Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transient Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

The development of sine vibration test requirements for Viking lander capsule components

In connection with the Viking project for exploring the planet Mars, two identical spacecraft, each consisting of an orbiter and a lander, will be launched in the third quarter of 1975. Upon arrival at the planet, the Viking lander will separate from the Viking orbiter and descend to a soft landing at a selected site on the Mars surface. It was decided to perform a sine vibration test on the Viking spacecraft, in its launch configuration, to qualify it for the booster-induced transient-dynamic environment. It is shown that component-level testing is a cost- and schedule-effective prerequisite to the system-level, sine-vibration test sequences.

Barrett, S.↗

Comparison of observed rheological properties of hard wheat flour dough with predictions of the Giesekus-Leonov, White-Metzner and Phan-Thien Tanner models

The measured rheological behavior of hard wheat flour dough was predicted using three nonlinear differential viscoelastic models. The Phan-Thien Tanner model gave good zero shear viscosity prediction, but overpredicted the shear viscosity at higher shear rates and the transient and extensional properties. The Giesekus-Leonov model gave similar predictions to the Phan-Thien Tanner model, but the extensional viscosity prediction showed extension thickening. Using high values of the mobility factor, extension thinning behavior was observed but the predictions were not satisfactory. The White-Metzner model gave good predictions of the steady shear viscosity and the first normal stress coefficient but it was unable to predict the uniaxial extensional viscosity as it exhibited asymptotic behavior in the tested extensional rates. It also predicted the transient shear properties with moderate accuracy in the transient phase, but very well at higher times, compared to the Phan-Thien Tanner model and the Giesekus-Leonov model. None of the models predicted all observed data consistently well. Overall the White-Metzner model appeared to make the best predictions of all the observed data.

Non-NASA Center↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Testing↗

Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

Future NASA missions could include long-duration flyby, orbital, lander, or rover applications where generating power from sunlight may be limited. Radioisotope power systems (RPSs) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past 16 years, NASA Glenn Research Center has been supporting the development of RPSs. The advanced Stirling radioisotope generator (ASRG) utilized a pair of advanced Stirling convertors (ASCs). Although flight development of the ASRG has been canceled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct-current output voltage for the spacecraft, and synchronizes the piston motion of the two convertors to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot-end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies, Inc., has designed, developed, and tested an ASC control unit engineering development unit (ACU EDU) to support this effort. GRC used the ACU EDU as part of its nonnuclear representation of a RPS that also consists of a Dual advanced Stirling convertor simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built with flexibility to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical interactions between as many as three radioisotope power generators, associated control strategies, and typical electric system loads. The first phase of testing included a DASCS that was developed by Johns Hopkins University Applied Physics Laboratory and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. Testing included the following spacecraft electrical energy storage configurations: capacitor, battery, and supercapacitor. Testing of the DASCS and ACU in each energy storage configuration included simulation of a typical mission profile and transient voltage and current data during load turnon and turnoff. Testing for these devices also included the initiation of several system faults such as short circuits, electrical bus overvoltage, undervoltage, and a "dead bus" recovery to restore normal power operations. The goal of this testing was to verify operation of the ACU(s) when connected to a spacecraft electrical bus. The results of these tests are presented here.

General↗

Performance Evaluation of Multi-Vendor Grid-Forming Inverters for Grid-Connected Operation Through Hardware Experimentation: Preprint

Existing real-world projects of GFM inverters that operate in parallel to power grids typically are sized between dozens and a few hundreds Megawatt (MW) scale according to a recent NERC GFM inverter white paper. These large systems are often difficult to evaluate prior to deployments because of their large size. The performance of smaller GFM inverters (dozens to a few hundreds MW) that operate parallel with power grids (distribution systems) is even less understood. There is an opportunity to better understand these systems through hardware testing under controlled laboratory conditions. Therefore, this paper presents the functional performance evaluation tests of multiple (three) commercial GFM inverters when they operate in parallel with the grid through hardware experiments. The goal of these tests is to explore the GFM inverters' functionalities and dynamic response when in parallel with power grids to eventually develop universal specifications for GFM inverters. Both steady state (changing the inverter's frequency and voltage droop) and transient (adding step change in grid's frequency/voltage) tests are performed for each GFM inverter with the same testing circuit and testing protocol. The experimental results indicate the bench-marked performance that: 1) the GFM inverters can be dispatched through frequency and voltage droop intercepts to output the target power when paralleled to the grid; 2) the GFM inverters automatically respond to system frequency and voltage events to output the needed power, however, the GFM inverters all show stability issues when absorbing reactive power from the grid.

grid-forming inverters↗

Experiment to Investigate the On-set of Transient Fission Gas Release Under Simulated LOCA Conditions

Continuing efforts to better understand the phenomenon of transient fission gas release in irradiated commercial light water reactor fuel undergoing a simulated loss of coolant accident (LOCA) will be discussed in this work. During heating associated with LOCA conditions there is an additional release of fission gas beyond what is typically released during steady state operation. The exact timing of this release could impact the cladding balloon and rupture as the LOCA progresses in an actual accident. Recent experiments performed on the upgraded Severe Accident Test Station at Oak Ridge National Laboratory have expanded the current assessment of transient fission gas release. This system evaluates fission gas release by sweeping fission gas out of the LOCA test furnace and into cryogenically cooled cold traps where radioactive noble gas fission products are measured by gamma spectrometry. Additionally, the sweep gas can be monitored by a gas mass spectrometer to provide additional data on noble gas release and changes in the sweep gas atmosphere during heating. Several different conditions have been evaluated that explored the response of irradiated fuel to different thermal ramp conditions and different overpressure conditions. This further confirmed the impact of an overpressure in suppressing transient fission gas release. Further experiments are planned to evaluate the on-set temperature of transient fission gas release under a known overpressure. This test will progressively step through different temperature conditions while maintaining hydrostatic pressure on the fuel that is representative of high burnup fuel conditions. The available results from this type of testing will be discussed. Post-test microscopy will be compared to other transient fission gas release and standard LOCA tests to further understand the microstructural source of transient fission gas release.

Harp, Jason [ORNL] (ORCID:0000000253458440)↗

Use of Heated Helium to Simulate Surface Pressure Fluctuations on the Launch Abort Vehicle During Abort Motor Firing

The solid-rocket plumes from the Abort motor of the Multi-Purpose Crew Vehicle (MPCV, also know as Orion) were simulated using hot, high pressure, Helium gas to determine the surface pressure fluctuations on the vehicle in the event of an abort. About 80 different abort situations over a wide Mach number range, (0.3< or =M< or =1.2) and vehicle attitudes (+/-15deg) were simulated inside the NASA Ames Unitary Plan, 11-Foot Transonic Wind Tunnel. For each abort case, typically two different Helium plume and wind tunnel conditions were used to bracket different flow matching critera. This unique, yet cost-effective test used a custom-built hot Helium delivery system, and a 6% scale model of a part of the MPCV, known as the Launch Abort Vehicle. The test confirmed the very high level of pressure fluctuations on the surface of the vehicle expected during an abort. In general, the fluctuations were found to be dominated by the very near-field hydrodynamic fluctuations present in the plume shear-layer. The plumes were found to grow in size for aborts occurring at higher flight Mach number and altitude conditions. This led to an increase in the extent of impingement on the vehicle surfaces; however, unlike some initial expectations, the general trend was a decrease in the level of pressure fluctuations with increasing impingement. In general, the highest levels of fluctuations were found when the outer edges of the plume shear layers grazed the vehicle surface. At non-zero vehicle attitudes the surface pressure distributions were found to become very asymmetric. The data from these wind-tunnel simulations were compared against data collected from the recent Pad Abort 1 flight test. In spite of various differences between the transient flight situation and the steady-state wind tunnel simulations, the hot-Helium data were found to replicate the PA1 data fairly reasonably. The data gathered from this one-of-a-kind wind-tunnel test fills a gap in the manned-space programs, and will be used to establish the acoustic environment for vibro-acoustic qualification testing of the MPCV.

Panda, Jayanta↗

Thermal Vacuum Facility for Testing Thermal Protection Systems

A thermal vacuum facility for testing launch vehicle thermal protection systems by subjecting them to transient thermal conditions simulating re-entry aerodynamic heating is described. Re-entry heating is simulated by controlling the test specimen surface temperature and the environmental pressure in the chamber. Design requirements for simulating re-entry conditions are briefly described. A description of the thermal vacuum facility, the quartz lamp array and the control system is provided. The facility was evaluated by subjecting an 18 by 36 in. Inconel honeycomb panel to a typical re-entry pressure and surface temperature profile. For most of the test duration, the average difference between the measured and desired pressures was 1.6% of reading with a standard deviation of +/- 7.4%, while the average difference between measured and desired temperatures was 7.6% of reading with a standard deviation of +/- 6.5%. The temperature non-uniformity across the panel was 12% during the initial heating phase (t less than 500 sec.), and less than 2% during the remainder of the test.

Daryabeigi, Kamran↗

Analyses of Control Surface Seal Tested in the Ames Arc Jet Tunnel (Panel Test Facility)

The contents include: 1) Rope Seal; 2) Improvements to porous medial simulation in CFD-ACE+; 3) Porous media heat transfer validation case-stead-state and transient flat plate; 4) Simulation of GRC cold flow seal test fixture; 5) Simulation of calibration plate in the Panel Test Facility (PTF); and 6) Simulation of rope seal test in the PTF. This paper is in viewgraph form.

Reich, Alton J.↗

A universal procedure for evaluation and application of surge-protective devices

The source, nature, and frequency of occurrence of transients must be identified and a representative standard test wave chosen for proof testing. The performance of candidate suppressor devices then can be evaluated against the withstand goals set for the equipment. The various suppressors divide into two classes of generic behavior. The key to a universal procedure for evaluating both classes lies in representing transients as quasi-current sources of defined current impulse duration. The available surge current is established by the Thevenin equivalent transient voltage and source impedance. A load line drawn on the V-I characteristic graph of the suppressor quickly determines the clamping voltage and peak current. These values then can be compared to the requirement. The deposited energy and average power dissipation for multiple transients also can be calculated. The method is illustrated with a design example for motor vehicle alternator load dump suppression.

Source record↗

Report on Initial Sodium Testing on the Thermal Hydraulic Experimental Test Article (THETA) (Fiscal Year 2024 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that is used to develop sodium components and instrumentation as well as to acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility simulates nominal thermal hydraulic conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field may be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility was designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary coolant and secondary coolant system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. In fiscal year 2023, thermal stratification tests were completed with the primary system online, while the secondary system was being constructed [1]. These tests had shown that the core barrel and intermediate heat exchanger (IHX) outlet required increased thermal insulation. The THETA primary system was removed from METL, cleaned, thermal insulators installed, and then inserted into METL Test Vessel 4. At the time of this writing the THETA primary and secondary system are operational. During this fiscal year 100+ hours of testing was completed to characterize thermal hydraulic phenomena associated with steady state and transient conditions in a pool type liquid metal cooled reactor. A majority of the testing campaign was completed to satisfy the experimental data acquisition requirements for the GAIN Voucher with Oklo, CRADA 2021-21121. THETA is still operational at the time of this publication and future testing is planned for fiscal year 2025. Work is underway to publish existing and future data to an online database to facilitate collaboration with SFR engineers looking to validate their systems code or computational fluid dynamics models.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Geomagnetically Induced Current Field Test on Large Grid-Connected Power Transformers: Analysis, Model Development, and Simulations

Geomagnetic-induced current (GIC) flow in power grids can cause undesirable effects such as transformer overheating, harmonics, higher reactive power demand, etc. Many simulation models have been developed to study these effects, but real-world verification on modern transformer designs is rare. Here, this paper presents the first long-duration GIC field test in the U.S. performed on high-voltage, grid-connected transformers featuring winding clamps and tie rods instead of conventional tie bars. Field measurements were taken to evaluate GIC effects. These measurements also aided in developing and validating thermal and electromagnetic transient (EMT) models of the transformers. During the test, significant current and voltage distortions were observed along with considerable transformer reactive power losses. Analysis of the field measurements showed that the transformers’ hottest spot was at the inner windings, and their k-factors were close to factory test and software default values. Thermal simulations indicated that the transformers would not violate their thermal limits even for a GIC waveform that peaks at about 200 A/phase. EMT simulations revealed that increased transformer loading may reduce GIC-induced reactive power demand and harmonics in certain scenarios. The study also highlighted potential inaccuracies in using the k-factor method to calculate transformer reactive power losses.

EMTDC↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

Single-Event Transients in Voltage Regulators

Single-event transients are investigated for two voltage regulator circuits that are widely used in space. A circuit-level model is developed that can be used to determine how transients are affected by different circuit application conditions. Internal protection circuits-which are affected by load as well as internal thermal effects-can also be triggered from heavy ions, causing dropouts or shutdown ranging from milliseconds to seconds. Although conventional output transients can be reduced by adding load capacitance, that approach is ineffective for dropouts from protection circuitry.

circuit testing↗

Purpose, Design, and Analysis of the NSTX-U Centerstack Casing Lateral Support Shims

The National Spherical Torus Experiment Upgrade (NSTX-U) centerstack casing surrounds the central magnet core of NSTXU. It provides the inner vacuum boundary of the plasma chamber and supports the radially inboard plasma facing components lining the plasma chamber. The casing is supported like a cantilever, fixed at the lower flange by a connection to the TF Bundle through a G-10 ring. It is flexibly supported at the top by bellows, and insulated shims intended to react the largest part of the inventory of the disruption loads at the upper support, thereby protecting the upper and lower connections from excessive loads. A large part of the qualification of the casing and tiles requires addressing and quantifying disruption loads. These have been estimated based on extensions of the behavior of NSTX during its run period roughly 15 years ago. Structural qualification of the Upgrade used these estimates of the loading as input to calculations to demonstrate adequacy for a “most probable” disruption. The estimates are included in a requirements document to guide conservative design of all components loaded by disruptions. However, the changes made for the upgrade made the extrapolation of disruption behavior uncertain. Disruptions include axisymmetric loading from axisymmetric currents induced in the vessel shells. In addition, more complex currents called Halo currents are a result of plasma poloidal currents impinging on the casing. The halo currents add another layer of uncertain behavior and net lateral loading to the casing. As a result, NSTX-U is equipped with a number of instruments intended to assess the nature and severity of disruptions. The casing shims are required for lateral support of the casing, but these have also been converted to load cells to provide another measure of the magnitude of symmetric and asymmetric loading. Some of the logic in the development of the requirements document are presented. Electromagnetic analysis of axisymmetric and halo loading is described. Global simulations of the casing transient dynamic response, and local analysis and testing of the shim/load cell are included. The shim load cells and other instrumentation will be an important guide in planning NSTX-U experiments beyond its next run period expected in late 2026 or early 2027.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Transient Liquefaction on the Lunar or Martian Surface Operational Demonstration

The Cryogenic Fluid In-situ Liquefaction for Landers (CryoFILL) activity has been investigating concepts for the liquefaction of cryogenic fluids produced on the surface of the Moon and Mars. Liquefaction testing of oxygen in a scaled lander tank using an integrated, industrial cryocooler system was completed. The testing covered the determination of the nominal performance operation of the system, constant liquefaction performance, and transient liquefaction performance. The goal of the testing was to demonstrate cryogenic liquefaction operational capabilities on the Lunar and Martian surfaces for landers and In Situ Resource Utilization. The testing met all key performance parameter threshold values including liquefaction rate (demonstrated 1.6 kg/hr compared to threshold of 1.1 kg/hr), number of variables as transient (goal of 3: liquefaction flow, environmental temperature, and cryocooler input power – all demonstrated), and number of fill levels (goal of 3: < 5%, 50%, and 90% - all demonstrated). Key testing results from oxygen liquefaction testing will be discussed including sensitivities provided by the analysis team.

Liquefaction↗

Parachute gore shape and flow visualization during transient and steady-state conditions.

Single parachute gore segments were tested in an experimental wind tunnel having a unique 'V' splitter plate test section with a glass panel on the near side and a grid of orifices for smoke injection on the back panel. The parachute gore shape and flow patterns were viewed in cross section during the inflation process and also during changing flow conditions as would occur with rapid reduction of payload weight. Observations of flow during inflation revealed a transient internal counterflow and the formation and degeneration of several trailing vortices. Gore shapes observed compared well with those of free flight.

Dereng, V. G.↗