Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

International Space Station USOS Crew Quarters On-orbit vs Design Performance Comparison

The International Space Station (ISS) United States Operational Segment (USOS) received the first two permanent ISS Crew Quarters (CQ) on Utility Logistics Flight Two (ULF2) in November 2008. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The CQs provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, communication equipment, redundant electrical systems, and redundant caution and warning systems. The racksized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. The deployment and initial operational checkout during integration of the ISS CQ to the Node is described. Additionally, the comparison of on-orbit to original design performance is outlined for the following key operational parameters: interior acoustic performance, air flow rate, temperature rise, and crewmember feedback on provisioning and restraint layout.

Broyan, James Lee, Jr.↗

Preliminary design of the Space Station internal thermal control system

The baseline preliminary design configuration of the Internal Thermal Control system (ITCS) of the U.S. Space Station pressurized elements (i.e., the Habitation and U.S. Laboratory modules, pressurized logistics carrier, and resources nodes) is defined. The ITCS is composed of both active and passive components. The subsystems which comprise the ITCS are identified and their functional descriptions are provided. The significant trades and analyses, which were performed during Phase B (i.e., the preliminary design phase) that resulted in the design described herein, are discussed. The ITCS interfaces with the station's central Heat Rejection and Transport System (HRTS), other systems, and externally attached pressurized payloads are described. Requirements on the ITCS with regard to redundancy and experiment support are also addressed.

Herrin, Mark T.↗

Electrochemically regenerable metabolic CO2 and moisture control system for an advanced EMU application

Regenerable CO2 and moisture removal techniques that reduce expendables and logistics requirements are needed to sustain people undertaking extravehicular activities for the Space Station. NASA has been investigating ways to advance the Electrochemically Regenerable CO2 and Moisture Absorption (ERCA) technology to replace the nonregenerable solid lithium hydroxide absorber for the advanced Portable Life Support System (PLSS). The ERCA technology, due to its use of liquid absorbent, has the ability to effectively satisfy the high metabolic CO2 and moisture removal requirements of PLSS applications. This paper defines the ERCA technology concept and its advantages for the PLSS application, reviews breadboard and subscale testdata and presents the results of design concepts for a prototype Absorber Module of improved performance and the physical characteristics of the projected flight hardware.

Lee, M. C.↗

STS-100 Crew Activity Report: Flight Day 7 Highlights

On this seventh day of the STS-100 mission, the crewmembers of Endeavour, Commander Kent Rominger, Pilot Jeffrey Ashby, and Mission Specialists Chris Hadfield, Scott Parazynski, John Phillips, Umberto Guidoni, and Yuri Valentinovich Lonchakov, are seen as they unload equipment from the Rafaello Logistics Module. Guidoni and Rominger answer questions from the Italian and European Space Agencies in an on-orbit press conference. The computer glitch that delayed tests on the Canadian Robotic Arm and another boost to the International Space Station (ISS) is described.

Source record↗

NASA’s In-Space Manufacturing Project: Update on Manufacturing Technologies and Materials to Enable More Sustainable and Safer Exploration

NASA’s In-Space Manufacturing (ISM) project seeks to develop the materials, processes, and manufacturing technologies needed to provide an on-demand manufacturing capability for deep space exploration missions. The ability to manufacture and recycle some parts on demand rather than launch them from earth has the potential to reduce logistics requirements on long duration missions and enhance crew safety. With the launch of the first 3D printer (built and operated by Made in Space through a Small Business Innovative Research – SBIR -- contract) to the International Space Station (ISS) in 2014, the ISM project demonstrated the feasibility of operating an on-demand manufacturing system in a microgravity environment. This paper will provide an update on recent advancements in ISM under three key technology areas: manufacturing, recycling, and development of a design database. ISM continues to pursue development of manufacturing technologies for space applications and use the ISS as a critical test bed to prove out these technologies before deploying them on next generation exploration systems. Activities under this focus area include: characterization of materials manufactured using the Additive Manufacturing Facility (AMF), the second generation commercial 3D-printer on ISS, also owned and operated by Made in Space; development of prototype payloads for metal manufacturing through phase II SBIR contracts with Tethers Unlimited, Made in Space, and Ultra Tech Machinery; development of a multi-material fabrication laboratory capable of processing metals and providing inspection of manufactured parts through a Broad Agency Announcement (Techshot, Interlog, and Tethers Unlimited); an in-line sensing system for ISM platforms; and development of higher strength feedstocks for 3D polymer printers. In the area of recycling, the Tethers Unlimited Refabricator payload (an integrated 3D printer and recycler for ULTEM 9085) launched to ISS in November 2018 and began operating in early 2019. This payload represents the first demonstration of on-orbit recycling; down massed specimens will assess material degradation in the polymer over multiple recycling cycles to define limits on material re-use. Other work in the recycling area includes development of common use materials intended to be reused and recycled on space missions (Tethers Unlimited and Cornerstone Research Group) and a sterilization capability for multiple-use materials (ERASMUS from Tethers Unlimited). Concurrent with manufacturing technology and materials development work is creation of a design database, a curated list of parts that can be manufactured using the suite of In-Space Manufacturing capabilities.

Tracie Prater↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

A Historical Review of Logistics Mass and Crew Time Demands for ISS Operations

Following over 20 years of continuously crewed operations on the International Space Station (ISS), NASA is planning to return to the Moon and eventually send humans to Mars. ISS operations provide vital data to inform mission analysts as NASA prepares for longer and more complex missions with increased mission endurance. Endurance, defined as crewed operating time between cargo deliveries (or crew launch and return to Earth), is an important metric when analyzing mission needs. NASA is developing architectures to support sustained deep-space habitats in cislunar space, the lunar surface, Mars transit, and the surface of Mars. Unlike the ISS, these systems will not be continuously crewed, and unlike the Space Shuttle, these systems will not return to Earth for regular refurbishment between missions. Lunar systems will routinely go through long uncrewed periods between crewed missions. The systems on board will need to survive these dormancy periods with no crew present to provide maintenance. Mars systems will experience significantly longer endurance than past experience. Additionally, the inability to have quick aborts to return to Earth increases the need for system reliability, redundancy, and maintainability, as well as plans for contingency operations. This paper examines the historical logistics and crew time demand for ISS operations and mission objectives and provides an overview of missions to the ISS over its operating history, the mass and items delivered with the missions, and the crew time spent during missions. These parameters provide insight and valuable data to inform logistics and crew time estimates for future long-endurance crewed exploration missions.

Crew Logistics↗

A Historical Review of Logistics Mass and Crew Time Demands for ISS Operations

Following over 20 years of continuously crewed operations on the International Space Station (ISS), NASA is planning to return to the Moon and eventually send humans to Mars. ISS operations provide vital data to inform mission analysts as NASA prepares for longer and more complex missions with increased mission endurance. Endurance, defined as crewed operating time between cargo deliveries (or crew launch and return to Earth), is an important metric when analyzing mission needs. NASA is developing architectures to support sustained deep-space habitats in cislunar space, the lunar surface, Mars transit, and the surface of Mars. Unlike the ISS, these systems will not be continuously crewed, and unlike the Space Shuttle, these systems will not return to Earth for regular refurbishment between missions. Lunar systems will routinely go through long uncrewed periods between crewed missions. The systems on board will need to survive these dormancy periods with no crew present to provide maintenance. Mars systems will experience significantly longer endurance than past experience. Additionally, the inability to have quick aborts to return to Earth increases the need for system reliability, redundancy, and maintainability, as well as plans for contingency operations. This paper examines the historical logistics and crew time demand for ISS operations and mission objectives and provides an overview of missions to the ISS over its operating history, the mass and items delivered with the missions, and the crew time spent during missions. These parameters provide insight and valuable data to inform logistics and crew time estimates for future long-endurance crewed exploration missions.

Crew Logistics↗

Hardware Autonomy for Space Infrastructure

NASA prioritizes autonomous systems development with the expectation that it will continue to drive significant improvements in human and science exploration capability. Crew operations benefit from a spectrum of machine assistance to complete replacement of dangerous or highly repetitive tasks. Many science operations have a teleoperation component, and similarly benefit from a range of autonomy implementations that make long distance applications feasible. As we consider longer duration deep space missions, we also consider higher levels of autonomy in order meet emergent safety, maintenance, and logistics needs. One of the challenges within this scope is installation and maintenance of infrastructure, such as large scale instrumentation and communications equipment, crew habitats, and operational facilities. We describe how a programmable meta-material architecture may shift the paradigm of how we design, build, and operate future space infrastructure and assets. A primary objective of this strategy is to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted. This integrates advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Engineering systems that utilize a modular and reconfiguration building block approach, such as digital communication and computation systems, currently lead in terms of size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials life-cycle management and expand our space exploration mission capabilities to meet long duration and deep space infrastructure needs, in accordance with long term NASA goals of "in-space reliance" and "mass-less exploration."

In space assembly↗

Sabatier Reactor System Integration with Microwave Plasma Methane Pyrolysis Post-Processor for Closed-Loop Hydrogen Recovery

The Carbon Dioxide Reduction Assembly (CRA) designed and developed for the International Space Station (ISS) represents the state-of-the-art in carbon dioxide reduction (CDRe) technology. The CRA produces water and methane by reducing carbon dioxide with hydrogen via the Sabatier reaction. The water is recycled to the Oxygen Generation Assembly (OGA) and the methane is vented overboard resulting in a net loss of hydrogen. The proximity to earth and the relative ease of logistics resupply from earth allow for a semi-closed system on ISS. However, long-term manned space flight beyond low earth orbit (LEO) dictates a more thoroughly closed-loop system involving significantly higher recovery of hydrogen, and subsequent recovery of oxygen, to minimize costs associated with logistics resupply beyond LEO. The open-loop ISS system for CDRe can be made closed-loop for follow-on missions by further processing methane to recover hydrogen. For this purpose, a process technology has been developed that employs a microwave-generated plasma to reduce methane to hydrogen and acetylene resulting in 75% theoretical recovery of hydrogen. In 2009, a 1-man equivalent Plasma Pyrolysis Assembly (PPA) was delivered to the National Aeronautics and Space Administration (NASA) for technical evaluation. The PPA has been integrated with a Sabatier Development Unit (SDU). The integrated process configuration incorporates a sorbent bed to eliminate residual carbon dioxide and water vapor in the Sabatier methane product stream before it enters the PPA. This paper provides detailed information on the stand-alone and integrated performance of both the PPA and SDU. Additionally, the integrated test stand design and anticipated future work are discussed.

Abney, Morgan B.↗

Integrated Logistics and Supportability Challenges of Sustained Human Lunar Exploration

NASA’s Artemis program plans to establish a sustained human presence on the lunar surface. The International Space Station other space station programs have demonstrated long-duration human spaceflight operations that reuse infrastructure in Low Earth Orbit, sometimes including long uncrewed “dormant” periods. In contrast, human lunar exploration to date has consisted solely of relatively short sortie missions, rather than a sustained presence. A sustained human outpost on the Moon that can support month-long crewed exploration missions and be reused by multiple crews will be more challenging than past operations, particularly from the perspective of logistics, supportability, and risk. This paper examines the integrated logistics and supportability challenges of sustained human lunar exploration and provides a review of historical spaceflight experience in terms of crewed mission endurance, uncrewed duration, transportation overhead, and access to abort. Planned Artemis Base Camp crewed mission endurance is approximately 2.5 times longer than past lunar surface crewed mission endurance, but similar to average time between resupply for the International Space Station. Sustained human spacecraft have only twice experienced uncrewed durations longer than the planned interval between Artemis Base Camp missions, and Artemis surface assets will face long uncrewed periods more regularly than any past sustained human spacecraft. Transportation of crew and cargo to and from the Moon will be more difficult and time-consuming than transportation to and from Low Earth Orbit, and crew access to abort will be more limited. The implications of Artemis lunar operations for crewed Mars mission planning are also discussed. Historical approaches to risk management—including logistics, supportability, and abort strategies—should be reexamined and re-optimized for this new mission context. Sustained lunar operations will provide a valuable proving ground for testing new approaches to crewed space exploration.

logistics↗

STS-79 Flight Day 4

On this fourth day of the STS-79 mission, the flight crew, Cmdr. William F. Readdy, Pilot Terrence W. Wilcutt, Mission Specialists, Thomas D. Akers, John Blaha, Jay Apt, and Carl E. Walz, are seen docking with the Mir Space Station. After two hours of pressure and leak checks, the hatches between the two spacecraft is then opened. The two crews are seen greeting one another to begin five days of joint operations. The rendezvous and docking went flawlessly as Readdy flew the orbiter manually through the final 2,000 feet. Docking occurred within seconds of the pre-planned time and flight controllers reported that only slight oscillations were felt through the Orbiter Docking System as the two spacecraft locked together. Within hours of the hatch opening, crew members John Blaha and Shannon Lucid formally swapped places before going to bed with Blaha becoming a member of the Mir-22 crew and Lucid joining the STS-79 crew to wrap up 179 days as a member of the Mir station. Blaha joins Mir 22 Commander Valery Korzun and Flight Engineer Alexander Kaleri on Mir for the next four months. Soon after the crew members completed their welcoming ceremony, they went to work, hauling bags of water and other supplies from the Shuttle's Spacehab module into the Mir. More than 4000 pounds of equipment and logistical supplies will be transferred to the Mir before Atlantis undocks from the space station.

Source record↗

Integrated Logistics and Supportability Challenges of Sustained Human Lunar Exploration

NASA’s Artemis program plans to establish a sustained human presence on the lunar surface. The International Space Station and other space station programs have demonstrated long-duration human spaceflight operations that reuse infrastructure in Low Earth Orbit, sometimes including long uncrewed “dormant” periods. In contrast, all human exploration beyond Low Earth Orbit to date has consisted solely of relatively short sortie missions, rather than a sustained presence. A sustained human outpost on the Moon that can support month-long crewed exploration missions and be reused by multiple crews will be more challenging than past operations, particularly from the perspective of logistics, supportability, and risk. This paper examines the integrated logistics and supportability challenges of sustained human lunar exploration and provides a review of historical spaceflight experience in terms of crewed mission endurance, uncrewed duration, transportation overhead, and access to abort. Planned Artemis Base Camp crewed mission endurance is approximately 2.5 times longer than past lunar surface crewed mission endurance, but similar to the average time between resupply for the International Space Station. Sustained human spacecraft have only twice experienced uncrewed durations longer than the planned interval between Artemis Base Camp missions, and Artemis surface assets will face long uncrewed periods more regularly than any past sustained human spacecraft. Transportation of crew and cargo to and from the Moon will be more difficult and time-consuming than transportation to and from Low Earth Orbit, and crew access to abort will be more limited. The implications of Artemis lunar operations for crewed Mars mission planning are also discussed. Historical approaches to risk management—including logistics, supportability, and abort strategies—should be reexamined and re-optimized for this new mission context. Sustained lunar operations will provide a valuable proving ground for testing new approaches to crewed space exploration.

logistics↗

Orbital Aggregation and Space Infrastructure Systems (OASIS)

This paper summarizes the results of a NASA lead study performed to identify synergistic opportunities and concepts between human exploration initiatives and commercialization of space. The goal of this initiative, called Orbital Aggregation & Space Infrastructure Systems (OASIS), is to develop an in-space architecture and associated concepts that provide common infrastructure for enabling a large class of space missions. The concepts include communications, navigation and power systems, propellant modules, tank farms, habitats, and in-space transportation systems using several propulsion technologies. OASIS features in-space aggregation of systems and resources in support of mission objectives. The concepts feature a high level of reusability and are supported by inexpensive launch of propellant and logistics payloads from the Earth/moon system. Industry, NASA and other users could share infrastructure costs. The anticipated benefits of synergistic utilization of space infrastructure are reduced mission costs and increased mission flexibility for future space exploration and commercialization initiatives.

Troutman, Patrick A.↗

STS-114: Crew Interviews 1. Andy Thomas 2. Steve Robinson

STS-114 Mission Specialists, Andy Thomas and Steve Robinson, are seen in this pre-flight interview. Andy Thomas begins by talking about his interest in spaceflight as a young boy growing up in Australia. He expresses that the chances of an Australian boy studying to eventually become an astronaut was very remote. His Mechanical Engineering Degree in Australia and a Doctorate enabled him to acquire unique skills to come to the United States to work for Lockheed Martin. On the topic of return to flight, he reflects on experiences that he had working with the Michael Anderson and Kalpana Chawla of the ill-fated Space Shuttle Columbia. He also talks about the safety of the Space Shuttle Discovery and repairs to its Thermal Protection system. He explains in detail the Logistics Flight (LF) 1, spacewalks, Multipurpose Logistics Module (MPLM) and the External Stowage Platform (ESP)-2. Steve Robinson expresses that he had many interests as a child and becoming an astronaut was one of them. He was fascinated with things that fly and wanted to find out how they flew. He also designed hang gliders as a teenager. He expresses how his family feels about the risky business of spaceflight. He talks about how the space shuttle discovery crew will remember the Columbia crew by including seven stars on their patch so that they can bring them into orbit and then back home. Robinson also talks about his primary job, and the spacewalks that he and Soichi Noguchi will be performing.

Source record↗

Stowage Assessment of the Common Habitat Baseline Variants

This paper performs a stowage assessment of the four baseline variants of the Common Habitat, a SLS-derived long duration, multi-mission habitat. The Common Habitat can be utilized as a lunar surface outpost, a Mars surface outpost, or an in-space habitat for Mars transit flights. The paper will discuss the stowage philosophy applied to all baseline variants of the Common Habitat and will discuss the approaches taken to domain-specific stowage, bulk stowage, and fluid and gas stowage. Water and air stowage for the closed loop ECLS subsystem is described across the four variants. Stowage of other supplies, consumables, and equipment is also described across the four variants and based on logistics sizing studies, a self-contained mission endurance is predicted for each variant – e.g. how long a mission each can support without a docked logistics module. Finally, follow-on assessments, including a habitability evaluation, are discussed along with specific stowage issues relevant to these assessments.

Deep space habitat↗

Replacement of HCFC-225 Solvent for Cleaning NASA Propulsion Oxygen Systems

Since the 1990's, when the Class I Ozone Depleting Substance (ODS) chlorofluorocarbon‐113 (CFC‐113) was banned, NASA's propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have relied upon hydrochlorofluorocarbon‐225 (HCFC‐225) to safely clean and verify the cleanliness of large scale propulsion oxygen systems. Effective January 1, 2015, the production, import, export, and new use of HCFC‐225, a Class II ODS, was prohibited by the Clean Air Act. In 2012 through 2014, leveraging resources from both NASA and the Defense Logistics Agency ‐ Aviation Hazardous Minimization and Green Products Branch, test labs at MSFC, SSC, and Johnson Space Center's White Sands Test Facility (WSTF) collaborated to seek out, test, and qualify a replacement for HCFC‐225 that is both an effective cleaner and safe for use with oxygen systems. This presentation summarizes the tests performed, results, and lessons learned. It also demonstrates the benefits of cross‐agency collaboration in a time of limited resources.

Lowrey, Nikki M.↗