Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Overview of Marshall Space Flight Center Activities for the Combustion Stability Tool Development Program

This presentation covers the overall scope, schedule, and activities associated with the NASA - Marshall Space Flight Center (MSFC) involvement with the Combustion Stability Tool Development (CSTD) program. The CSTD program is funded by the Air Force Space & Missile Systems Center; it is approximately two years in duration and; and it is sponsoring MSFC to: design, fabricate, & execute multi-element hardware testing, support Air Force Research Laboratory (AFRL) single element testing, and execute testing of a small-scale, multi-element combustion chamber. Specific MSFC Engineering Directorate involvement, per CSTD-sponsored task, will be outlined. This presentation serves a primer for the corresponding works that provide details of the technical work performed by individual groups within MSFC.

Kenny, R. J.↗

V/STOL tilt rotor aircraft study. Volume 7: Tilt rotor flight control program feedback studies

An exploratory study has been made of the use of feedback control in tilt rotor aircraft. This has included the use of swashplate cyclic and collective controls and direct lift control. Various sensor and feedback systems are evaluated in relation to blade loads alleviation, improvement in flying qualities, and modal suppression. Recommendations are made regarding additional analytical and wind tunnel investigations and development of feedback systems in the full scale flight vehicle. Estimated costs and schedules are given.

Alexander, H. R.↗

Some new satellite sensors and applications.

It would appear that over the next few years general diagnostic space exploration by satellite-borne conventional sensors will be well on its way under the sponsorship of many nations. It is the objective of this paper to review two new sensor developments and an application program. The first sensor (the photopolarimeter) makes use of polarized light to determine unique signatures ranging from aerosols to signatures for surface moisture. The second sensor (the correlation interferometer) makes use of absorption spectroscopy to detect anomalous gas concentrations and will be used to explore the CO sink problem, significant in pollution. In the applications area, some demonstration experiments in the general area of space processing, scheduled for the remaining Apollo flights, are described. If successfull, these experiments will give some indication of typical products which could be produced cost effectively in space.

Steg, L.↗

An assessment of the Instrument Pointing Subsystems (IPS) requirements for spacelab missions

Instrument Pointing Subsystem requirements for Spacelab missions in solar physics, stellar astronomy, and earth observation are analyzed and design guidelines for fine pointing instrument platforms are presented. The requirements for the platforms are time-phased based on NASA projections of flight mission models and payload scheduling. The experiments used for these projections are to be viewed as representative payloads. Other experiments or experiment groupings within any one discipline may be accommodated by an Instrument Pointing Subsystem that meets these requirements.

Nein, M. E.↗

Preliminary simulation of an advanced, hingless rotor XV-15 tilt-rotor aircraft

The feasibility of the tilt-rotor concept was verified through investigation of the performance, stability and handling qualities of the XV-15 tilt rotor. The rotors were replaced by advanced-technology fiberglass/composite hingless rotors of larger diameter, combined with an advanced integrated fly-by-wire control system. A parametric simulation model of the HRXV-15 was developed, model was used to define acceptable preliminary ranges of primary and secondary control schedules as functions of the flight parameters, to evaluate performance, flying qualities and structural loads, and to have a Boeing-Vertol pilot conduct a simulated flight test evaluation of the aircraft.

Mcveigh, M. A.↗

Adaptive remote sensing technology for feature recognition and tracking

A technology development plan designed to reduce the data load and data-management problems associated with global study and monitoring missions is described with a heavy emphasis placed on developing mission capabilities to eliminate the collection of unnecessary data. Improved data selectivity can be achieved through sensor automation correlated with the real-time needs of data users. The first phase of the plan includes the Feature Identification and Location Experiment (FILE) which is scheduled for the 1980 Shuttle flight. The FILE experiment is described with attention given to technology needs, development plan, feature recognition and classification, and cloud-snow detection/discrimination. Pointing, tracking and navigation received particular consideration, and it is concluded that this technology plan is viewed as an alternative to approaches to real-time acquisition that are based on extensive onboard format and inventory processing and reliance upon global-satellite-system navigation data.

Wilson, R. G.↗

Experiments in infrared multispectral mapping of earth resources

Two evolutionary infrared remote sensing experiments provide the basis for the development of an operational mapping capability for geology exploration. A 10-band radiometer scheduled for an early Shuttle flight has completed an aircraft flight program which demonstrated the utility of a number of narrow spectral channels. A multispectral mapper utilizing an infrared area array detector to acquire simultaneous images in multiple wavelengths is being assembled. A design concept for an operational sensor which employs area arrays for registered multispectral image data acquisition is under study. The sensor would utilize onboard spectral band selection, radiometric correction, and data compression to satisfy the demanding requirements of the user community.

Wellman, J. B.↗

Analysis of Satellite Drag and Spin Decay Data

Work was begun as an effort to obtain satellite drag and upper atmospheric wind data from a spinning spherical satellite to be launched from the space shuttle scheduled for the STS-11 flight. The satellite was an inflated sphere having high area-to-mass ratio which would result in measurable orbital decay due to aerodynamic drag forces experienced by the satellite in the Earth's upper atmosphere. The satellite would also experience a spin decay due to the aerodynamic torque acting to slow the satellite spinning. The original proposal was to develop data analysis procedures to be employed to extract the desired information. Work was performed concerning the data analysis procedure prior to the STS-11 launch; however, the major effort was to begin after the data had been obtained. Unfortunately, the launch of the inflatable sphere on STS-11 was a failure in that the sphere did not inflate properly and no data was obtained. The emphasis of the work planned under this effort was then changed to develop a proposal for a series of experiments similar to the one originally planned for STS-11.

Karr, G. R.↗

X-ray satellite

The 3rd Quarter Status Report on DFVLR's ROSAT project confirms that with regard to technical performance and costs the project is on schedule. The valid schedule for engineering model and flight model completion on May 7, 1985 leads to a launch date on October 30, 1987. Progress in each department is compared to and explained with regard to the milestone plan. Continued problems with the gold damping of the FM-mirror system and contamination of the sterile rooms where the mirrors are stored have led to postponement of milestone 7. It is not yet completely clear to what extent all successive milestones will be affected by this factor.

Source record↗

To catch a child's imagination 2: Educational update on CAN-DO

At the G.A.S. Symposium last year, the Charleston County Public School CAN DO Project outlined an ambitious educational program revolving around the photography of Comet Halley from the Shuttle using a GAS canister. The target flight was STS 61-E scheduled for a March, 1986, launch. Such strict time constraints and highly specific mission requirements made the CAN DO program even more risky than normal. In spite of this, almost all of the planned educational goals were achieved, even after the postponement of all Shuttle activities in January of 1986. This follow-up paper summarizes the effects of events on the program as proposed and the attempts to carry out as many of the activities as possible. It is hoped that this paper will suggest constructive ways in which to cope with the delays and mishaps that are the invariable lot of pioneers who break new ground and attempt the new and untried.

Nicholson, James H.↗

Operational aspects of a spacecraft planning/scheduling expert system

Various operational aspects of the Earth Radiation Budget Satellite (ERBS) Tracking and Data Relay Satellite System (TDRSS) are described. The ERBS-TDRSS Contract Planning System is an expert system which has been used operationally since June 1987 by the ERBS Flight Operations Team (FOT) at Goddard Space Flight Center to build weekly schedules of requests for service from the TDRSS. The basic operation of the system and significant enhancements and changes are discussed.

Mclean, David R.↗

Solar flare gamma-ray and hard x ray imaging with the GRID-on-a-balloon

A primary scientific objective for solar flare research during the rapidly approaching maximum in solar activity is the imaging of gamma-ray and hard x ray sources of solar flare emissions. These goals will be pursued by the Gamma Ray Imaging Device (GRID) instrument, one of three instruments recently selected for NASA's Max '91 Solar Balloon Program. The GRID instrument is based on the technique of Fourier transform imaging and utilizes scanning modulation grid collimator optics to provide full-Sun imaging with 1.9-arcsecond resolution over the energy range from 20 to 700 keV at time resolutions from 0.1 to 2 s. The GRID telescope will employ 32 subcollimators, each composed of a matched pair of high-Z collimator grids separated by 5.2 meters and a phoswich scintillation spectrometer detector having no spatial resolution. The subcollimators and integrally-mounted fine aspect system are contained within a telescope canister which will be pointed to 0.1 degree accuracy and cyclically scanned to produce source modulation. The 32 subcollimators provide a uniform distribution of grid slit orientations and a logarithmic distribution of slit spacings corresponding to angular dimensions of 1.9 arcseconds to several arcminutes. The instrument is several orders of magnitude more sensitive than the HXIS instrument on the Solar Maximum Mission (SMM) and nearly 10 times more sensitive than any similar instrument scheduled to fly during the next solar maximum. The payload, designed for long-duration high-altitude balloon capability, is scheduled for its first science flight (8 to 14 days duration) from the Antarctic in January of 1992.

Orwig, Larry E.↗

Considerations for the retrofit of data link

Human factors issues related to the retrofit of data link in commercial transport aircraft are discussed. Topics that must be considered for data link implementation include, the loss of the party line, (i.e., the availability to all aircraft of information transmitted on a common voice frequency), and the scheduling of information to the flight crew. This paper focuses primarily on the human factors issues related to retrofit of Mode S. Retrofits is a difficult task because panel space accessible to flight crew members is limited. As with all cockpit equipment, data link implementation will have to comply with Federal Aviation Regulation 25.1523, which requires the manufacturer to address the conspicuity and ease of use of the data link device, and to assess the impact on crew workload. Operational sequence diagrams are provided to illustrate a methodology that can be used to decompose the flight crew body channel utilization of candidate avionics configurations in order to optimize the pilot-vehicle interface.

Corwin, William H.↗

ACAP: Acceleration Characterization and Analysis Project

Information on the Acceleration Characterization and Analysis Project presentation to the Vibration Isolation Workshop is given in viewgraph form. Topics covered include the microgravity acceleration requirements curve, a schedule of major microgravity payload flights, and determination of shuttle orbiter center of gravity.

Baugher, Charles R.↗

Status report, June 1988 - April 1992

The Mars Mission Research Center (MMRC) is one of nine University Space Engineering Research Centers established in June 1988 by NASA's Office of Aeronautics and Space Technology to broaden the nation's engineering capability to meet the critical needs fo the civilian space program. It includes North Carolina State University (NCSU) at Raleigh and on North Carolina A&T State University at Greensboro. The goal of the Center is to focus on research and educational technologies necessary for planetary exploration, especially transportation to and from our moon and Mars. The research combines mission analysis and design, hypersonic aerodynamics, structures and controls, composite materials, and fabrications. Covered here are activities of the Center from June to April 1992. The Center supports 26 graduate students, 29 undergraduates, 27 faculty and 6 staff. An additional 88 undergraduates worked on four special projects. Three facilities at A&T were renovated and a new 7,000 square foot facility was occupied at NCSU in October 1991. Five laboratories have been developed for composite processing and fabrication facility (A&T), materials testing (A&T), weaving (NCSU), braiding (NCSU), and structures (NCSU). During the past two years, the Center added a new dimension to its program - special projects which involve analysis, design, construction, and testing. The first two projects were full-scale research models of a Mars aerobrake and the HL-20 Personnel Launch System. Both projects received considerable new coverage and appeared in national publications. Additional projects include a model of a Mars Exclusion Vehicle, an Orbiter Ejector, and a Remotely Operated Vehicle. The Orbiter Ejector is scheduled to fly on Shuttle Flight STS-47 in October 1992. Special projects have increased undergraduate student participation and provided a mechanism for more interaction between the universities, NASA centers, and industries. The faculty developed 26 new courses related to the activities of the Center. They conducted four workshops on interplanetary spacecraft, lunar/Mars aerobrakes, spacecraft controls, and aerodynamic heating. The Outreach Program developed into a significant component of the Center. Faculty and students have conducted 12 tours of facilities and given 67 lectures to schools (grade k-12) and civic organizations.

Source record↗

In-Situ Resource Utilization (ISRU): Surface systems program area of the exploration technology program

The topics presented are covered in viewgraph form and include the following: (1) utilization of Lunar and Mars resources; (2) oxygen - an example of cost savings; (3) In Space Resource Utilization (ISRU); (4) basic resource processing methods; (5) planetary mining; (6) raw materials preparation; (7) validation, testbeds, and flight experiments; (8) mission readiness schedule; and (9) ISRU budget guideline.

Mckay, David S.↗

Advanced timeline systems

The Mission Planning Division of the Mission Operations Laboratory at NASA's Marshall Space Flight Center is responsible for scheduling experiment activities for space missions controlled at MSFC. In order to draw statistically relevant conclusions, all experiments must be scheduled at least once and may have repeated performances during the mission. An experiment consists of a series of steps which, when performed, provide results pertinent to the experiment's functional objective. Since these experiments require a set of resources such as crew and power, the task of creating a timeline of experiment activities for the mission is one of resource constrained scheduling. For each experiment, a computer model with detailed information of the steps involved in running the experiment, including crew requirements, processing times, and resource requirements is created. These models are then loaded into the Experiment Scheduling Program (ESP) which attempts to create a schedule which satisfies all resource constraints. ESP uses a depth-first search technique to place each experiment into a time interval, and a scoring function to evaluate the schedule. The mission planners generate several schedules and choose one with a high value of the scoring function to send through the approval process. The process of approving a mission timeline can take several months. Each timeline must meet the requirements of the scientists, the crew, and various engineering departments as well as enforce all resource restrictions. No single objective is considered in creating a timeline. The experiment scheduling problem is: given a set of experiments, place each experiment along the mission timeline so that all resource requirements and temporal constraints are met and the timeline is acceptable to all who must approve it. Much work has been done on multicriteria decision making (MCDM). When there are two criteria, schedules which perform well with respect to one criterion will often perform poorly with respect to the other. One schedule dominates another if it performs strictly better on one criterion, and no worse on the other. Clearly, dominated schedules are undesireable. A nondominated schedule can be generated by some sort of optimization problem. Generally there are two approaches: the first is a hierarchical approach while the second requires optimizing a weighting or scoring function.

Bulfin, R. L.↗