Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE DISPOSAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Immobilization of Organic Liquid Radioactive Waste (LWR) in a Sulfur Composite Matrix at the BN-350 Fast Neutron Reactor Site, Kazakhstan - 18031

The immobilization treatment and final disposition of all forms of organic radioactive liquids, such as pump oil, spent solvent, tri-butyl-phosphate (TBP) and scintillation fluids, remain a significant challenge for nuclear waste generators and national regulators. The majority of nuclear nations have instituted regulations that require some form of encapsulation of treated organic liquid, notwithstanding LLW organic liquids that can be safely incinerated. In most cases cement is the designated material for encapsulation; however, cement can pose certain problems with the containment of treated organic liquids. In 2013, with funding from the U.S. Department of Energy - National Nuclear Security Administration through its Global Initiative for Proliferation Prevention Program (GIPP), a proven U.S. technology for the treatment of radioactive organic liquids was introduced at the BN-350 fast neutron reactor facility in Aktau, Kazakhstan. As the facility was undergoing full decommissioning, one hundred and sixty cubic meters of contaminated pump oil (including Cs-137, Sr-90 and U-235/238) contained in large above ground tanks had to be treated for final disposal. As a result of the research conducted over a two-year period, a new 2-step treatment process was invented by combining the U.S. solidification technology with a newly developed inorganic filler and molecular sulfur, referred to as radiation-resistant composite (RRC) to fully encapsulate the waste oil. The outcome of extensive test program indicates that the final form can reach up to 60 wt.% with a compressive strength of about 100 kg/cm{sup 2}. Preliminary conclusions indicate that RRC outperforms cement as an encapsulation form for final waste treatment which meets U.S. Nuclear Regulatory requirements for final disposal. This paper examines the preliminary experimental work that was conducted in Kazakhstan with the U.S. polymer technology and radioactive pump oil, and the subsequent secondary process of combining the solidified material into a homogeneous final form utilizing RRC. Topics covered in the paper include: - Kazakhstan's regulatory requirements for attaining an achievable waste form for acceptance, which led to the RRC invention; - Technical objectives for the application of polymer technology and RRC materials to radioactive liquid waste; - Polymer solidification with radioactive oil and the result; step one of the RRC process; - Description of RRC materials, their origin and chemical characteristics; - Process of combining the solidified polymer mass with RRC materials into a solid, homogeneous matrix; step two of the RRC process; - Experimental results including leaching data, waste loading estimates and heat process calculations to create the matrix; - Cost advantages of the RRC process over cementation; - Limitations of the RRC process; - Next steps to verify conformance of the RRC technology to the U.S. requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of a Radioactive Release in a Nuclear Waste Disposal Facility

The Waste Isolation Pilot Plant (WIPP) is a 655-meter deep mine near Carlsbad, New Mexico, used to dispose the nation’s defense transuranic waste. Limited airborne radioactivity was released from a container of radioactive waste in WIPP on 14 February, 2014. As designed, a mine ventilation filtration system prevented the large scale release of contamination from the underground. However, isolation dampers leaked, which allowed the release of low levels of contaminants after the event until they were sealed. None of the exposed individuals received any recordable dose. While surface contamination was limited, contamination in the ventilation system and portions of the underground was substantial. High efficiency particulate air (HEPA) filters in the operating ventilation system ensure continued containment during recovery and resumption of disposal operations. However, ventilation flow is restricted since the incident, with all exhaust air directed through the filters. Decontamination and natural fixation by the hygroscopic nature of the salt host rock has reduced the likelihood of further contamination spread. Contamination control and ventilation system operability are crucial for resumption of operations. This article provides an operational assessment and evaluation of these two key areas.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

End of Life Decisions for Sealed Radioactive Sources

Sealed radioactive sources are encountered in a wide variety of settings – from household smoke detectors and instrument check sources, through fixed industrial gauges, industrial radiography and well logging sources, to irradiators and medical teletherapy devices. In general, the higher the level of activity in the sealed source, the stricter the regulatory control that is applied to its use, control and ultimate disposition. Lower levels of attention and oversight can and do lead to sources ending up in the wrong place – as orphan sources in uncontrolled storage, disposed in a sanitary landfill, melted down in metal recycling operations and incorporated into consumer products, or handled by an unsuspecting member of the public. There are a range of issues that contribute to the problem of improper disposal of sealed sources, and, in particular, to disused source disposal. General licensed sources and devices are particularly at risk of being disposed incorrectly. Higher activity general licensed sources, although required to be registered with the Nuclear Regulatory Commission (NRC) or Agreement State, receive limited regulatory oversight and are not tracked on a national scale. Users frequently do not consider the full life-cycle costs when procuring sources or devices and discover that they cannot afford to package, transport and dispose of their sources properly. The NRC requirements for decommissioning funding plans and financial assurance are not adequate to cover sealed source transport and disposal costs fully. While there are regulatory limits for storage of disused sources, enforcement is limited and there is no financial incentive for owners to dispose of the sources. In some cases, the lack of availability of approved Department of Transportation (DOT) Type B shipping casks also presents a barrier to sealed source disposal. The report of the Disused Sources Working Group does an excellent job of framing these issues. This article reviews both the issues and the report’s recommendations, which are designed to improve sealed source control and encourage proper disposal of disused sources.

disused source↗

The High Capacity Type B Waste Transport Cask to Serve Dismantling Project - 18344

The United States have already announced around 20 reactor shutdown and many more in the next 10 year. Financial constraints on plant operators and the low cost of fossil energy contribute to accelerate the shutdown of additional reactors. The industry has been gaining experience with reactor dismantling and is continuously trying to improve the cost efficiency of the upcoming projects. To do so, larger and more capacitive transport casks are needed to transport increasing volume of Low Level Waste (LLW) at a more attractive cost. Waste disposal is also a major cost element in a dismantling project. Consequently, the capacity to segment, package and transport the waste in the most optimized configuration will result in significant cost savings. While for LLW, the constraints for package requirements are limited, activated waste resulting mainly from reactor vessel and vessel internals segmentation require additional shielding to meet disposal and transportation regulations. The key element to succeed is the availability on the market of a licensed type B transport package with a larger payload that allows at the same time an optimization of the waste segmentation. AREVA TN has designed and licensed versatile high capacity type B casks for the transport of spent fuel canisters as part of the NUHOMS{sup R} system that can also be used to transport radioactive waste. While it will take a few more years to transport spent fuel to a consolidated interim storage facility and even more to a repository, the type B casks can be used to transport activated LLW from dismantled reactors to disposal sites. A first of a kind project will be performed with AREVA's partner NorthStar at Vermont Yankee Nuclear Power Plant. AREVA's team will perform the reactor segmentation and package the material into an AREVA's large capacity type B cask. This unmatched cask capacity is expected to significantly decrease the LLW disposal costs, as well as the onsite operations costs, while optimizing the schedule. The package will be transported by rail to waste disposal facilities. This paper will present the main characteristics of the package, provide an update of the overall schedule, and explain the innovations that contribute to simpler and more cost effective transport and operation. Finally, it will emphasize the benefits of using larger type B casks for immediate and future transportation needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Methodology for defining intermediate level waste package characteristics that ensure criticality safety in a geological disposal facility - 14599

Radioactive Waste Management (RWM) is responsible for implementing geological disposal of the UK's higher activity radioactive wastes. These wastes include fissile nuclides and, therefore, demonstration of the criticality safety of the wastes under disposal conditions forms an important component of RWM's disposal system safety case. The basis for ensuring criticality safety of intermediate level waste (ILW) packages is to specify controls on the fissile material content of individual packages through the application of deterministic criticality safety assessments (CSAs). The approach is defined and controlled through RWM's Disposability Assessment process, which aims to ensure that: criticality is prevented during waste package transport to a GDF; the risk of criticality is tolerable and as low as reasonably practicable (ALARP) during GDF operations; and the likelihood and consequences of criticality arising from the evolution of waste packages after GDF closure are low. The most restrictive phase determines the package fissile material limit and, until now, in many cases the GDF post-closure phase has provided the most restrictive limit. Currently, the GDF post-closure limits are derived deterministically using highly stylised and conservative assumptions about fissile material accumulations occurring on very long timescales into the future. RWM, waste producers and regulators do not currently consider this approach to be yielding an appropriate balance of risk. Therefore, RWM is modifying the process for setting fissile material limits on ILW packages by making use of the outcomes of its recent research projects to establish the likelihood of post-closure criticality in a GDF and the consequences of hypothetical post-closure criticality events (presented in companion papers). This paper presents the revised methodology, which is based on the requirement that criticality in a GDF can be demonstrated to be of low and tolerable consequences with regard the performance of a GDF. A probabilistic 'low-likelihood package envelope' is proposed that establishes the packaging and disposal facility conditions under which post-closure criticality is considered to be of low likelihood and low consequence. The bounding conditions for establishing the extent of the package envelope have been evaluated through application of the methodologies and models developed in RWM's Likelihood of Criticality research project. It is expected that the vast majority of ILW packages would meet the package envelope requirements. The methodology also allows the use of other options, such as deterministic CSAs, for waste packages that fall outside the low-likelihood package envelope. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation of Low-Level Radioactive Waste from KAERI to the Final Repository - 18179

The Korea Atomic Energy Research Institute (KAERI) collects the radioactive wastes generated during the operation of nuclear facilities and R and D processes. Radioactive wastes are treated and repackaged according to the national radioactive waste management policy, and then transferred to the final disposal site at the Korea Radioactive Waste Agency (KORAD). After 2015, the wastes delivered to the final disposal site have consisted of spent filters and combustible wastes such as clothes and gloves generated during R and D or facility operation processes at KAERI. The wastes generated by each facility are collected at the radioactive waste treatment facility, then treated and repackaged in 200 L drums according to their generation characteristics, i.e. each drum contains waste of the same type from the same facility, and with the same date of generation. Then, a radionuclide inventory is obtained for the repackaged drum by using a direct measurement method such as the drum assay system, radiochemical analysis through random sampling or an indirect measurement method such as applying a scaling factor. When performing sampling of the radioactive waste drums, the waste samples with a high contamination are selected in a conservative approach as representative. The radioactive waste drums are inspected and checked for acceptability by the Quality Management Division of KAERI, and a preliminary inspection is carried out on-site by KORAD. At this time, the acceptability of the radioactive waste drums is assessed through visual inspection, the appropriateness of their nuclide analysis value is confirmed, and a survey or smear test of sample drums is performed. Drums that meet the acceptance criteria are transferred to KORAD after a radiation environmental impact assessment of the transportation. Since 2015, 1,084 low-level operational radioactive wastes have been transferred from KAERI to the final disposal site, and further preparation work is now being made for the transportation of additional drums. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Long-term Safety Assessment for the Planned LLW Disposal Facility at Al-Tuwaitha, Iraq - 18142

Before 1991, Iraq had a significant nuclear program which encompassed ten nuclear sites spread out across the country. The largest nuclear site was located at the Al-Tuwaitha site near Baghdad where 18 nuclear facilities were concentrated. During the first Gulf War in 1991, all sites suffered significant damage from bombing and subsequent looting. Currently, the Ministry of Science and Technology is responsible for the ten heavily damaged nuclear sites and for the management of radioactive waste in Iraq in general. The task of decommissioning the damaged nuclear facilities and managing the resulting waste is being supported by the International Atomic Energy Agency (IAEA), the European Commission (EC), and the United States (US). In the framework of its Instrument for Nuclear Safety Cooperation (INSC), the EC has launched a cooperation project to support the planned construction of an engineered repository for short-lived low- and intermediate level waste for the safe disposal of radioactive waste resulting from the decommissioning activities, as well as for waste from the continuing use of radioisotopes in medicine and the oil and gas industry in the country. The main objectives of this project, which was awarded to a Consortium led by NUKEM Technologies Engineering Services GmbH and joined by DBE Technology GmbH of Germany and JAVYS a.s. of Slovakia, are the development of an initial conceptual level basic design and preliminary safety assessment report (PSAR) and the subsequent detailed engineering design and supporting pre-construction safety assessment report (PCSAR). The current paper focuses on the development of the PSAR. Special focus is given to the long-term calculations and difficulties associated with the limited data base in regard to site characterization as well as the expected inventory for the future repository. Because of the ongoing security concerns in Iraq, the Ministry of Science and Technology had already selected the Al-Tuwaitha Site as the best suited location for the planned surface repository at the start of the project. Although some site characterization work had already been carried out prior to the start of the project, certain data for modelling the geology and hydrology of the site are still lacking. Missing data have been compensated by conservative assumptions and the assessment of alternative scenarios. Consequently, for the development of the simplified GoldSim{sup R} computer model used to carry out the long-term calculations supporting the PSAR, existing site information was used and, as appropriate, amended or replaced by conservative assumptions. Due to the nature of the waste, data on the expected inventory are associated with large uncertainties. Although certain estimates related to the future volume of the waste exist, little to no information is available on the expected radionuclide vector and respective activities. Therefore, the long-term calculations were carried out for a generic inventory including a broad range of radionuclides that are to be expected as being important considering the kind of waste to be disposed of in the facility. Based on the results of these calculations, the maximum total capacity of the facility was estimated and converted into activity limits for individual radionuclides that will be integrated into the existing general WAC for the facility. Compliance with these WAC will then guarantee the safety of the repository in regard to potential radionuclide releases via the groundwater pathway. In parallel to the determination of activity limits for the WAC, long-term calculations were carried using different estimates for the expected total activity to determine the general suitability of the proposed technical solution of the repository for receiving the total amount of Iraqi radioactive waste principally acceptable for surface disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of disposal container designs for disposal of high level waste and legacy spent fuel in the UK - 15471

Radioactive Waste Management Limited (RWM), a fully owned subsidiary of the Nuclear Decommissioning Authority (NDA), is responsible for the implementation of geological disposal in the UK. Three illustrative concepts of a geological disposal facility (GDF), corresponding to three generic geological environments - higher strength rock, lower strength sedimentary rock and evaporite rock - have been developed to demonstrate the viability of geological disposal of intermediate level waste, high level waste and spent fuel. It is envisaged that HLW which has been encapsulated in Waste Vitrification Plant (WVP) canisters, advanced gas-cooled reactor (AGR) SF which has been stripped of their spacers and packaged into slotted fuel cans, and PWR SF will be packaged into disposal containers for disposal. A set of schematic designs of these disposal containers was developed in the late 2000's. The design concept for the higher strength rock environment was based on the joint Posiva/SKB disposal container design, and the design concept for the lower strength sedimentary rock and evaporate rock illustrative environments was based on the disposal container concept from Switzerland's National Cooperative for the Disposal of Radioactive Waste (Nagra). The size, mass and dimensions of the disposal containers in the scheme designs vary significantly. The construction method and the lid closing method also vary between the disposal containers for the different waste contents. A design study has indicated that optimization of the number of HLW WVP canisters and the number of AGR slotted fuel cans in the disposal containers, standardizing construction method and closure arrangement across the containers for each geology type, providing handling features at both ends of the disposal container, and balancing of shielding around the containers, could bring significant advantage to the overall GDF programme by reducing the number of disposal containers, reducing GDF footprint, and reducing the extent of excavations, spoil generated and materials that are required for construction. A project to develop the scheme designs to conceptual level was carried in 2011 to 2013. In this project, the above changes were taken into account, technical underpinning of the designs was carried out and manufacturing method was considered. Two disposal container variants for different host rock environments have been developed: - Variant 1, for compatibility with the higher strength rock illustrative disposal system design. This is constructed from copper, with a cast iron insert and is based on the joint Posiva/SKB disposal container design. - Variant 2, for compatibility with the lower strength sedimentary rock and evaporite rock illustrative disposal system designs. This is a steel container based on the NAGRA disposal container design. Each variant has three internal configurations to accommodate 3 HLW vitrified canisters, 16 consolidated cans of AGR SF and 4 PWR spent fuel assemblies. These designs have been shown to bring significant benefit to the GDF designs, bringing a significant reduction to the operating programme and GDF programme cost, including reducing the number of disposal containers by 33% for HLW, 50% for AGR SF and reducing the size of the GDF footprint by 25%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposing of High-Level Radioactive Waste in Germany - A Note from the Licensing Authority - 12530

Following the national German consensus on the termination of utilisation of nuclear energy in the summer of 2011, the Federal and Laender Governments have declared their intention to work together on a national consensus on the disposal of radioactive waste as well. Projected in the early 1970's the Federal Government had started exploring the possibility to establish a repository for HLW at the Gorleben site in 1977. However, there is still no repository available in Germany today. The delay results mainly from the national conflict over the suitability of the designated Gorleben site, considerably disrupting German society along the crevice that runs between supporters and opponents of nuclear energy. The Gorleben salt dome is situated in Lower Saxony, the German state that also hosts the infamous Asse mine repository for LLW and ILW and the Konrad repository project designated to receive LLW and ILW as well. With the fourth German project, the Morsleben L/ILW repository only 20 km away across the state border, the state of Lower Saxony carries the main load for the disposal of radioactive waste in Germany. After more than 25 years of exploration and a 10 year moratorium the Gorleben project has now reached a cross-road. Current plans for setting up a new site selection procedure in Germany call for the selection and exploration of up to four alternative sites, depending only on suitable geology. In the meantime the discussion is still open on whether the Gorleben project should be terminated in order to pacify the societal conflict or being kept in the selection process on account of its promising geology. The Lower Saxony Ministry for Environment and Climate Protection proposes to follow a twelve-step-program for finding the appropriate site, including the Gorleben site in the process. With its long history of exploration the site is the benchmark that alternative sites will have to compare with. Following the national consensus of 2011 on the termination of nuclear energy utilisation, it is now the time to reach a national consensus on the disposal of radioactive waste as well. This is a task that the country and society, federal and state governments, political parties and the citizens will have to jointly master within the current generation and within German territory. The basis for the consensus will be a reset to the beginning of this process. It has to start with a new site selection procedure that will take into account and compare up to four alternative sites. This procedure will have to follow the principle of highest possible security. It should be based on a stepwise approach, strictly following scientific criteria. Public confidence in the process and trust can only be achieved by a transparent procedure allowing for the participation of the public and the stakeholders. It is therefore mandatory to consult, both on a national and regional level, all involved parties (public authority, scientist and citizen). The national consensus must also include a decision on the future of the Gorleben exploratory site. The site selection procedure must therefore take this site into account as well. Furthermore, the final decision on safe disposal of German radioactive wastes must be made by sovereign rule by Federal Parliament and Federal Council. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Keep It Smart and Simple - Henriette - The Advanced Designed Drum Gripper for Remote Handling Tasks - 19327

A power manipulator has many applications in the handling, treatment and packaging of radioactive waste. In high radiation environments, where humans cannot work safely, a power manipulator is essential to perform difficult and heavy tasks. For more than 40 years, Waelischmiller has provided power manipulators to the nuclear market. Specifically in a high radiation nuclear environment, electrical driven manipulators are preferred. The basic design of a power manipulator is divided into the following parts: Bridge, carriage, telescopic mast and manipulator arm. All parts are customizable in length, width and capacity. The standard power manipulator version is equipped with a manipulator arm. For the nuclear waste disposal industry, there is a special need for a drum gripper. Drums are used for packing low, medium or high activated material and for storage. After packing, the drums must be handled remotely. For both tasks, a power manipulator with a drum gripper is needed. For this project KTE (Kerntechnische Entsorgung Karlsruhe GmbH) required a total refurbishment of equipment in a cell used for handling, sorting and packaging radioactive waste drums. The power manipulator was obsolete and provided low availability and through put. This cell was an essential asset in their decommissioning process and was impacting KTE's ability to meet their volume objectives. Our challenge was to develop a new system with few details from the original cell construction. The new manipulator must meet all capabilities of the old system and in addition have the ability to achieve 180 degree tilting of the drums. An additional challenge was the requirement to use the existing rails in the cell which were very close to the roof structure which required a special design. Our project, named internally Henriette, is the first of its kind. The drum gripper is based on the power manipulator A1000 series. The biggest challenges in this project were to adapt the standard components of the power manipulator to the non-standard type of gripper to have 180 deg. tilting of the drum and a handling capacity of 1200 kg in the whole working range. The new manipulator fits to the old rails and is mountable in a hot cell with restricted access and can operate with the other A1000 manipulator which is located in the cell. The result is a system with no external wiring, maintenance-free and easy to decontaminate. Other features include a 5 t auxiliary hoist on additional and parallel carriages, emergency drives for bridge and carriage, emergency drive for telescope turn movement and emergency lifting unit for telescope. A tilt and pan holder for camera on the telescope and external mechanical emergency drives on the gripper were also essential. This paper will address the complexity, challenges and engineering ingenuity required to replace very old and obsolete equipment with a state-of-the-art system within very limited physical space and within a high radiation environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the Licensing Procedure and Regulatory Framework for the Spent Fuel Storage facility in Korea - 16423

The Public Engagement Commission on SNF management (PECOS) published the recommendation report on the spent fuel management of Korea in June, 2015. Based on this report, the future national policy for spent fuel management of Korea has been established, taking into consideration the national/international trends on policy and technology development. Regardless of the recommendation report of PECOS, Spent fuel storage casks are necessary in Korea. Therefore, various types of spent fuel storage casks are now being developed by Korea vendors. For example, Concrete storage casks and dual purpose metal casks are now under development by the KORAD (Korea Radioactive waste agency) for future use in the interim storage facility. Unfortunately, there is no independent licensing procedure for spent fuel storage casks in Nuclear Safety Act (NSA) because is the casks are considered an integral part of the interim storage facility safety equipment. Furthermore, the definition of radioactive waste in the NSA was changed recently. Now, spent fuel is separated from the definition of 'radioactive waste'. Spent fuel can only become radioactive waste by the decision through the meeting of the relative ministers of Korea government. For that reason, the licensing procedure for interim spent fuel storage facilities was separated from the current 'disposal facility, etc.' in accordance with the article 63 of NSA. The aim of this study is to develop the licensing procedure for the storage cask, and also to develop a revised draft of interim storage facility procedure within the NSA. Once this independent licensing procedure on the spent fuel storage cask is introduced to the NSA, it is expected that developers or operators can develop and commercialize the storage cask in Korea. In this study, an independent licensing procedure for the spent fuel storage facility was developed including the storage cask licensing procedure for the NSA. The procedure was composed of the permit for construction and operation of interim storage facility, criteria for permit, inspection criteria, periodic safety review, and decommissioning criteria, etc. The detailed contents of these requirements were also developed to introduce the regulatory framework for the interim storage facility. Particularly, periodic safety review and decommissioning criteria were developed in accordance with the recommendation of IRRS (International Regulatory Review Service) of IAEA. The developed licensing procedure for spent fuel storage facility will be introduced in NSA in response to the revised definition of NSA and the recommendation report of PECOS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying Technology and Experience to Ensure Safe In Situ Decommissioning - 19587

Permanent entombment of a radioactively contaminated facility as a decommissioning option (In Situ Decommissioning, ISD) has been completed for DOE facilities at the Savannah River Site (P and Reactors, HWCTR reactor), Hanford (U Canyon) and Idaho (CP-601/604),and is currently being considered for implementation at a limited number of selected DOE facilities as well as for the NPD and WR-1 reactors in Canada and various facilities in the United Kingdom. A general description of an ISD project encompasses an entombed facility which in some cases is limited to just the below-grade portion of a facility with the above-ground portion being decommissioned, packaged and disposed in a conventional manner. The entombed portions of the facility are of robust construction, generally of reinforced concrete exterior, that provides a migration barrier between internal contamination and the environment with significant internal void spaces backfilled or grouted. The scope of entombment may include ancillary equipment and structures and may contain radioactive and hazardous materials and contamination within the facility and waste imported from outside the facility. ISD is most often a permanent decommissioning end-state although in some instances (e.g. the U.K.) there may be a need to revisit the ISD facility after 300 years to effect traditional decommissioning. The defined completion (the end-state) of the decommissioned facility is therefore project-specific and in conformance with environmental approval processes and planned future activities. In all cases however, the final condition is passive, meaning that there are no requirements for ongoing operational systems or equipment within the decommissioned facility. ISD projects in the USA are presumed to be under indefinite institutional control of the U.S. Government. The regulatory framework in the U.S. is currently in place to provide assurance that the risk posed by an ISD facility is within regulatory acceptance criteria. (The framework in the U.K. and Canada is evolving towards that in the USA). Special emphasis is placed on the fact that an entombed facility is not considered a waste disposal facility; rather it is a decommissioning end-state option. ISD does not eliminate the need for effective and careful management of contaminated materials and structures, nor does it serve to abandon contaminated buildings in place. Further, ISD is safe and cost-effective for a relatively small number of facilities across the DOE Complex. This paper explores the current programmatic considerations and technical aspects of the ISD process and discuss the measures taken to ensure that an 'entombed' facility is safe for both site workers and the general population. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned From Decommissioning B411 Decontamination Centre at Whiteshell Laboratories - 18211

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on the largest organically cooled, heavy water moderated nuclear reactor in the world, the WR-1. It is now operated by Canadian Nuclear Laboratories (CNL) and is the first major decommissioning project of a nuclear research establishment in Canada. One of the major projects to support the closure of Whiteshell Laboratories (WL) is the decommissioning and demolition of the Building 411 (B411) Decontamination Centre, which provided a decontamination service for maintaining research and development of experimental rigs, equipment and tools in a safe usable state. It also provided a laundry service for radioactively contaminated clothing. The team successfully self-performed their first demolition of a nuclear facility, but not without challenges. The baseline decommissioning strategy assumed most of the facility would meet unconditional clearance levels; however when characterization revealed the extent of contamination exceeded initial assumptions projected from process knowledge, in conjunction with resource challenges and a waste disposal pathway not firmly established, active remediation of the facility was undertaken. With an unknown waste acceptance criteria for the future waste disposal facility, sludge that had accumulated in a tank used to collect xylene and organic coolant from contaminated tools and equipment and the selection of appropriate waste packages for waste storage, transportation and disposal forced the project team to adjust their demolition timeline. This, coupled with developing an open air demolition plan and managing an uncertain end state criteria, were just some of the major tasks the team successfully navigated. The impact on both schedule and cost performance caused by the change in strategy, and the lessons learned experienced by the WL Decommissioning Project Team that are being applied as the Whiteshell Laboratories Closure Project (WLCP) moves forward with the next major decommissioning challenge, are highlighted in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Uranium Catalyst Waste for High Volume Reduction of the Final Waste to be Disposed - 19023

A large volume of problematic radioactive waste of spent uranium catalyst, approximately 7,000 drums was generated by a chemical company in Korea. The spent uranium catalyst has since been stored onsite awaiting a management strategy that is to minimize the volume/cost requirements for final disposal of the uranium-bearing waste. This work developed for the first time a process to greatly reduce the waste volume to be disposed while the secondary wastes generated from the process being released to the environment are controlled to meet the discharge criteria in Korea. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solidification of Low and Intermediate Level Waste - A Comparison between Different Methods - 19584

The treatment of radioactive materials results in products that have to be suitable for a period of interim storage as well as for disposal in a repository. Considering available options for treatment of radioactive waste, future disposal also has to be taken into account. Up to now, only cementation and encapsulation in geopolymer (only to limited extent) are relevant treatment methods for the solidification of German waste for disposal in the repository Grube Konrad. However, a synopsis of other solidification technologies is considered to be helpful in order to be prepared for future developments in the fields of radioactive waste treatment. Treatment methods addressed in this paper are: - Cementation; - Encapsulation into geopolymer matrix; - Vitrification; - SYNROC; - Geomelting. The criteria for evaluation of the treatment methods are as follows: - Requirements concerning waste properties; - Safety of treatment facilities; - Fulfillment of waste acceptance criteria for repository Grube Konrad; - Fulfillment of requirements for near surface disposal; - Suitability for long-term interim storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Borehole Disposal: Update on the Science, Technology, and Potentially Suitable Radioactive Wastes - 20170

A recent Special Issue of the Energies Journal on Deep Borehole Disposal of Nuclear Waste has delivered a timely update on the science and technology of borehole disposal and the types of radioactive wastes it could potentially accommodate. The Special Issue papers discuss (i) circumstances under which a national waste management programme might wish to consider deep borehole disposal [1], (ii) a status report of deep borehole disposal options in Germany [2], (iii) the use of deep horizontal drill-holes in sedimentary, metamorphic or igneous rocks for disposal of spent nuclear fuel and high-level radioactive waste [3], (iv) the analysis of corrosion performance of engineered barrier systems [4], (v) a review of the potential cementing systems suitable for deep borehole disposal [5], (vi) the thermal evolution around heat-generating waste for a wide range of material properties and disposal configurations [6], (vii) a geochemical analysis of deep brines focussed on fluid-rock interactions [7], (viii) post-closure performance assessment calculations for deep borehole disposal of Cs/Sr capsules [8], and (ix) an example safety case for deep borehole disposal of nuclear wastes [9]. This paper provides an overview of the main findings from these publications and highlights some of the technological and scientific challenges that need to be overcome when developing a deep borehole disposal concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Rock - the 60-Year-Old Prodigy Host Rock for Consent-Based Disposal of Long-Lived Radioactive Waste - 16010

The USA's HLW-disposal program has been on hold since 2010 pending enabling legislation for its only candidate HLW-repository since 1987 at the Yucca Mountain site in Nevada and/or other, 'consent-based', HLW-disposition solutions. Related projections in 2008 and 2012 suggested they might open 9-12 years and 35 years after being adequately enabled, respectively. In 2014, domestic HLW arisings exceeded the capacity of the candidate repository by >4,000 metric tons (MT) and they were projected to grow by 2,000-2,300 MT/year. One or more new HLW repositories are thus highly-likely in the future. In the meantime, the DOE should make every effort to promptly take title to civilian-generated HLW by other means. Historical evidence in the USA and abroad during the past 30+ years shows that all HLW-repository siting and development schedules and costs are governed by the inherent, intricate, relationships and related domino effects of the: 1. Maturity/robustness of the disposal concept; 2. Related levels of relevant domestic repository-sciences/engineering expertise, data, institutional knowledge, and applicable regulations; 3. Abundance and 'ease' of physical access to potentially-suitable host-rock sites; 4. 'Trust' in the implementing and regulating organizations; 5. Timely resolution of inevitable contentions and lawsuits; 6. Facility-host-acceptance level; 7. Timely and adequate enabling legislation, and therefore, ultimately, by 8. Prevailing Political Will. Based upon their respective status at the end of 2015, salt rock still offers the most, but not the only, promising path forward for new, mined, HLW repositories in the USA, and ∼5-km-deep boreholes offer the most-promising disposal-solution for small HLW containers/packages/pellets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗