Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

20-24 GeV FFA CEBAF Energy Upgrade

A proposal was formulated to increase the CEBAF energy from the present 12 GeV to 20-24 GeV by replacing the highest-energy arcs with Fixed Field Alternating Gradient (FFA) arcs. The new pair of arcs would provide six or seven new beam passes, going through this magnet array, allowing the energy to be nearly doubled using the existing CEBAF SRF cavity system. One of the immediate accelerator design tasks is to develop a proof-of-principle FFA arc magnet lattice that would support simultaneous transport of 6-7 passes with energies spanning a factor of two. We also examine the possibility of using combined function magnets to configure a cascade, six-way beam split switchyard. Finally, a novel multi-pass linac optics based on a weakly focusing lattice is being explored.

Bogacz, Slawomir Alex↗

DESIGNING THE SPREADERS AND SPLITTERS FOR THE FFA@CEBAF ENERGY UPGRADE

A degrader device is being built at the CEBAF injector to degrade the electron beam phase space for machine acceptance studies. The electron beam is degraded through multiple scattering in a thin target before further transport in the injector beamline for injection into CEBAF. The degraded electron beam will approximate phase space distributions expected from a bremsstrahlung-based polarized positron source as in the PEPPo method. The effort is in broader support of the Ce+BAF positron capability that is currently under study. Two options for the degrader device are considered, and simulation results are presented.

Sy, A.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

The upcoming Jefferson Lab K-Long experiment at Hall D will require unique beam conditions with a much lower bunch repetition rate and atypically high bunch charge. To optimize the Continuous Electron Beam Accelerator Facility (CEBAF) injector for this experiment, we performed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) to determine the magnetic elements and RF settings necessary for the K-long bunch charge (0.64 pC) at 200 kV. We also investigated the transmission and beam characteristics of low to high charge per bunch electron beams through the injector for simultaneous operations of all four CEBAF Halls and characterized the transmission as a function of the photocathode laser spot size and pulse length. Our findings provide valuable insights into optimizing the CEBAF injector for the Jefferson Lab K-Long experiment, as well as for other experiments with similar beam conditions

Kazimi, R.↗

RESONANT MATCHING SECTION FOR CEBAF ENERGY UPGRADE

In order to prevent emittance growth during long stores of the proton beam at the future Electron-Ion Collider (EIC), we need to have some mechanism to provide fast cooling of the dense proton beams. One promising method is coherent electron cooling (CeC), which uses an electron beam to both ?measure? the positions of protons within the bunch and then apply energy kicks which tend to reduce their longitudinal and transverse actions. In this work, we discuss the under- lying physics of this process. We then discuss simulations which constrain the electrons to move only longitudinally in order to perform fast optimizations and long-term track- ing of the bunch evolution, and benchmark these results against fully 3D codes. Additionally, we discuss practical challenges, including the necessity of a high-quality elec- tron beam and sub-micron alignment of the electrons and protons.

Deitrick, K.↗

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25

An often-overlooked aspect of Low Level Radio Frequency (LLRF) design is commissioning of a new system. During Jlab’s Scheduled Accelerator Maintenance (SAM) in 2024, two C75 Cryomodule were installed in CEBAF with Jlab’s LLRF 3.0 system. Jlab’s team has invested effort in automating and standardizing their commissioning process. Several key components are klystron characterization, cavity characterization, and interlock verification. This poster will present the summary of LLRF preparation and commissioning efforts at Jlab.

Accelerator Physics↗

Status of SNS Proton Power Upgrade SRF Cavities Production Qualification

The Pro­ton Power Up­grade pro­ject at Oak Ridge Na­tional Lab’s Spal­la­tion Neu­tron Source (SNS PPU) cur­rently being con­structed will dou­ble the pro­ton beam power from 1.4 to 2.8 MW by adding 7 ad­di­tional cry­omod­ules, each con­tains four six-cell high beta (\beta = 0.81) su­per­con­duct­ing radio fre­quency cav­i­ties. The cav­i­ties were built by Re­search In­stru­ments, Ger­many, with all the cav­ity pro­cess­ing done at the ven­dor site, in­clud­ing elec­trop­o­l­ish­ing as the final ac­tive chem­istry step. All 28 cav­i­ties needed for 7 cry­omod­ules were de­liv­ered to Jef­fer­son Lab, ready to be tested. The cryo­genic RF qual­i­fi­ca­tions and he­lium ves­sel weld­ing were done at Jef­fer­son Lab. The per­for­mance largely ex­ceed the re­quire­ments, and greatly ex­ceeded the per­for­mance of the orig­i­nal SNS cav­ity pro­duc­tion se­ries. Here, we pre­sent the sum­mary of RF test on pro­duc­tion cav­i­ties to this date.

Dhakal, P.↗

Project Report: School Retrofit Demonstration of Lighting and Outlet Controls with LED Upgrades

A technology demonstration project funded by the U.S. Department of Energy (DOE) was hosted by Boston Public Schools (BPS). This project evaluated wireless controls technology for lighting systems and plug loads (energy consumed by devices plugged into electrical outlets), implemented along with LED lighting retrofits in two classrooms. This study assesses technology readiness and effectiveness to determine the deployment potential of the technology in schools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

US High-Luminosity LHC Accelerator Upgrade Program (AUP)

HL-LHC project aims at increasing luminosity from 300 fb -1 to 3000-4000 fb -1 . The project is led by CERN with the support of an international collaboration of 29 institutions in 13 countries, including the United States.

43 PARTICLE ACCELERATORS↗

Room Temperature Electrochemical Upgrading of Methane to Oxygenate Fuels

The overall objective of this project is to discover the nature of the electrochemically active sites and to uncover the mechanisms for the electrocatalytic transformation of small organic molecules to oxygenate products such as methanol, formaldehyde, carbon monoxide and ethylene. Among the feedstocks of interest in this study were: methane, carbon dioxide, and acetic acid. Methane is an incredibly attractive potential feedstock because of the recent discovery of large shale deposits; carbon dioxide is potentially a very available feedstock from carbon capture technologies; acetic acid (as well as CH4 and CO2 and ethanol) has potential as a bio-derived feedstock. This report summarizes the major results to date regarding the electrochemical transformation of CH4, CO2 and acetic acid to chemicals and fuels – with a primary focus on methane. It should be noted that this was a grant that was transferred to the University of South Carolina following the PI’s move from the University of Connecticut. Therefore, this report – as a summary document – contains the results over the entire duration of the project. In addition to the primary objective, the work in this project has led to synergistic discoveries that are advantageous to other fields including: catalyst layer deposition, anion exchange membrane fuel cells, CO2 capture and li-ion batteries. Those are very briefly discussed as well.

03 NATURAL GAS↗

Conversion of cellulosic biomass-based sugars to mevalonate for downstream chemical upgrading and market development

In collaboration with Visolis, ABPDU researchers have demonstrated a viable path for conversion of cellulosic feedstocks into renewable precursors for commodity fuels and chemicals. This process was demonstrated with equal success for both glucose and xylose conversion. Following proof of concept in 2L bioreactors, the process was scaled and demonstrated in a 50L bioreactor.

09 BIOMASS FUELS↗

SRF Resonators for a bi-directional Energy Ramping Upgrade of the Isotope Production Facility Beamline at LANL

The LANL Isotope Production Facility (IPF) is one of the two high-current proton linear accelerators operated under the auspices of the DOE Office of Nuclear Physics Isotope Development and Production for Research Applications Program. The IPF beamline operates with a fixed 100-MeV energy proton beam, diverted from the LANSCE accelerator and guided towards the isotope production target station. The fixed beam energy limits the number of isotopes that can be produced at IPF, and adversely affects the purity of isotopes produced at non-optimal energies. In particular, the IPF program is receiving increasing numbers of requests for high purity isotopes such as Np-236 (national security applications) and Re-186 (medical therapy). These are typically produced via (p,n) and (p,2n) nuclear reactions, requiring very tight control of the incident energies on the production targets to ensure an end product with a high radionuclidic purity. It is well known that this level of energy control cannot be achieved when a 100 MeV beam of mono-energetic protons is degraded to the required energies, typically below 30 MeV, as too much energy spread is acquired. Operating the IPF beamline at lower, mono-energetic beam energies such as at 40 MeV will allow the required tight energy control in target assemblies to ensure a high purity product. In addition, NP has requested a LANL/BNL/ORNL collaboration focus on establishing a national large-scale production capability for the therapy isotope Ac-225. Recent nuclear cross section measurements done at LANL show that due to a steep rise in production cross section towards higher proton energies (See Figure 2), proton beams at energies substantially greater than 100 MeV will be highly beneficial for Ac-225 production [AC255]. Such higher-energy beams cannot be delivered to IPF at present. Lower-energy beams (70 MeV and 40 MeV) can be delivered but only in sole-use mode; all other LANSCE users must be offline during 70 MeV or 40 MeV operation.

07 ISOTOPE AND RADIATION SOURCES↗

Economic Extraction, Recovery and Upgrading of Rare Earth Elements from Coal-Based Resources

The overall objective of this project is to produce a rare earth elements product with greater than 8% rare earth elements from coal-based resources using an economically viable and environmentally benign processing methodology. The objective of the coal processing work will be to acquire appropriate coal feed and produce a viable clean coal product, a concentrated REE feed stream, and a pyrite stream (where available) that can be used to enhance leaching. The objective of the bio-oxidation portion of the project is to utilize bacteria to oxidize sulfide minerals and ferrous ions to ferric ions to accelerate leaching and remove the sulfides to prevent future acid mine drainage and related liabilities. The objective of the solution conditioning work is to remove iron and control leaching solution conditions to facilitate extraction of REEs without significant thorium extraction. The objective of the column leaching work is to engineer/model and simulate heap leaching to demonstrate low-cost extraction of REEs from coal-based resources. The objective of the solvent extraction work is to selectively extract and recover through controlled stripping of REEs that are solubilized through leaching. The objective of the precipitation portion of the project is to recover the REEs from the solvent extraction stripping solutions and dry them to achieve the final product of rare earth elements that is > 8 % REEs. The objective of the technical, economic, and environmental analysis is to determine the overall viability of the processing approach that is demonstrated in this project. This project encompasses a range of technologies that are currently in industrial practice that are applied and engineered to produce rare earth element product from coal feed sources. The potential sources include large coal feed resources in active coal mines in addition to coal waste. This technology involves the utilization of advanced coal processing technology that can be used to deliver clean coal for the market as well as rare-earth-element-bearing non-coal rock that is of the correct size for heap leaching applications in addition to providing concentrated sulfide minerals (for mid to high sulfur coals) for cleaner coal and for enhanced bio-oxidation to accelerate leaching of REEs from the non-coal rock. The removal of the sulfide minerals cleans the coal, accelerates subsequent REEs extraction, and it removes the future potential for most acid-rock drainage. (For low sulfur coals some pyrite may be purchased if needed.) The processing method also utilizes bio-oxidation to enhance ferric ion production to enhance leaching, while also consuming the sulfide mineral and its associated environmental liability. The project includes a technical, economic, and environmental analysis to facilitate an appropriate assessment of commercial viability for this processing technology.

01 COAL, LIGNITE, AND PEAT↗

Benched: Upgrading and Updating the Los Alamos Benchmark Suite for the 21st Century [Slides]

The presentation begins by stating that most organizations make choices to handle specific things when preparing input files for validation, such as which elemental abundance data to use, how to decompose specific elements, and setting calculation precision. It also discusses the consequences, which include differing calculation results between different organizations for the same case, even when using the same code. This is illustrated by the intercomparison exercise and input files that are prepared by one organization and are not necessarily correct for another. The presentation explains that the Los Alamos Benchmark Suite is a centralized repository of high-quality benchmark models currently under development at LANL. The objectives of the new repository are to remain up to date with the latest ICSBEP revision, to have a formal review and revision process, to (eventually) be an open-source repository, and to provide new tools for improved input and output file generation and review.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

AI-Based Upgrades to Observational Data Centers to Facilitate Data Interoperability

Focal Areas: (1) Data acquisition and assimilation enabled by machine learning, AI, and advanced methods including experimental/network design/optimization, unsupervised learning (including deep learning), and hardware-related efforts involving AI (e.g., edge computing). Focal areas 2 and 3 have critical dependencies to the modernization described. Key benefits to the focal areas: (1) Modernized observatory framework capable of agile adaptive observation, (2) Advanced instrument and data tagging supporting AI data acquisition for assimilation or validation, and (3) Widespread data interoperability bridging Earth system prediction scales

54 ENVIRONMENTAL SCIENCES↗

Wet Waste Hydrothermal Liquefaction and Biocrude Upgrading to Hydrocarbon Fuels: 2020 State of Technology

Data from Pacific Northwest National Laboratory’s conversion hydrothermal liquefaction (HTL) program for wet waste was used to update the pathway techno-economic analysis (TEA) for the fiscal year 2020 State of Technology (2020 SOT). The modeled fuel blendstock MFSP for the 2020 SOT is estimated at $4.50/GGE (with ammonia stripping of the AP), a reduction of $0.61/GGE, or 12%, relative to the 2019 SOT (Snowden-Swan et al. 2020). Progress in the HTL area includes increased reactor LHSV from 3.6 to 4.0 and a newly designed staged approach for the sludge pumping and heating, resulting in a 1 cent and 26 cent reduction in modeled MFSP, respectively. The newly designed heat exchanger configuration is less material and capital intensive than the previous SOT, and provides a system design that is more scalable with regard to practical fabrication limitations. Further improvements may be possible with the use of core inserts to enhance tube velocity and heat transfer rates. Biocrude hydrotreating research progress improved weight hourly space velocity (WHSV) from 0.67 to 0.72 hr-1 in the guard bed and from 0.39 to 1.02 hr-1 in the main hydrotreating bed, a 7% and 162% improvement, respectively. Hydrotreating performance was not sacrificed at the higher throughput rates and catalyst activity remained stable over the run. The demonstrated increase in WHSVs reduced the modeled MFSP by $0.34/GGE.

20 FOSSIL-FUELED POWER PLANTS↗