Search NASA⌕ Search

SEARCH · Search NASA

Results for “Welding Simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

547 records · Page 31

Initial measurements of BN-350 spent fuel in dry storage casks using the dual slab verification detonator

The Dual Slab Verification Detector (DSVD) has been developed, built, and characterized by Los Alamos National Laboratory in cooperation with the International Atomic Energy Agency (IAEA) as part of the dry storage safeguards system for the spent fuel from the BN-350 fast reactor. The detector consists of two rows of 3He tubes embedded in a slab of polyethylene which has been designed to be placed on the outer surface of the dry storage cask. By performing DSVD measurements at several different locations around the outer surface of the DUC, a signature 'fingerprint' can be established for each DUC based on the neutron flux emanating from inside the dry storage cask. The neutron fingerprint for each individual DUC will be dependent upon the spatial distribution of nuclear material within the cask, thus making it sensitive to the removal of a certain amount of material from the cask. An initial set of DSVD measurements have been performed on the first set of dry storage casks that have been loaded with canisters of spent fuel and moved onto the dry storage pad to both establish an initial fingerprint for these casks as well as to quantify systematic uncertainties associated with these measurements. The results from these measurements will be presented and compared with the expected results that were determined based on MCNPX simulations of the dry storage facility. The ability to safeguard spent nuclear fuel is strongly dependent on the technical capabilities of establishing and maintaining continuity of knowledge (COK) of the spent fuel as it is released from the reactor core and either reprocessed or packaged and stored at a storage facility. While the maintenance of COK is often done using continuous containment and surveillance (C/S) on the spent fuel, it is important that the measurement capabilities exist to re-establish the COK in the event of a significant gap in the continuous CIS by performing measurements that independently confirm the presence and content of Plutonium (Pu) in the spent fuel. The types of non-destructive assay (NDA) measurements that can be performed on the spent fuel are strongly dependent on the type of spent fuel that is being safeguarded as well as the location in which the spent fuel is being stored. The BN-350 Spent Fuel Disposition Project was initiated to improve the safeguards and security of the spent nuclear fuel from the BN-350 fast-breeder reactor and was developed cooperatively to meet the requirements of the International Atomic Energy Agency (IAEA) as well as the terms of the 1993 CTR and MPC&A Implementing Agreements. The unique characteristics of fuel from the BN-350 fast-breeder reactor have allowed for the development of an integrated safeguards measurement program to inventory, monitor, and if necessary, re-verify Pu content of the spent fuel throughout the lifetime of the project. This approach includes the development of a safeguards measurement program to establish and maintain the COK on the spent fuel during the repackaging and eventual relocation of the spent-fuel assemblies to a long-term storage site. As part of the safeguards measurement program, the Pu content of every spent-fuel assembly from the BN-350 reactor was directly measured and characterized while the spent-fuel assemblies were being stored in the spent-fuel pond at the BN-350 facility using the Spent Fuel Coincidence Counter (SFCC). Upon completion of the initial inventory of the Pu content of the individual spent-fuel assemblies, the assemblies were repackaged into welded steel canisters that were filled with inert argon gas and held either four or six individual spent-fuel assemblies depending on the type of assembly that was being packaged. This repackaging of the spent-fuel assemblies was performed in order to improve the stability of the spent-fuel assemblies for long-term storage and increase the proliferation resistance of the spent fuel. To maintain the capability of verifying the presence of the spent-fuel assemblies inside the welded steel canisters, measurements were performed on the canisters using the Spent Fuel Attribute Monitor (SPAM), which was a neutron coincidence counter very similar in design to the SFCC, but with a larger operational volume to accommodate the canisters. The analysis of the neutron coincidence data from the measurements of the welded steel canisters using SP AM yielded a Canister Attribute (CA) that was shown to be proportional to the total amount of Pu mass that was present inside the canister and comparable to the CA values that were calculated based on the previous SFCC measurements. The next step in securing the spent fuel from the BN-350 reactor is the packaging of the steel canisters into Dual-Use Casks (DUCs) and the transportation of the DUCs to a remote dry storage site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ghost microstructure evolution and identification in the coarse grain heat affected zone of 2.25Cr-1Mo-V-Ti steel using tint etching

Microstructural characteristics of the CGHAZ (coarse grained heat affected zone) made of the 2.25Cr-1Mo-V-Ti material for the thermal power plant boiler tube were discussed using the technique of tint etching. To conduct the micro structural characterization, the sample on which CGHAZ was produced by using a high temperature thermal cycle simulator, Gleeble 3500 equipment was used for comparative analyses using the existing Nital etching (ASTM E407-74) and the alkaline etching (ASTM E40785). The latter was used to observe a specific phase. For the microstructure on which the alkaline etching was experimented, the shape of a black strip (Ghost microstructure) in a few microns was observed, which was not observed from the Nital etching. It was found from the phase identifications based EPMA, EBSD and TEM experiments that the image of the black strip in a few microns represented the alpha phase in which C, Cr and Mo became segregated. In addition, it was verified that austenite and M{sub 23}C{sub 6} phase were present around the segregated zone. Based on such results, the mechanism by which the image of the black strip in a few microns was formed at the CGHAZ. In this study, we have investigated the mechanism of the appeared black strip in the CGHAZ. - Highlights: •Ghost microstructure was observed which was not observed from the nital etching. •Ghost microstructure has high concentrations of carbon and molybdenum than matrix. •Schematic illustration proposed of why Ghost microstructure was generated. •Ghost microstructure caused by partial dissolution of M{sub 23}C{sub 6} precipitation.

36 MATERIALS SCIENCE↗

Forward Skirt Structural Testing on the Space Launch System (SLS) Program

Structural testing was performed to evaluate heritage forward skirts from the Space Shuttle program for use on the Space Launch System (SLS) program. One forward skirt is located in each solid rocket booster. Heritage forward skirts are aluminum 2219 welded structures. Loads are applied at the forward skirt thrust post and ball assembly. Testing was needed because SLS ascent loads are roughly 40% higher than Space Shuttle loads. Testing objectives were to determine margins of safety, demonstrate reliability, and validate analytical models. Two forward skirts were structurally tested using the test configuration. The test stand applied loads to the thrust post. Four hydraulic actuators were used to apply axial load and two hydraulic actuators were used to apply radial and tangential loads. The first test was referred to as FSTA-1 (Forward Skirt Structural Test Article) and was performed in April/May 2014. The purpose of FSTA-1 was to verify the ultimate capability of the forward skirt subjected to ascent ultimate loads. Testing consisted of two liftoff load cases taken to 100% limit load followed by an ascent load case taken to 110% limit load. The forward skirt was unloaded to no load after each test case. Lastly, the forward skirt was tested to 140% limit and then to failure using the ascent loads. The second test was referred to as FSTA-2 and performed in July/August of 2014. The purpose of FSTA-2 was to verify the ultimate capability of the forward skirt subjected to liftoff ultimate loads. Testing consisted of six liftoff load cases taken to 100% limit load followed by the six liftoff cases taken to 140% limit load. Two ascent load cases were then tested to 100% limit load. The forward skirt was unloaded to no load after each test case. Lastly, the forward skirt was tested to 140% limit and then to failure using the ascent loads. The forward skirts on FSTA-1 and FSTA-2 successfully carried all applied liftoff and ascent load cases. Both FSTA-1 and FSTA-2 were tested to failure by increasing the ascent loads. Failure occurred in the forward skirt thrust post radius. The forward skirts on FSTA-1 and FSTA-2 had nearly identical failure modes. FSTA-1 failed at 1.72 times limit load and FSTA-2 failed at 1.62 times limit load. This difference is primarily attributed to variation in material properties in the thrust post region. Test data were obtained from strain gages, deflection gages, ARAMIS digital strain measurement, acoustic emissions, and high-speed video. Strain gage data and ARAMIS strain were compared to finite element (FE) analysis predictions. Both the forward skirt and tooling were modeled. This allows the analysis to simulate the loading as close as possible to actual test configuration. FSTA-1 and FSTA-2 were instrumented with over 200 strain gages to ensure all possible failure modes could be captured. However, it turned out that three gages provided critical strain data. One was located in the post bore and two on the post radius. More gages were not specified due to space limitations and the desire to not interfere with the use of the ARAMIS system on the post radius. Measured strains were compared to analysis results for the load cycle to failure. Note that FSTA-1 gages were lost before failure was reached. FSTA-2 gages made it to the failure load but one of the radius gages was lost before testing began. This gage was not replaced because of the time and cost associated with disassembly of the test structure. Correlation to analysis was excellent for FSTA-1. FSTA-2 was not quite as good because there was more residual strain from previous load cycles. FSTA-2 was loaded and unloaded with 12 liftoff cases and two ascent cases before taking the skirt to failure. FSTA-1 only had two liftoff cases and one ascent case before taking the skirt to failure. The ARAMIS system was used to determine strain at the post radius by processing digital images of a speckled paint pattern. Digital cameras recorded images of the speckled paint pattern. ARAMIS strain results for FSTA-2 just prior to failure. Note a high strain location develops near the left side. This high strain compares well to analysis prediction for both FSTA-1 and FSTA-2. The strain at this location was also plotted versus limit load. Both FSTA-1 and FSTA-2 had excellent correlation between ARAMIS and analysis strains. Acoustic emission (AE) sensors were used to monitor for damage formation that may occur during testing (e.g., crack formation and growth or propagation). AE was very important because after disassembly of FSTA-1, a crack was observed in the ball fitting radius. The ball fitting did not crack on FSTA-2. AE data was used to reconstruct when the crack occurred. The AE energy versus time plot for FSTA. The energy increased considerably at 850 seconds (152% limit load), indicating a crack could have formed at this point. The only visual evidence found that could have corresponded to this was the crack that initiated in the ball fitting. The cracks in the forward skirt aluminum structures would likely have been lower energy due to a lower modulus and all that were found after failure correlated to occurring after the initial crack in the post radius. This was verified by high-speed cameras used to record the failure.

Lohrer, J. D.↗

Advanced Ultrasupercritical (AUSC) Materials Thick-Walled Cycling Header Development for ComTest-AUSC (Final Report)

Alstom Power Inc., a wholly owned subsidiary of the General Electric Company (GE) recently completed “Advanced Ultrasupercritical (AUSC) Materials Thick-Walled Cycling Header Development for ComTest-AUSC” under Award No. DE-FE0026183 for the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL). This project developed a design for testing of a high temperature nickel-based superalloy thick-walled header to simulate cycling and flexible plant operation in new and existing plants. The objective was to simulate the expected thermal stresses of a new AUSC plant or a retrofit header in an existing plant to improve flexible dynamic operation while maintaining component integrity and overall power plant reliability. The high performance superalloy materials that enable higher operating temperatures and pressures can support future transformational power technologies including new AUSC plants at 4250-5000 psi, 730°C/760°C or will serve as a replacement component in a repowered or retrofit USC coal powered cycling plant at 3600 psi, 600°C. These alloys can also enable supercritical CO2 cycles, nuclear power, solar power and more efficient natural gas combined cycle units as targeted by the U.S. DOE/NETL Cross-Cutting Research Technology Program Plan. Recently developed advanced nickel alloys such as Inconel 740H (740H) and Haynes 282 (H282) have been successfully tested on a pilot scale for fireside corrosion using steam loop tubing at AUSC temperatures of 760°C in actual operating coal fired boiler. These high strength materials have been demonstrated their adequacy for use in other high temperature boiler components such as superheater tubes. Thick-walled superheater outlet headers which operate at high temperatures and pressure under severe cycling condition are considered as one of the most critical component in the AUSC coal fired boiler. Over the design life of a plant, these headers are exposed to the most severe fatigue and creep damage accumulation and need to be properly designed for the expected cycling in an AUSC plant with flexible operation. These materials need to demonstrate adequate design life of 20 to 30 years for creep and fatigue conditions. The following tasks were performed: 1. A conceptual design was developed of a thick-walled component representative of typical headers with several tube connections and proper flow rates (~100,000 lbs/hr) suitable for Phase II test at 760°C operation. This was based on a process analysis of expected full scale new and component retrofit designs for AUSC; 2. A multi-physics flow and heat transfer computational fluid dynamics (CFD) analysis of the component for proper layout of the header configuration, number and geometry (size) of tubes required for bypass flow, flow rates through the tubing, and sectional pressure drops was performed. Steam to header metal heat transfer film coefficients in the header section and the tubes during the two stages (half load and full load) of the cycling operation were evaluated and used in the stress analysis; 3. Detailed analytical evaluation of the thick-walled pipe and tube connections for mechanical integrity under cycling conditions was performed. This included transient thermal stress analysis and fatigue usage estimation including the tube-to-pipe weld geometries and weld materials; 4. A layout and design of the thick-walled test component was developed and instrumentation required for a test was identified; 5. Continuum Damage Mechanics (CDM) creep prediction models were extended to 740H and H282 and validated with public data on 740H and H282 for use in creep analysis. In addition, detailed creep analyses were performed separately for the design life of the conceptual AUSC superheater outlet header using these General Electric (GE) creep constitutive models. GE was the prime contractor for the project, which was directed by Principal Investigator Robert Schrecengost and Lead Scientist Dr. B. Reddy Ganta. Other collaborative participants in this project included GE Global Research, GE Boiler Engineering, and a Technical Consultant from EPRI.

01 COAL, LIGNITE, AND PEAT↗

Chemical Free Surface Processing for High Gradient Superconducting RF Cavities

Chemical treatment such as buffered chemical polishing (BCP) or electro polishing (EP) followed by high pressure rinsing (HPR) of niobium (Nb) superconducting RF (SRF) cavities is expensive and complex multistep process. Furthermore, the cavity RF surfaces after the treatment still have numerous bubbles and pits that result from welding. These quench-producing weld defects together with the particulate contamination, result in significant scatter of the multi-cell Nb SRF cavities performance characteristics. This scatter is the major problem in the current manufacturing of the Nb SRF cavities. When developed the chemical free surafce processing using IEB will benefit first J-lab's CEBAF and Fermilab's Project X. Also, light sources, require 1.3 - 1.5 GHz SRF structures. Furthermore, IEB will produce much broader impact because it can be implemented into manufacturing of many other types of RF devices including both superconducting as well as normal conducting RF cavities. This program will develop a new process that will enhance quality of the superconducing radio-frequency cavities and allow acceleration of charged particles to much higher energies. The process also will improve the cavity manufacturing and result in substantial cost reduction of superconducting radio-frequency high-energy particle accelerators. Niobium samples were successfully processed by a DC electron beam to a degree that is suitable for the interior surface of an SRF cavity. To accomplish this, a complete system was developed from the ground up. A vacuum chamber system was acquired and adapted to act as the vessel for performing the Nb processing experiments. An extremely robust high voltage power supply was developed and manufactured to provide the power necessary to drive the multi-kW DC electron gun. A high voltage isolation filament transformer was also designed and manufactured to provide the necessary current to drive the filament within the electron gun. Finally, a beam melt characterization DC electron gun was created. This gun was used to explore the parameter space of interest for processing Nb SRF cavities. The beam melt characterization tests concluded that multiple quick passes at moderate beam power provided the most ideal melt zone characteristics Nb surfaces. It was also found that excellent melt and polish results could be achieved at lower voltages than originally conceived, getting the great results at a beam voltage of 20kV versus the 50kV used in the initial Phase I testing at Jefferson Laboratory. Operating at 20kV will also greatly reduce the challenges of designing a compact DC electron gun for processing of complete Nb SRF cavities, which will be done in Phase III. This final report is divided in eight parts which cover the major investigation work and results which have been performed and achieved. The first part addresses the design, fabrication and testing of the vacuum chamber. In the second part, the DC power supply output circuit design is presented for providing an operating space of 50-60kV with currents from 20-160mA and short and open circuit fault modes are considered and resolved. The third section covers testing and commissioning of the high voltage step up transformer and 150kV isolation transformer. Section four covers the design, construction and performance for a 100kV high voltage bushing. Section number five treats the filament design and load testing. Section number six covers electron gun design and simulation of electron beam melting. Section seven presents the beam target design, assembly and testing and test gun with solenoid magnet, design, fabrication and testing. Finally, section eight demonstrates electron beam melting and polishing of Nb, Cu and SS samples.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

Creep and Creep-Fatigue Crack Growth at Structural Discontinuities and Welds

The subsection ASME NH high temperature design procedure does not admit crack-like defects into the structural components. The US NRC identified the lack of treatment of crack growth within NH as a limitation of the code and thus this effort was undertaken. This effort is broken into two parts. Part 1, summarized here, involved examining all high temperature creep-fatigue crack growth codes being used today and from these, the task objective was to choose a methodology that is appropriate for possible implementation within NH. The second part of this task, which has just started, is to develop design rules for possible implementation within NH. This second part is a challenge since all codes require step-by-step analysis procedures to be undertaken in order to assess the crack growth and life of the component. Simple rules for design do not exist in any code at present. The codes examined in this effort included R5, RCC-MR (A16), BS 7910, API 579, and ATK (and some lesser known codes). There are several reasons that the capability for assessing cracks in high temperature nuclear components is desirable. These include: (1) Some components that are part of GEN IV reactors may have geometries that have sharp corners - which are essentially cracks. Design of these components within the traditional ASME NH procedure is quite challenging. It is natural to ensure adequate life design by modeling these features as cracks within a creep-fatigue crack growth procedure. (2) Workmanship flaws in welds sometimes occur and are accepted in some ASME code sections. It can be convenient to consider these as flaws when making a design life assessment. (3) Non-destructive Evaluation (NDE) and inspection methods after fabrication are limited in the size of the crack or flaw that can be detected. It is often convenient to perform a life assessment using a flaw of a size that represents the maximum size that can elude detection. (4) Flaws that are observed using in-service detection methods often need to be addressed as plants age. Shutdown inspection intervals can only be designed using creep and creep-fatigue crack growth techniques. (5) The use of crack growth procedures can aid in examining the seriousness of creep damage in structural components. How cracks grow can be used to assess margins on components and lead to further safe operation. After examining the pros and cons of all these methods, the R5 code was chosen as the most up-to-date and validated high temperature creep and creep fatigue code currently used in the world at present. R5 is considered the leader because the code: (1) has well established and validated rules, (2) has a team of experts continually improving and updating it, (3) has software that can be used by designers, (4) extensive validation in many parts with available data from BE resources as well as input from Imperial college's database, and (5) was specifically developed for use in nuclear plants. R5 was specifically developed for use in gas cooled nuclear reactors which operate in the UK and much of the experience is based on materials and temperatures which are experienced in these reactors. If the next generation advanced reactors to be built in the US used these same materials within the same temperature ranges as these reactors, then R5 may be appropriate for consideration of direct implementation within ASME code NH or Section XI. However, until more verification and validation of these creep/fatigue crack growth rules for the specific materials and temperatures to be used in the GEN IV reactors is complete, ASME should consider delaying this implementation. With this in mind, it is this authors opinion that R5 methods are the best available for code use today. The focus of this work was to examine the literature for creep and creep-fatigue crack growth procedures that are well established in codes in other countries and choose a procedure to consider implementation into ASME NH. It is very important to recognize that all creep and creep fatigue crack growth procedures that are part of high temperature design codes are related and very similar. This effort made no attempt to develop a new creep-fatigue crack growth predictive methodology. Rather examination of current procedures was the only goal. The uncertainties in the R5 crack growth methods and recommendations for more work are summarized here also.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗