Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Slope Extensions to ASL Library

Extensions to the AMPL/solver interface library (http://netlib.sandia.gov/ampl/solvers) to compute bounds on algebraic expressions, plus a test program. use in uncertainty quantification and global optimization algorithms. This software is not primarily for military applications.

Gay, David↗

MueLu Multigrid Preconditioning Package

MueLu is intended for the research and development of multigrid algorithms used in the solution of sparse linear systems arising from systems of partial differential equations. The software provides multigrid source code, test programs, and short example programs to demonstrate the various interfaces for creating, accessing, and applying the solvers. MueLu currently provides an implementation of smoothed aggregation algebraic multigrid method and interfaces to many commonly used smoothers. However, the software is intended to be extensible, and new methods can be incorporated easily. MueLu also allows for advanced usage, such as combining multiple methods and segregated solves. The library supports point and block access to matrix data. All algorithms and methods in MueLu have been or will be published in the open scientific literature.

Source record↗

TASK 2: QUENCH ZONE SIMULATION

Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. A key feature of the AR gasifier design is the transition from the gasifier outlet into the quench zone, where the raw syngas is cooled to ~ 400°C by injection and vaporization of atomized water. Earlier pilot plant testing revealed a propensity for the original gasifier outlet design to accumulate slag in the outlet, leading to erratic syngas flow from the outlet. Subsequent design modifications successfully resolved this issue in the pilot plant gasifier. In order to gain greater insight into the physical phenomena occurring within this zone, AR developed a cold flow simulation apparatus with Coanda Research & Development with a high degree of similitude to hot fire conditions with the pilot scale gasifier design, and capable of accommodating a scaled-down quench zone for a demonstration-scale gasifier. The objective of this task was to validate similitude of the cold flow simulation model by comparison of pilot-scale outlet design performance, and to assess demonstration scale gasifier design feasibility from testing of a scaled-down outlet design. Test results did exhibit a strong correspondence with the two pilot scale outlet designs, indicating credible similitude for the cold flow simulation device. Testing of the scaled-down outlet revealed important considerations in the design and operation of the demonstration scale gasifier, in particular pertaining to the relative momentum between the downcoming raw syngas and the sprayed quench water and associated impacts on flow patterns within the quench zone. This report describes key findings from the test program, including assessment of pilot plant configuration simulations relative to actual results on the pilot plant gasifier and demonstration plant design recommendations, based on cold flow simulation results.

01 COAL, LIGNITE, AND PEAT↗

DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT

The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbines with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.

CFD↗

Enabling Coal Technology with Carbon Capture for Future Markets with Flameless Pressurized Oxy-Combustion (FPO)

Future markets for power are expected to require more load following power plants, which reduces output during the night and early morning. This is when the demand for electricity is the lowest, so plants must respond rapidly at any time to peak loads resulting from the variable output of wind and solar power. A coal power plant based on Flameless Pressurized Oxy-combustion (FPO) can go from 5% to 100% of capacity rate in less than 30 minutes in response to fluctuating demand, operating at capacity when power prices are highest. FPO is a proven oxy-combustion technology that was developed to recover energy from low ranking coal, other brown fuels and wastes. ITEA began developing FPO in 2003 on a 5-MWth pilot in Gioia del Colle, Italy, to destroy hazardous industrial waste and as such, design objectives were very high combustion efficiencies and capture of metals in the fuel in the vitreous slag. The technology was subsequently deployed in 2009 at the 15-MWth scale at the Jurong Island petrochemical cluster in Singapore for waste incineration. FPO is an oxy-combustion process whereby oxygen is separated from the air, and it is used in combustion with recirculated flue gas to maintain combustion temperatures at acceptable levels. The resultant flue gas is primarily CO 2 and water, which allows for a relatively simple and cheap CO 2 capture process. This is in contrast to air-combustion systems which require a complex and costly post-combustion capture (PCC) process. Coal is fed to the combustor slurried in water, and the combustor operates at elevated pressure (approximately 12 bar) which improves the overall efficiency and reduces the size and cost of the combustor. Notably, the FPO cycle maintains high efficiency by recovering most of the heat of vaporisation of the contained water. The combustor is designed to coalesce the molten ash particles so that they settle to the chamber walls and drain to the outlet, significantly reducing the particulate content in the exhaust gas and allowing the use of coals with up to 40% alkaline ash content. FPO is a low-emission technology: zero thermal NOx minimises overall NOx; any organic nitrogen is converted to elemental nitrogen (N2). Total organic content (TOC) at combustor exit is hundreds of times lower than for traditional combustion processes, with dioxin and furans close to zero. Work commenced on a DOE funded pilot demonstration project in October 2016 to provide the design for a 50-MWth FPO pilot plant that can fire a wide range of high-to-low rank coals. The project will investigate updating and improving the cycle for power generation with CO 2 capture by incorporating a turbo-expander with a principal steam power island that utilizes a heat recovery steam generator, increasing the overall efficiency of the cycle. A cost study is also performed on the updated FPO design as part of the project. The FPO pilot plant built based on the design will then be demonstrated over a 3-year test program to generate data for the design of a commercial-scale 500 MWth firing module commercial power plant with integral carbon capture and sequestration (CCS), which could start construction in 2025. A discussion of the levelized cost of electricity (LCOE) of various cases are presented, including a comparison of established supercritical with PCC (SCPC) technologies with FPO fitted with CO 2 compression and liquefaction, and FPO ready for carbon capture and sequestration (CCS-ready). This would enable CO 2 capture for use in enhanced oil recovery (EOR) or sequestration when market conditions make it attractive to do so. In addition, a comparison of LCOE of FPO and conventional processes for firing low-ranking coals with high water and ash content will be provided.

01 COAL, LIGNITE, AND PEAT↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Global Power System Transformation Consortium

The Global Power System Transformation (G-PST) Consortium, an expert- and practitioner-driven initiative, engages key power system operators, research and educational institutes, governments, businesses, and stakeholders in all regions of the world to accelerate clean energy transitions at the ambitious scope and scale that is required. The G-PST Consortium provides coordinated, holistic support and knowledge infusion for system operators pursuing clean energy transitions, including performing cutting-edge research; providing implementation support for world-class engineering and operational solutions; supporting workforce development; building and disseminating open-access data and tools; and accelerating localized technology adoption, standards development, and testing programs.

consortium↗

A709 Qualification Plan Update and Mechanical Properties Data Assessment

This report provides a summary of the development effort for the qualification of Alloy 709, an advanced austenitic stainless steel, in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors. It provides an assessment of the mechanical properties data generated to date from the tensile, creep, fatigue and creep-fatigue tests of the precipitation-treated Alloy 709 from two commercial heats in plate product form. It was concluded that the mechanical properties of Alloy 709 with the precipitation treatment continued to outperform those of Type 316 stainless steel. This affirms the recommendation to Code qualification this alloy as a replacement for Type 316 stainless steel to support the objective of reducing the construction and operating costs to incentivize advanced reactor deployment. The data also demonstrated that the precipitation treatment is effective in enhancing the creep-fatigue resistance of Alloy 709 while maintaining a significant creep strength advantage over Type 316 stainless steel. This report also provides an update to the test conditions for the creep, fatigue and creep-fatigue test matrices in order to cover the Code Case data package more effectively. Finally, it is recommended to continue the Alloy 709 Code Case Testing Program to develop the data package needed for the determination of the material-specific design parameters for inclusion in the Alloy 709 Code Case.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Drawings

These are drawings that display dimensions and orientation of specimens for the graphite baseline program test specimens.

99 GENERAL AND MISCELLANEOUS↗

Water Capsule RIA Testing

Presentation on the status of the water-based RIA testing program in TREAT for the 2020 AFC Annual Review Meeting.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mercury emissions from coal combustion in China

This chapter reviews the magnitude and spatial distribution of mercury emissions from coal combustion in China. Due to the large quantities of coal burned and the relatively low level of technology, particularly in industry, emissions are high. Emissions were stable at about 200-210 Mg during the period 1995-2000, but because of rapid economic growth starting in 2001, mercury emissions grew quickly to a value of 334 Mg in 2005. The annual average growth rate for the period 1995-2005 was 5.1%. The uncertainty in emission estimates is about {+-}35% (95% confidence intervals). Emissions are concentrated in those provinces with high concentrations of mercury in coal (like Guizhou Province) and provinces in which a lot of coal is burned (like Shanxi Province). Because significant amounts of coal are burned in homes and small industrial facilities, without any kind of emission control at all, emissions of particulate mercury are higher in China than in the developed world; the speciation profile nationwide is: 64% Hg{sup II}, 19% Hg{sup p}, and 17% Hg{sup 0}. In the future, growth in mercury emissions is expected to be limited by the application of FGD for SO{sub 2} control and other advanced technologies. Estimates of emissions are hampered by the lack of comprehensive and reliable emissions testing programs in China.

01 COAL, LIGNITE, AND PEAT↗

Evaluation of accuracy of calculations of VVER-1000 core states with incomplete covering of fuel by the absorber

An additional verification of bundled software (BS) SAPFIR-95 and amp;RC [1] and code KORSAR/GP [2] was performed. Both software products were developed in A.P. Alexandrov NITI and certified by ROSTEKHNADZOR of RF for numeric simulation of stationary, transitional and emergency conditions of VVER reactors. A benchmark model for neutronics calculations was created within the limits of this work. The cold subcritical state of VVER - 1000 reactor stationary fuelling was simulated on the basis of FA with an increased height of the fuel column (TVS-2M) considering detailed presentation of radial and front neutron reflectors. A case of passing of pure condensate slug through the core in initially deep subcritical state during start of the first RCP set after refueling was considered as an examined condition of reactor operation. A relatively small size of the slug, its spatial position near the reflectors (lower and lateral), as well as failure of the inserted control rods of the control and protection system (CPS CR) to reach the lower limit of the fuel column stipulate for methodical complexity of a correct calculation of the neutron multiplication constant (K{sub eff}) using engineering codes. Code RC was used as a test program in the process of reactor calculated 3-D modeling. Code MCNP5 [3] was used as the precision program, which solves the equation of neutrons transfer by Monte-Carlo method and which was developed in the US (Los-Alamos). As a result of comparative calculations dependency of K{sub eff} on two parameters was evaluated - boron acid concentration (Cb) and CPS CR position. Reactivity effect was evaluated, which is implemented as a result of failure of all CPS control rods to reach the lower fuel limit calculated using the engineering codes mentioned above. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of an Integrated Leachate Treatment Solution for the Port Granby Waste Management Facility - 12429

The Port Granby Project (the Project) is located near the north shore of Lake Ontario in the Municipality of Clarington, Ontario, Canada. The Project consists of relocating approximately 450,000 m{sup 3} of historic Low-Level Radioactive Waste (LLRW) and contaminated soil from the existing Port Granby Waste Management Facility (WMF) to a proposed Long-Term Waste Management Facility (LTWMF) located adjacent to the WMF. The LTWMF will include an engineered waste containment facility, a Wastewater Treatment Plant (WTP), and other ancillary facilities. A series of bench- and pilot-scale test programs have been conducted to identify preferred treatment processes to be incorporated into the WTP to treat wastewater generated during the construction, closure and post-closure periods at the WMF/LTWMF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford WTP LAW Melter Startup and Tuning Feed Material Development - 17065

The U.S. Department of Energy's (DOE) Hanford Site in southeast Washington state is home to 56 million gallons of chemical and radioactive waste stored in underground tanks, the result of more than four decades of plutonium production. To address this challenge, the U.S. Department of Energy contracted Bechtel National, Inc., to design and build the world's largest radioactive waste treatment plant. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will use vitrification to immobilize most of Hanford's waste. Vitrification involves blending the waste with glass-forming materials, and heating it to high temperature to form molten glass, then pouring it into stainless steel containers. In this glass form, its radioactivity will decay over hundreds to thousands of years. In advance of full operation of WTP, a sequential process of commissioning will be undertaken to ensure the plant operates safely and within design requirements. The first phase of WTP operations will focus on the Low-Activity Waste (LAW) Vitrification Facility and its supporting facilities and systems. Commissioning of the LAW Facility will employ a progressive approach to address the complexity of system operation and introduction of hazards. This approach starts with introduction of low hazard and simple testing configurations, and incrementally increasing the complexity and hazardous makeup of testing feed materials, culminating in fully integrated treatment of radioactive tank waste during hot commissioning. Testing with simulants that are chemically similar to radioactive tank waste introduces significant chemical hazards into treatment systems in the form of nitrogen oxides (NOx) and anhydrous ammonia. A method of testing to allow tuning and demonstration of equipment and to develop operator proficiency prior to introducing these chemical hazards was deemed necessary. To that end, the development and testing of a new 'tuning feed' material is in progress. The tuning feed is important because its use will enable the first-time integration of all LAW Facility process systems. The tuning feed must include key physical and chemical characteristics that correspond to the commissioning simulant and low activity tank waste, without the inherently hazardous materials or toxic off-gas constituents that result from tank waste treatment. Tuning feed is being developed to provide representative melter feed rheology, glass chemistry, cold cap formation, and off-gas generation rate in order to predict system response to actual tank waste to the extent practical. The tuning feed must also be compatible with process equipment and other process streams that will be encountered during the cold commissioning testing program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Temperature Ternary Chloride Molten Salt Pump

This work investigates the design criteria considering thermal, structural, and material selection of a ternary chloride (MgCl2-NaCl-KCl) molten salt pump that is capable of running at temperatures above 720 °C. In this work, preliminary testing of salt-wetted hydrodynamic bearings was done to investigate different material pairings including Colmonoy grades, Stellite grades, and a novel Nickel Tungsten Carbide alloy (HybrimetTM NiWC3b) used as a High Velocity Oxygen Fuel (HVOF) coating. The coating has shown to withstand the corrosive nature of the molten salt. The pump wetted components are made of Inconel 625 and features a carbon ring seal (CIRPAC Seal) flooded with a N2 gas flow on the overhead to keep salt vapors from interacting with the external ambient air. A comprehensive pump test program has been completed. Over 90 hours run time pumping hot chloride salts at temperatures up to 720 °C in which enough data was captured to produce performance curves at 3 different operating speeds. This research showcases a promising design for use in the Concentrated Solar Power (CSP) Gen 3 liquid-pathway and sets the ground for further development and use of the HybrimetTM NiWC3b as a competitive alternative to available superalloys.

14 SOLAR ENERGY↗

Why accredit ISO/CEI 17025 a nuclear waste management laboratory? - 15112

When there is no storage, nor repository, available on a site, the entity in charge of nuclear waste management should find outlets in order to evacuate outside the site. Each outlet has his rules and waste acceptance criteria (packaging rules, physical/chemical/radiological criteria for example). Before you are able to evacuate your waste, an acceptance's process (or contract review) takes place. This process scans the entire measures implemented by the site in order to satisfy outlet's criteria. When the acceptance is obtained, shipments could be organized, and the process gets into an observation's phase. During this phase, the outlet could choose to inspect a finished nuclear waste package or to audit regularly the waste management process. In this last case, the outlet re-scans the entire documents and implemented measures. This audit lasts from one to several days. A way to tackle/approach the audit is to acknowledge, by a trusted third party (i.e. independent from the outlet), all or part of waste management system, in order to base one's reputation on this organism and win outlet's trust. For this purpose, the entity could choose certification or accreditation. Certification (ISO 9001 as often as not) aims at evaluating a system for managing the quality of one product or service. Accreditation (ISO 17025, for example) provides formal recognition for technical skills within a quality management system (clauses 5 and 4 of the ISO 17025 standard). In 2006, the LDM laboratory is the first French laboratory accredited, in accordance with ISO 17025 standard, for the characterization by gamma spectrometry on 100 L- and 200 L- radioactive waste drums (accreditation No 1-1712 - scope available on www.cofrac.fr). This accreditation allows the lab: - to update the quality management system, - to compile the entire technical file of the gamma-ray assay (description, evaluation of the uncertainties, calibration, proficiency testing programs, measurement procedures,...), - to pass previous identified constraints on to producers and nuclear waste package production, - to maintain permanent quality improvement loop, - to lighten the programs of outlets audits, through the acknowledgement of the technical competence of the laboratory to evaluate by gamma spectrometry the activity contained in our nuclear waste drums. On the other hand, the lab is re-evaluated periodically to ensure its continued compliance with requirements: within a 12 month's interval for an internal audit, with a 18 month's period for COFRAC (French sole official national accreditation body). Since 2006, the lab is accredited. His accreditation renewed in 2010. A new entire renewal audit is planned in 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of FREMES to Characterize and Sort Soil During Site Remediation - 20182

During decommissioning of buildings and the related release of nuclear sites, large amounts of bulk materials such as soil must be measured for clearance. These measurements are required to demonstrate that for example potentially contaminated soil is below the respective radiological limits. Doing so also helps to minimize the amount of bulk material which has to be disposed of as nuclear waste. NUKEM Technologies Engineering Services GmbH (NUKEM) applies their FREMES technology in a project at the former fuel element factory of FBFC International at Dessel, Belgium. The purpose is to measure and check for potential contamination within the excavated soil. The project started in 2017 with design and procurement of the necessary equipment. In October 2017 the FREMES system was installed at the site. After installation and an extensive test program the FREMES facility went fully into operation in July 2018. Original foreseen to measure between 4.000 and 8.000 tons of material, it has currently (mid 2019) measured 23.600 tons. It is expected that another 5.000 tons still have to be measured before the project successfully ends. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗