Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Technology Flight Validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

Montgomery, Edward E.↗

TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

Young, Roy M.↗

Small Project Rapid Integration and Test Environment (SPRITE) An Innovation Space for Small Projects Design, Development, Integration, and Test

Over the past few years interest in the development and use of small satellites has rapidly gained momentum with universities, commercial, and government organizations. In a few years we may see networked clusters of dozens or even hundreds of small, cheap, easily replaceable satellites working together in place of the large, expensive and difficult-to-replace satellites now in orbit. Standards based satellite buses and deployment mechanisms, such as the CubeSat and Poly Pico-satellite Orbital Deployer (P-POD), have stimulated growth in this area. The use of small satellites is also proving to be a cost effective capability in many areas traditionally dominated by large satellites, though many challenges remain. Currently many of these small satellites undergo very little testing prior to flight. As these small satellites move from technology demonstration and student projects toward more complex operational assets, it is expected that the standards for verification and validation will increase.

Lee, Ashley↗

Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn↗

Affordable Development and Optimization of CERMET Fuels for NTP Ground Testing

CERMET fuel materials for Nuclear Thermal Propulsion (NTP) are currently being developed at NASA's Marshall Space Flight Center. The work is part of NASA's Advanced Space Exploration Systems Nuclear Cryogenic Propulsion Stage (NCPS) Project. The goal of the FY12-14 project is to address critical NTP technology challenges and programmatic issues to establish confidence in the affordability and viability of an NTP system. A key enabling technology for an NCPS system is the fabrication of a stable high temperature nuclear fuel form. Although much of the technology was demonstrated during previous programs, there are currently no qualified fuel materials or processes. The work at MSFC is focused on developing critical materials and process technologies for manufacturing robust, full-scale CERMET fuels. Prototypical samples are being fabricated and tested in flowing hot hydrogen to understand processing and performance relationships. As part of this initial demonstration task, a final full scale element test will be performed to validate robust designs. The next phase of the project will focus on continued development and optimization of the fuel materials to enable future ground testing. The purpose of this paper is to provide a detailed overview of the CERMET fuel materials development plan. The overall CERMET fuel development path is shown in Figure 2. The activities begin prior to ATP for a ground reactor or engine system test and include materials and process optimization, hot hydrogen screening, material property testing, and irradiation testing. The goal of the development is to increase the maturity of the fuel form and reduce risk. One of the main accomplishmens of the current AES FY12-14 project was to develop dedicated laboratories at MSFC for the fabrication and testing of full length fuel elements. This capability will enable affordable, near term development and optimization of the CERMET fuels for future ground testing. Figure 2 provides a timeline of the development and optimization tasks for the AES FY15-17 follow on program.

Hickman, Robert R.↗

Affordable Development and Demonstration of a Small NTR engine and Stage: A Preliminary NASA, DOE, and Industry Assessment

In FY'11, Nuclear Thermal Propulsion (NTP) was identified as a key propulsion option under the Advanced In-Space Propulsion (AISP) component of NASA's Exploration Technology Development and Demonstration (ETDD) program A strategy was outlined by GRC and NASA HQ that included 2 key elements -"Foundational Technology Development" followed by specific "Technology Demonstration" projects. The "Technology Demonstration "element proposed ground technology demonstration (GTD) testing in the early 2020's, followed by a flight technology demonstration (FTD) mission by approx. 2025. In order to reduce development costs, the demonstration projects would focus on developing a small, low thrust (approx. 7.5 -16.5 klb(f)) engine that utilizes a "common" fuel element design scalable to the higher thrust (approx. 25 klb(f)) engines used in NASA's Mars DRA 5.0 study(NASA-SP-2009-566). Besides reducing development costs and allowing utilization of existing, flight proven engine hard-ware (e.g., hydrogen pumps and nozzles), small, lower thrust ground and flight demonstration engines can validate the technology and offer improved capability -increased payloads and decreased transit times -valued for robotic science missions identified in NASA's Decadal Study.

Spacecraft design↗

NASA's Efforts to Pursue Commercial Communications Services for Missions in Near Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program enables high speed, robust, secure and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is seeking commercial services for all its future near Earth requirements by incorporating additional direct to Earth (DTE) providers and introducing commercial satellite communications (SATCOM) vendors as NASA’s Tracking and Data Relay Satellites (TDRS) begin to decline. Through the progression of these efforts, SCaN is also integrating commercial services in the cislunar domain. The overarching objective is to satisfy the demands from the mission community – both in terms of capacity and capability – in a robust and cost-effective way, leveraging the strong and growing commercial space sector. For near earth space relay, six SATCOM vendors were awarded Funded Space Act Agreements in June of 2022 to demonstrate the ability to serve near-Earth missions, and are working through their committed milestones. The failure of TDRS Flight-9 (F9) in late 2022 prompted an increased tempo of mission engagement to identify driving user needs that commercial SATCOM can meet in the near-term. NASA has set a course to accelerate a decision to terminate commitments for TDRS services to new missions and has developed a plan to execute validation and risk reduction efforts with early adopter “pathfinder” missions to pave the way to earlier operational services. As the Artemis Program matures and builds on the successful Artemis I flight in November/December of 2022, the definition of the supporting communications and navigation architecture has further been refined. Although NASA government assets will continue to play a key role in provision of services, such as through the Deep Space Network, SCaN is pursuing commercial services offerings to expand ground network capability and implement lunar relay services. In February of 2023, SCaN released solicitation for services that include DTE services to missions near-Earth and in cislunar space, as well as lunar relay services. Further, SCaN is seeking opportunities to integrate commercial capability into lunar surface communications infrastructure. NASA is also advocating for standards that promote interoperability and strategic technology investments in the commercial sector. This paper addresses the recent progress and future plans in the near-Earth space and lunar regimes, discusses the unified approach for industry engagement, and highlights both the common and unique challenges of commercialization efforts in the two regimes.

commercialization↗

NASA’s Efforts to Pursue Commercial Communications Services for Missions in Near Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program enables high speed, robust, secure, and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is seeking commercial services for all its future near-Earth requirements by incorporating additional direct to Earth (DTE) providers and introducing commercial satellite relay communications (SATCOM) vendors as NASA’s Tracking and Data Relay Satellites (TDRS) begin to decline. Through the progression of these efforts, SCaN is also integrating commercial services in the cislunar domain. The overarching objective is to satisfy the demands from the mission community – both in terms of capacity and capability – in a robust, reliable, and cost-effective way, leveraging the strong and growing commercial space sector. For near earth space relay, six SATCOM vendors were awarded Funded Space Act Agreements in June of 2022 to demonstrate the ability to serve near-Earth missions with space-based communication relay services. All six vendors are working through their committed milestones with end-to-end service demonstrations tacking place throughout the mid-2020’s. The failure of TDRS Flight-9 (F9) in late 2022 prompted an increased tempo of mission engagement to identify driving user needs that commercial SATCOM can meet in the near-term. NASA has set a course to accelerate a decision to terminate offering TDRS services to new missions and is developing a plan to execute validation and risk reduction efforts with early adopter “pathfinder” missions, paving the way to operational services. As the Artemis Program matures and builds on the successful Artemis I flight in November-December of 2022, the definition of the supporting communications and navigation architecture has further been refined. Although NASA government assets will continue to play a key role in provision of services, such as through the Deep Space Network, SCaN is pursuing commercial services offerings to expand ground network capability and implement lunar relay services. In February of 2023, SCaN released solicitation for services that include DTE services to missions near-Earth and in cislunar space, as well as lunar relay services. Further, SCaN is seeking opportunities to integrate commercial capability into lunar surface communications infrastructure. NASA is also advocating for standards that promote interoperability and strategic technology investments in the commercial sector. This paper addresses the recent progress and future plans in the near-Earth space and lunar regimes, discusses the unified approach for industry engagement, and highlights both the common and unique challenges of commercialization efforts in the two regimes.

commercial services↗

An overview of autonomous rendezvous and docking system technology development at General Dynamics

The Centaur avionics suite is undergoing a dramatic modernization for the commercial, DoD Atlas and Titan programs. The system has been upgraded to the current state-of-the-art in ring laser gyro inertial sensors and Mil-Std-1750A processor technology. The Cruise Missile avionic system has similarly been evolving for many years. Integration of GPS into both systems has been underway for over five years with a follow-on cruise missile system currently in flight test. Rendezvous and Docking related studies have been conducted for over five years in support of OMV, CTV, and Advanced Upper Stages, as well as several other internal IR&D's. The avionics system and AR&D simulator demonstrated to the SATWG in November 1990 has been upgraded considerably under two IR&D programs in 1991. The Centaur modern avionics system is being flown in block upgrades which started in July of 1990. The Inertial Navigation Unit will fly in November of 1991. The Cruise Missile avionics systems have been fully tested and operationally validated in combat. The integrated AR&D system for space vehicle applications has been under development and testing since 1990. A Joint NASA / GD ARD&L System Test Program is currently being planned to validate several aspects of system performance in three different NASA test facilities in 1992.

Kuenzel, Fred↗

Reduced Pressure Cabin Testing of the Orion Atmosphere Revitalization Technology

An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by Hamilton Sundstrand and baselined for the Atmosphere Revitalization System for moderate duration missions of the Orion Multipurpose Crew Vehicle. In previous years at this conference, reports were presented on extensive Johnson Space Center testing of this technology in a sea-level pressure environment with simulated and actual human metabolic loads in both open and closed-loop configurations. In 2011, the technology was tested in an open cabin-loop configuration at ambient and two sub-ambient pressures to compare the performance of the system to the results of previous tests at ambient pressure. The testing used a human metabolic simulator with a different type of water vapor generation than previously used, which added some unique challenges in the data analysis. This paper summarizes the results of: baseline and some matrix testing at all three cabin pressures, increased vacuum regeneration line pressure with a high metabolic load, a set of tests studying CO2 and water vapor co-adsorption effects relative to model-predicted performance, and validation tests of flight program computer model predictions with specific operating conditions.

Button, Amy↗

Reduced Pressure Cabin Testing of the Orion Atmosphere Revitalization Technology

An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by Hamilton Sundstrand and baselined for the Atmosphere Revitalization System for moderate duration missions of the Orion Multipurpose Crew Vehicle. In previous years at this conference, reports were presented on extensive Johnson Space Center testing of this technology in a sea-level pressure environment with simulated and actual human metabolic loads in both open and closed-loop configurations. In 2011, the technology was tested in an open cabin-loop configuration at ambient and two sub-ambient pressures to compare the performance of the system to the results of previous tests at ambient pressure. The testing used a human metabolic simulator with a different type of water vapor generation than previously used, which added some unique challenges in the data analysis. This paper summarizes the results of: baseline and some matrix testing at all three cabin pressures, increased vacuum regeneration line pressure with a high metabolic load, a set of tests studying CO2 and water vapor co-adsorption effects relative to model-predicted performance, and validation tests of flight program computer model predictions with specific operating conditions.

Button, Amy↗

Exploration Life Support Technology Development for Lunar Missions

Exploration Life Support (ELS) is one of NASA's Exploration Technology Development Projects. ELS plans, coordinates and implements the development of new life support technologies for human exploration missions as outlined in NASA's Vision for Space Exploration. ELS technology development currently supports three major projects of the Constellation Program - the Orion Crew Exploration Vehicle (CEV), the Altair Lunar Lander and Lunar Surface Systems. ELS content includes Air Revitalization Systems (ARS), Water Recovery Systems (WRS), Waste Management Systems (WMS), Habitation Engineering, Systems Integration, Modeling and Analysis (SIMA), and Validation and Testing. The primary goal of the ELS project is to provide different technology options to Constellation which fill gaps or provide substantial improvements over the state-of-the-art in life support systems. Since the Constellation missions are so challenging, mass, power, and volume must be reduced from Space Shuttle and Space Station technologies. Systems engineering analysis also optimizes the overall architecture by considering all interfaces with the life support system and potential for reduction or reuse of resources. For long duration missions, technologies which aid in closure of air and water loops with increased reliability are essential as well as techniques to minimize or deal with waste. The ELS project utilizes in-house efforts at five NASA centers, aerospace industry contracts, Small Business Innovative Research contracts and other means to develop advanced life support technologies. Testing, analysis and reduced gravity flight experiments are also conducted at the NASA field centers. This paper gives a current status of technologies under development by ELS and relates them to the Constellation customers who will eventually use them.

Ewert, Michael K.↗

Reduced Pressure Cabin Testing of the Orion Atmosphere Revitalization Technology

An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by United Technologies Corp. Aerospace Systems (UTAS, formerly Hamilton Sundstrand) and baselined for the Atmosphere Revitalization System for moderate duration missions of the Orion Multipurpose Crew Vehicle (MPCV). In previous years at this conference, reports were presented on extensive Johnson Space Center testing of this technology in a sea-level pressure environment with simulated and actual human metabolic loads in both open and closed-loop configurations. In 2011, the technology was tested in an open cabin-loop configuration at ambient and two sub-ambient pressures to compare the performance of the system to the results of previous tests at ambient pressure. The testing used a human metabolic simulator with a different type of water vapor generation than previously used, which added some unique challenges in the data analysis. This paper summarizes the results of: baseline and some matrix testing at all three cabin pressures, increased vacuum regeneration line pressure testing with a high metabolic load, a set of tests studying CO2 and water vapor co-adsorption effects relative to model-predicted performance, and validation tests of flight project computer model predictions with specific operating conditions.

Button, Amy B.↗

Cold-End Subsystem Testing for the Fission Power System Technology Demonstration Unit

The Fission Power System (FPS) Technology Demonstration Unit (TDU) consists of a pumped sodiumpotassium (NaK) loop that provides heat to a Stirling Power Conversion Unit (PCU), which converts some of that heat into electricity and rejects the waste heat to a pumped water loop. Each of the TDU subsystems is being tested independently prior to full system testing at the NASA Glenn Research Center. The pumped NaK loop is being tested at NASA Marshall Space Flight Center; the Stirling PCU and electrical controller are being tested by Sunpower Inc.; and the pumped water loop is being tested at Glenn. This paper describes cold-end subsystem setup and testing at Glenn. The TDU cold end has been assembled in Vacuum Facility 6 (VF 6) at Glenn, the same chamber that will be used for TDU testing. Cold-end testing in VF 6 will demonstrate functionality; validated coldend fill, drain, and emergency backup systems; and generated pump performance and system pressure drop data used to validate models. In addition, a low-cost proof-of concept radiator has been built and tested at Glenn, validating the design and demonstrating the feasibility of using low-cost metal radiators as an alternative to highcost composite radiators in an end-to-end TDU test.

Briggs, Mazwell↗

Propellant Densification Ground Testing Conducted for Launch Vehicles

The NASA Glenn Research Center at Lewis Field has taken the lead in the development of practical densified cryogenic propellants for launch vehicle applications. The technology of subcooling cryogenic propellants below their normal boiling point to produce a denser fluid is one of the key process technologies necessary to meet the challenge of single-stage-to-orbit and reusable launch vehicles. Densified propellants are critical to lowering launch costs because they enable more propellant to be packed into a given unit volume, thus improving the performance by reducing the overall size and weight of the launch vehicle. This two-pronged research and test program has evolved into (1) conducting tank loading tests using densified liquid hydrogen and (2) developing two large-scale propellant densification systems that will be performance tested next year at Glenn. The propellant-loading test program was undertaken at Glenn in coordination with Lockheed Martin Michoud Space Systems. In this testing, the liquid hydrogen recirculation and densification process was simulated, and the thermal stratification of the densified propellant was recorded throughout the tank. The test article was a flight-weight tank constructed from composite materials similar to those to be used on the X-33 launch vehicle. The tank geometry as designed by Lockheed Martin had two cylindrical lobes with a center septum. Liquid hydrogen flow rate, pressure data, and temperature data plotted over time were collected while the subscale tank was filled with 27 R (15 K) densified liquid hydrogen propellant. This testing has validated mathematical models and demonstrated the readiness of densified propellant technology for near-term use. It marks the first time that such a process has been carried out with a multiple-lobe, flight-similar tank. Glenn researchers have also been working on providing a process and critical test data for the continuous production of densified liquid hydrogen (LH2) and densified liquid oxygen (LO2). Each densification production process uses a high-efficiency, subatmospheric boiling bath heat exchanger to cool the working fluid. A near triple-point hydrogen boiling bath is used to condition and subcool hydrogen to 27 R (15 K), and a nitrogen boiling bath is used to cool the liquid oxygen to 120 R (66.7 K). Multistage centrifugal compressors operating at cryogenic inlet conditions maintain the heat exchanger bath vapor pressure below 1 atm. The LO2 propellant densification unit shown in the photograph has a 30 lb/sec capacity, whereas the LH2 unit was designed to process 8 lb/sec of propellant. Each densification unit will be transported to Glenn's South Forty area after all fabrication work is completed sometime late next year. There the LO2 and LH2 densifier performance tests will be conducted with another larger Lockheed Martin tank designated the Structural Test Article (STA). This liquid oxygen tank is a full-scale, flight-weight, prototype aluminum tank designed for the X-33. It has a capacity of 20,000 gallons of LO2. The tank loading and recirculation testing planned for next year with STA will provide the data necessary for full-scale development of propellant densification technology.

Tomsik, Thomas M.↗

The Kilopower Reactor Using Stirling TechnologY (KRUSTY) Nuclear Ground Test Results and Lessons Learned

The Kilopower nuclear ground testing nicknamed KRUSTY (Kilopower Reactor Using Stirling TechnologY) was completed at the Nevada Nuclear Security Site (NNSS) on March 21, 2018. This full scale nuclear demonstration verified the Kilopower reactor neutronics during startup, steady state, and transient operations in a space simulated environment. This was the first space reactor test completed for fission power systems in over 50 years and marked a turning point in NASA's nuclear program. The completed reactor power system design incorporated flight prototypic materials and full scale components in an effort to study the reactor dynamics at full power and significantly reduce follow on risk of a future flight demonstration. This design provided a unique opportunity for the power system to simulate several expected and unexpected mission scenarios that allowed the designers to verify that the reactor dynamics could tolerate many worst case conditions regarding reactor stability and control. The dynamic changes imposed on the reactor validated the ability of the reactor to load follow the power conversion system and passively control the fuel temperature and overall system stability. With successful completion of the KRUSTY experiment, the NASA/DOE team will evaluate the lessons learned throughout the project and apply them towards a flight demonstration of a Kilopower reactor.

Gibson, Marc A.↗

Kilopower Reactor Using Stirling Technology (KRUSTY) Nuclear Ground Test Results and Lessons Learned

The Kilopower nuclear ground testing nicknamed KRUSTY (Kilopower Reactor Using Stirling TechnologY) was completed at the Nevada Nuclear Security Site (NNSS) on March 21, 2018. This full scale nuclear demonstration verified the Kilopower reactor neutronics during startup, steady state, and transient operations in a space simulated environment. This was the first space reactor test completed for fission power systems in over 50 years and marked a turning point in NASA's nuclear program. The completed reactor power system design incorporated flight prototypic materials and full scale components in an effort to study the reactor dynamics at full power and significantly reduce follow on risk of a future flight demonstration. This design provided a unique opportunity for the power system to simulate several expected and unexpected mission scenarios that allowed the designers to verify that the reactor dynamics could tolerate many worst case conditions regarding reactor stability and control. The dynamic changes imposed on the reactor validated the ability of the reactor to load follow the power conversion system and passively control the fuel temperature and overall system stability. With successful completion of the KRUSTY experiment, the NASA/DOE team will evaluate the lessons learned throughout the project and apply them towards a flight demonstration of a Kilopower reactor.

Gibson, Marc↗

The Space Technology 5 Avionics System

The Space Technology 5 (ST5) mission is a NASA New Millennium Program project that will validate new technologies for future space science missions and demonstrate the feasibility of building launching and operating multiple, miniature spacecraft that can collect research-quality in-situ science measurements. The three satellites in the ST5 constellation will be launched into a sun-synchronous Earth orbit in early 2006. ST5 fits into the 25-kilogram and 24-watt class of very small but fully capable spacecraft. The new technologies and design concepts for a compact power and command and data handling (C&DH) avionics system are presented. The 2-card ST5 avionics design incorporates new technology components while being tightly constrained in mass, power and volume. In order to hold down the mass and volume, and quali& new technologies for fUture use in space, high efficiency triple-junction solar cells and a lithium-ion battery were baselined into the power system design. The flight computer is co-located with the power system electronics in an integral spacecraft structural enclosure called the card cage assembly. The flight computer has a full set of uplink, downlink and solid-state recording capabilities, and it implements a new CMOS Ultra-Low Power Radiation Tolerant logic technology. There were a number of challenges imposed by the ST5 mission. Specifically, designing a micro-sat class spacecraft demanded that minimizing mass, volume and power dissipation would drive the overall design. The result is a very streamlined approach, while striving to maintain a high level of capability, The mission's radiation requirements, along with the low voltage DC power distribution, limited the selection of analog parts that can operate within these constraints. The challenge of qualifying new technology components for the space environment within a short development schedule was another hurdle. The mission requirements also demanded magnetic cleanliness in order to reduce the effect of stray (spacecraft-generated) magnetic fields on the science-grade magnetometer.

Speer, Dave↗