Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

The Pascal Discovery Mission: A Mars Climate Network Mission

The climate of Mars is a major focus of Mars exploration. With the loss of MCO, however, it remains uncertain how it will be achieved. We argue that a truly dedicated climate mission to Mars should have both orbital and landed components, and that these should operate simultaneously for at least 1 Mars year if not longer. Pascal is a Discovery mission that emphasizes the landed component. Its principal goal is to establish a network of 24 small weather stations on the surface of Mars that will operate for 2 Mars years, with an extended mission option for an additional 8 Mars years bringing the total mission lifetime up to 10 Mars years. The stations will collect hourly measurements of pressure, temperature, and optical depth. After delivering the probes to Mars, Pascal's carrier spacecraft will go into an elliptical orbit which will serve as a relay for the landers, and a platform for synoptic imaging. These simultaneous measurements from the surface and from orbit will allow us to characterize the planet's general circulation and its interaction with the dust, water, and CO2 cycles. During entry, descent, and landing, each of Pascal's 24 probes will also measure the temperature structure of the atmosphere and acquire images of the surface. These data will allow us to determine the global structure of the atmosphere between 15 and 130 km, and characterize the local terrain to help interpret the landed data. The descent images are part of Pascal's outreach program, as the probe camera system will be developed by faculty-supervised student project. The intent is to generate enthusiasm for the Pascal mission by directly involving students. Pascal will be launched on a Delta II-7925 in August of 2005. A type I trajectory will deliver Pascal to Mars in January of 2006. On approach, the three-axis stabilized carrier spacecraft will spring deploy the Pascal probes in 4 separate salvo's of 6 each. Global coverage is achieved with small time-of-arrival adjustments in between each salvo. Pascal's probes utilize an aeroshell, parachute, and crushable material for entry, descent and landing. On the surface, their long life and global coverage is enabled by a Micro Thermal Power Source with demonstrated heritage. After all probes are released, the carrier spacecraft will execute a small burn for insertion into an elliptical orbit. The long lifetime of the Pascal network was chosen in part to maximize the chances that orbital sounding, like that planned with MCO, would occur at some point during the mission. If Pascal is selected for launch in '05, this could occur if MCO-like science is reflown in the '05 opportunity or, if it is reflown in '03, the mission is extended to overlap with Pascal. The combination of temperature sounding from orbit, and surface pressure mapping from the surface will allow a direct determination of the full 3-D wind field for the first time.

Haberle, R. M.↗

The Pascal Discovery Mission: A Mars Climate Network Mission

The climate of Mars is a major focus of Mars exploration. With the loss of MCO, however, it remains uncertain how it will be achieved. We argue that a truly dedicated climate mission to Mars should have both orbital and landed components, and that these should operate simultaneously for at least I Mars year if not longer. Pascal is Discovery mission that emphasizes the landed component. Its principal goal is to establish a network of 24 small weather stations on the surface of Mars that will operate for 2 Mars years, with an extended mission option for an additional 8 Mars years bringing the total mission lifetime up to 10 Mars years. The stations will collect hourly measurements of pressure, temperature, and optical depth. After delivering the probes to Mars, Pascal's carrier spacecraft will go into an elliptical orbit which will serve as a relay for the landers, and a platform for synoptic imaging. These simultaneous measurements from the surface and from orbit will allow us to characterize the planet's general circulation and its interaction with the dust, water, and CO2 cycles. During entry, descent, and landing, each of Pascal's 24 probes will also measure the temperature structure of the atmosphere and acquire images of the surface. These data will allow us to determine the global structure of the atmosphere between 15 and 130 km, and characterize the local terrain to help interpret the landed data. The descent images are part of Pascal's outreach program, as the probe camera system will be developed by faculty-supervised student project. The intent is to generate enthusiasm for the Pascal mission by directly involving students. Pascal will be launched on a Delta 11-7925 in August of 2005. A type I trajectory will deliver Pascal to Mars in January of 2006. On approach, the three-axis stabilized carrier spacecraft will spring deploy the Pascal probes in 4 separate salvo's of 6 each. Global coverage is achieved with small time-of-arrival adjustments in between each salvo. Pascal's probes utilize an aeroshell, parachute, and crushable material for entry, descent and landing. On the surface, their long life and global coverage is enabled by a Micro Thermal Power Source with demonstrated heritage. After all probes are released, the carrier spacecraft will execute a small bum for insertion into an elliptical orbit. The long lifetime of the Pascal network was chosen in part to maximize the chances that orbital sounding, like that planned with MCO, would occur at some point during the mission. If Pascal is selected for launch in -05, this could occur if MCO-like science is reflown in the '05 opportunity or, if it is reflown in '03, the mission is extended to overlap with Pascal. The combination of temperature sounding from orbit, and surface pressure mapping from the surface will allow a direct determination of the full 3-D wind field for the first time.

Haberle, Robert M.↗

Integrated Systems Engineering, Safety, Reliability and Risk Management – Minimizing Black Swan Events

This paper examines key barriers that can possibly inhibit safe and reliable mission execution and, in the worst case, result in loss of human life due to many unknown contributory factors that can lead to Black Swan events. Some of the representative contributory factors include decision errors, overconfidence and a host of common causes including cultural and human factors. Decisions are always easy to criticize in hindsight when more information is available after a major accident. Depending on the type and complexity of the project and/or mission, the catastrophic risks of drifting into failure can be alleviated by implementing uniquely and strategically tailored Integrated-System-of-Systems, dynamic, risk-informed decision management processes. This paper presents some of the lessons learned from James Webb Space Telescope (JWST), NASA’s Human Space Flight program, and industry that provide motivation to organizations working on mega-complex missions to prudently accomplish targeted mission success. These lessons are important for future human Lunar, Mars and Beyond missions planned to be pursued by NASA through a public-private partnership using nimble but effective safety-conscious, proven sound engineering practices including implementation of integrated risk mitigation practices.

SLS↗

U.S. Energy Service Company (ESCO) Industry: Recent Market Trends

This study presents an analysis of the market size, growth projections and industry trends of the U.S. Energy Service Company (ESCO) industry, drawing on information provided by ESCO executives in late 2015. We define ESCOs as energy service companies for whom performance-based contracting is a core business offering. We identified forty-seven firms that met our definition of an ESCO.1 Forty-three of these companies responded to our requests for information, representing a 91% response rate.2 We also report 2014 ESCO industry revenues by market segment, region and business activity type, and for new versus existing customers. Finally, we report on use of tax incentives and financing tools, and incorporation of non-energy benefits into performance-based project economics. We summarize key findings below.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WWAO-WSWC Workshop Report 2019 Final

EXECUTIVE SUMMARY The Western States Water Council (WSWC) and the NASA Western Water Applications Office (WWAO) hosted a joint workshop on technology transfer for water management in the Western U.S. The goals of the workshop were to understand how different agencies approach the technology transfer and research to operations (R2O) process, identify best practices, and discuss existing barriers to successful technology infusion into operational water resource management systems at the state and federal level. The workshop took place August 7-9, 2019 in Irvine, CA. Key outcomes of the meeting include the following:• U.S. Rep. Grace Napolitano provided opening remarks for the workshop, where she highlighted the critical value of water data and the importance of collaboration between state and federal agencies in working to advance the use of water data in water management, planning and policy. • A total of 33 participants (including remote participants) were part of the workshop. They included principal investigators and project teams supported by NASA (Cyanobacteria Assessment Network, Evapotranspiration for Western States, Evaporative Stress Index, the Airborne Snow Observatory, Satellite-based Snow Water Equivalent in the Sierra Nevadas, and Fallowed Area Mapping) as well as representatives from federal (USGS, NOAA, USBR, EPA) and state (CA, WY, OR, NE) agency partners. • One main outcome of the meeting was the consensus that successful transitions of new applications and new technologies into operations require careful planning, effective communication within and across institutions, resources and considerable time investments. In addition, there was broad agreement that significant lead time is often required to allow for identification of financial and technical resources to sustain operational use of new data, information and tools.• The meeting included remarks from U.S. Rep. Napolitano and discussions during presentations and breakout groups about key opportunities to develop best practices and streamline the technology transfer process. • For example, one key set of best practices that emerged revolved around the the importance of building trust and establishing clear lines of communication between the research and operational institutions. The conversations led to defining two key components of trust-building. The first aspect is purely technical. It requires effectively demonstrating that the proposed application meets the end user’s needs in terms of accuracy, format, resolution, latency, metadata and documentation. The second aspect of building trust involves developing sustained, productive and mutually-beneficial relationships with the partner operational agency. The best practices presented here span both the technical as well as the relational aspects of cultivating trust. • This workshop served as a first step in developing a broader community discussion around R2O in western water management. Many of the best practices and lessons learned described in this report represent starting places for action within the WWAO, WSWC and our colleagues’ institutions. • Effective implementation of the best practices that emerged from this workshop will require sustained investments of time, resources and transition planning. In recognition of this, the WSWC and the WWAO proposed continuation of discussions begun at the workshop through a series of semi-annual or annual workshops.

Wilardson, Tony↗

ARPA-E: Guiding Technologies to Commercial Success

ARPA-E’s Technology-to-Market Advisors work closely with each ARPA-E project team to develop and execute a commercialization strategy. ARPA-E requires our teams to focus on their commercial path forward, because we understand that to have an impact on our energy mission, technologies must have a viable path into the marketplace. ARPA-E Senior Commercialization Advisor Dr. John Tuttle discusses what this Tech-to-Market guidance in practice looks like with reference to two project teams. OPEN 2012 awardees from Harvard University and Sunfolding share their stories of how ARPA-E worked with their teams to analyze market conditions and identify commercial opportunities that ultimately convinced them to pivot their technologies towards market applications with greater potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tailoring of NASA-STD-3001 to Lunar Gateway Program Requirements

The Gateway Program must meet NASA's Agency-level human rating requirements, which are intended to accommodate human capabilities and limitations while protecting the safety of the crew, and providing to the maximum extent practical, the capability to safely recover the crew from hazardous situations. Human systems integration represents a key human rating component of Moon to Mars systems to support the execution of Artemis missions, including compliance with mandatory standards for Health and Medical, Safety and Mission Assurance, and Engineering. The human system requirements, together with the human systems integration plan, medical operations requirements, and Gateway sub-system specifications, represent the flow-down of NASA Health and Medical Standards (NASA-STD-3001, Volumes 1 and 2) into the Gateway system. This paper discusses how these documents and other human systems integration activities provide full consideration of human capabilities and limitations as part of the total system design trade space, serving as an example on how the human must be effectively integrated as part of the system in order to achieve mission success. At a bigger scale, the paper con-tributes to the application of systems engineering standards to cutting-edge space exploration initiatives and to the dialogue on how systems engineering can continue to evolve to meet the needs of such ambitious projects.

Systems engineering↗

Usability Evaluation of Fleet Management Interface for High Density Vertiplex Environments

To meet the rising demand for an Advanced Air Mobility (i.e. urban and rural unmanned aircraft systems) ecosystem, NASA Aeronautics Research Mission Directorate (ARMD) is hosting a series of simulations and flight tests under the High Density Vertiplex sub-project (HDV). HDV aims to develop an integrated automation architecture to support terminal area flight operations. The HDV simulations and flight tests address safety, integration, and operational challenges, while integrated systems and software demonstrate design readiness, robustness, and interoperability. During the initial HDV simulation in 2021, a prototype traffic management tool developed by NASA called Fleet Management Interface (FMI) was tested. FMI was designed to introduce an advanced level of human-automation interaction to aid both Ground Control Station Operators (GCSOs) and Fleet Managers (FMs) in remotely managing flights under their ownership. In a human-in-the-loop simulation, a usability study was conducted with FMI to identify optimal approaches for displaying information for human operators using subjective measures of usability, workload, situation awareness, risk, and trust, along with qualitative feedback. This study consisted of task analysis in which GCSO and FM subjects used an Urban Air Mobility (UAM) environment to develop and execute a plan for two different traffic scenarios of remotely controlled vehicles. In each scenario, a controlled vehicle completed a takeoff, active flight, and landing sequence while automated traffic flew in the background at a rate of 20 operations per hour. In the first scenario, the controlled vehicle flew a nominal route with takeoff and landing at the same vertiport. In the second scenario, the controlled vehicle started on the nominal route, then diverted to an unplanned location mid-flight. Results showed that self-reported performance, usability, trust, and situation awareness ratings of FMI were moderately to strongly high. There were small differences between scenarios, with Scenario 2 being perceived as more unstable, complex, variable, risky, and potentially harmful than Scenario 1. Furthermore, participants described improvements that could be made to create a better user experience. For example, users would like greater configurability of the interface based on their personal information requirements, and they would like the opportunity to review routes before assigning them. The results from this study will inform future development of the FMI with the end goal of creating a reference automation tool for airspace management procedures in AAM. The FMI could be introduced as a potential way to reduce dependency on traditional air navigation services through increased automation in high density vertiplex environments.

vertiplex↗

Industrial Carbon Capture from a Cement Facility Using the Cryocap FG Process (FE0032136)

The project's objective was to execute and complete front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separate 95% of the total CO2 emissions at an industrial facility, producing at least 100,000 metric tonnes/year of CO2 for sequestration. The industrial facility selected is the Holcim (US) Ste. Genevieve cement manufacturing facility (the largest single kiln line in the world), while the carbon capture system selected is Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology developed by Air Liquide. The impact of the project on Environmental Justice and the regional economy was also analyzed.

01 COAL, LIGNITE, AND PEAT↗

South Dakota Region Scientific Deep Dive

EPOC uses the Deep Dive process to discuss and analyze current and planned science use cases and anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Questions crafted to explore this space include the following: 1) How, and where, will new data be analyzed and used? 2) How will the process of doing science change over the next 5–10 years? and 3) How will changes to the underlying hardware and software technologies influence scientific discovery? Deep Dives help ensure that key stakeholders have a common understanding of the issues and the actions that a campus or regional network may need to undertake to offer solutions. The EPOC team leads the effort and relies on collaboration with the hosting site or network, and other affiliated entities that participate in the process. EPOC organizes, convenes, executes, and shares the outcomes of the review with all stakeholders

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

The Development of a Small-Scale Project Model for Waste Management at the Port Hope Conversion Facility - 19126

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. Over time, Cameco's ongoing operations contributed to an increase in the volume of low-level radioactive waste managed onsite. Since 2011, Cameco has completed annual waste management campaigns with the goal of accelerating the recycle/disposal of accumulated legacy radioactive wastes stored at its Ontario operations. With disposal options for low-level radioactively contaminated wastes in Canada limited due to cost considerations and no commercially accessible landfills licensed for radioactive material. In recent years, Cameco has started to ship marginally contaminated wastes (<500 ppm uranium) to the United States for disposal in an appropriate landfill owned by US Ecology in Idaho. Numerous successful campaigns totaling over 1,000 successful shipments, have been completed to transport drummed and/or bagged material by rail in gondola cars to the disposal facility in Idaho since 2011. All shipments have been completed in compliance with all environmental regulations, with a perfect compliance record maintained to date. To achieve this excellent compliance record, the campaigns require careful planning by both organizations, as well as deployment of personnel from the Idaho facility during the campaign for project management, characterization and/or radiation monitoring support. As the accumulated waste inventory has been reduced through these projects, the scope and duration of each campaign has also decreased. In the last few years, road transport directly to the Idaho facility has also been utilized. This option allows for the deployment of small projects that may be completed for a smaller inventory of a specific waste type and to manage newly-generated low-level radioactive wastes on an ongoing basis. These projects have ranged from a single standard van shipment to multiple trucks running continuous loops between the Ontario and Idaho or Ontario and an intermediary site and have been utilized for marginally contaminated wastes (<500 ppm uranium) as well as marginally contaminated wastes with additional hazard classification. Cameco and US Ecology personnel have collaborated to develop characterization and shipment procedures that enable these projects to be executed in full compliance with all Canadian and US regulations, without deployment of personnel from the Idaho facility, while maintaining adequate oversight by both organizations to ensure that the waste is safely and compliantly managed. These protocols have been implemented and optimized for the Port Hope Conversion Facility and will be rolled out to other Cameco facilities in Ontario through 2019. Cameco expects to utilize the small project model for the long term to ensure that eligible marginally contaminated wastes (<500 ppm uranium) are managed appropriately to ensure that once the legacy material is eliminated, it remains so. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industrial Carbon Capture from a Cement Facility Using the CryocapTM FG Process (2023 FECM/NETL Conference Proceeding)

The project's objective was to execute and complete front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separate 95% of the total CO2 emissions at an industrial facility, producing at least 100,000 metric tonnes/year of CO2 for sequestration. The industrial facility selected is the Holcim (US) Ste. Genevieve cement manufacturing facility (the largest single kiln line in the world), while the carbon capture system selected is Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology developed by Air Liquide. The impact of the project on Environmental Justice and the regional economy was also analyzed.

01 COAL, LIGNITE, AND PEAT↗

The SACADA database for human reliability and human performance

Lack of appropriate and sufficient human performance data has been identified as a key factor affecting human reliability analysis (HRA) quality especially in the estimation of human error probability (HEP). The Scenario Authoring, Characterization, and Debriefing Application (SACADA) database was developed by the U.S. Nuclear Regulatory Commission (NRC) to address this data need. An agreement between NRC and the South Texas Project Nuclear Operating Company (STPNOC) was established to support the SACADA development with aims to make the SACADA tool suitable for implementation in the nuclear power plants' operator training program to collect operator performance information. The collected data would support the STPNOC's operator training program and be shared with the NRC for improving HRA quality. This paper discusses the SACADA data taxonomy, the theoretical foundation, the prospective data to be generated from the SACADA raw data to inform human reliability and human performance, and the considerations on the use of simulator data for HRA. Each SACADA data point consists of two information segments: context and performance results. Context is a characterization of the performance challenges to task success. The performance results are the results of performing the task. The data taxonomy uses a macrocognitive functions model for the framework. At a high level, information is classified according to the macrocognitive functions of detecting the plant abnormality, understanding the abnormality, deciding the response plan, executing the response plan, and team related aspects (i.e., communication, teamwork, and supervision). The data are expected to be useful for analyzing the relations between context, error modes and error causes in human performance.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of the Trajectory Operations Applications Software Task (TOAST)

The Trajectory Operations Applications Software Task (TOAST) is a software development project under the auspices of the Mission Operations Directorate. Its purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle program. As an Application Manager, TOAST provides an isolation layer between the underlying Unix operating system and the series of user programs. It provides two main services: a common interface to operating system functions with semantics appropriate for C or FORTRAN, and a structured input and output package that can be utilized by user application programs. In order to evaluate TOAST as an Application Manager, the task was to assess current and planned capabilities, compare capabilities to functions available in commercially-available off the shelf (COTS) and Flight Analysis Design System (FADS) users for TOAST implementation. As a result of the investigation, it was found that the current version of TOAST is well implemented and meets the needs of the real-time users. The plans for migrating TOAST to the X Window System are essentially sound; the Executive will port with minor changes, while Menu Handler will require a total rewrite. A series of recommendations for future TOAST directions are included.

Perkins, Sharon↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

Operational Overview for UAS Integration in the NAS Project Flight Test Series 3

The National Aeronautics and Space Administration Unmanned Aircraft Systems Integration in the National Airspace System Project has conducted a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The 2015 Flight Test Series 3, supported two separate test configurations. The first configuration investigated the timing of Detect and Avoid alerting thresholds using a radar equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries. The second configuration included a surrogate unmanned vehicle (flown from a ground control station, with a safety pilot on board) flying a mission in a virtual air traffic control airspace sector using research pilot displays and Detect and Avoid advisories to maintain separation from live and virtual aircraft. The test was conducted over an eight-week span within the R-2508 Special Use Airspace. Over 200 encounters were flown for the first configuration, and although the second configuration was cancelled after three data collection flights, Flight Test 3 proved to be invaluable for the purposes of planning, managing, and execution of this type of integrated flight test.

unmanned aircraft systems↗

Usability Evaluation of Fleet Management Interface for High Density Vertiplex Environments

To meet the rising demand for an Advanced Air Mobility (AAM) (i.e. urban and rural unmanned aircraft systems) ecosystem, the NASA Aeronautics Research Mission Directorate (ARMD) is hosting a series of simulations and flight tests under the High Density Vertiplex sub-project (HDV) to prototype and study the effectiveness AAM capabilities under various operational contexts. HDV aims to develop an integrated automation architecture to support terminal area flight operations. The HDV simulations and flight tests address safety, integration, and operational challenges, while integrated systems and software demonstrate design readiness, robustness, and interoperability. During the initial HDV simulation in 2021, a prototype traffic management tool developed by NASA called the Fleet Management Interface (FMI) was tested. FMI was designed to introduce an advanced level of human-automation interaction to aid both Ground Control Station Operators (GCSOs) and Fleet Managers (FMs) in remotely managing flights under their ownership. In a human-in-the-loop simulation, a usability study was conducted with the FMI to identify optimal approaches for displaying information to human operators using subjective measures of usability, workload, situation awareness, risk, and trust, along with qualitative feedback. This study consisted of task analysis in which GCSO and FM subjects used an Urban Air Mobility (UAM) environment to develop and execute a plan for two different traffic scenarios of remotely controlled vehicles. In each scenario, a remotely controlled vehicle completed a takeoff, active flight, and landing sequence while simulated traffic flew in the background at a rate of 20 operations per hour. In the first scenario, the controlled vehicle flew a nominal route with takeoff and landing at the same vertiport. In the second scenario, the controlled vehicle started on the nominal route, then diverted to an unplanned location mid-flight. Results showed that self- reported performance, usability, trust, and situation awareness ratings of FMI were moderately to strongly high. There were small differences between scenarios, with Scenario 2 being perceived as more unstable, complex, variable, risky, and potentially harmful than Scenario 1. Furthermore, participants described improvements that could be made to create a better user experience. For example, users suggested customizable interfaces to accommodate information display preferences, and the ability to review routes before assigning them. The results from this study will inform future development of the FMI with the end goal of creating a reference automation tool for airspace management procedures in AAM. The FMI could serve to reduce dependency on traditional air navigation services through increased automation in high density vertiplex environments.

Fleet manager↗

Algorithms and Libraries

This exploratory study initiated our inquiry into algorithms and applications that would benefit by latency tolerant approach to algorithm building, including the construction of new algorithms where appropriate. In a multithreaded execution, when a processor reaches a point where remote memory access is necessary, the request is sent out on the network and a context--switch occurs to a new thread of computation. This effectively masks a long and unpredictable latency due to remote loads, thereby providing tolerance to remote access latency. We began to develop standards to profile various algorithm and application parameters, such as the degree of parallelism, granularity, precision, instruction set mix, interprocessor communication, latency etc. These tools will continue to develop and evolve as the Information Power Grid environment matures. To provide a richer context for this research, the project also focused on issues of fault-tolerance and computation migration of numerical algorithms and software. During the initial phase we tried to increase our understanding of the bottlenecks in single processor performance. Our work began by developing an approach for the automatic generation and optimization of numerical software for processors with deep memory hierarchies and pipelined functional units. Based on the results we achieved in this study we are planning to study other architectures of interest, including development of cost models, and developing code generators appropriate to these architectures.

Dongarra, Jack↗