suite to see if the NRAP-Open-IAM has been installed correctly. To run the test suite separately, run "python iam_test.py" in the "test" folder. User's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669 Developer's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/3bc6ee7d-609d-4eb6-80ba-fa6130ee0313 Reservoir simulation data used in some examples distributed with NRAP-Open-IAM: - Kimberlina: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/eb62cece-61b2-4037-9b6d-32407dde2ab8 - Kimberlina (compartmentalized): https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/366f9530-3b32-4b84-affe-ab2df1d9a8b5 - FutureGen 2.0: https://edx.netl.doe.gov/dataset/futuregen-2-0-1008-simulation-reservoir-lookup-table NRAP-Open-IAM GitLab repository: https://gitlab.com/NRAP/OpenIAM Related publications: - Bacon, D., Yonkofski, C., Brown, C., Demirkanli, D. and Whiting, J., 2019. Risk-based post injection site care and monitoring for commercial-scale carbon storage: Reevaluation of the FutureGen 2.0 site using NRAP-Open-IAM and DREAM. International Journal of Greenhouse Gas Control 90: 102784. - Bacon, D. Demirkanli, D., and White, S., 2020. Probabilistic risk-based Area of Review (AoR) determination for a deep-saline carbon storage site. International Journal of Greenhouse Gas Control 102: 103153. - Harp, D., Oldenburg, C., and Pawar, R., 2019. A metric for evaluating conformance robustness during geologic CO2 sequestration operations. International Journal of Greenhouse Gas Control 85: 100-108. - Lackey, G., Vasylkivska, V., Huerta, N., King, S., and Dilmore, R., 2019. Managing well leakage risks at a geologic carbon storage site with many wells, International Journal of Greenhouse Gas Control, 88 :182-194. - Vasylkivska, V., Dilmore, R., Lackey, G., Zhang, Y., King, S., Bacon, D., Chen, B., Mansoor, K., and Harp, D., 2021. NRAP-Open-IAM: A flexible open-source integrated assessment model for geologic carbon storage risk assessment and management, Environmental Modelling & Software, 143: 105114. Presentations: - Chen, B., Harp, D., and Pawar, R., A data assimilation approach (ES-MDA) coupling with NRAP-Open-IAM for quantifying uncertainty reduction in geological CO2 sequestration. AGUFM 2019: T44A-02. - Chen, B., and Harp, D., Improving risk analysis precision for geologic CO2 sequestration by quantifying the uncertainty reduction before and after acquiring monitoring data. 14th Greenhouse Gas Control Technologies Conference, Melbourne, Australia, 2018, pp. 21-26. - Harp, D., National Risk Assessment Partnership Task 2: Containment Assurance. No. LA-UR-19-28654, Los Alamos National Laboratory (LANL), Los Alamos, NM (United States), 2019. - Vasylkivska, V., King, S., Bacon, D., Harp, D., Chen, B., Mansoor, K., Onishi, T., Yang, Y., Zhang, Y., and Keating, E., NRAP-Open-IAM: An open-source integrated assessment model, poster, Mastering the Subsurface Through Technology Innovation, Partnerships and Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting, Pittsburgh, PA, August 13-16, 2018. - Vasylkivska, V., Lackey, G., King, S., Wentworth, A., Huerta, N., Creason, C., DiGiulio, J., Yang, Y., and Dilmore, R., Long-term risk analysis of a geologic CO2 storage project during the post-injection period, SIAM Conference on Computational Science and Engineering, Spokane, WA, February 25-March 1, 2019. - Vasylkivska, V., Overview of the NRAP-Open-IAM tool for carbon storage (beta release), 2019 Annual NRAP Tool Users Meeting, Pittsburgh, PA, August 27, 2019. - Vasylkivska, V., Bacon, D., Chen, B., Dilmore, R., Harp, D., King, S., Lackey, G., Lindner, E., Liu, G., Mansoor, K. and Zhang, Y., NRAP-Open-IAM: A new, open-source code for integrated assessment of geologic carbon storage containment effectiveness and leakage risk, poster, American Geophysical Union Fall Meeting 2020 (virtual meeting), December 2020. - Vasylkivska, V., NRAP open-source integrated assessment model and relevant application, oral presentation, NRAP workshop "NRAP Tools for Geologic Carbon Storage Risk-Based Decision Making" held in conjunction with Groundwater Protection Council (GWPC) 2021 Annual Forum (virtual meeting), Salt Lake City, UT, September 2021. - Vasylkivska, V., NRAP-Open-IAM: open-source integrated assessment model, digital poster/demonstration, software demonstration session, 2022 Carbon Management Project Review Meeting, August 16, 2022

AoR↗

Probabilistic Solar Power Forecasting Using Bayesian Model Averaging

There is rising interest in probabilistic forecasting to mitigate risks from solar power uncertainty, but the numerical weather prediction (NWP) ensembles readily available to system operators are often biased and underdispersed. We propose a Bayesian model averaging (BMA) post-processing method suitable for forecasting power from utility-scale photovoltaic (PV) plants at multiple time horizons up to at least the day-ahead timescale. BMA is a kernel dressing technique for NWP ensembles in which the forecast is a weighted sum of member-specific probability density functions. We tailor BMA for utility-scale PV forecasting by modeling power clipping at the AC inverter rating and advance the theory of BMA with a new beta kernel parameterization that accommodates theoretical constraints not previously addressed. BMA is demonstrated for a case study of 11 utility-scale PV plants in Texas, forecasting at hourly resolution for the complete year 2018. BMA's mixture-model approach mitigates underdispersion of the raw ensemble to significantly improve forecast calibration, while consistently outperforming an ensemble model output statistics (EMOS) parametric approach from the literature. At 4-hour lead time, the BMA post-processing achieves continuous ranked probability skill scores of 2--36% over the raw ensemble, with consistent performance at multiple lead times suitable for power system operations.

14 SOLAR ENERGY↗